Error while doing Promotion action
Hi,
I am implementing in a demo system to check if all the configurations are working properly.
I have hired an employee on 01.01.2012. Then tried to perform promotion action on 01.08.2012.But it is showing error as employee active since 01.01.2012.
As of what i expected,when i run promotion action,the hire action will be delimited that is from 01.01.2012 to 31.07.2012 and promotion action will be from 01.08.2012 to 31.12.9999.
I am really not getting where it might be wrong.Pls help me on this.
Thank u
Hi Nisha,
I suspect you are not completely aware of the Personnel Actions configuration - it seems that your Promotion action is not customized as you wish.
If you don't want the Promotion action to delimit the previous action, you can configure it as an action that is saved only on Infotype 0302 (these kind of action don't change the employee's status). This is done by view T529A: make sure that flag U0000 is off and flag U0302 is on.
If the system alerts that the employee is active when you perform the promotion action, this is caused by another wrong configuration of this action: make sure that field T529A-NAMEN is empty for that actions.
Regards,
Liran
Similar Messages
-
Error while doing MIRO-Overflow for arithmetical operation (type P) in prog
Hi ,
I am getting the error while doing the MIRO as below-
Runtime Errors COMPUTE_BCD_OVERFLOW
Exception CX_SY_ARITHMETIC_OVERFLOW
Date and Time 20.05.2009 10:07:03
Short text
Overflow during the arithmetical operation (type P) in program "SAPLMRMC".
What happened?
Error in the ABAP Application Program
The current ABAP program "SAPLMRMC" had to be terminated because it has
come across a statement that unfortunately cannot be executed.
What can you do?
Note down which actions and inputs caused the error.
To process the problem further, contact you SAP system
administrator.
Using Transaction ST22 for ABAP Dump Analysis, you can look
at and manage termination messages, and you can also
keep them for a long time.
Error analysis
An exception occurred that is explained in detail below.
The exception, which is assigned to class 'CX_SY_ARITHMETIC_OVERFLOW', was not
caught in
procedure "MRM_AMOUNT_QUANTITY_PROPOSE" "(FUNCTION)", nor was it propagated by
a RAISING clause.
Since the caller of the procedure could not have anticipated that the
Please let me know how can this be removed.Hi,
There can be some problem with tolerances set in the customizing.
In my case, I was getting this error because of delivery date variance. The difference between delivery date maintained in PO and invoice date was huge and hence the multiplication of price of PO and difference of delivery date was huge and that was the reason for error.
Similarly in your case also, there will be some tolerance limit problem.
Please check your tolerance limits set in customizing.
Regards,
Mihir Popat -
Error while doing J1IH (Excise JV) - TR6 Challan posting
I am getting the following error while doing, J1IH (Excise JV) - TR6 Challan posting
Please assist....
Short text
The COMMIT WORK processing must not be interrupted.
What happened?
Error in the ABAP Application Program
The current ABAP program "SAPLFACS" had to be terminated because it h
come across a statement that unfortunately cannot be executed.
What can you do?
Note down which actions and inputs caused the error.
To process the problem further, contact you SAP system
administrator.
Using Transaction ST22 for ABAP Dump Analysis, you can look
at and manage termination messages, and you can also
keep them for a long time.
Error analysis
During the COMMIT WORK statement, the following are executed:
- the routines registered with the statement PERFORM .. ON COMMIT,
- the registered methods for the events of the object services
and
- possibly the local update (SET UPDATE TASK LOCAL).
An exception was raised and caught. The normal sequence of the routines
was interrupted by this resulting in the program being continued before
the call of COMMIT WORK. As this can lead to inconsistencies, the
processing cannot be continued in the normal way.Thanks Milind...
I am also getting the following error:
Balance in transaction currency
Message no. F5702
Diagnosis
A balance has occurred in transaction currency 'INR' with the following
details:
Exchange rate '00', amount ' 500,000.00' and currency key 'INR'.
The data in the transaction currency were transferred from the calling
application.
System Response
Your data cannot be processed in FI.
Procedure
The error is probably in the calling application.
Please assist -
HI
I am getting the bellow error while doing the standby recovery
SQL> recover datafile 1;
ORA-00283: recovery session canceled due to errors
ORA-01124: cannot recover data file 1 - file is in use or recovery
ORA-01110: data file 1: '/pchpgi/oradata/data02/system01.dbf'
SQL> select *from v$version;
BANNER
Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
PL/SQL Release 10.2.0.4.0 - Production
CORE 10.2.0.4.0 Production
TNS for Linux: Version 10.2.0.4.0 - Production
NLSRTL Version 10.2.0.4.0 - Production
SQL>
SQL> recover standby database;
ORA-00283: recovery session canceled due to errors
ORA-01124: cannot recover data file 1 - file is in use or recovery
ORA-01110: data file 1: '/pchpgi/oradata/data02/system01.dbf'
Thanks
Edited by: 887400 on Dec 3, 2011 4:37 PM887400 wrote:
HI
I am getting the bellow error while doing the standby recovery
SQL> recover datafile 1;
ORA-00283: recovery session canceled due to errors
ORA-01124: cannot recover data file 1 - file is in use or recovery
ORA-01110: data file 1: '/pchpgi/oradata/data02/system01.dbf'
SQL> select *from v$version;
BANNER
Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi
PL/SQL Release 10.2.0.4.0 - Production
CORE 10.2.0.4.0 Production
TNS for Linux: Version 10.2.0.4.0 - Production
NLSRTL Version 10.2.0.4.0 - Production
SQL>
SQL> recover standby database;
ORA-00283: recovery session canceled due to errors
ORA-01124: cannot recover data file 1 - file is in use or recovery
ORA-01110: data file 1: '/pchpgi/oradata/data02/system01.dbf'
Thanks
Edited by: 887400 on Dec 3, 2011 4:37 PM
01124, 00000, "cannot recover data file %s - file is in use or recovery"
// *Cause: An attempt to do media recovery found that the file was not
// available for recovery. Either it is online and the database is
// open in some instance, or another process is curently doing
// media recovery on the file.
// *Action: Do not do media recovery. -
Error while doing ABGL Asset Credit Memo
Hi Friends,
I am getting the below error while doing Asset Credit Memo in ABGL. Please help me in fix this issue.
Balance for transaction type group 10 negative for the area 01
Note:In Asset Explorer Fiscal year start Asset value is 98,425.45 and Change is 4768.19. So total Asset value as of now is 1,03,193.64.
Now we are trying to do ABGL with 12,790.23 value (Transaction type is 105). System is giving the above highlighted error.
If we give the amount 4768.19 in ABGL transaction, system is not giving any error. If we give more that that system is giving error.
Why system is giving error even the asset has balance of 1,03,193.64? Please help me on this..
Thanks
SunilHi,
If the asset has been capitalized during earlier years, use ABGF to post credit memo. ABGL is meant for assets capitalized during the year.
Best Regards,
Madhu -
Error while doing "Visulaize Plan"
Hi,
Before i did Visualize plan many times without any problem.Now I am getting error while doing so.
I was able to run "Explain Plan" successfully.
I am on HANA revision 60.
I saved above error log and the log information is given below:
I can identify invalid XML tag <TablesInvolved><![CDATA[raj/AN_VIZ]]></TablesInvolved> but how to fix this issue?
I gone through various blogs related to Visulaization Plan but not found related to this issue.
<Plan xmlns="http://www.sap.com/ndb/planviz" ID="ID_0" Type="Estimated">
<SQL><![CDATA[SELECT KOKRS, BELNR, PERIO, SUM(MEGBTR)
FROM "_SYS_BIC"."raj/AN_VIZ"
GROUP BY KOKRS, BELNR, PERIO]]></SQL>
<CompileTime>
<Start Unit="us">1401281467643661</Start>
<End Unit="us">1401281467658329</End>
</CompileTime>
<RootRelation ID="ID_0" TypeName="PROJECT" Status="Finished">
<Name>Project</Name>
<ExecutionType>Row Search</ExecutionType>
<Summary><![CDATA[raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO, SUM(raj/AN_VIZ.MEGBTR)]]></Summary>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">2.12902e+06</Exclusive>
<Inclusive Unit="us">2.64021e+06</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Details><![CDATA[{"Projected Cols":"raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO, SUM(raj/AN_VIZ.MEGBTR)","Project column0":"NString(4, 0) __trex_field_NVarchar3__() ....... [3]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [0]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [1]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 0 ....... [2]:LOAD:<4/5 (4B)>:","Project column1":"NString(10, 0) __trex_field_NVarchar3__() ....... [8]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [5]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [6]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 1 ....... [7]:LOAD:<4/5 (4B)>:","Project column2":"NString(3, 0) __trex_field_NVarchar3__() ....... [13]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [10]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [11]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 2 ....... [12]:LOAD:<4/5 (4B)>:","Project column3":"Decimal(18, 3) __typecast__() ....... [23]:076:<10/12 (16B)>:
/1/ Fixed16(18, 3) __trex_field_Fixed16__() ....... [19]:043:<6/8 (16B)>:
/1/ void* \"__rids__\" ....... [15]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [16]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 3 ....... [17]:LOAD:<4/5 (4B)>:
/4/ int32_t(10, 0) const := 3 ....... [18]:LOAD:<5/6 (4B)>:
/2/ int32_t(10, 0) const := 18 ....... [21]:LOAD:<8/9 (4B)>:
/3/ int32_t(10, 0) const := 3 ....... [22]:LOAD:<9/10 (4B)>:"}]]></Details>
<Child ID="ID_8" >
</Child>
</RootRelation>
<Relation ID="ID_8" TypeName="TREX_SEARCH" Status="Finished">
<Name>Column Search</Name>
<ExecutionType>Column Search</ExecutionType>
<Summary><![CDATA[Aggregation on a single table]]></Summary>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">511194</Exclusive>
<Inclusive Unit="us">511194</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<TablesInvolved><![CDATA[raj/AN_VIZ]]></TablesInvolved>
<LogicalPlan ID="ID_11" Type="Estimated">
<RootRelation ID="ID_11" TypeName="PROJECT" Status="Finished">
<Name>Project</Name>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Child ID="ID_12" >
</Child>
</RootRelation>
<Relation ID="ID_12" TypeName="GROUP_BY" Status="Finished">
<Name>Aggregation</Name>
<Summary><![CDATA[raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO\nSUM(raj/AN_VIZ.MEGBTR)]]></Summary>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Details><![CDATA[{"Grouping Cols":"raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO","Aggregation Cols":"SUM(raj/AN_VIZ.MEGBTR)"}]]></Details>
<Child ID="ID_13" >
</Child>
</Relation>
<Relation ID="ID_13" TypeName="TABLE" Status="Finished">
<Name>Column View</Name>
<Schema><![CDATA[_SYS_BIC]]></Schema>
<ObjectName><![CDATA[raj/AN_VIZ]]></ObjectName>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>682404</EstimatedOutputCardinality>
</Relation>
</LogicalPlan>
</Relation>
</Plan>
Regards
RajHi,
To solve this you must update your studio. In lower studio versions (PlanViz) does not allow "unknown" XML tags sent by higher version servers. A fix for this issue was made so that PlanViz parser can simply skip unknown tags.
Please go to version 74, if possible.
Regards,
Michael -
Error while doing EHP4 upgrade in downtime phase
HI .
Iam facing the below error while doing the EHP4 upgrade , in downtime phase.
Checks after phase MAIN_SWITCH/STARTSAP_TRANS were negative!
Last error code set: RFC call to subst_get_uvers failed with key RFC_ERROR_COMMUNICATION (open): SAP_CMINIT3 : rc=20 >
Connect to SAP gateway failed Connect_PM GWHOST=Hydhtc4526D, GWSERV=sapgw04, SYSNR=04 LOCATION CPIC (TCP/IP) on local host with Unicode ERROR partner '10.136.162.30:3304' not reached TIME Mon Jun 06 18:17:46 2011 RELEASE 720 COMPONENT NI (network interface) VERSION 40 RC -10 MODULE nixxi.cpp LINE 3286 DETAIL NiPConnect2: 10.136.162.30:3304 SYSTEM CALL connect ERRNO 10061 ERRNO TEXT WSAECONNREFUSED: Connection refused COUNTER System start failed
Please help me in resolving this error.
Sanketh.Hi,
Upgrade tool is trying to start the system but system is not coming up. Try to start system manually and see if system comes up or not. If not then check logs in work directory for why system is not coming up.
Thanks
Sunny -
Error while doing GR for scheduling aggrement
Dear Experts,
We are facing error while doing GR for scheduling aggrement.
we have done the following steps.
1) Scheduling aggreement in ME31L
2) Released in ME35L
3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
When we are trying to do GR in MIGO system is giving the following message.
Document 5500000152 does not contain any selectable items
can I know what I have missed in the above steps.
Please guide me to resolve this.
Regards,
PrasadHi,
Please check Please check if Gr is already done against this document. Also please check whether you have attached SA in the source list with line items.
T-code:ME01
Enter Mat.code & Plant.
In the next screen pl.do the following:
Valid from - commencement date of the SA
Valid to - End date of the SA
Vendor - Vendor on whom the SA is released
POrg - Your purchase organisation
PPL - Leave it blank(This is only for interplant)
OUn - Ordering unit
Agreement - SA number
Item - 1
I hope this will resolve your issue. Thanking you -
Error While doing ABT1N transaction
Hi,
I am facing the below error while doing ABT1N in Asset Accounting.Please help me in fixing this Issue.
Error Message -No depreciation area for receiving the revenue
Message no.AAPO149
Diagnosis
You tried to post a retirement on asset 1000 100007-0.You entered transaction type 300,in which the retirement with revenue indicator is not set
You tried to transfer asset 1000 100007-0.According to transfer variant 0001,none of the areas on the asset uses a transaction type for retirement with revenue
In both of these cases, you are not allowed to enter revenue or make specifications for the determination of revenue.
Proceedure
Check the transfer variant and check your entry
please do the needful
Thanks
SupriyaHello,
You will have a check box for the same.
Double click on transaction type, you will see the check box for revenue.
Otherwise, tomorrow I will get back to you once I am in front of the system.
Regards,
Ravi
Edited by: Ravi Sankar Venna on May 5, 2009 7:53 PM -
Error while doing F-90 Asset Acquisation
Hi,
I am getting the below error while doing F-90 Asset Acquisation scenario. Please help me to fix this issue.
Tax code V1 country IN does not exist in procedure TAXINN
Message no. FF713
Diagnosis
You entered a tax code which is not defined for the country of the company code to be posted to in the tax calculation procedure.
System Response
Procedure
Check and, if necessary, correct the entry.
Procedure for System Administration
If it is not an input error, check and possibly change the system settings.
To do this, choose Maintain entries (F5).
Check whether the company code is assigned to the correct country and whether the correct tax calculation procedure has been entered for the company code country.
Create a new tax code if necessary.
Caution:
Since it is possible that the tables in question are being updated at a different time on another computer, it can take a certain amount of time for the tax code to be on all local machines in client server architectures after saving the new code.
Thanks
KBHi,
you need to maintain Tax Code A0 & V0 in t.code OBCL t.code.
and also ensure to check whether you have created tax code V1 or not in FTXP t.code. If not, create V1 tax code and assign GL on that in the right Transaction event keys in OB40.
Try.... if not working let me know....
Regards,
MOhan. -
Error while doing AIAB Settlement
Hi I am facing the below error while doing AIAB during AUC settlement. Please do the needful.
Data for determination of capitalization not managed in area 01
Message no. AW507
Diagnosis
You have chosen a depreciation area, which does not carry the depreciation data from table COEPBR.
Procedure
Choose a different depreciation area.
Thanks
KCHi,
This message could be helpful:
Error AW507
Please check the field T082AVIEWB-AUTHORITY. If it is not on 2 this is the reason.
In this case, you can change the value in T093-VIEW1 using the coding as per SAP note 29706 which you have already discovered. There will be no risk involved in changing this value.
regards Bernhard -
Error while doing AUC Settlement in KO88
Hi
I am getting the below error while doing KO88. I have maintained the Allocation structure for FXA and given the cost element group in the Source field & Given FXA in Receiver category and selected By cost element option aginast Receiver category FXA in Settlement Cost Element field. I am getting the below error while settling in KO88.
Define a settlement cost element for receiver type FXA
Message no. KD506
Diagnosis
In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type FXA.
Procedure
Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
Please help me
Thanks
KishorePlease check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
regards
Ranjan -
Error while doing BAM configuration in JDeveloper
Hi,
I tried to create a connection to my local BAM Server in JDev 10.1.3.2.0 and also in 10.1.3.3, but I always failed! Error messages:
"Server is not set up correctly SOA1"
I'm running on Windows 2003 and installed BAM according to the Installation Guide (version was Bam with Enterprise Link for windows 10.1.3.3.0).
I did not get any error while doing the other setups and can access the different BAM tools via the Oracle BAM Start page, but I can't create a connection in JDev. I used the following parameters:
Host Name: SOA1(system name)
Port Number: 80
User Name: Administrator
Password: <windows domain pwd>
Domain Name: DOMAINNAME
Any help would be highly appreciated.
Regards,
Shailyhi Shaily
It looks like suggesting a different forum is not needed, because you already tried that ...
Error while doing BAM connection in jdeveloper
Error while doing BAM connection in jdeveloper
Error while doing BAM connection in jdeveloper
I hope you get some answers.
success
Jan Vervecken -
Error while doing BAM connection in jdeveloper
Hi,
I tried to create a connection to my local BAM Server in JDev 10.1.3.2.0 and also in 10.1.3.3, but I always failed! Error messages:
"Server is not set up correctly SOA1"
I'm running on Windows 2003 and installed BAM according to the Installation Guide (version was Bam with Enterprise Link for windows 10.1.3.3.0).
I did not get any error while doing the other setups and can access the different BAM tools via the Oracle BAM Start page, but I can't create a connection in JDev. I used the following parameters:
Host Name: SOA1(system name)
Port Number: 80
User Name: Administrator
Password: <windows domain pwd>
Domain Name: DOMAINNAME
Any help would be highly appreciated.
Regards,
Shaily*** Duplicate Posting ***Edited by: damorgan on Oct 6, 2008 11:05 PM
-
Error while doing File to File Scenario
All,
I am trying a simple file to file scenario - where xi picks up the file from a location and maps the message and dumps it in another location.
I am Getting the below error while doing the same .........
Time Stamp Status Description
2009-03-30 14:30:24 Success Channel Test_send_cc: Send binary file "d:\input\input.xml". Size 203 with QoS EO
2009-03-30 14:30:24 Success Application attempting to send an XI message asynchronously using connection AFW.
2009-03-30 14:30:24 Success Trying to put the message into the send queue.
2009-03-30 14:30:24 Success Message successfully put into the queue.
2009-03-30 14:30:24 Success The application sent the message asynchronously using connection AFW. Returning to application.
2009-03-30 14:30:24 Error Attempt to delete file "d:\input\input.xml" after processing failed. Retry
2009-03-30 14:30:24 Success The message was successfully retrieved from the send queue.
2009-03-30 14:30:24 Success The message status set to DLNG.
*+2009-03-30 14:30:24 Error Transmitting the message to endpoint http://filip:8000/sap/xi/engine?type=entry using connection AFW failed, due to: com.sap.aii.af.ra.ms.api.RecoverableException: Received HTTP response code 401 : Unauthorized.*
2009-03-30 14:30:24 Success The asynchronous message was successfully scheduled to be delivered at Mon Mar 30 14:35:24 GMT+05:30 2009.
And i cant see the meesages using the SXMB_MONI trasaction
please help me resolve ths issue
Regards,
Mahesh.
Edited by: mahesh uma on May 3, 2008 2:12 PMHi Uma,
Go through this links::
Hope these links are useful to you..
Urgent: Message not transmitted from AFW to Integration server
Error with huge file
File to JDBC error
Thanks,
Satya Kumar..
Maybe you are looking for
-
Problem with mac mini 2012 connection
Hello!I have a problem with my mac mini 2012 connection!The hdmi to hdmi connection working great at my mac mini!The thunderbolt(mac mini) to hdmi (display) is not working!But when i have the hdmi to hdmi cable and the thunderbolt to hdmi at the same
-
Acrobat pro 7 won't display japanese
I am unable to locate a font pack for Acrobat 7 Is it available or do I need to pay for an upgrade?
-
I am a beginner in a JDBC .. and I need your help.. I already make the connection and it is fine.. but now If I want to save data in a table including (Time, Date, Longitude, Latitude and speed) and I want to overwrite the exist data in the table eve
-
The CC desktop app is not working! Its showing the spinning progress wheel and absolutely nothing is working. Trying to quit it docent work, or even going to the help doesn't go any where. Increadibly frustrating when you're prompted to download an
-
Pictures resolution in InDesign
So I am not talking about resampling images in InDesign. But I have a question related to the resolution of pictures as InDesign sees it. I have some photos in JPEG format I want to use in InDesign, not scaled, not anything. All same dimension (pixel