Error while releasing the Process order

while releasing the Process order i am getting the follwing error message
Message no. CO118      Release of order not possible
Cna you Please any body explain me detail of thi error ie where the error lies.
Thanks

Hi,
In Process Order Header Screen Go to ---> Log ---> On Release.Here you will find the detail error behind this problem.Go though it .Resolve it and then try to release the Process Order, and if required get back to us.
Suppose reason may be,
- Missing part
- Missing Capacity
- Batch Determination is required to perform.
- Any User Exit (Other then std. SAP)
Regards,
Dhaval

Similar Messages

  • Automated TR creation while release the Process Order

    I have to split the quantity into smaller units based on the ‘LE quantity’ before TR creation. In transaction LB03, there should be additional line items after the quantity split.
    I am using the EXIT ‘EXIT_SAPLLCPP_001’. It is triggering during the transaction run. But it doesn’t serve the purpose.
    Can anyone help me to achieve this functionality?

    Hi,
    In Process Order Header Screen Go to ---> Log ---> On Release.Here you will find the detail error behind this problem.Go though it .Resolve it and then try to release the Process Order, and if required get back to us.
    Suppose reason may be,
    - Missing part
    - Missing Capacity
    - Batch Determination is required to perform.
    - Any User Exit (Other then std. SAP)
    Regards,
    Dhaval

  • Interface triggering while releasing the process order

    Hi, please guide me that when i release the process order, standard idoc LOIRPRO02 triggers. How to set to trgigger this idoc and how to verify the same. i want to give one try in IDES, please advise.
    Edited by: raju garu on Nov 28, 2010 3:21 PM

    Closed as no response received.

  • Error while releasing the service order .

    Hi,
    After creating sales order from service order (ZOR3), when I am trying to release the service order by clicking on the green flag it is giving me error 'WBS for the Variant Service Line selected does not exist'.
    Kindly advice a solution.
    regards,
    SDG

    What is the error message number ??  If it starts with "Z", then through some user exit, this control is applied which you have to check with your ABAPer on the coding.
    thanks
    G. Lakshmipathi

  • Error while saving the process order

    Hi All,
    I changed the quantities of the components and trying to save the process order. But I'm getting a message " "PLEASE REEXPLODE BOM, SINCE THE PROCESS ORDER COMPONENTS HAVE CHANGE". What would be the reason? It is not happening to all the users. Some users can able to save after changing the qty. Some users can't?
    Regards,
    Sureshbabu G.

    Hi,
    "PLEASE REEXPLODE BOM, SINCE THE PROCESS ORDER COMPONENTS HAVE CHANGE"
    I think it is your Develpment and not from SAP Standard One.So it is difficult to trace out the cause, better will be contact your devlopment team to trace out the reason.
    Regards,
    Dhaval

  • Serial number error while creating the production order

    Hello frds,
    I am getting the following error while creating the production order.
    "Item 000000 requires exactly 100 serial numbers for the asset".
    If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
    I have tried using the new serial number profile also, but it is giving same error.
    Kindly guide.
    Regards,
    Narendra Bora

    Dear Narendra
    Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
    Procd Procedure description Ser.Usage
    PPRL PP order release 02
    since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
    Regards
    Soundar

  • Error While saving the Production Order

    Dear Experts
    Pls let me know why am getting the below error while saving the production order after release..
    PSFC_STD_LAYOUT does not exist
    Message no. SSFCOMPOSER004

    Dear,
    Please check have you assigned the scheduling profile in work scheduling view of materail master?
    Then go to OPKP check the same scheduling profile where you have activited the On realese execute printing remove this tick mark and then try with new order.
    Or you can do the configuration in Tocde :OPK8 here assign the PSFC_STD_LAYOUT in forum.
    Regards,
    R.Brahmankar

  • Fiscal Year Not allowed while creating the Process order (COR1)

    Hi Friends,
    My Indian client is following the Fiscal year of 2011 for the period of April 2010 to March 2011). We have gone live one month before. But now the problem we are facing is while creating the process order (T.Code COR1) system gives the error message "Fiscal year 2010 is not allowed".
    The Diagnosis shows as below
    Fiscal year 2010 is not allowed
    Message no. F5568
    Diagnosis
    The fiscal year entered (2010) is different from the fiscal year derived from the posting date and fiscal year variant (2011).
    System Response
    Error.
    Procedure
    Correct the fiscal year entered.
    I have Checked the Controlling area version. Fiscal Year 2011 starts from 01.04.2010. This issue is only at the time of Process oder creation and not in other module like FI, MM, SD, PS, QM and PM. I have checked with V3 Variant also and there is no problem with that.
    Can any one help me where the setting is missing or what whould be the probable reason for this issue.
    Regards,
    Deva

    Hi Prakash,
    Thank you for your reply. I have checked the MMPV and MMRV set up and that is fine with fiscal year 2011. We are also processed lot many Material receipts for the fiscal year 2011. I have checked with OB52 for finace it is opened for the entire year of 2011 from 2009 for all periods.
    We are facing only when we try to create the process order. When we enter the starte date as 24.11.2010 the derived period shows as fiscal year 2011. But entered fiscal year shows as 2010. We are not entering any other dates in the process order.
    Is there any other probablity the date is picking from any Production related set ups??
    The costing version fiscal year 2011 starts from 01.04.2010. So no problem with Controlling area. I have Checked the Factory calendar. The calendar starts from 01.01.2010 to 31.12.2010 for the year 2010.
    Is there any other possibility of the missing settings or problem in date control???
    Regards,
    Deva

  • Error when release the production order

    Hi all,
    while release the production order i am getting the error :-   Plant 1000 is not the only plant assigned to valuation area 1000 , how to resolve this error .
    & can we release the prod order without calculating the cost ?
    Thanks & regards
    satish

    Hello,
    I'm facing the same issue when trying to create a production order using tran. CO01 with inputs (Material:  P-100, Production plant: 1000, Order type: PP01. Next the total quatity of material is chosen freely, Dates/start is set to todays date, Scheduling is set to Forwards scheduling).
    Error message :
    "Plant 1000 is not the only plant assigned to valuation area 1000"
    Message no. CK238
    As explanation SAP says:
    "Diagnosis
    You are attempting to use material costing or order costing. However, the system has determined that plant 1000 is not the only plant assigned to valuation area 1000.
    Costing is only possible when each plant has its own valuation area to which no other plants are assigned.
    System Response
    It is not possible to cost in your system.
    Procedure for System Administration
    Go into Customizing for the Corporate Structure and check the valuation level. The valuation level must be the plant level"
    The error message implies that the user is not given the opportunity to create and save a production order.
    I have secured the followings:
    1. Valuation level is set to Plant level so that the valuation is now done at plant level. (The other option was at Company code level, which is not checked.)
    Question:
    Is there a solution to this problem?
    Thanks and Regards!
    Edited by: WilliamG on Feb 16, 2010 4:04 PM

  • Error while creating the sales order with billing reference

    hi alll
    i am getting error while creating the sales order with billing reference.The line items are coming in grey.I am not able to change the items as well as the quantity field.Can u guide me
    cheers
    shalsa007........

    Dear SAP SD 007
    I can confidently tell that an enhancement or an user exit has been applied in your scenario
    You have to check that
    Normally when creating a sales order with respect or referring billing documents the qty will be in editable mode and it is standard problem
    Your people has solved the standard problem by enhancement
    Usually OR--LF-PGI----F2 (SAY THE QTY IS 25 UNITS)
    Now you are creating returns order with reference to F2 in the return order type Re there is a standard issue that user can edit the qty to 30 from the original 25
    To solve this only your people have used userexit
    Line items and qty greyed out means definately there is some enhancement or user exit applied
    You have to check that
    Regards
    Raja

  • Error while running the process chain

    Hi, I am getting following error while running the process chain.
    "Lock NOT set for: Deleting the data completely from a data target"
    Please suggest.
    amit

    hi,
    This is due to a lock on the objects which is being used by ur load.
    Even if master data used by this would be in a lock by an attribute change run. wait till that attribute change run finishes and then repeat.
    If this target itself is locked by someother process like rollup , compression , this error would appear. In this case also repeat the step after those locking process finish.
    some general locks during loading:
    Sometimes parallel processing in DTP might lead to this, its better set the DTP and infopackage in serial processing. In this case change the settings and then repeat the process.
    There is a specific case in which the Serial DTP gets locked by itself, in this case repeat it untill it succeeds.
    You can identify the above scenario as below. This is applicable only if the DTPs processing mode is serial.
    if u see in SM 37 this load would have three DTP processes running.
    it should have only two.
    In this case cancel the process and repeat it untill u get it right.
    hope this helps u
    regard,
    ranjith
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:44 AM
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:46 AM

  • Error while releasing the custom table

    Hi Everyone,
    Modified the User defined include files of a particular table for one of our requirements ( In the function group of the table maintenance generator ) and encountered an error while releasing the request to Quality server, the error disappeared after regenerating the table, this seem to be happening only when the user includes of a table maintenance is introduced/modified, why the release doesnt work when there is any change in the maintenance generator?,
    Rgds,

    Hi Sailatha,
    After modifying, you need to re-generate everything so that, the changes come in effect.
    Trying to release without re-generating will surely result in error.
    Regards,
    Raj

  • Error While Releasing the Billing Document Msg No. KE/AD 243

    I am getting error while releasing the billing document
    Error No KE/AD 243
    This error comes in particular billing document only others are posted correctly.
    Rgds
    Dhiraj

    Dear Anil
    We had applied EHP3 enhancement, before EHP3 is working fine with no transfer sign assignment but after EHP 3 it gives the error and not in all billing document but in particular document only. so i think there is no changes required in KE4I.
    Rgds
    Dhiraj

  • Error while creating a process order

    Dear Guru's
    While creating a process order ,i am facing an error.
    "Unable to create batch. Storage location BPSS is invalid for material 112100050
    Message no. 40116".
    How to assign specific storage loaction to that particular material.I have assigned in material master "work scheduling tab",But it was throwing an error while doing process order.Pls help me to solve this problem.
    Thanks in advance,
    Rgds,
    cherukuri

    Hi Cherukuri
    Are u using special procurement key "80"? It seems that storage location is not mentioned for the header material in the production plant.
    Maintain this using T Code MMSC. It will solve ur issue
    Rgds

  • Error while designing the Process Chains

    Hi All,
    I have a issue on Process Chains.
    In my Project there are 2 ODS.
    ODS 1 : Status Header ODS (ZODS)
    ODS 2 : Service Order Header. (0CRM_PROH)
    In CRM, if any Service Order is created, it is available in delta Queue(RSA7) immediately.
    While loading the data to ODS 2(Service Order),it is checking the data from status ODS 1(Status ODS)
    For Example, I am loading the data of service Order 80001 to ODS 2(0CRM_PROH). Before loading to ODS 2, i am checking whether this service Order Number(80001) is available in ODS 1.
    If the service Order 80001 is there in ODS 1, it will update the data to ODS 2.
    If the service order 80001 is not there in ODS 1, it will not Update the data to ODS 2.
    Problem i am facing :
    1. First i am loading the data to ODS 1 (Status ODS). Early Morning 2.30AM and it completes the data load at 2.40AM. And document posting is happening on 2.37AM and ODS 1 doesnt pull the data of document posted.
    2. Once the ODS 1 is completed, by 2.41AM, the data loading will happen for ODS 2 (Service Order Header).It brings all the data including the document posted on 2.37AM.
    3.While loading all the data is available, and while loading to ODS 2, it is checking the status ODS. And it is checking for the document posted on 2.37AM and this document is not there in Status ODS 1 and the data(posted on 2.37AM) will not update in ODS 2.
    Because of this, some records are missing in ODS 2. And while loading, we cant stop the document posting also.
    How can i achieve this using the process Chain.
    Design i have tried in Process Chain :
    1. Start Variant.
    2. Load Infopackage to PSA only for ODS 2.
    3. Load Infopackage to PSA and activate ODS for ODS 1 (Status ODS)
    4. Read PSA (of ODS 2) to Load data to ODS 2.
    5. Activate the ODS.
    I tried, but i got a error message while designing the process Chains.
    No type "Activate DataStore Object Data" process can be in front of process "Read PSA and Update Data Target" variable PSA_SERVICE_ORDER in the chain
    Pls suggest how to recify this according to my design.
    Thanks & Regards,
    Ram.

    Hi,
    You can try this..
      .......................................... Start  ...................................................
    Load data to PSA (ODS 2) ..................................... Load data to PSA (ODS 1)         
    ..................................................................................Load data to ODS 1
    ...................................................................................Activate ODS 1
      ........................................... AND ..........................................................
      ........................................ Load data to ODS 2 .............................................
       .......................................... Activate ODS 2 ...........................................
    Regards,
    Anup.
    Edited by: Anup ShankarBS on Sep 3, 2009 4:56 PM