Error Workflow Project Server 2013
I have Sharepoint 2013 farm.
In SPD 2013 create workflow Sharepoint 2013-Project Server.
And want to write in workflow log Project UID.
But in during i see error:
System.ApplicationException: HTTP 403 {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["2"],"SPClientServiceRequestDuration":["120"],"SPRequestGuid":["4b9dff8b-d69b-8e93-0f66-fd65358fdc26"],"request-id":["4b9dff8b-d69b-8e93-0f66-fd65358fdc26"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4420"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Tue, 26 Feb 2013 07:58:54 GMT"],"Server":["Microsoft-IIS\/8.0"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}
{"error":{"code":"35120, Microsoft.ProjectServer.PJClientCallableException","message":{"lang":"ru-RU","value":"WorkflowActivityInvalidArgument"}}} в Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext
context) в System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager
Hi guys, I have this error in a Project Server environment with SP1 installed. Is the CU of December included within the SP1? Or are there other reasons the error persists?
Here is the complete error message I got (looks the same as above right?):
RequestorId: 74967e53-aaf2-c09f-db28-36781c2c6f50. Details: System.ApplicationException: HTTP 403 {"error":{"code":"35120, Microsoft.ProjectServer.PJClientCallableException","message":{"lang":"en-US","value":"WorkflowActivityInvalidArgument"}}}
{"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["62"],"SPRequestGuid":["d4a58ef4-480e-4a4e-96ed-cf413fe705b5"],"request-id":["d4a58ef4-480e-4a4e-96ed-cf413fe705b5"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4420"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Mon, 13 Oct 2014 11:00:04 GMT"],"Server":["Microsoft-IIS\/7.5"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}
at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor
executor, BookmarkManager bookmarkManager, Location resultLocation)
Similar Messages
-
Saving Error in Project Server 2013, Need Help!
Hey All,
I am running into issues with a Projects saving from Project Pro 2013 to our Project Server 2013 Farm.
It is strange, when someone tries to save a project out of Project Pro 2013 to Project Server, it will run through the "Synchronizing Data to the Server", and then bombs out with error
Job Type: Save
Error ID:9000(0x2328)
The project could not be saved to the server, Etc..
My understanding is that this is a generic save error that could mean many things.
In the ULS logs under "Active Cache Save" , I am getting:
"Cancelling correlation 1339927b-e9e5-e311-941d-00155d2bc10d as save is an overwrite or resubmit"
What is strange at this point is if I check the project back in, and re-open/re-checkout the project, and try to save again, it is successful in saving.
Just a few details about the environment:
Project Server Version: 2013 RTM (In the process of upgrading)
SharePoint Version: 2013 RTM (In the process of upgrading)
Project Structure: One Master Project with all other projects being subprojects of the master
Published Status: All Published
SQL Version: SQL Server 2012 SP1
User Count: About 5 currently
Deployment: 1 WFE, 1 APP Server, 1 SQL Server
It is just odd, as it seems to be completely random. We have tried clearing caches out to see if that resolves it but it did not. It is just odd that it takes two saves for it to actually work correctly, and is problematic as the many times they are saving
from the master and it bombs out there.
I am not sure how it could be an issue as it is usually just a single user working on the individual subprojects.
Maybe it is an issue in the RTM? I couldn't find any info in any of the CU's or SP's that addresses this directly
Has anyone seen this, or have any suggestions?
MS Support has not been any help at all.
Thanks allI have heard of issues with Master and Sub-Projects and both being published to Project Server, as a rule it is a feature I learnt to avoid as a result of bad experiences with earlier versions of Project Server.
Whilst this will not resolve the issue you have encountered the following suggestion may help you avoid pain in the future and leverages the potential of Project Server to represent common attributes for projects.
Typically a Master/Sub Project environment is intended to reflect projects that are commonly aligned - it is not unusual for a Master Project to represent a programme and for there to be multiple sub-projects forming the programme - there can be programme
level events that have multiple predecessors from multiple sub-projects.
Rather than create a master and sub-project situation I would suggest looking to define two Enterprise Custom Project fields to assist with such situations. The first being a Project Field called Programme that has a look up table with a list of current
programmes you can select from. The second Project Field would be a Programme Status Field with an associated lookup table with 3 values, Master, Sub-Project, Standalone.
You can have a project represent the Master (Programme) project and open it and all sub-projects in the programme (albeit this would have to be a one by one action to begin with). With all the projects open go and open a New Window in Project Professional
and elect to include all the open projects in the new window - this will create a new project with all the selected projects showing as
"embedded objects" and then create dependencies from sub-projects to programme level events in the Master Project (I would suggest what I call
"one way traffic" when creating "cross project dependencies" to avoid further headaches). Close the project, you will be prompted to save changes which you should do but do not save the new window
"container" project. The dependencies across the projects will persist - in each project you will be able to see external successors - tasks in the master project. In the master project you will be able to see external predecessors.
In PWA you can create Project Centre Programme views that filter to exclude projects that ARE Standalone and group them by Programme and sort by Programme Status Field - this will ensure that the "Master" sits at the top of the pile for each programme grouping.
Just a suggestion - I hope the issue you have encountered is resolved soon.
Dominic Moss | MAPM Microsoft Certified Technology Specialist | Our Newsletter:
PM News Project Server Specialists
Project Server PRIME | Twitter:
@Twitter | Facebook:
@Facebook | Linkedin:
Wellingtone -
Hi,
I set myself as team member in Project Server 2013, when i click on Project,Approvals and Timesheet i receive the below error:
"Cannot communicate with the server. Verify your connection and try again"
I have other account with Project Manager rights, with that account i can open these pages.
Please help.
K.GokulrajHi Gokulraj,
What permission mode are you using in project server 2013? Is it "project permissions mode" or "SharePoint permissions mode"?
If you are using "project permissions mode", then go to Server Settings -> Manage users and click on the user with "team member" permissions to edit.
In the next page, expand "Global Permissions" and "View Approval" permission.
It could be the issue with the categories and category level permissions.
Happy troubleshooting...
Vikram Daruru - MSFT -
Hi sir,
when I have try to fetch the value of project start date and finish date and some other field value , I have recived error message like The property or field 'StartDate' has not been initialized. It has not been requested or the request has not been
executed. It may need to be explicitly requested.
I have used client context for project server 2013.
I have also load and execute query.but fail to resolve it Please suggest me and provide solution.
vijayHi,
If you use the Include<TSource> Method in the Load method, we will retrieve only the ids of items in this query, so
the listItems.ListItemCollectionPosition will not be initialized.
You can use the <ViewFields> tag in CAML Query to specify the field values to return with each item instead.
Best regards
Patrick Liang
TechNet Community Support -
Error creating Project Server 2013 Server Side Event Handlers
Hi,
I have created a WCF service and deployed it successfully. Now when trying to add a new event receiver for Project CheckIn event, nothing happens. Checking the service using Services panel, it shows Microsoft Project Server Events Service 2013
is started. I check the ULS logs and see exception:
System.Data.SqlClient.SqlException (0x80131904): Could not find stored procedure 'pub.MSP_ADMIN_SetEventReceivers15RTM'
I have service pack 1 installed for Project Server and SharePoint, version 15.0.4571.1502. Any ideas? I see there is a stored procedure without '15RTM' suffixed in PWA database. I read another post on the forum relating to this same issue
but didn't want to create each additional item in the DB (table, data type, stored procedure, etc). Am I missing something? Looking for suggestions here. Your help is always appreciated.
Thanks,
kashifHi Gokulraj,
What permission mode are you using in project server 2013? Is it "project permissions mode" or "SharePoint permissions mode"?
If you are using "project permissions mode", then go to Server Settings -> Manage users and click on the user with "team member" permissions to edit.
In the next page, expand "Global Permissions" and "View Approval" permission.
It could be the issue with the categories and category level permissions.
Happy troubleshooting...
Vikram Daruru - MSFT -
8315 Error in Project Server 2013
Hey all,
My Project 2013 server just recently started throwing an 8315 error. Its details are:
Machine 'NTPRJWEB2 (SharePoint - 80(_LM_W3SVC_1989583194_ROOT))' failed ping validation and has been unavailable since '6/18/2014 2:27:52 PM'.
and:
Machine 'NTPRJWEB1 (SharePoint - 80(_LM_W3SVC_1989583194_ROOT))' failed ping validation and has been unavailable since '6/18/2014 2:27:49 PM'.
I have never had to deal with this error before. Can some one advise me what I need to do to resolve this?
Thanks,
JonathanHi Jonathan,
Are you having RTM version of SharePoint 2013? 8315, 8316, 8317, 8318 are known issues related to Request
management service in RTM build of SharePoint 2013. These issues should go off once you upgrade to the latest SP/CU.
Hope this helps,
Guillaume Rouyre, MBA, MCP, MCTS | -
Project Server 2013 - This webpart was unable to load
Hi all,
I am getting the following error in project server 2013 project sites:
This webpart was unable to load. For more information, please contact your server administrator.
<Guid>
I only get this error message on 'Project Summary Web Part'.
Any idea what it could be?
Thank you,
SJHi there!
I got similar problem in a PDP that was working perfectly even after migration to 2013. On this case, my PDP was showing the webpart that let you to choose what fields and custom fields want to show on a specific PDP.
I created a copy of the crashed PDP and got the same error. So I bet for remove all the custom fields and add one by one to see what happens. The surprise came up when it started to work when my PDP had just pair of custom fields. With this procedure,
I found that the problem was on some specific custom fields created that had null values to all the projects created before. Once I forced value on those fields it worked properly!!
Sometimes EPM2013 has a very strange behavioural and in some cases just clicking on EDIT and SAVE without any change have solved some of my problems too.
I hope it helps this to you and feel free to contact me if I can somehow help you :)
Diego -
Hi,
Workflow status web part gives error when going back to previous stage (using GO TO) transition activity in Project Server 2013 workflow.
Please guide how to create a workflow which restarts from a desired stage.Thanks for your prompt reply....
It gives following error
Workflow Status
This Web Part was unable to load.
Information that may be useful in solving this problem was written to the Unified Logging Service (ULS) log on the Project Web App with the following ID: e95a9c9c-1f68-90d7-0a3e-5951df70fec6
For more information, contact your Project Web App administrator.
what do you mean to restart the Project Server 2013 with different project name, please elaborate.... -
Help needed Regarding Project Server - 2013 Workflow
Hi All,
I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial.
I have created a project type associated with a workflow and my workflow is as follows :
So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue.
The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
Please help me to solve this issue.
Thanks,
shankyHi Kiran,
I am now facing issue while assigning a task to a person in the workflow.
I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
And I am using a workflow as :
Stage : Conceptual
Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
Transition to stage
Go to Approval
But this is again giving issue as :
Workflow Internal status : Cancelled
Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
permission to perform this action or access this resource."}}}
PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
Thanks,
Shanky -
Workflow in Project server 2013 online not going particular stage after Approval
Hi All,
i have created workflow using sharepoint designer 2013 for project server 2013 online. and i have also set the approver after the first stage. when i create a project using this workflow, project is created successfully and the approval task also go for
a approval to specific user. and i have set the property that after approval it has to go on specific stage. but the problem is when user approve the task it shows approved but my stage in workflow is remain same. it is not going to any stage.
i don't know why this type of problem is occur.
FYI, i have created same workflow for Project server 2013 on premise(Which is installed in my server) and
it is working fine but when i want to deploy this workflow in
project server 2013 online its giving error.
so please help me to solve this type of issue.
ThanksI am also experiencing issues with this. After the approval task is completed, the Workflow gets cancelled with the following message
RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
bookmarkManager, Location resultLocation)
All other desired workflow actions work as expected. Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
workflow fails.
What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
not COMPLETED, which is what would be expected.
Has anyone seen this - any potential resolution? -
How to handle PSW approval task in project server 2013 through declarative workflow VS 2013
Hello,
Plz explain in detail handling PSW approval task in project server 2013 through declarative workflow VS 2013
bcoz when using am posted on with this error when i try to approve the item
"This list item has not been created by the workflow.you cannot apply this content type"
any help would be appreciated!!!!
Thanks regards, Vignesh.I am also experiencing issues with this. After the approval task is completed, the Workflow gets cancelled with the following message
RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
bookmarkManager, Location resultLocation)
All other desired workflow actions work as expected. Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
workflow fails.
What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
not COMPLETED, which is what would be expected.
Has anyone seen this - any potential resolution? -
The Stage Gate Workflow get suspended in project server 2013
Hi,
Getting following error when i am trying to create an stage gate project/workflow in project server 2013. The submit button in
the ribbon gets disabled and when i see the workflow status it is suspended. and getting following error message.
RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: An unhandled
exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"x-ms-diagnostics":["3001000;reason=\"There has been an error authenticating the request.\";category=\"invalid_client\""],"SPRequestGuid":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"request-id":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"SPRequestDuration":["153"],"SPIisLatency":["0"],"Server":["Microsoft-IIS\/8.0"],"WWW-Authenticate":["Bearer
realm=\"2a5d48f2-f71d-4589-a6ae-ab6c0d30fafd\",client_id=\"00000003-0000-0ff1-ce00-000000000000\",trusted_issuers=\"00000005-0000-0000-c000-000000000000@*,[email protected]0d30fafd\"","NTLM"],"X-Powered-By":["ASP.NET"],"MicrosoftSharePointTeamServices":["15.0.0.4481"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
RequireReadOnly"],"Date":["Thu, 04 Jul 2013 11:20:43 GMT"]} at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance
instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager bookmarkManager, Location resultLocation)
Could anyone help me to fix this issue and reason why the Stage gate workflow isgetting suspended.
Thanks,
SunithaCheck your User Profiles and make sure that the user's domain is correct. We've seen workflows suspend with 401 errors when the User Profile Service syncs with AD and pulls the wrong domain name - for
example if your FQDN is corp.company.com and the user logs in with company\username, UPS might have corp\username instead. Hence a 401 error...
Here is a link that includes the steps to fix this:
http://social.technet.microsoft.com/wiki/contents/articles/18060.sharepoint-20xx-what-if-the-domain-netbios-name-is-different-than-the-fqdn-of-the-domain-with-user-profile.aspx
Neall -
Configure Workflow Manager 1.0 in Project Server 2013 with FBA
Hi,
Please suggest the ways to configure Workflow manger in Project server 2013 where PWA using FBA
we have tried for below situation, but no luck!!
The workflow manager configured using windows login account, we are associating a FBA site with workflow manager which is
Register-SPWorkflowService -SPSite 'http://FBAsite' -WorkflowHostUri 'http://workflowmanagerapplication:12291'
Following steps are taken care while creating workflow.
We have added users to the user service profile services
User profile synchronization is started
The user by whom we are logged is available in User Profile list
we are not running workflow with share point system account
Final step full synchronization of User Profile Application
Below the error we are getting when workflow run
Resume this workflow
RequestorId: 879e36f9-9db0-3c16-0000-000000000000. Details: An unhandled exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["440"],"SPRequestGuid":["879e36f9-9db0-3c16-a91c-356d29becb34"],"request-id":["879e36f9-9db0-3c16-a91c-356d29becb34"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4605"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Sun, 15 Jun 2014 12:44:03 GMT"],"Server":["Microsoft-IIS\/7.5"],"WWW-Authenticate":["NTLM"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}
at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor
executor, BookmarkManager bookmarkManager, Location resultLocation)Hi Mafeer,
Since this issue is related to Project Server, I would like to recommend you to post there for more effective support:
Project Server General Questions and Answers
Thanks for your understanding. -
Error while creating a Timesheet - Project Server 2013
Hi everyone,
One of user of PWA encounters an issue when he tries to create a timesheet. This error only occurs with a timesheet of
a specific period, he can create all the other timesheet.
So, when he creates the timesheet, this error occurs : "The timesheet creation failed, because of problems with Project Web App or with data validations"
After reloaded the list of the timesheets, a link to go to the specific timesheet
is available but if we click on it, we have this error :
"View Failue - The view failed to load"
I think , this error occurs
because the timesheet is not realy existing even if we have a link to it.
In the log (full log at the end), I've got this error :
Exception occured in method 'TimeSheet.CreateTimesheet' System.ArgumentException: These columns don't currently have unique values.
I've found this link with the same kind of problem :
http://social.technet.microsoft.com/Forums/projectserver/en-US/b0a92afc-11fc-40ef-9a44-357d953b31f6/unable-to-open-or-create-timesheets-these-columns-dont-currently-have-unique-values?forum=projectserver2010general but I've checked and published all the
user project but still have the error.
Have you got any idea where are these columns ? How can I found them without checked every project of PWA ?
Thanks,
Patmol
Full logs, for information :
[bucketHash:E3B9DED0] Exception occured in method 'TimeSheet.CreateTimesheet' System.ArgumentException: These columns don't currently have unique values. at System.Data.ConstraintCollection.AddUniqueConstraint(UniqueConstraint constraint) at System.Data.ConstraintCollection.Add(Constraint constraint, Boolean addUniqueWhenAddingForeign) at System.Data.DataTable.set_PrimaryKey(DataColumn[] value) at Microsoft.Office.Project.Server.DataAccessLayer.Generated.TimesheetDalBase.ReadCustomFieldsForAssignments(ISet`1 assignmentUids) at Microsoft.Office.Project.Server.BusinessLayer.Timesheet.ImportCustomFields(HashSet`1 assignmentUids) at Microsoft.Office.Project.Server.BusinessLayer.Timesheet.ImportActualsAndCustomFields(IEnumerable`1 assignmentUids, ISet`1 userImported) at Microsoft.Office.Project.Server.BusinessLayer.TimesheetLoaderForGrid.Load() at Microsoft.Office.Project.Server.BusinessLayer.TimeSheet.CreateTimesheet(TimesheetDataSet dsDelta, PreloadType preloadType) at Microsoft.Office.Project.Server.Wcf.Implementation.TimeSheetImpl.<>c__DisplayClass45.<CreateTimesheet>b__44() at Microsoft.Office.Project.Server.Wcf.Implementation.WcfMethodInvocation.InvokeBusinessObjectMethod(String businessObjectName, String methodName, IEnumerable`1 actions) StackTrace: at Microsoft.Office.Project.Server.Native.dll: (sig=6ea170d1-988e-4153-9f1d-0305c0ea0309|2|microsoft.office.project.server.native.pdb, offset=3C1E) at Microsoft.Office.Project.Server.Native.dll: (offset=1255D)
Watson bucket parameters: Microsoft Project Server 2013, ULSException14, 070f6ea0 "project server", 0f0011db "15.0.4571.0", ea364808 "system.data", 0400766f "4.0.30319.0", 52310bef "thu sep 12 02:33:51 2013", 00000e02 "00000e02", 00000020 "00000020", 44395864 "argumentexception", 00101621 "aeby7"
Error is: GeneralUnhandledException. Details: General Unhandled Exception in _TimeSheet.CreateTimesheet_ Attributes: System.ArgumentException: These columns don't currently have unique values. at System.Data.ConstraintCollection.AddUniqueConstraint(UniqueConstraint constraint) at System.Data.ConstraintCollection.Add(Constraint constraint, Boolean addUniqueWhenAddingForeign) at System.Data.DataTable.set_PrimaryKey(DataColumn[] value) at Microsoft.Office.Project.Server.DataAccessLayer.Generated.TimesheetDalBase.ReadCustomFieldsForAssignments(ISet`1 assignmentUids) at Microsoft.Office.Project.Server.BusinessLayer.Timesheet.ImportCustomFields(HashSet`1 assignmentUids) at Microsoft.Office.Project.Server.BusinessLayer.Timesheet.ImportActualsAndCustomFields(IEnumerable`1 assignmentUids, ISet`1 userImported) at Microsoft.Office.Project.Server.BusinessLayer.TimesheetLoaderForGrid.Load() at Microsoft.Office.Project.Server.BusinessLayer.TimeSheet.CreateTimesheet(TimesheetDataSet dsDelta, PreloadType preloadType) at Microsoft.Office.Project.Server.Wcf.Implementation.TimeSheetImpl.<>c__DisplayClass45.<CreateTimesheet>b__44() at Microsoft.Office.Project.Server.Wcf.Implementation.WcfMethodInvocation.InvokeBusinessObjectMethod(String businessObjectName, String methodName, IEnumerable`1 actions) . Standard Information: PSI Entry Point: Project User: i:0#.w|wavenet\cev Correlation Id: 9709e41b-9a18-e411-941e-00155d029b05 PWA Site URL: http://intranet.wavenet.lan/PWA SA Name: Project Server Application PSError: GeneralUnhandledException (42), LogLeve...Hi Patmol,
Have you tried to go to the previous or next timesheet and then navigate with the "previous period" or "next period" to the timesheet in question.
Also have you tried to open it using a delegation session?
Hope this helps,
Guillaume Rouyre, MBA, MCP, MCTS | -
Error while installing MS Project Server 2013(trial) on Sharepoint 2013(CAL)
My problem is that I get the following error:
trial editions and licensed editions of SharePoint, Project Server, and Office Web Apps products may not be installed on the same server
when I try to install MS Project Server 2013(180 days-evaluation) over a Sharepoint 2013(MAPS license).
What does exactly this error say?
Do I need to have Sharepoint and MS Project Server with same type of license?
If so, I suppose I'll have to remove Sharepoint(MAPS) and install a 180 days-evaluation Sharepoint. Will this re-installation be acceptable or I'll get some license type incompatibility issues?Hello. You are correct, you will need to have the same license types either both trials or both licensed. Uninstalling/ reinstalling with trials should work fine or build another trial farm. Paul
Paul Mather | Twitter |
http://pwmather.wordpress.com | CPS |
MVP | Downloads
Maybe you are looking for
-
I need a replacement keyboard for a Lenovo 3000 C200 Model# 8922-2FU
My wife dumped a glass of water on her laptop and I am having a really hard time finding a replacement keyboard. Why do wives love to break the machines? Thanks
-
How do i get rid of an album that I synced to my phone
how do i get rid of an album that I synced to my phone
-
How can I prevent sudden shutdown of my BlackBerry Bold 9780 during cmaera usage?
My BlackBerry shuts down after taking 2 or 3 photos. Don't think battery is the issue as there's no problem with normal usage for calling or texting. Can usually last a few days without charging.
-
Trouble with swipe gesture in Mac OS X Lion.
Hello everyone, I updated my mac yesterday with Lion. I was so looking forward to the upgrade, however I have stumbled on a problem ever since I upgraded. The swipe gesture isn' t working correctly for me. I look at the WWDC 2011 and I checked youtub
-
I can't recognize the rescue email.
Hi The Face Time is not working from 2days ago. And I tried to update my apple ID. But I could not remember the answers of security questions. It said Sent reset security info email to s*****@gmail.com but I don't recognize this rescue email address.