ERS Settlement Issue

Hi all,
I'm facing an error "ERS settlement: No message was found for partner ....../company code  ......"
while doing settelment through MRRL Transaction.
Pls Note: I had done all the settings to the best of my knowledge, but still this Error is appearing.
Settings that i had done and Checked:
1. In Vendor Master --> Purchasing View.
   Set the GR Based IV Verfication and AutoEvalGRSetmt Del. indicators.
2. In Purchase Info Rec --> No ERS checked is removed.
3. In Purchase Order, GR Based IV and ERS Check are defaulted and Tax Code is also Specified.
4. Message output is also Defined in SPRO
Message type is maintained with Access Seq 0002 'Ccode + Vendor'
condition is also maintained in MRM1 transaction and Printer is also attached in communication.
But still i'm facing this error.
Regards,
S Anand

Hi
error : ( ERS settlement: No message was found for partner ERS : co code : 1111)
Ans : SPRO u2192 Logistic Invoice verification u2192 Message determination u2192 Master condition.
Message setting = ERS
Key combination ; Co. Code;
Regards
anand

Similar Messages

  • Txn MRRL - Not able to exclude documents in ERS settlement

    Hi
    We are using ECC 6.0. If we run Txn MRRL in "Test Run" mode, it will give list of Documents ready to be processed for invoice. And upon running the Txn, it will process all the eligible documents and generate FI documents.
    Now my question is how to exclude some of the documetns from ERS settlement. We used 4.6C so far, in which we have an option in the header "Exclude from ERS". But in 6.0 we don't have such option. What should we do to exclude some docuemnts from ERS when running MRRL.
    Thanks
    Venkat

    I have the same issue.  however when i hit save - save to exclude, and then re-run MRRL without the test run, the line items have not been excluded, and it creates FI documents.
    Any help on why its not excluding the items?

  • ERS Settlement Error message Reg

    Dear All,
                      Im doing the ERS settlement configuration first time i have configured the Messages and outputs but at the time of settlement run it is showing error message as "ERS Settlement No message was found for partner 305469 company code 1000"
    how to resolve this issue...
    REgards
    Anand.

    hi,
    have you configured the condition record for the output  type ERS with that particular vendor what you are using.
    check and revert back.
    Regards,'
    velu

  • ERS Settlement transaction MRRL exclude items

    Hi SAP Gurus,
    We are using ERS Settlement transaction MRRL on ECC 5.0.
    When I ran the settlement, there was an item that I wanted to exclude for the current settlement run. So I selected the item and then clicked the save button (exclude from ERS). But now, I want that item to appear in a subsequent settlement run and it does not.
    How do I get it to appear?
    Thanks for your help.
    Linda

    Linda
    An easier option is to make the exclusion in the selection screen where you click on the multiple selection and exclude the document required to be excluded. The next time you could only select the item excluded and complete the ERS run. However you can run the ERS run by selecting only the ones you had excluded by mistake. Also since this was under test run, you could cancel it and then subsequently add it also.Hope this helps.
    Since it was a test run only, you can cancel it and run the job again.
    Karthik
    Message was edited by:
            Karthik Coneru

  • ERS Settlement MRRL Exclude items

    Hi SAP Gurus,
    We are using ERS Settlement transaction MRRL on ECC 5.0. 
    When I ran the settlement, there was an item that I wanted to exclude for the current settlement run.  So I selected the item and then clicked the save button (exclude from ERS).  But now, I want that item to appear in a subsequent settlement run and it does not.
    How do I get it to appear?
    Thanks for your help.
    Linda

    Hi Linda,
    You can do the itemwise settlement for ERS vendor & it is working fine in my case.
    I am also working in ECC 6.0
    How many line item you have in your purchase order.Please write in detail.
    Regards,
    Manish
    Don’t forget to give point if useful ans.

  • Asset settlement issue from Project System

    Hello everyone,
    In SAP, we have tied Project System and Fixed Asset in the sense that for each network/activity in PS we create and link an asset in Asset Accounting. In the Purchase Order, the network/activity number is assigned and all the transactions that occur through this PO (including down payment, its clearing, GR/IR)  are then settled on the specified asset when we execute settlement run at month end through CJ88.
    However, we have encountered scenarios where an asset was not timely allocated to the network/activity but the transactions were carried out through the PO. When the settlement run was executed, its impact was not visible in Asset Accounting. Later, it was realized and the asset was created and assigned. Once the asset was assigned, all the subsequent transactions through the PO were then being settled successfully. But the problem is with those transactions for which the asset number was initially not assigned.
    Is there any program that can be executed to include the impact of the previous transactions. Otherwise, suggest alternatives.
    Thanks

    Hi Thanks for your reply, But that is not relevent to this issue.
    The issue here is -
    First 2 documents has value date of 4th period and the amount is 8800
    Next document has value date of 5th period and the amount is 1200
    Now i am trying to settle 10000(8800+1200) with 5th period date. Its givign an error Settlement amount is greater than Available amount
    Will it solve if i settle 4th period with 8800 first and then 1200 with 5t period? or any other process?
    Thanks
    Yadayya

  • Rebate settlement issue

    Hi Guru,
    Could you plase advise about my issue which is related to rebare agreement.
    in my client theu are mainting rebates for trade promotion.
    that rebate is created in Jan 2009. validity from 01.01.2009 to 02.02.2009.
    they didn't given any accrual percentage. but hey given settlement percentage.
    as of now it is not settled it means still it is open.
    now they wants to close the rebate ageement without any settlement.
    when they are settleling it is showing the credit value...it is posting in customer master...
    i tried somany ways...which are below..
    there are two ways to close the rebate agreement
    1     i changed  settlement percentage is zero (o%)...
         here i am not able to processes completely  because of zero values willnot post in fi....here the rebate agreement ststus wll be
              " C "
    2       i deleted agreement, because it is old date it is not require to show afterwards.....
    3   please kindly advise me what is procedure to close the rebate agrement with out settlement.
    Thanks & Regards,
    Muthyam.G

    thanks gyus...i got solution

  • Settlement issue.

    Hi PS Experts,
    I am faced a lots of issue in settling the project cost.
    I am able to run the transaction code CJ88 successfully.
    But when I checked CJI3 Report, The project cost is not changed to "ZERO". (Project cost is same)
    I don't know from where the below Cost element is captured in the CJI3 Report.
    I have attached the screenshot settlement Profile and allocation structure.
    Request you to let us know how to settle the project cost to "ZERO" in CJI3 report and settle all the cost to AUC,as I am doing settlements for the first time.
    Regards,
    Wasim.

    Hello,
    Line item reports pull all postings as actual, settlement & statistical, so have you tried to exclude the statistical cost from the report selection and run the report? You can exclude the statistical cost using filter function on the output screen.
    2nd thing check whether cost is showing in CJI3 after settlement is not that manual posting to asset if yes then reverse those entry and go though CJ88 then check CJI3 you will get expected result.
    Regards,
    Sanjeev

  • Settlement issue for Pooled asset

    Hi all,
    I created a notification (type MF) for pooled asset in IW21. I was able to view the notification in the planning board (PAM03). I was also able to do the planning of the demand and was able to reserve, issue and return the pool asset.
    Now, I am facing an issue during settlement. Which I try to do the settlement, system is giving an error 'Unable to determine the pool category for requirement'. Message No. PAMS145
    Below is the detailed message:
    Diagnosis
    In Customizing for PAM, you define activity types for each pool category for
    each controlling area.
    When settling a PAM requirement, the system calculates the service performed
    for the activity types defined for 'Rental price' and 'Price/unit.'
    The pool category is determined using the equipment or message (in this
    order) for the requirement
    The controlling area is determined from the equipment.
    Unable to determine a pool category for the requirement.
    System Response
    The settlement of the requirement is terminated.
    Procedure
    Depending on the business process, store a pool category in the equipment or
    the message.
    I think I am not able to tie up the pool category which is there in the configuration of PAM with the equipment I created. Has someone faced similar issue before? What could be the possible way to resolve this error?
    Thanks,
    Tajinder

    hello Gandalf ,
    Create an IO Through KO01 with extra Create AUC........
    Then post the exp to AUC........
    Then assign the settlement rule as Fixed assed and enter the Asset number and give % or amount....
    Settle the IO through K088
    Hope this will resolve your issue............
    Regards
    Kumar

  • Project Settlement Issue

    Hi All,
    We had an invoice that was entered with a wbs that had the following currencies:  CO Currency = USD, Transaction Currency = USD and Object Currency = GBP within a company with a currency of GBP.  However, when settling through CJ88, the settlement produces CO Currency = USD (zeros out), Transaction Currency = GBP (balance) and Object Currency = GBP (zeros out).  So, when you try to settle for the next month, CJ88 states that there is an error states "Execute amount settlement up to and including settlement period 003 2009 first"
    Message no. KD262. 
    As a bit of background, the project is in USD by some of the wbs elements within the project are based in GBP from the company code which is in GBP.  I'm not sure how to have the settlement work out so that there is no balance.
    Any assistance would be greatly appreciated!
    Pete

    Hi Sarang,
    We settle on an individual wbs element so I tried reversing the settlement and then re-settling the wbs once again.  The same issue is occurring where the CO Currency = USD, Transaction Currency = USD and Object Currency = GBP within a company with a currency of GBP. However, when settling through CJ88, the settlement produces CO Currency = USD (zeros out), Transaction Currency = GBP (balance) and Object Currency = GBP (zeros out).  In order to properly settle, all 3 currencies need to zero out but it is still not working.
    Any other thoughts?
    Pete

  • IO Wrong asset settlement Issue

    Hi
    We settlement rule for internal order 2500007 was erroneously set to settle costs to asset 11 (company 123). That asset is already part of a different internal order.
    Costs from internal order ***0007 were settled to that asset in prior periods(from Jan 2104) and depreciation has begun. This is incorrect since the asset should not be related to that internal order.
    We would like to reverse the amounts settled to that asset from IO ***0007 and settle them to a different asset instead.
    This should result in a reversal of the depreciation booked to this asset from the costs settled from IO ***0007.
    Do suggest how to achieve this.
    Thanks & Regards,
    D Dixon.

    Hi,
    You have two issue, one is wrong settlement to asset, and wrong amount of deprecation is posted.
    First of all you need to reverse the depreciation, to reverse the depreciation, just change the depreciation key to 0000 in asset master AS02, and repeat the depreciation run to reverse the depreciation for this assets. once you verified that depreaction is reversed for this asset, just go AS02 and again change the dep. key to original one.
    Second step is to reverse the Settlement, you can reverse the settlement from the same t.code from where you have settled the order, lets say KO88, just go to settlement menu and Click on "Reverse"
    After settlement reversal,  create the correct settlement rule, and post the settlement, then again run the the depreciation AFAB in repeat mode, to post the correct deprecation.
    I hope this will help you.
    Regards
    Javed

  • AIAB issue (asset settlement issue)

    Dear Sapguru,
    On dev system, we are facing an issue for tcode AIAB. In our current process we park & post document through MIR7 & MIR6 respectively. While posting the document we post to CWIP asset & later on transfer from CWIP to actual asset.
    But from January 2012, CWIP asset master shows document  posted  but while transfering from CWIP  to main asset through t code AIAB line items are not display. but in QA the same is working fine.
    Kindly help us to resolving issue.
    Thanks & regards,
    Pramod Chavhan

    Varsha,
    When did you settle the Values from IO to AUC?
    If this was done in 2011, just look after year closing and opening new.
    If it is in 2012, go to AR01, AR02 and AR03 and check if the values are appearing for AUC
    Let us know the results
    Thanks

  • CJ88 - Final settlement issue

    Hi All,
    Seek solution for this issue:
    After final settlement (CJ88) the cost that is getting settled and posted in FI is equal to the sum of the difference of Closing CTC (cost to complete) for period 10 and Opening CTC for period 10 and the closing CTC for the period.
    But the amount that should actually get settled is the difference of Closing CTC (cost to complete) for period 10 and Opening CTC for period 10. 
    For eg.  the amount that should get settled for Period 10 is 11,85,220.70 (Which is shown in Result Analysis - KKA2 under the head 'Changes in the period - C(period)'. This is the difference of Closing CTC for period 10 and Opening CTC for period 10).
    But the amount that is actually getting settled is, this amount i.e. 1185220.70 + Closing CTC i.e. 29,481,426.30.
    What could be the reason and solution for this? 
    Best regards,
    Nimish Goswamy

    Hi
    First maintain IT16 Contract elements
    IT185-subtype 03gratuity
    For Termintation Work bench both these IT are a must.
    Lock Personnel no in PU03 before running the termination workbench
    pc00_m40_term
    Then Enter personnel no-reason for and notice date and leaving date.
    Gratuity Leave encashment and all other wagetypes can be given at the time of termination workbench for calculating F&FS
    All the amnts are automatically updtd in IT15
    Run the leaving action with the date which was entered in pc00_m40_term
    Release the personnel no in puo3 and run the payroll-pc00_m40_calc
    DO reward points
    regards
    Iyer

  • CJ88 and CJ8G tcodes - Settlement issue

    Dear Experts,
    We are having an issue in the settlement process. We ran the actual mass settlement for all the projects for the specific RA keys. I do see the cost has been posted and transferred and they are settled as expected. Accounting looks good as well. However, if I ran the settlement individually on tcode CJ88 that has been already settled in the mass settling process, it shows up on the list "to be settled" in the test mode. If I re-run it again in "Actual" mode, it settles without any issues and then it disappears from the list finally. Did anyone experience this issue before? I will post the example screenshots of the examples that I am analyzing.
    thanks,
    DK

    Hi D K,
    This doesn't seems to be a way it has to work, is there any support packs recently added, this can be a bug.
    If you are able to replicate the issue always, do raise it with SAP, they will be able to provide a resolution or conclusion.
    If you check with Orders, system will check for Networks or Work Orders assigned to the WBS element and the same should be settled, may be there is some cost pending from Order end. Check the order or network assignment.
    Regards
    Terence

  • Error for ERS settlement of frieght POs

    Hello All
    We have an issue where user is trying to settle Automated Freight POs with search criteria as (company code US20) and GR posting date (From- Blank/ To - till date) through MRRL transaction.
    Errors:
    1.Posting date is initial for few of them
    2."External system returned different number of lines than received" for remaining ones.
    I tried the same in testing client by settling them in batches say for a month and then it did not give an error and were settled as desired.
    Could anyone please help me on both errors. There is no long text available for the same.
    Best Regards

    can anyone please help or share knowledge on above errors?

Maybe you are looking for

  • Problem with scanning CM1312 on MAC Yosemite

    hi, Im not able to perform scanning on my Mac with Yosemite and CM1312 connected to wireless router.  Printing works fine but scanning is not possible. When i press scan button on my printer it shows that there is no destination added and check the u

  • Af:commandMenuItem action only works first time

    I am using the af:panelPage, and have added a menu1 facet that contains an af:menuTabs component with 3 af:commandMenuItems. I'd like the selection of each tab to invoke a bean 'action', where I'll set some flags that control the rendering of differe

  • Why can't I see the "word" in "prove you're not a robot" under regular and my own color settings?

    I have just acquired an iPad and noticed for the first time your synch feature; while trying to fill it out, there was nothing visible in the "prove you're not a robot" screen. Since I use my own system colors on the browser, this happens frequently,

  • Screen display and resolution problem

    Hello, i have lenovo thinkpad T61 its actual screen is potrait. I installed fresh copy of windows 7 32 bit. All was fine,Display was set according to standard vga driver. But when i installed driver for nivida quadro nvs 140 m display changed from po

  • Using zoom my camera

    Having trouble with my camera.  I tryed to zoom to take a video and it would not work... perhaps I was doing somehting wrong took some videos but not it will not take videos and the lenses seems to be stuck