Dear PP friends,
I am trying to create a Evaluation Structure with reference to an Evaluation Structure (t-code MCR7). I need to join the Standard Evaluation Structures S021 (Production Order) and S026 (Material Usage), but S021 is not appearing to choose characteristics and key figures.
Does anyone have suggestions?
My requirement is to create a report where I can see goods receipt x goods issues per order.
Thanks in advance.
Marcos

Hi,
         As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
Regards
Chandra

Similar Messages

  • Production Order in Repetitive Manufacturing

    Hi All,
    We are using REM scenarios. But we need to use the Production order for some material in the same plant where we are already using REM.
    Is it possible to use both Discrete and REM for the same material but at different periods? Using Discrete for some period and switching over to REM. Is there is anyway to use the above mentioned scenario.
    Kindly suggest.
    Regards,
    Sureshbabu G.

    Hi,
             As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
    To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
    Regards
    Chandra

  • Order type for planned order in repetitive manufacturing

    hi
    In repetitive manufaturing there is no prodcutiion order
    planned order only. so i want know what is order type  for repetitive manufacturing
    In configuration order type for  reptitive is required or not   if  yes  then how will define order type ,where
    In Discrete order type will define to control  prodution order
    like that i want know details about order type in repetive manufature
    ravikumar

    HI
    Planned order in REM is of PE type thar s non convertible in PO and also these planned orders are assigned to PVs thru Planning table and the Confirmation is done agianst these planned orders.
    check these links:
    Re: order type in repetitive manufacturing
    http://www.sapfunctional.com/PP/REM/page1.htm
    Regards
    Anupam Sharma

  • Differ Bom For Production order and Subcontracting

    Dear all
    Is there any process to defined BOM for Subcontracting & production Order  separately and how can we make the Bom For Both case ,If it is possible then how can we choose in the production order for in house production and also for subcontracting for purchase order.
    Rgds
    Pankaj Agarwal

    Hi,
    After giving 'X' in the procurment type, maintain quota arrange usage as '4'.
    Then use T.code meq1, for creating quotas.
    Give the material no. & then give validdity date. Double click the validity date, this will take you to another screen.
    Here give the procurment type as internal production, the %quota & the prod version in the 'Version field'& then in the second row choose external procurement & choose sub-contracting in the special procurement field, then enter the %quota & prod version in the 'version' field.
    After this in T.code omi4 (for lot-size), check if the lot size you use has got a tick in the splitting quota. If not check this indicator & then run mrp. Based on the quota %, pl order & pur req will be created.
    Regards,
    Senthilkumar SD

  • Bom for production order and subcontracting

    Dear guru ,
    I have a finished material that can be use both produced in-house and procured externally with subcontracting.
    Now i use one only bom with usage 1 (production ) for the two process.
    I have a problem for one component.
    For subcontracting i must consider this component as a phantom (with explosion of its components) , instead for the in-house production I must consider this component as a normal stock item.
    Can I use only one bom or I must create an alternative bom for manage the two cases ?
    Thanks for your help.

    Dear CRIS,
    In my understanding this may create discrepancies during the material transfer from own stock to the vendor and also during
    month end checking process.
    What's the problem of maintaining that component as a stock item?why it should be treated as a phantom only for sub-
    contracting?
    Even if you are maintaining 2 different alternative BOM's for the final product one with the component as a normal assembly and
    the next one as a phantom,you will be facing issues during costing purpose and material inventory also.
    Come back with your further questions.
    Regards
    Mangalraj.S

  • IDOC for Creation of Production order and also adding components

    Hi ,
    I have a requirement like I get the data from a 3rd party system and using that i have to create production orders and also should be able to add more materials in COMPONENTS part of that Production order. I was looking for a BAPI which can handle this process.
    And also can any one help me by letting me know is there any Message type available for handling this process of Production order creation and Adding extyra components to it.
    I have a  message type LOIPRO (for Production Order) and associated function modle CLOI_MASTERIDOC_CREATE_LOIPRO for creation of master IDoc, but not sure can i handle the Components part in this.
    Please do send replies ASAP, its very urgent.
    Or else atleast suggest me the other ways of doing this .
    Also send me any BDC program if anyone has already developed for this.
    Thanks
    Kumar
    Edited by: Phani Kumar Peddagopu on Mar 19, 2008 6:56 PM

    Resolved .

  • Production Order   : OUTPUT Type Configuration for Production Order  as EDI

    Dear SDN All ,
      OUTPUT Type Configuration for Production Order.
    <b>Doubt in third Point</b>
    We have found the IDoc " LOIPRO01 " for Production Order
    (Please confirm that this IDoc can be used for outbound IDoc for Production Order)
    And foloowing
    <b>1. Defining the Output Type for Particular Application.
       T-Code: “NACE”</b>
      A. Output type have created upder application "ME" description : "Inventory Management"
      B.  " ZEDI "  created for getting output as EDI type
         ZEDI is copied from "WF01" output type. and
         Transmision mediam as "EDI"          
         Program : RSNASTED
         Form Routine :  EDI_PROCESSING
              (Please confirm is this for IDoc creation)
    <b>2. Partner profile creation:</b>
      A. Partner profile created under logical system and
      B. and In outbound parameter declared as "LOIPRO"(This is for sending the IDoc "LOIPRO01" to XI system).
    <b>3. Customization for output type for Proction Order -- (For CO02,CO08)</b>   ---
       A. But only one functional customization is remaining to do, for getting the IDoc while saving the Production Order in T-Code "CO02" and "CO08"
            <i>For Example:
                in sales order transaction va02 (in DBI 450 client) and select any Sales order.
                & select following menu path.
                 Extras --- > Output -
    > Header -
    > output
               Here we can set our output type "that U defined in NACE Transaction-Code"</i>
    <b> Like the same way I want to set output type  for CO02, CO08 transaction.</b>
    But I couldn't find the menu Item in Co02 and Co08 for setting the output.(like VA03)
    Please help me out for setting the output type for Production Order Creation.
    Thanks in advance,
    Dhanabal T
    Message was edited by: Dhanabal T

    Hello.
    I have a similar requirement. Did you guys find the solution?

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • How to use the selection profile and status profile for production order?

    Hi expert,
       I want to know how to use the selection profile and status profile for production order. what's the usage for these two selection profile and status profile ?
      Please help me.
      thanks in advance.
      george.shi

    Hi George,
    There are are two types of statuses.One is system status and second one is user status.These statuses will tell us current situation of an order.
    We can't change system statuses.But we can create our own statuses through status profile.With this profile we can control user statuses.
    In this status profile,
    1.We define the sequence in which user statuses can be activated,
    2.We define initial statuses
    3. Allow or prohibit certain business transactions.
    Selection profiles are used to select the objects (say production orders) with different status combinations.We assign status profiles to selection profiles in BS42 T-Code.
    Regards,
    Raja.
    Edited by: Rajarao on Oct 30, 2008 6:21 AM
    Edited by: Rajarao on Oct 30, 2008 6:22 AM

  • IDoc Configuration for Production Order Creation and Change

    Hi All,
    Please Help me out for IDoc Configuration for Production Order Creation and Change
    I have found the IDoc for Production Order
    Messgae Type : LOIPRO and IDoc type : LOIPRO01
    Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
    I have done following Configurations:
    1. RFC Destination created for XI system
    2. PORT was created for XI
    3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
    I need to know how to do the followning.
    1. How do i configure the outbound Production order idocs when Production Order is created or changed.
    2. in NACE (Output control) which is the Application for Production Order.
    3. How can I set IDoc as output Type for Production Order Creation.
    Thanks in advance
    Dhanabal T

    Hi Michal,
    I know that it is the old thread but still want to get clarified from you out of curiosity.
    Unlike other IDOC, i actiavated change pointers for LOIPRO
    1.message and idoc type is linked
    2.function module , message type , idoc type is linked
    function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
    3.BD64, distribution model is created and distributed
    4. port and partner profile is in place.
    5. IDOC is not getting generated after creating the process order.
    do we need to activate the change documents for the message type in BD52,
    if yes can you please provide the object types for the same.
    or i am missing something else. please guide me in this regards.
    Thanks in advance for your time.
    S.Janagar

  • System status for IDOC creation and processing for production orders

    All
    I am creating IDOCs for production orders to send requirements to an external WM system for kitting execution.
    I need to know whether there are any system statuses to notify me when an IDOC has been created,failed and processed. If not, how do I go about creating user defined statuses for these statuses.
    Second question, which idocs should I use to confirm, teco and cancel the production orders from an external system?
    Thanks
    Evan

    HI Evan
    u can use the standard program - RBDMOIND scheduled in back ground to update the Idoc staus ,
    this helps to update the IDoc Status from
    '03     Data passed to port OK  '  to
    '12     Dispatch OK'
    status 03 indicates the IDoc is successfully transmitted to Communication Layer and the Status 12 helps to confirm the data dispatch to the receiving port.

  • Enhancement for Production Order Release and Batch Fixing.

    Hi Experts,
    I have assigned a enhancement for production order.The user exit is also given in the req as PPCO0001 through which i have to call a Z-Program for Batch fixing using Trans CO01 and release the order before saving once it is assigned to components.
    Now my probs is where to start working for the enhancement -is it possible to use any BAPI instead of Batch (BDC) or I can use any BADI instead User Exit.
    So if you guys have similar scenario worked on it or have similar example approach to solve it.Please do help.I will reward for all helpful answers.

    I figured out thr friends !
    Thanks,
    SriRam

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

Maybe you are looking for

  • TS2662 wireless mouse indicator light flashing

    have a new imac with wireless mouse. sometimes the mouse does not connect. the indicator light flashes when it does not work. intermitten connection. battery 100% & mouse connected

  • Material ledger and cash journal

    In a company code where and how do I check whether cash journal and Material Ledger is activated or not?

  • Problem in Database Replication in Oracle 9i

    i am trying to do database replication but am facing problems in 9i.i have two machines on network and both have a database created.i also have a common schema in both the database (testuser is the name of schema). i have created database links betwe

  • Help! import window will not disappear after loading wavs!

    i have been trying to import a wav file into garageband (16 bit 44.1 kHz)... the wav visibly loads, but the "importing file" window remains... any advice / help would be tremendously appreciated!

  • What can i use instead of timeservices API ?

    Hi, Timeservices API are deprecated. What can i use instead of this API to execute an action every minit for example. (Weblogic Server 6.1) Thank you in advance.