EVDRE Input Schedule - shifting of cells/formulas

Hi everybody,
I am using BPC version 5.1. I do have a problem with an EVDRE Input Schedule. It is a single EVDRE report which is nested with a product and an account dimension.
Underneath the Data Input Range, I have written additional information and included a button with the send function. If I change the selected product members through another button which is above the input range and expand the report, the additional information and the button always move one row up when expanding.
Has anybody experienced a similar problem or has a solution for the problem? I am happy to provide additional information.
On top of that problem I do have cell reference sin formulas that also change when expanding. I e.g. have a EVPROP formula that shifts the row in the reference one row up each time I expand. The formula is on the left side of the input range next to the row IDs. I don't know why, but this problem doesn't occur on all input schedules.
Does anybody have a clue how to solve the issue?
Thank you very much in advance!
Christopher

Hello experts,
I've got another similar problem:
I do have shapes in an Excel Input Schedule, as well as drop downs, both with assigned macros. I don't know why, but some of them (not always the same) disappear.
I have no idea how that happens or where the shapes are now.
Does anybody have a clue?
Thanks in advance!
CH

Similar Messages

  • How to build an EVDRE input schedule with more than 3 dimensions?

    Hello experts,
    can anybody tell me, how to build an EVDRE input schedule with more than 3 dimensions?
    How must the parameter configuration (expansion 1, 2, 3, 4) and range configuration (ColKeyRange, RowKeyRange, PageKeyRange) look like? If anybody could post an example, how such an input schedule could look like, I would be very thankful.
    Best regards,
    Stefan

    Well, posting an example might be quite difficult.  But there is no right-or-wrong approach.  Since Inputs are made at the lowest or base level members of all dimensions, the key is to determine which dimensions you want in your expansion, to be able to gather the input.  Otherwise, you may only need a couple of nested dimensions.  But if you open BPC for Excel, open a blank workbook and in any cell type [ =EVDRE() ], then press refresh, the DRE wizard will allow you to select your nested row and columns for the report, and then build a basic report for your foundation. 
    I personally like to NOT expand my columns, and only nest 2 or 3 row member sets, depending on the details we need for input.  SOmetimes, the whole input schedule is without any expansions, and just refreshes based on the CV changes, such as entity, category, time etc.
    If you need more details, keep posting what you are trying to accomplish and we will try to help.

  • Undo function in EVDRE Input Schedule

    Hi All,
    The undo functionality does not work in EVDRE Excel Input Schedules (SAP BPC NW 7.5)..Kindly let me know if you could use the same....

    Hi Shibu,
    I opened a dynamic input schedule in the Apshell appset. I entered a data in one of the cells, the color of the cell changes (due to the format range). I pressed ctrl + z. However, it didnt remove the data.
    I removed the formatrange option. Now when i press ctrl + z, it works perfectly.

  • EvDRE - Input Schedule

    Hi all,
    Please help!
    Material Dimension:
    ID     EvDescription ParentH1     Property (Entity)
    MATERIAL     MATERIAL                          Entity1000
    MAT001     MAT001     MATERIAL     Entity1000
    MAT002     MAT002     MATERIAL     Entity1000
    MAT003     MAT003     MATERIAL     Entity1000
    MATERIAL1     MATERIAL1                          Entity1000
    MAT004     MAT004     MATERIAL1     Entity1000
    MAT005     MAT005     MATERIAL1     Entity1000
    1. In my input schedule, I have expansion on Material Dimension and have set the Memberset to =u201DEntity=u201D&E1000u201Du201D. As I have materials in my dimension belonging to other Entities as well, I have a property defined in my Material dimension called ENTITY.
    But I need to give a gap between the two Materials. Ex: So I need to declare two row key ranges and use BAS(MATERIAL)|BAS(MATERIAL1).
    But how can I set BAS(MATERIAL)|BAS(MATERIAL1)  AND =u201DEntity=u201D&E1000u201Du201D in the same memberset?
    2.     When an authorized person belonging to E2000 logins to the same report through BPF, he should be able to see only Material2 and its childu2026 Similar to the above reportu2026 How can I achieve this?
    Please help..
    Thanks
    BSV

    Bharath, how are you?
    I've the following sugestions to your questions:
    1) There are two options. a) Use overwrite option to Entity members and create and specific input schedule to each entity member, or b) create an member acess profile for each entity member to associate them with material
    2) In this case, the best pratice is use member access profile.
    Hope it helps you,
    Joã

  • How to Restrict Expand for Input Schedule

    Dear Experts,
    In Input Schedule, I am writing Formulas for some cells.
    When I am trying to do u201CExpand Allu201D my formulas are not remaining in the cells.
    Can any body suggest solution.
    Can we restrict Expand for Input Schedule?
    Please help,

    Hi,
       Sorry, I didn't understood well your request and I give you wrong information.
    GetOnlyRange is used you only wants only function to behave in read-only mode. All cells defined in this range will only retrieve values from the DB but no entered value will be sent.
    If you want to keep your formula for some cells, you have to exclude those from the expansion range.
    This means in your RowKeyRange section to define something like
    =EVRNG(E14:E16,E18:E38, ...), not a continue range.
    Hoe this cen help you,
    Mihaela

  • BPC 7.5 NW: Inserting an excel formula the data col. in an EVDRE input sch.

    Hello,
    I am trying to design an input schedule for uploading trial balances from SAP. In one sheet, I have an extract of a trial balance from SAP. In another sheet, I have an EVDRE report which has an expansion in rows based upon the entities selected (so that the entities selected for data upload could match the entities in the trial balance. It is flexible for different users/regions).
    The problem is that I would like to use a VLOOKUP or SUMIF formula to populate the data column in the EVDRE report (pull the data from the trial balance sheet). But as soon as the data is submitted, the formula will disappear and I will just have data.
    Does anybody have any ideas as how this could be avoided.
    Many thanks.

    1. Login into BPC for Admin
    2. Once logged into your Appset , open the Dimension library
    3. Process each dimension by selecting the "Process members from membersheet" and by unchecking the "Take system offline" option
    4. Process all the dimensions one by one not together.
    5. Once processing the dimensions is done then open the Applications and Modify each Application by adding or changing the Application Description.
    6. Once done modifying Applications then logout of the BPC Admin and BPC Excel.
    7. Login back again into BPC for Excel by going through the connection wizard.
    Ideally this should solve your problem and If all the dimensions are processed successfully then logoff and login to see if you stilll see the EVDRE error.
    Hope this helps.
    Regards,
    Sanjeev

  • How to Create an Input Schedule Comparison with Data Using EVDRE

    Hello,
    I try implement the scenario described in "How to Create an Input Schedule Comparison with Data Using EVDRE".
    Once I am using the "Insert Function" from the panel and selecting the EVTIM function Excel crashes (see page 8 How to paper).
    Systems:
    BPC 7.0 NW SP02
    Office 2007
    BPCADminClient and BPCOfficeClient up to date
    Have anyone a solution?
    Thanks
    Oktay

    Hi Oktay -
    This function works in my BPC70NW SP02 system. Your issue might be that you are trying to access a TIME member that does not exist. Please make sure the offset value is a valid dimension member.
    I can confirm that EVTIM does allow the offset for base members (such as 2009.MAY) as well as parent nodes (such as 2009.Q1 or 2008.TOTAL)... BUT...the offset result of the EVTIM function needs to be a valid dimension member!
    Regards,
    Sheldon

  • How to get the refreshed data from Input schedule while using evsnd

    Hi Experts,
                     I am using EvSnd function for sending the data from a Input schedule.
    Acc                Value                                            
    xx----
        xy------        10
        xz-------       20
    these above cell value 10,20 are getting sent by evsnd function which is written in different cell.
    Now after successfully sending, how I can see these are also getting refreshed, like in Evdre
    Acc                Value                                            
    xx----
            30
        xy------        10
        xz-------       20
    Thanks
    Anupam

    Thanks my friend.
    But the point is I need to show the updated data for all the cells (for xx, xy,xz). The point is if I use the evsnd then after the data has been sent, those two cells xy & xz will be blank once again. And so if the user will not be able to check what the data they have sent for these member from that sheet.
                  They have to get a report which will show the figures.
    And we can't even use the evgts in the xy/xz cell as the formula is going to be erased as soon as the user enter the data in that.
    so how we can do the sheet similar to evdre ip schedule..where after every data send the cell range shows latest data.

  • Drop Down list in BPC Input Schedule

    Hi all,
    In an input schedule I need to have some values "controlled", and allow to give a value only among a list of specific values. So I came up on the idea to builld it using cell "validation" feature of native Excel, just like I have been able to find in [this thread|Re: Regarding the Function.......] (by the way, great the hint about using name's ranges for being able to define the list in a different sheet than where it is being used).
    So, I need to achieve one more thing. Let's say that the values I must include in the list are not numerical values, but alphanumerical, so I must combine in the schedule the alphanumerical value with the numerical value it represents. I have played around with excel and BPC formulas for quite a while already but cannot get it to work. Anybody has implented it?
    Regards,
    Rafael
    PS: I get to define the drop down list of values in a cell and get it to write the corresponding numerical value in another cell referenced by a EvSND, but this only works in one direction (the cell does not get updated when I change the current view for example).

    Hi Rafael,
    I've done something similar.
    In one cell I've put a drop down list, using Excel's data validation. The members in the list are human-readable text values, so the user can select one of these descriptive values.
    In a second cell, these text values are transcoded into numeric values, thanks to function VLOOLUP. This cell is in the data range of an EvDRE expansion area, so when the user saves data the numeric value gets written to the back-end.
    In a 3rd cell I fetch the numeric value currently saved on the server, via an EvGET.
    In a 4th cell, I transcode that value into the corresponding text value, using another VLOOKUP function.
    Finally, I've used function AFTER_REFRESH to read the content of the 4th cell, and set the value of the drop-down cell to that value. The VBA instruction to do the latter thing is something similar to:
    ActiveCell.FormulaR1C1 = <the value of the 4th cell>
    This way, the drop-down entry selected by default after refreshing data is the value currently stored on the server.
    However I still miss something. I've set the Excel validation only in the 1st cell of the 1st row, and I want that the EvDRE expansion copies the validation to all other cells in all rows resulting from expansion. But this does not happen! Validation is not copied during expasion.
    How's that? Everything else is copied--values, formats, formulas. Why validation is not copied?
    * UPDATE
    I've solved this issue. The solution is described here:
    http://scn.sap.com/thread/3209213
    Rafael Moreno wrote:
    Hi Ethan,
    yes, you are right, with VLOOKUP you get the information I want, but only in ONE direction. By "one direction" I mean that I can get in the cell with the VLOOKUP the text I want by reading a (numerical) value from a different referenced cell. But I would also need to be able of changing value in that same cell (by picking up one of those text values from a drop down list) and having the corresponding numerical value written on the referenced cell. Can you see the difference?
    In few words, I would need a cell to read and write a value (just as the raw EvSND allows), but converting the numerical value into its corresponding text value.
    Regards,
    Rafael
    Message was edited by: Davide Cavallari

  • Displaying hierarchy in input schedule

    Hi,
    I have a customer dimension with  hierarchy. i want to display the customer dimension in hierarchial fashion by using customer hierarchy in input schedule. i have gone throught the below thread
    Create Hierarchy in REport which expalins to use  REPT function REPT(" ",EVPRO(,$C47,"HLEVEL"))&EVDES($C47). when i'm expanding schedule after updating the description column(keeping customer dimension in row in evdre report) with the above said formula results are not displaying in tree like fashion. i have maintain hierarchy in customer dimension under  ParentH1 property.
    system doesn't generate HLEVEL property as expalined in the thread.
    Thanks
    UDAY

    Hi Uday,
    System does generate the HLEVEL property. You can confirm this by going into the SQL tables in the server. Open the table dim<dimension>. This table will have the HLEVEL column. This is a system generated property. If you have hierarchy in the member sheet, then you will have the HLEVEL property as well.
    Just to check, place the below formula in one of the cells
    =EVPRO(<appname>,<memberID>,"HLEVEL")
    The above formula should display you some number indicating the level of the member in the hierarchy. If it is working fine, then you can refer to my reply in the below post
    Create Hierarchy in REport
    This will definitely work.

  • How can BPC display the property in report input schedule

    When create a property, if the InApp is check, we can use the property in the MDX Query, however what is the best way to display the property in report and input schedule?
    Although we can use the EvPRO function, but according the definition of EvPRO
    "The EvPRO (Property value) function returns the value of a specified property for a specified member."
    for example =EVPRO("Finance","Sales","Currency") will returns USD, if the currency value for the member Sales is U.S. dollars., if I have a property group for account dimension, how could I display the value of group for all the account number?

    Hi
    you just use EVPRO like you mentioned:
    =EVPRO(Finance,$D20,group)
    In the cell $D20 your account number is displayed. You copy this function down for each account.
    -> just create an input schedule or report from a template, open the configuration panel. There you see this principle used for property High Level, Calc, ...
    D
    this method is perfect but you need to add the formula each time.
    I would prefer to use the formula using the after or before range in expansion options of evdre which would make it dynamic and you need not copy paste the formula to derive the property each time.
    Cheers
    Thanks and Regards
    Harish B K

  • How to build dynamic input schedule from version

    Hi experts,
    I want to create an input schedule based on my category selection which will allow users to enter data to budget part but changing the actual part is prohibited.
    For example I have category member which is 2010-09-1. This means I am working on 2010 Budget which has 9 periods of actual and 3 periods of forecast and 2011 Budget. In my input schedule I would have 24 months from 01.2010 to 12.2011 and I will copy actual to budget for the first 9 months but I do not want users to change first 9 months actual data from input schedule.
    What solution can you propose for this in BPC NW ?
    Regards,
    ergin

    Hi Ergin,
    From the description you have provided, I guess you will have the TIME dimension in the Column. The CATEGORY would be set to 2010-09-1, lets suppose. In this case, the first 9 columns should be locked for any changes. For this, you need to use the Data Validation technique, which is native to Excel.
    select an empty cell, lets say D1. in this cell, you should fetch the value "2010-09" from the version "2010-09-1". If the version is changed to "2010-10-1", the cell D1 will be automatically updated and will show "2010-10". In the column, in the row just above the Time dimension, write a formula to fetch the year and monthnum property of the Time member. Lets say, the time dimension members are displayed in the cells E4 to AB4 (24 columns for 24 months). In the cell E2, you can write the formula, =EVPRO("application name",E$4,"YEAR")&"-"&EVPRO("application Name",E$4,"MonthNum"). This will return 2010-01 in the cell E2 for the member 2010.JAN. Similarly, for 2010.FEB, the cell should display "2010-02". We will keep the formula in E2 only. After the expansion, the formula also will be expanded for the other cells.
    Select the first data cell of the EVDRE report. Open Data Validation. In the Settings Tab, in the Formula field, write =D1>E$2. Then go to the error alert tab and choose the style as stop and give some title and message. This would typically mean that if value of D1 (in this case 2010-09) is not greater than E2 (in this case 2010-01), then the error message will be displayed, when we try to enter values in these cells. And it will not allow to enter any value.
    Once the EVDRE is expanded, this data validation will be copied into all the other data cells. So, in this way, the enter input schedule can be kept dynamic.
    Hope this helps.

  • SAP BPC NW-  input schedule refresh issue

    Hi,
    I have created a input schedule which is working fine on my machine in dev and production and same is working fine in dev on my client machine but it is not working in the production system.
    I checked the input schedule in Production and found that EDVRE is not ok on my client machine but same template shows no error on my machine.
    Please suggest if i am missing someting.
    Regards,
    Sanjeev Kumar

    Hi Sanjeev,
    Without looking, it will be very difficult to tell the reason.
    When you are saying that the EVDRE is not OK, then check in the first cell, where EVDRE formula is written. You need to trace it down. It will be difficult for us to say. However, I have a feeling that there must be some problem in the key ranges only. Check the formulas as well.
    Hope this helps.

  • How to reduce the size of Input Schedule (Excel Template)

    Hi,
    I am preparing Static Input Schedule (Due to complexity, I am unable to use EvDRE). Due to many EvSND's and Formulas used in the template, the file size is almost more than 10 MB.
    So it takes a lot of time while opening the template. So is there any way to reduce the size of the excel file (Input Schedule template).

    Here are some suggestions on ways to reduce the size of your static input template, which sounds to be rather large.  Please note that these suggestions are not in any order with regards to being the most effective in reducing the template, but overall should help in reducing the size.
    -  Make the EvSNDS as dynamic as possible.  Even though it is a static template, try not to use an EvSND formula which contains a reference to each dimension you are loading to.  I'm not sure how many dimensions you have in you application, but if you are referencing 12 dimensions in each EvSND, and you have thousands of EvSNDS, that takes alot of size.  So, if you are doing this, see if there is any commonality with any dimension with the input schedule and hardcode that dimension's member in the control panel.  For example, if all the evsnds are going to the same Category (i.e. BUDGET), you do not need to reference the cell with memberid BUDGET in each evsnd cell, but instead be sure it is set in the Control Panel of the Template correctly.
    - Only have base level members in the input template.  Many input templates are built so that after the data is sent, the summary level (or parent level members), are retrieved in the template so users can see summarized results after a send.  If possible, build the report with base level members only, and build a report to view summarized report.
    - Keep the number of Woksheets in the template to a minimum.
    - Make the layout of the report as simple as possible.  Try to keep the Conditional Formatting to a minimum.
    - With regards to the formulas in the template which you mention, I'm not sure if you are referring to Excel calculation formulas, or something else, however you do want to keep the use of formulas to a minimum.
    I hope this information helps.

  • BPC for Excel Input Schedules

    Hi
    With Input Schedules in BPC for Excel, is there an easy way to see which cells get uploaded ?, for example, if I open a report written by another person, how can I easily see which cells get upload when MNU_ESUBMIT_REFRESH runs ?.
    Thanks in advance for your help.
    Kind Regards
    Gavin

    HI,
       There is no specific way (something like a menu command). You can define a specific colors or format for the cells(or some formulas which change the format of the cell), but this is related to the input schedule design.
    Best regards,
    Mihaela

Maybe you are looking for

  • Routing back to Direct Access Clients - is this possible?

    Hi, We have been using direct access for the past few months successfully, however the one problem we are still having is we can't use programs that require a route back to the Direct Access client (such as managing a Hyper-V machine on the local lan

  • Firefox is disabling all plugins (including flash) by default and will not let me enable them

    I am using Firefox 23 (updated) and the latest flash plugin from Adobe's website. I am trying to access any pages with flash on them, and it says the flash plugin is disabled. When I pull up the plugins page, it says all of my plugins are disabled. I

  • Computer says disk is almost full, but I have 14 GB free

    iBook G4 1.33 OS 10.5.8 1.5 GB of ram 40 gig hard drive I  get a message that says that the disk is almost full.  In disk utility, it states that 36 out of 37 gb of hard drive space has been used.  However when I open the finder window after clicking

  • What version of Photoshop to use?

    Hello, I "used to be" a professional photographer but am now retired.  I would like to get into using Photoshop but don't know what version to use.  Can someone help?  I have an HP w/AMD Athlon II X4 640 Processor w/6GB RAM and all the bells & whistl

  • FRM-41016:  I do not understand??

    I trying to set an item so it does not display using the following code Set_Item_Property('LIST_PROGRAM',VISIBLE,PROPERTY_FALSE); The problem is that i get the following error FRM-41016 Cannot set DISPLAYED attribute of the current item SEARCH_BLK.LI