Event linkage in Transaction SWETYPV

Hi Guys,
I had created a function module and Iam passing the Object Key for PO in the Importing parameters. When i tried to link the Create event of the Object type BUS2012 to my FM. Iam getting an error <b>Receiver FM Z_PO_Acceptance: Parameter SENDER not available</b>.
Can anyone let me know the configuration and the parameters i need to assign to make this work. Do i need to configure any other steps before coming to SWETYPV.
Thanks,
KC
Message was edited by:
        kittu chowdary

Rob,
Even thought i had declared the Interface with the Importing Parameter.Iam getting the following error :
Parameter SENDER not available
Message no. WA683
Diagnosis
A parameter was expected for the specified function module, which does not exist in the interface.
System Response
The action was aborted.
Procedure
Check the function module's interface.
I would like to know whether there is anymore config which we need to do before coming to SWETYPV.Since iam new to workflow i dont know the config steps in this.
Thanks,
KC

Similar Messages

  • Event Linkage for custom Workflow and Custom BO

    Hi Friends,
    I have created one Custom Module Pool, Business Object and Workflow Definition. In Business Object I have created one Business Event and the event is triggered from Custom Module Pool using function module SWE_EVENT_CREATE. I have created event linkage in transaction SWETYPV and receiver type given Workflow Template No: (WS*) and receiver function Module SWW_WI_CREATE_VIA_EVENT_IBF and checked Event Linkage Active checkbox. Finally I have activated the Triggering Event in the Workflow basic data section. But the Workflow is not getting triggered. Can anyone of you give me a solution for this or tell whether i missed any of the setting for the workflow?
    Regards
    Sujith

    Hi Sujith,
    Did you include a commit work statement after the call to SWE_EVENT_CREATE?
    Regards
    Gareth

  • Event Linkage Getting Disabled In PO release Workflows : Plz help

    hi all
    i am working on PO Release Workflow
    my problem is when I create PO and save it , the event  linkage in SWETYPV gets disabled
    plz help me its urgent.
    regards
    ravish

    Hi
    If you have an error in the event linkage (could be a binding error, or an error in your business object), the event linkage will deactivated (the standard customizing).
    You can change this behavior through transaction SWE2 -> double click on your event linkage -> change the "Behavior Upon Error Feedback". (I think you can change this globally but I'm not quite sure where)
    In my book best practice here will be;
    1. Use the event queue
    2. Set the "Behavior Upon Error Feedback" flag to something like "Keep linkage but flag as having an error" - I'm not on the system so I'm not quite sure what it's called
    By doing this you make sure that you will collect your event in the event queue, in case of an error.
    or
    In the detail screen of SWETYPV there's an option called Bahaviour upon error in receiver, if you change this to option 3 then the linkage won't be disabled in cases of errors.
    Sometimes you want the event linkage to be disabled in cases of errors, espescially when the only reason that an error can occur is a very serious one.

  • Event Linkage to Workflow

    Hi,
    I need to enable the Standard WF 1000105 PdvAppraisal for the Appraisal Approval/Rejection by Appraisee.
    I enabled the Event linkage in the Trnx: SWETYPV.
    Unlike the other WFs, this WF has the binding with the triggering Event deactivated.
    I activated the binding, saved the WF. But after some time..approx 15 min, I check the binding linkage in other session and see it deactivated. The Linkage dint get saved actually. I am not sure of what might be the reason.
    Please suggest.
    Thanks,
    Suryakiran D.
    Thanks,
    Suryakiran D.

    Suryakiran,
    I assume that this workflow runs every 15 minutes or is activated after the period and an error occurs during runtime.
    One possible cause might be that something in your workflow or even the standard SAP WF went wrong. I've watched this behaviour, too when coding some own workflows before.
    This means that the workflow system will deactivate any faulty workflow in case sthg. went wrong.
    Perhaps you can check using transaction SM58 for any RFC errors or look into ST22 for short dumps.
    Of course you could also debug ot test methods using transaction SWUD. Transaction SWU0 allows you to test event linkage.
    HTH,
    Michael

  • Workflow for PO-Event Linkage get unchecked after making Purchase Order

    Hi,
    I have a client reqiirement for setting Workflow for Purchase Order.
    I have done all the settings for PO Workflow. I am getting the mail for the first time but from the second PO onwards I am not getting the mail.
    When I checked the settings, the Event linkage in SWETYPV gets unchecked for BUS2012 Object Type automatically after making the first PO.
    Again when I activate that, I am able to get mail for the first PO only. From the second onwards, no mail is triggered.
    Could anyone suggest?
    Thanks,
    S.Raghavan
    Hi,
    I now have changed the "Behavior Upon Error Feedback" to "Mark Linkage as having Errors" in SWETYPV
    After this change if I make a PO, the link doesn't get break but "Receiver Status" shows "Errors".
    I could also see the overview of errors in Transaction code  SWEQADM. It shows 3event with Errors and 1 linkage with errors.
    I do not know in which event error is there and in which linkage error is there?
    Can anyone help to see the events and linkage where error persists?
    Edited by: S.Raghavan on Aug 30, 2011 6:22 PM
    Hi all,
    Any suggestion for the issue posted?

    In SWDD select WS 20000075 in the first task assign agents(users, ie create u r own users),
    without user IDs(as u r step 2).if u design "organization plan" then userID's r assigned (like manager,supervisor, clerk etc.,)
    try it

  • Event-Linkage process programming

    HI,
    Can any one  expain in detail on "Event-Linkage process programming"?
    Is there any  URLs related to this topic ?
    Thanks
    sankar
    Edited by: sankar Mullagura on Feb 10, 2009 4:43 PM

    Please ask the admin to define the sap library (SR13 transaction), or if it's already done, link it to your user profile (menu help, settings, application help, iwbhelp). If you don't understand how to do it, look at forum.
    Otherwise, this is the url to SWETYPV in sap library on the web : http://help.sap.com/saphelp_nw2004s/helpdata/EN/c5/e4afe6453d11d189430000e829fbbd/frameset.htm

  • Reason and details for Deactivation of Event linkage in Production

    Hi Friends,
    Recently I have come across Event deactivation For AP invoice, Vendor Creation and Customer Creation workflows in Production, I have checked further and found that those are set as deactivate event linkage as default system behavior.
    So that mean when ever an error will occur while event triggering then linkage will be disabled by the system.
    Correct me if I am wrong.
    So friends, my big doubt her is that What all are can be the reasons for that system error?
    *And How I can get details for those errors? *
    Regards
    Dev

    Hi,
    While defining the Event linkage in SWETYPV ->
    When ever u click on Business object it will open one new window ->
    In that window -> There are four options to define in the field
    Behaviour upon Error Feedback -> system defaults
                                                      Deactivation of linkage
                                                      Mark linkage as having errors
                                                      Do not change linkage
    if the linkage is not activated as per the syatem defaults ( when ever error occurs)
    You need to specify the type as -> Do not change linkage
    Please check the four options once u will come to know the difference.
    And also please check the following link
    [http://mailman.mit.edu/pipermail/sap-wug/2004-October/014617.html]
    Edited by: vijayareddy on Jun 1, 2009 11:56 AM

  • How to Debug During Event Linkage( Reciever Function Module )

    Hi all,
           If anybody knows how to debug a reciever function module in event linkage method then please respond.The scenario is that whenever service order is changed the change event will fire the custom business object which has a supertype BUS2088.

    Hi Nishanth,
    You can debug event linkage using the transaction SWUE.
    Here you can raise an event and specify an object key (using an already created service order). 
    Just flag the trigger receiver FM synchr. checkbox and your break point will be hit.
    Hope that helps.
    Cheers,
    Brad

  • In HCM form & process Workflow event linkage changed to inactive status.

    Hi,
    In HCM  form & process event linkage is activated in HRASR_DT and workflow object .
    Now once we complete the process from EP portal ,reference number is generated and enteries are created in  table T5ASRPROCESSES .
    In SWEL,event is triggered and linked with the same workflow.
    Now the problem is,thesre is no workitem in SWIA with this workflow numbmer and the event linkage also changed to inactive status ( both in proces and  workflow )after we complete the process from EP.
    Thanks
    Manoj

    Hi
       When you are delaing workflows with HCM Process and form the behaviour is slightly different from the normal.. In order to check why the event linkage is inactive the possibilities are
    1. Either there are some chnages done in the workflow  and it is not activated from the transaction HRASR_DT.
    2. The other possibility is that you might have directly actovated the workflow from SWDD transaction and if you have done in this way then it is a wrong way of generating and activating the workflow
    Follow the below steps to find the error
    1. Execute HRASR_DT txn and try to activate the workflow from here. If you try to activate the workflow from this transaction the check function module which is linked to the workflow will be knowing that for which specific process which workflow has to be triggered..
    so in HCM process and forms frame workf it is always suggestable that try to create the workflow from HRASR_DT transaction using forward navigation and activate the respective event linkages.
    The other point you need to check is make sure that all the respective program exit classesare included in the basic data of the workflow other wise even if you miss the program exit classes in the basic data the workflow will not be able to start its process/execution.
    Regards
    Pavan

  • IDOC event linkage deactivated automatically

    HI All,
    We are facing an issue in Production. IDOC event linkage deactivated automatically when we execute one custom transaction.
    Below is the log from Workflow trace SWEL transaction.
    IDOC     PROCESSSTATEREACHED     10.11.2010     09:25:43     TS30200090     @5C\QFeedback after error@     SWW_WI_CREATE_VIA_EVENT
    IDOC     PROCESSSTATEREACHED     10.11.2010     09:25:46     TS30200090     @5C@     Deactivated
    Could you please let me know what is the actual issue.
    Edited by: Phanindra Annaparthi on Nov 10, 2010 8:10 AM
    Edited by: Phanindra Annaparthi on Nov 10, 2010 8:12 AM

    Hello,
    Check the event log (SWEL) for the actual error. Could be a missing mandatory parameter.
    regards
    Rick Bakker
    hanabi technology

  • How to ensure the event linkage of the Workflow active/enabled?

    Dear Experts,
    Iam new to the Workflow. We have one Workflow event linkage not activated/Enabled in the production system eventhough it was active in DEV as well as QA. We have transported the Customising request to enable event linkage in Production.
    my question is why the event linkage is deactivated/disabled in Production?
    is there any way to ensure that it (event linkage) will not be disable in production system? (please answer to this)
    Please suggest .
    Warm Regards,
    Murthy.

    Hi
    When there is an error in event, then linkage often gets broekn. In SWE2 or SWETYPV settings, Behaviour error upon feedback make it as do not change linkage.
    This will sure that when there is an error, only that workflow will be in error mode and event linkage is not broken.
    Regards
    Sachin

  • SCDO to Event linkage

    Hello All,
    I am trying to create linkage between SCDO object to a BO event.
    In tcode SWEC, i have entered SCDO object , BO object type,   event. (Here events, i am not getting the names of events in F4, for my BO object type )
    After this when the table is changed still the event is not triggred.
    Any suggestions please??
    Thank you.
    Best Regards
    Amarender Reddy B
    Moderator message:  please have a look in the Workflow forums.
    Edited by: Thomas Zloch on Dec 2, 2010 1:02 PM

    Suryakiran,
    I assume that this workflow runs every 15 minutes or is activated after the period and an error occurs during runtime.
    One possible cause might be that something in your workflow or even the standard SAP WF went wrong. I've watched this behaviour, too when coding some own workflows before.
    This means that the workflow system will deactivate any faulty workflow in case sthg. went wrong.
    Perhaps you can check using transaction SM58 for any RFC errors or look into ST22 for short dumps.
    Of course you could also debug ot test methods using transaction SWUD. Transaction SWU0 allows you to test event linkage.
    HTH,
    Michael

  • Tcode to check the event linkage for a terminating event

    Hi ,
    Can some one plzz let me know the transaction code for checking the event linkage for a terminating event
    Thanks
    Sheetal

    And yes the FM RH_GET_TASKS_OF_EVENT gives you the list of tasks for a given BO-terminating event combination. Pass the parameters for this FM as folllows,
    CLSTYP = 'BO'
    CLSNAM = '<BO name>'
    EVENT = '<terminating event name>'
    GET_START_EVENTS = ' '
    GET_TERM_EVENTS = 'X'
    you will get the task list in the table TASKS_OF_EVENTS.
    Thanks,
    Prasath N

  • SWEQADM - Events linkage become disactivated

    Friends,
    We had a problem, some WF's event likage got desactivated, and I saw it by SWEQADM, and on 'Overview' tab, on 'Content of event queue' was showing N events with error.
    What could happen with the event linkages so all the WF's got stopped, and I had to redeliver all of them.
    1)important information about that:
    -Event queue background job is not acticated;
    -Event queue switched off;
    2)on 'Linkage with errors', Before I redeliver the events, I've clicked on 'status of linkage' button, and it got green. But it can't become red again. is that ok ?
    Thanks.

    Hi
    If you have an error in the event linkage (could be a binding error, or an error in your business object), the event linkage will deactivated (the standard customizing).
    You can change this behavior through transaction SWE2 -> double click on your event linkage -> change the "Behavior Upon Error Feedback". (I think you can change this globally but I'm not quite sure where)
    In my book best practice here will be;
    1. Use the event queue
    2. Set the "Behavior Upon Error Feedback" flag to something like "Keep linkage but flag as having an error" - I'm not on the system so I'm not quite sure what it's called
    By doing this you make sure that you will collect your event in the event queue, in case of an error.
    Regards
    Morten Nielsen

  • How to find out the list of workflows with active event linkage?

    Hi All,
    I want to find out the list of workflows whoe event linkage is activated in the system.
    Through SWU0, we can get a list of workflows attached to a particular event of a business object.
    Thanks,
    Sivagami

    Hi,
    Thanx for ur reply..
    I got the list from the table...
    thanks,
    sivagami

Maybe you are looking for

  • Oracle 10g RAC on Windows

    Installed Oracle 10g RAC on Windows... Everything was working fine, now when I install CRS it completed at 100% and then in the configuration it gives error INFO: exitonly tools to be excuted passed: 0 INFO: Starting to execute configuration assistan

  • FCE:  I'm missing DV convertor option from Easy Setup

    I've had to reinstall FCE on a couple of machines. After the install, under the easy set up, I no longer have the DV convertor option. Did I do something wrong in the set up? How do I find these options?

  • Oracle lsnrctl stops and hangs

    Hi , I installed Oracle 11g in OEL Linux . OEL Linux is inside Oracle VM . I installed in another machine (OEL Linux inside Oracle VM) . In the other machine installed Weblogic 10.3.2 , SOA Suite and RCU . I've noticed connection problems and hangs s

  • ANT Failing

    I am tryig to deploy of one of the tutorilas through ant scipt and its failing? Any Idea Why it is failing? orabpel@nyfinapp01t:/ebsbpel/orabpel/product/10.1.3.1/bpel/samples/tutorials/101.HelloWorld $ ant Buildfile: build.xml Trying to override old

  • What is that grey/black lozenge shaped thing?

    I was just looking at the new iPod touch and there's this grey/black lozenge shaped thing on the back. What is it, the wifi antenna or something?