Excess material issue against RSQ

Hi Gurus,
We are using repetitive manufacturing in our organization (Automotive Industry), the material staging is done based on the plan order with pull list as per the BOM, but in case excess components are required how can we stage this excess material?
Scenario-In BOM we are having steel washers as 4units (staged against pull list printout) and during operation 2 units got scrapped, how can we stage this additional requirements of 2units at production supply area?Against which document this additional requirement can be staged in REM?
Regards
cs

Hi Antony,
Thanks for your reply..
Yes I agree it can be done with component scrap during MFBF transaction,requirement here is the printout of required excess material issue,against which the store guy will stage the material.
The store department want to record against which plan order this excess material has been issued.
Please advice.
Regards
cs

Similar Messages

  • Excess goods issue against Production order

    HI PP Gurus,
    My requirement is to block excess goods issue of raw material against a production order.
    Ex. Production order qty = 10 , For producing 10 Finish goods i require 10 raw material. When i do confirmation via CO11N  the system automatically shows GR & GI Values in Goods Movement tab. there i change GI value of RM from 10 to 20 the system takes the value and does the GR & GI.
    My requirement is that the system should not do GR & GI if the GI value is more than that is calculated at the time of creation of Prod. Order.
    Thanks in Advance,
    Deven

    Hi,
    Rstriction of excess goods issue against production order is not possible in standard setting.
    For achiving this you have to go for User exit.
    The logic should be
    In MIGO check mvt. type 261
    Pass the order through table RESB and select all the components with quantity.
    Capture the header material of order and use this as input along with the order creation date, plant and BOM application to explode function module CS_BOM_EXPLOSION.
    THis will give you the BOM components which were valid at the time of order creation.
    Now compare these BOM components with the components from RESB with quantity.
    Here conditions will come in picture
    If quantity is exactly matching then GI will be possible
    or if you want to keep tolerance limit say for 10% then accordingly you can map the condition.
    Regards
    Amit Parkhi

  • Report for Material Issued against Service Orders But not Billed.

    Hi Experts,
    For CRM Service Orders Based on the Reservation number generated in CRM we will make the Goods issue document in ECC.
    My Question In CRM Do we have any standard report to see Material issued against CRM Service orders but not billed. i.e. Work in progress.
    Thanks in Advance,
    Abhinesh

    Hi Vivek,
    What I wanted to say that you won't get information from VAV about billing since as far as I know it doesn't contain any relevant table.
    You should try create a query using LIKP-LIPS-(joint type: left outer)-VBRK. This will connect deliveries to billing document, you can also get SO number. Please try this.
    (Sorrowully I don't know which logical database would be good for you)
    BR
    Csaba

  • PO number and material issued against this PO for subcontracting

    How to know the link in between the PO number and material issued against this PO for subcontracting.
    I have checked that PO history is not getting updated.
    Thanks,

    Hi,
    We have 2 different scenarios where you can post a goods issue to Subcontract Venodrs.
    Scenarios 1: You can post the goods issue against a subcontrac vendor with out referencing the Subcon PO from ME2O, at this stage we will be knowing what is the stock at subcontract vendor but we will not be knowing the issues against which and how much Quantities are posted.
    So when we are post goods receipt, then we will come to know the consuption quantities.
    Scenario: 2, If we use the delivery concept then we can track the goods issues against the subcon POs.
    If you really keen to track the material issued to Subcon vendor against a PO so better use with delivery.
    Thansk,
    Satya.

  • How to stop excess goods issue against production order from MB1A

    Hi Gurus,
    In our organization goods issue against production order is done by using MB1A T.Code manually.Due to this reason sometimes excess quantity of RM issue against production order.Now I want to stop the excess goods issue against production order by using MB1A but I want to mainatain a certain tolerence.
    Please advice what to do?
    Regards
    Nirmal

    Hi ,
    Use user exit MBCF0002
    This is called when u do goods movement for production order.
    Regards,
    Vishal

  • Material issue against PR

    hello friends.
    i have a small querry.
    i have stock of raw material in storage location.
    my scenario is make to order.
    i have generated a sales order and then i have done planning of the final material.
    as the planning process is carried out hence all materials from top to bottom are planned.
    but as there is already raw material in stock, the pr that is generated should issue raw material from the stock.
    i do not want to purchase raw materail.
    is it possible to issue stock material against PR.
    thanks for the help .
    warm regards.

    Hi,
    Material cant be issued against PR. You can issue material against reservation and close the PR. It seems you are not using MRP.
    Regards

  • Scrap of material in subcontract and Excess material issue

    Hi,
             I want to know is there any setting such that ,  for mfg. a finish good material,  some qty. of raw material is scrap   the qty which is scrap i have add as negative qty in BOM  and  but after making the GR for Finish material , all positive qty. are consume by deduction of qty which i have mention as negative but scrap is not done automatically,  i am doing scrap sepearetely  so it is possible  whenevr i make the GR for finish good material then ,  the material for which i have maiatain as negative should get automatically scrap,  as the raw maetria are consum using 543 materials,
    second thing  the negative  qty of material i have mention in BOM of finish good  but insted of maiatining -ve qty in BOM  is it possible   to add the excess qty in PO  as -Ve qty  because  when we select the finish  material in Subcontract PO  all BOM components appear in PO   but there there is no option to add some addition material in PO.
      can we make the above settings
      regards,
        zafar

    Hi,
      Thanks for your reply.
      Just want to know one more think, as in subcontract  we are issue the material as per BOm,  as suppose, total qty of one raw material required is 4500,  which is to be consume for making the finish good but due to std. packing of raw material i want to issue the qty 5000,  but while making the GR  only 4500 should be consume and the reamining 500  should be shown as in vendor stock  after getting material back  we will take that as 542 movement.
      regards,
        zafar

  • Excess material issue for subcontract should not be add in GR

    Hi,
      I have one problem,   we have one Finish materia   X   for making one    X we use three raw material  A,,B & C to make one X 1 qty of each A,B,C required  so while we make the GR for one X  we issue One A and B  but as C is having std. packing of 5  so we want to issue the 5 qty of C to vendor,  now    when we make the GR   for X  with MB01,  first we ahve to give the Qty. of X material  so we ahve given  1  as the PO is for 1 qty  X , then we ahve to give the qty. of raw materials for A,B,C   here sytem first automatically taking qty. 1 for A  one for B  and 5 for C  but we want that as only one C is required to make one X  so sytem should take only one C qty  and remaining 4 qty. of C should be with vendor  stock  that we wil adjusct in next PO for X materail  and challna should be close properly,
        How we can handle this.
      regards,
        zafar

    Hi,
            I want to transfer the material with ref. to purchase order only, so that all the material which are present in that PO should automatically conme in the MB1B for transfer of material,
            Is there any other way such that while making GR the qty. will come as per BOM only for consumptio.
      regards,
       zafar

  • Material Issue against multiple reservation in one step

    Hello everybody,
    I want to issue materials against multiple reservation (originating from Service order or PM order) in one step because the number of reservations is quite large (say thousands of reservation in a day). If i go one by one through MB1A it will take a lots of time. Please suggest some solution for the same.
    Regards
    Amit Gupta

    Hi,
    You could write a program (new dialog transaction), in which you can select the reservations for which you want to issue, show the summarized list of materials and quantities to be issued, then you decide which materials you actually want to process, and then call BAPI_GOODSMVT_CREATE to post the individual reservations in the background.
    This is just a general idea, but you can use it to develop the real thing, which will probably turn out to be quite more complex.
    Regards,
    Mario

  • Alternate material issue against production order if stock is zero

    Hi,
      I have one requirement  we have 3 material codes
    X, Y and Z.  Material X is present in the Bom of ABC  material Y and Z are not in any BOM  but both those codes are use for procurement of material and can be use insted of X  but due to some requirement as material of different make  we dont want to combine the stock of all.
         Now as per BOM when material for ABC is issue as per BOM  the 'X'  will get issue   but in case  the X stock is zero  system should check stock of Y   and if it is avalibale  then it should issue from Y  insted of X and if Y stock is zero  system should check for Z  if stock is there system should issue from Z.
    can this map in system.
    regards,
    zafar

    Hi,
    While maintaining BOM for FG, maintain all materials X, Y & Z with same qty.
    For material line items Y & Z, maintain "AltItemGroup" at Item Detail level.
    Here enter any key for e.g. "AL" and Press enter then it will ask for following;
    Priority
    Strategy - (1 - Manual maintenance/by usage probability OR 2 - 100% check)
    Usage prob.
    After maintaining all these just check the effect in transaction production order, reservation, confirmation.

  • Material Issue to Shopfloor

    Hi Expert,
    The scenario is, in the begining of the month production personnel takes the material from central store to shopfloor storage location & consume in different different process orders. If required he repeat the same activity during the month.
    To get the material from the central store, production guys provide them a reservation slip. Which movement type should be use at the time of creation of reservation? should we use movt type 201 or 311? what is the complete process flow for creating reservation to consumption?
    In my case Exicse register will update through Movt type 261.
    Thanx in advance....
    Regards,
    neha

    Hi experts,I have one clarification, recently SAP implemented in my company.
    I have raise the process order in COR1 – consumption based bill of material qty automatically assign in if backflushing is active in mvnt.type : 261. So
    1.what is the way of material issue against the process order to store person?
    2.If it damaged ( scrap )for any packing material during process what is the way of return the items? 
    3.If I need excess packing material in the same process order what is the way followed for production and store person?

  • ABC Analysis of Planned Consumption(Issue against Reservation).

    Hi Experts,
    Is there any standard report is available for ABC Analysis of Planned Consumption(material issued against Reservation)?
    thx in advance...

    Hi,
    I allready tested with Tcodes such as MC.9 (gives details of total & unplanned consump. not for Planned consump.) & MB51(gives details for only one Mov. Type say either 261 or 262 not possible to do ABC ana. for balance of both)
    Is there any other std report as ABC analysis of planned consp.
    Thx in advance...

  • Issue against multiple reservations

    I want to restrict a material issue against reservations.
    System shall allow issue of material in the sequence of reservations created.
    If reservation R1 is created 1st for a material than res R2 then system shall nor allow the issue of material against R2 unless all the items have been issued against R1.
    Thanks,
    Suz

    Suz,
    Not supported by standard SAP.  This will require custom development.
    Rgds,
    DB49

  • Excess Raw Material  issue & FG reciept in Make to order Production

    In MTO Scenario I have created sales order for 10EA.After MRP run planned order of 10EA was created.I converted to Production Order.GI of raw material & GR for FG happens during order confirmation.If for that customer during Production physically 11Ea was produced.How i will show that extra FG (1EA) production & raw material booking against the order..

    Can you clarify, does it  mean you have consumed raw material for 11 EA FG, or you consumed only equivalent of 10 EA and due to production efficiency increase you gtot 11 EA output.
    In any case you can post this as a normal production order output. For additional 1 EA you can add this in Tolerance.

  • Material issue without order/ project

    dear all,
    i need one advise from your side :
             we purchase some materials from outside, assemble it and sell it to customer. but we dont want to create production order for that is it any certain process in SAP so that when we do the assembly and gr for parent material will done at the same time child material will automatically issue from stores.

    we usually buy some kit material from vendor. we assemble it in our factory and sell to customer. as per std, sap process. we have to create bom and production order for parent material and material will issue against assembly operation in operation sequence of order. but this KIT materials having many of material codes which are difficult to maintain in bom and process. so my request is to bypass order system ,

Maybe you are looking for

  • Can't drag and drop into Preview's sidebar

    Most of the time that I try to drag and drop image into Preview's sidebar (OS10.5.2), it doesn't work -- no cursor, no nothin'. Strangely enough, I can open one or more of the very same images using "open" in the menu, but I can't drag them from one

  • Os language preferences not changing system menu and windows

    Hello fellow problem solvers; I am trying to switch system preferences to French from English under X.4.3, and after log out or reboot Finder, File, Edit, View, and Go , stay in English in the finder. Applications that have localisations work fine, l

  • Total Newbie here.  How to import .dmp.

    I am completely new to Oracle Databases. The only thing I have used in the past is access. I have been given a Oracle Database .dmp file that I need to import into a database to see what is in it. I have installed Oracle Database 11g Express Edition

  • How to find out all table names which has a particular data

    Hi, How could i get all the table names from a database(for a schema) which has data 'KST6490' in one of the fileds in the table.There are many tables with this data. Data type is Varchar2. Thanks.

  • BTF Editor -disable buttons

    Hi , I want to disable some standard buttons (like bold button) which were displayed in BTF editor toolbar. Are there any options to do it.. i have search the class cl_btf , cl_btf_editor  for this..but couldn't make out. Thanks, Sandy.