Exchange rate issue while doing incomin  invoice

Hello All,
        The user has posted PO with frame work order for that while doiing Incomin invoice he is getting the following error. Pls anyone help me regarding this issue.
  Error:
EXCHANGE  RATE OF CHF FIXED FOR TRANSLATION FROM CHF TO 1.0000
DIAGNOSIS
An exchange rate type is used for exchange rate CHF/CHF which is defined as a fixed exchange rate . However the exchange rate with which the system should continue to calculate is different from this fixed exchange rate.
In OB22 exchange rate type is specified M
In dev environment fixed  check box has not selected for exchange rate type M.Company code currency is CHF.
In invoice under DETAILS  tab in currency field - CHF is there and  in exchange rate field - 1.00000 is there.
Why this error is coming am not understanding pls anyone can provide me solution .
thanks in advance
regds
ramachandra

Hello
For this error i am giving more details. company code currency is CHF frame work order has posted in CHF. In PO exchange rate it has picked up /1.0000 and fixed exchange rate check box has not selected. While doing MIRO the system has picked after entering PO number curreny CHF and exchange rate /1.00000. i think this is correct.
             In OB22 first local currency is CHF ,translation taking transaction currency as basis and Group currency is USD , translation taking first local currency as basis, and index based currency is CHF. , translation taking as transaction currency as basis . for all we are using exchange rate type M . i  am getting the error msg type F5 and message number 768.Doc type it is taking KB. for doc type KB no exchange rate type has assigned.
Edited by: ramachandra rama on Nov 3, 2008 1:35 PM

Similar Messages

  • EXCHANGE RATE ISSUE WHILE EBS

    Hi,
    - Company Code Currency and GL currency is INR
    - for EBS (auto BRS) we created 3 GL account for each bank a/c (Main account, Incoming A/c and Outgoing A/c).  all maintained in INR.
    - posted an entry in above outfoing GL account  - 1000 USD @ 49.60.
    while clearing this line item at the time of EBS, system through an error : Ex.rate diff.accts are incomplete for account 0000233062 currency.
    my requirement is exchange fluctuation should not be calculate at the time auto BRS.  Please let us know where went wrong.
    Thx & Rgrds
    Venkat

    Hi,
    E.g. following entry has been passed on 20.12.2011(USD to INR 45)
    Dr Vendor 1000 USD(1000*45=45000) 45000 INR
    Cr Bank outgoing a/c 1000 USD--45000 INR
    Month end you are doing BRS(31.12.2011)(USD to INR 46)
    Dr Bank outgoing a/c 1000 USD-----46000 INR
    Cr Main Bank a/c    1000 USD-----46000 INR
    Here 1000 INR difference is coming which should be posted to Fx difference accounts.
    So, please check the first entry posting date and second entry posting date, if both are same no Fx difference
    otherwise Fx difference will arise.
    Rgds
    Murali. N

  • Exchange Rate Issue ( Ditect & Indirect Quotation )

    Dear,
    Alll Experts.
    I am stuck up at one level , that is Exchange Rate issue.
    User is creating shopping cart in SRM, Local Currency is USD and the goods is ordering from Canada ( CAD ).
    While doing this amount is getting calculated   in - ( Negative ), And it is going to wrong approval for shopping cart approval.
    When I see the TCURR table I am seeing there as negative sign in exchange rate because it is maintained in Indirect Quotation.
    I want to calculate the same amount in postive figure.
    How this can be achieve? If I maintain the same in direct quotation it will calculate positive but final amount will be bigger which is not proper one.
    Experts guidance will be helpful.
    Regards,
    Sharvari Joshi.

    Hi,
    I gave the OB08 entries, not sure if you wanted me to explain the logic. Here it is..
    Maintain 'Indirect quotation' from Local currency(USD) to Transaction currency(CAD) and 'Direct quotation' from Transaction currency(CAD) to Local currency(USD).
    Direct quotation is where the cost of one unit of foreign currency is given in units of local currency, whereas indirect quotation is where the cost of one unit of local currency is given in units of foreign currency.
    Your local currency is USD:
    - Direct exchange rate: 1CAD = 0.92819 USD
    - Indirect exchange rate: 1USD = 1.08238 CAD
    The following settings have been made in the standard system:
      - Direct quotation: ' '
    -   Indirect quotation: ' / '
    Direct exchange rates do not have a prefix.
    Your local currency is USD. You enter a business transaction in the transaction currency CAD. Until now, you had to use direct quotation to enter the exchange rate (1CAD =0.92819 USD). If you have defined '/' as the prefix for indirect quotation, you can also enter the exchange rate with indirect quotation (1 USD = 1.08238 CAD) by entering '/1.08238' in the exchange rate field.
    Direct or indirect quotation can be maintained as the standard form of quotation for a certain currency pair. You use:
             - '1' for direct quotation
             - '2' for indirect quotation
    If a standard form of quotation has not been specified for a currency pair, the system automatically uses direct quotation.
    You make the settings in the IMG: General Settings -- Currencies -- Set Standard for Direct/Indirect Quotation per Currency Pair.
    Thanks
    Ganesh

  • Import Goods Reciept(MIGO) - Exchange rate issue

    Dear all,
    In import procurement cycle,we are creating purchase order(backdated) on goods receipt,
    maintained exchange rate(Currency EUR) based on exchange rate given by customs vendor in working sheet,
    capturing custom duties in required condition types in purchase order,Doing Customs MIRO based on Purchase order in
    currency INR,because duty is paid to customs through customs vendor in local currency,
    maintained exchange rate for EUR Currency in OB08 for current date with exchange rate type 'M',
    referring commercial invoice no.
    in migo,entering all other details quantity,batch,date of manufacturing,delivery note no,bill of lading no.,excise invoice no,
    excise date, excise duties were flowing fine except material base value which is calculated on 1 EUR = 44.17 INR,
    But actual exchange rate maintained on purchase order & as well as in OB08 is 1 EUR = 63.75 INR ,
    Material base value should be calculated for exchange rate 63.75 INR but it is calculating for 1 EUR = 44.17 INR,
    Due to this accounting document get posted taking wrong exchange rate(44.17 INR)
    Is there any configuration for exchange rate is missing ?
    How to solve the above issue ???

    Hi Jeyakanthan,
    Normally in SAP Standard settings for exchange rate type 'M' for 'EUR' currency transactions will have alternative exchange rate type as 'EURX' please check the rate might be taking from EURX.
    Kind Regards,
    Kiran Yelamarthy

  • Issue while doing material posting through Usage Decision

    Hi all,
    I have an issue while doing material posting through Usage Decision. Please find below the details.
    Inspection Lot  10000604689
    Material        1730PCPBS.0031
    Batch           QP611097      GQ02
    Out of total qty of 2100 we need to post the following
    To unrestricted use                     2,098
    To sample usage                         2
    Following error appears,
    Deficit of SL Stck.in qual.insp 1,638 NO : 1730PCPBS.0031 62GQ GQ02 QP611097
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 1,638 NO.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    I have checked that quantity 2100 of material 1730PCPBS.0031 is in QI stock. Kindly advice what is the issue and why we are getting the error?
    Regards,
    Brijesh

    Hi Brijesh,
    What is the status of inspection lot?
    One of the possibilities I think could be inconsistencies between MM and QM.
    Have a look on SAP note 48815- Checking possible inconsistencies between MM and QM.
    Regards,
    Anand Rao

  • Issue while posting the invoice in background using the WF-BATCH user

    Hi Friends,
      I am facing an issue while posting the invoice in background using the WF-BATCH user. I am using a invoice approval workflow where in when the approver approvers the invoice the invoice document get posted using a background method, which uses BO FIPP and Method POST and i am returning the Message Text to my workflow container from this method. When i see the log an exception is rasied from this method with an error  message "V004: You are not authorized to change this document", but WF-BATCH is having SAP_ALL and SAP_NEW authorizations. If i try to post the invoice using the method from my user id it is getting posted. What could be the issue. Please advice.

    Hi Sapient,
    The Parameter, Roles would be different for the LOGIN USER and WF-BATCH.. So ask your administrator
    to set the Roles & Parameters similar to that of LOGIN USER to WF-BATCH.
    For further refrence check in SU01 giving the LOGIN USER and then check with WF-BATCH... you would
    find the difference...
    Hope this would help you..
    Good luck
    Narin

  • Exchange rate issue at PO & Invoice area

    Hi Gurus,
    I have a scenario, Creation of PO time i'm getting EUR conversion rate 1.345 to an USD rather than to get 1.502. Prior to this i have checked the OB08 there my rate shows 1.502 for the particular period but by default it's pulling the conversion rate as 1.345 which wrong right now, if the user not know abt this conversion rate then it become an issue.
    How to restrict and get it correct rate, what could be the reason plz.
    Could any body through some light on this issue plz.
    Points are avail, thanks in advance.
    Rgds,
    Vyas

    Hi All,
    This was happend bcoz of alternative Ex. rate existing for "M" Ex. rate as "EURX".
    At Ex. rate table maintenance, I take out the 'EURX'  rate for 'M' than the problem was solved.. it's picking the 'M' Ex. rate promptly..
    You can see at query: M exchange rate is over riding by Eurx... in sdn.sap.com, it gives more understanding.
    Thanks for your valuable inputs..
    Vyas

  • Customer exchange rate issue

    Hello to everyone,
    we are facing an issue with customer exchange rate.
    We have a customer belong to a company which pay in EUR while this customer has USD as currency in MASTER DATA.
    in the quotation (tcode VA23) the price is not picked correctly and it seems the system does a convertion from USD to EUR.
    Since the billing is in USD and the invoices are in USD the system shouldn't do this convertion.
    Do you know how we can fix this issue?
    Thank You

    Why you want a alternative way ?
    Your company code currency is EUR and you are paying to the customer in USD. So system will calculate the amount with exchange rate.
    System will always calculate the amount as per company code currency. So system is taking the exchange rate calculation.
    It is the standard logic, how can system less / add the amount which bill or invoice has the different currency.
    If you do not want to do any calculation from exchange rate, then your all currencies has to be same.
    Anywhere if system will find a different currency, then system will always calculate the amount as per company code currency via exchange rate calculation.

  • Exchange rate difference while posting ME21N MIGO and MIRO

    Hi All,
    I am facing one problem with exchange rate type between M and EURX  and EURX is maintanined in the SPRO>SAP Netweaver>General Settings>currencies>Check Exchange rate types
    EXRT :  EURX
    Usage    :  EMU Reg,fixed                       
    Ref.Curr    : EUR  
    Buy.ra.at   
    Sall .Rat.At    
    Inv   
    EMU   :X
    FIXED
    Scenario:
    Company(USD) is maintaning Exchange rate type: M and no exchange rates are maintained for USD:EUR or EUR:USD.
    Eur is maintaing in Exchange rate type EURX.
    1) PO (ME21N) is posting for the Vendor on posting date 01/01/2008. Transaction currency is EUR and company code currency is USD and Quantity : 25000
    --> Exchange rate 'M' is not maintained for EUR and values are picking from the EURX Type. In the PO, Exchange rate is picking correctly from the EURX table entries on 01/01/2008.
    2) MIGO: GR  is posted on 01/25/2008 and with 15000 Quantity. Exchange rate is getting currecly from the table on 01/25/2008.
    3) MIRO: IR is posted on 02/15/2008 and Vendor Account is picking correct exchange rate from the table but GR/IR account is caluculations EUR:USD is differntly .
    Note: It is not GR based IR.
    Ex:
    PK AC                DESCRIPTION                    Tran Curr (EUR)    Local Curr  USD
    31 5004789     Vendor Account                       24,718.48-            38,777.12- USD
    86 2525000      A/P-GR/IR NON-INV                24,718.48            38,883.73  USD
    91 6584785      SERV-OTHER O/S                    0.00                 106.61- USD
    Here GR/IR account is cal dirrently.
    4) Credit Memo posted against IR on 03/25/2008. Exchange rate is given while posting CM same as Invoice. But system rate is different. Here also how the GR/IR is calculating is question is it not taking from Table or from any other rate types . Same problem like IR for GR/IR account.
    Entry is posted like
    PK  ACC         Description                            Tran curr(EUR)  Local curr(USD)
    21 5004789     Vendor                                   24,718.48        38,777.13  USD
    96 2525000     /P-GR/IR NON-INV                   24,718.48-      38,892.22- USD
    81 6584785     SERV-OTHER O/S                     0.00            115.09  USD
    This problem is same like GR and also SPL document is posting differenly for ZG and ZL ledger.
    ZL ledger is posting same like Accounting CM document ZG is posting with the different amount . This different amount is nothing but the exchange rate as per the posting date 03/25/2008. Exchange rate on 03/25/2008 is differe from IR date 02/15/2008 .
    ZL ledger is calculating based on the 02/15/2008 date and ZG ledger is calculating based on the 03/25/2008 . Difference between Exchange rate entered in the CM and 03/25/2008 table entry rate is showing exchange rate difference field in the Addtional field in the document display.
    Thanks in Advance.

    Dear Friends,
    Thanks for your helpful answers, actually we are in big export business. So we have to clear 100s of invoice lines with payments at one go, (which obviously being booked at different dates) so it would be very difficult for the user to go one by one invoice.
    My concern is, why system does not calculate exchange rate difference based on actual documents, i.e. Invoice to payments only. I think there might be some configuration needed to implement this functionality.
    Please help.
    Regards

  • Exchange rate fetched while calculating depreciation is historical rate

    Hello All,
    Following is the issue:
    As part of depreciation process, SAP posts amount in local and group currency. SAP while converting local currency depreciation value into group currency (USD) isnu2019t able to pick up right foreign currency rate i.e average rate for that month. Instead SAP chooses historical exchange rate which existed at the time of capitalization and converts the depreciation value.
    Exchange rates for both historical and average are maintained in OB08.
    I would like to know whether any more configuration is required or should i do a debug and understand why historical rate is fetched instead of Average rate
    Appreciate an early reply
    Best regards,
    Sundar

    Hello Srinu,
    Does ECC 6.0 allows any tweaking in configuration or in the depreciation program to fetch average exchange rate for depreciation?
    Appreciate your time!
    Regards,
    Sundar

  • Transfer of Freight Conditions to Billing Document - exchange rate issue

    I am having an issue with my freight costs copy to customer billing document and the exchange
    rate causing the values to change. 
    Example - SCD freight = 400 USD, but vendor is being invoiced in BRL (807.44). 
    The freight is passed to customer billing document, which happens to have local document currency of
    EUR, but customer being invoiced in USD.  However the freight is going thru some kind of exchange rate conversion, causing my original 400 USD freight
    to show as 414.44 USD on the customer invoice.
    I am looking for way to keep the freight from changing between SCD + Customer Billing document.
    Regards
    Rita

    Can you share your screens from F-60 involving EUR to USD conversion?
    Also, try using transaction EWCT to test conversions between currencies,
    you can choose your two currencies that give you the issue, and test by
    entering the initial value, seeing the converted value.

  • Exchange rate issue during PO creation

    Dear Friends
    I am getting the below error whenever I am trying to create an Import PO
    Enter rate USD / INR rate type  for 28.10.2010 in the system settings
    Message no. SG105
    I have entered the rates in OB08 table-  for direct & Indiret exchange rates for M
    I also have cheched the OBBS and made entries for the date 28.10.2010
    But still I am getting the error
    How do I proceed
    Samuel
    Edited by: samuel mendis on Oct 28, 2010 1:07 PM

    Guys
    We have solved this issue. Even though we were getting the SG105 error, the real problem was some where else. 
    We have never used CIN in our our organisation as it is not applicable. The problem we did is to use the Import pricing procedure for our use which was copied from IN: Purchasing for Imported materials.
    Whenever we tried to create a Import PO it was validating the CVD entries which we make in the company code settings for Tax on Goods Movements. Once I maintained a dummy G/L account the error was gone.
    The problem is why it validated CVD during PO creation we never understood. Since in my opinion CVD capturing is done during Invoicing verification stage and not during PO stage. Either way we have already updated these details to the SAP Support bench.
    Thanks
    Samuel

  • Addl LC Activated, No Exchange Rate Differences Posting on AP Invoice

    We set up a new Company Code for India.  The CoCode is configured as USD.  We have configured INR as an Additional Local Currency (LC2) for statutory reporting.  The INR is configured as 'Hard Currency'.
    Since going live, we've come to learn that paying USD invoices is not generating INR exchange gains/losses with changes in exchange rate between INR and USD.  When I look at a clearing document, both lines are posted at the historical invoice exchange rate.
    For the statutory accounting to be correct, I would have expected the AP payment document to clean the vendor line at the invoice exchange rate and the offset line to post at the current exchange rate.  I would have then expected a third line to the payment document with the offset to exchange gain/loss.  The exchange gain/loss line would post with a USD amount zero with an INR amount in the Hard Currency/LC2 field.
    I believe the Open Item configuration (TransCode OBA1, KDF item) is correct.  The Currency Type is 'BLANK'; therefore, good for all Currency Types including the Hard Currency.
    I can't figure out what the heck I'm missing!  Anyone have any idea why the clearing AP invoice is not generating the exchange gains/losses as expected?
    Thanks in advance for any assistance!

    Gordon,
    When you say
    "With this version, you probably have very few options"
    Does this mean with SAP B1 2007 the same problems are not there.
    Please say its so and i'll upgrade immediately as I'm experiencing the same problem as the one described above by Claudio
    We use one exchange rate per month. We have BP accounts whose currency is Multi Currency this is where the customer would pay either in LC (KES) or SC (USD).
    The problem occurs when running conversion differences, the journal entry to the unrealized exchange gain\loss is one-sided i.e. only the SC currency is posted.
    This leads to both the P&L and the Trial balances being wrong.
    Thanks in advance for any assistance
    Regards,
    Michael Mbiyu Itotia

  • Exchange rate type mismatch in the invoice

    Hi experts,
    When I am creating an invoice, invoice is picking up wrong exchange rate type MTR which is not at all maintained in the customer details. The sold to party is having the exchange rate type TR2. Can anybody please help on the issue.?

    Hi,
    If it is not picking correct exchange rate type from the sold to party, please check the change log in the SP customer master for the field.  It could've been changed after sales order creation and invoice would've referred to your S.O details.
    Also, please check whether the below info is useful.
    [http://www.sap-img.com/sap-sd/exchange-rate-billing-documents.htm]
    Regards,
    P Gomatheeswaran
    Edited by: Gomatheeswaran Palaniappan on Aug 29, 2011 7:32 PM

  • Currency Coversion and Exchange Rate Issue

    Hi,
    I have a scenario in query which is related to currency conversion and exchange rates.
    Company Code     Matter Code      Invoice          Invoice date     Amount     
                        Number          (DD/MM/YYYY)
    1001          1111          INV101          01/01/2011     $100
    1001          2222          INV202          05/01/2011     $150     
    1001          3333          INV303          10/01/2011     $200     
    1001          4444          INV404          15/01/2011     $250
    Here , Amount field is in GBP currency by default.
    User gives choice as USD on selection screen and the amount field is converted to USD in output.
    Now, I wonder which day's exchange rate is applied for same ??
    And what steps should I do if I want to apply a particular day's exchange rate ??
    i.e.
    Consider that there are different exchange rates maintained on daily basis.
    For each invoice number (INV101 , INV202.....) There is an invoice date (01/01/2011, 05/01/2011...).
    The corasponding output amount should take that particular date's exchange rate for conversion of currency.
    How to achive same ??
    I have gone through t-code RSCUR for same. Nothing helpful found.
    I have even gone through some documents for currency conversion., but unable to find out such scenario.
    Please help me for same.
    Edited by: Sachdev_Nirav on Aug 5, 2011 11:53 AM

    Sachdev-
    Currency translations are a very complex issue for BW developers. What you need to do is manage a currency translation that is based on the exact 0CALDAY of the transaction. Here are some helpful hints
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/dc43c445-0d01-0010-23a1-ca348ff5f975?quicklink=index&overridelayout=true
    The standard SAP business content includes some standard translations as shown in the article, like these:
    0MEANTODAY Average rate using actual date (0SY-DATUM)
    u2022 0MEANDAILY Average rate using 0CALDAY of the data record
    u2022 0TRA_DATE Average rate using 0TRANS_DATE of the data record
    u2022 0PSTNG_DAT Average rate using 0PSTNG_DATE of the data record
    u2022 0DOC_DATE Average rate using 0DOC_DATE of the data record
    However, you MUST have a translation available in the main SAP Currency translation table (Transaction oB08 ) for the period in question, and you MUST report in the appropriate date. If, for example, you wish to report in an aggregate by 0CALMONTH, for example, the currency translation will need to be associated with 0CALMONTH, and the exchange rate will not calculate on a day by day basis, but on the standard that you set for the month. So, to your users, the data will be 'wrong'.
    A more robust method involves adding a value field to your data soiurce that uses the currency exchange rate in effect as of the day of the transaction. We do this in our data models, to with:
    Mexico Data source:
    Each value field will be available in the document currency(whatever), the company code currency(MXP), and in the corporate currency (USD).
    Good luck ! Most users don't understand the whole issue, and we spend a bit of time explaining it to them.

Maybe you are looking for

  • I am trying to do a destructive recovery to a HP Compaq 6830s – XP Professional-

    I am trying to do a destructive recovery to a HP Compaq 6830s – XP Professional- I backed up my entire system to an external hard drive. I made sure that I was set to start from cd drive. I put disk 1 in and started computer, click on any key to boot

  • ATV2 CANNOT REMEMBER WIFI !!! WIFI KEEP DROPPING

    I am using the Dlink 655 Router and when connected for serval minutes the wifi dropped(The apple TV is not connected to the Internet) Then it wont reconnect it again!!! Sometimes when the ATV2 Standby and I wake up by remote, the Wifi wont automatica

  • Why do I not start the developer prompt?

    I installed Oracle BPEL Process Manager 10.1.2 on my computer. The Developer prompt can't start, but other components can start and be well. I installed it on my classmate's computer, the prompt can start. I don't know why. PLS help me! I feel anxiou

  • Module pool program modifications

    hi All, i want to modify a screen out of three screens in a modulepool program. Example: there are 3 screens 100,200,300. i want to modify in the 300 screen. in the main program the 300 screen is called like if sy-subrc = 0. call screen t019w-winnr  

  • How to save documents in their original format?

    Hi, we have the problem that we have to save and archive received documents at the adapter engine in their original format, p.e. EDIFACT- or RosettaNet-documents in their original EDIFACT- or RosettaNet-format. Is it possible to save the documents at