Exclude Storae location from MRP

Dear All,
How to exclude a storage location from MRP planning?
What are the steps to be followed?
Please advice
Regards
Edited by: Csaba Szommer on Jun 10, 2011 4:30 PM

In MMSC,  for the Matl-Plant-Sloc combination,   in the MRP field select option-1 (exclude from MRP)

Similar Messages

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Need to exclude storage location from MRP.

    Hi Gurus,
    Is there an option to exclude a specified storage location from MRP at configuration level. But not at material level as in MRP4 view.
    We have excluded the stoarge location in config OMIR, however the system considers that stock if the same is not excluded in MRP4 of that material.
    Now, the problem is every time i need to go to the material master of every material  i have to excude from MRP, which is very time consuming..!
    Please advise me is there any option in point of view of Storage Location,  just simply  define the storage location to be excluded from MRP run.
    Thanks in advance.
    Naveen.

    Dear,
    Yes you can do it though OMIR or MMSC 1-Storage location stock excluded from MRP.
    Also check this link for more details,
    Exclude purchase order on storage location from MRP
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on May 25, 2009 12:22 PM

  • Exclude purchase order on storage location from MRP

    Hi Everyone,
    We have excluded storage location 1200 from MRP.
    The result shows only stock on 1200 excluded from MRP, PO on storage location 1200 (storage location 1200 in PO) still considered in MRP.
    Is there any way to exclude PO on 1200 i MRP also?
    Best Regards,
    Bin

    Dear,
    Go to MRP 4 view of the material master .
    In the field SLoc MRP indicator field "1".
    If it is for a material than in the material master level it can be done. If you are looking for all materials in that storage location, than it is better to define this in SPRO->Production->MRP-->Planning-->Define Storage Location per MRP plant. Here for that storage location in that plant you need to define "2" - Storage location stock planned seperately or "1" - Exclude Storage location from MRP.
    Also u can use t.code MMSC.
    Select Material & Plant and Assign MRP =1 for the Sloc to be excluded
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 14, 2008 9:32 AM

  • To exclude SCARP storage location from MRP

    Hi Gurus,
    We have a issue regarding the scrap Quantities. we need to exclude these materials from the available stock for MRP. We have a setting in the MRP available stock with Blocked stock not checked and restricted stock checked.
    My question is if we un check the restricted stock, is the MRP will not consider the stock in scrap storage location.
    Please help to find the solution.
    Thank you.
    naveen.

    Hi,
    Your scrap str location is not either blocked or restricted str location. This is a regular str location but the name is scrap location.
    System will consider this str location as a regular str location. So do setting to exclude this str location from MRP as previous member explained.
    Regards,
    Dharma

  • I want to exclude a storage location from MRP

    I want to exclude repair storage location from MRP so that the stock with repairs storage location should not be considered for other demands.
    Also repair storage location stock should not be calculated against 'stocks'  term in MD04.
    How to do this ? Pls share.

    Hi,
    In transaction OMIR, choose your plant & then for the storage location you want to exclude from MRP enter 1 (exclude from MRP).
    After this setting is maintained, whenever a material is created in this plant & storage location, it will have MRP indicator as "1" in the mrp 4 view .
    For materials already in this storage location if the MRP indicator "1" is not maintained in mrp 4 view, please go for a mass change maintenance in the material master & maintain this indicator.
    Stock in the excluded storage location will not add up to the stock which is displayed in the top in the md04 screen. This stock will be displayed separately in the bottom of the screen.
    Please let me know if you have any questions.
    Regards,
    Senthilkumar

  • Deactivation of storage locations from MRP run

    Hi gurus,
    How can i deactivate a particular storage location from MRP in a particular plant.
    Regards
    Kaisar

    Hello,
    There are 2 ways of doing that.
    1. With the Transaction OMIR and selecting th indicator 1 Storage location stock excluded from MRP
    This storage location will be excluded from MRP.
    2. For a Specific Material(s), if you want the Storage location to be excluded from MRP:
    You need to select the storage locatio MRP indicator as 1 in MRP4View of the Material.
    Some concerns:
    Your Materials are extended to the St.location say xxxx.
    Now if you want this storage location to be excluded from the MRP.
    By simply seeting the Customization settings will not work.
    You need to manually select the MRP4 view and change the St.Loc MRP Indicator to 1.
    The Materials created after this customization setting will adopt this settings automatically.
    Hope this helps..
    Regards,
    Siva

  • Exclude Stock Transfer from MRP Net Requirements

    Hi,
    Is it possible to exclude the Stock Transfer Orders from the Net Requirements generated by MRP? I want to base the requirements only from historical consumption. In my Stock/requirements list (MD04) for example, the Requisition generated by MRP increases in quantity since there are open Stock Transfers which are to be served by that plant to other plants.
    Regards,
    Lee

    Nazrin,
    Availability check configuration (OVZ9) has no impact on MRP.  MRP relies on its internal rules when it is performing its net requirements calculation.  You have very little control over which elements are included/excluded.
    You can exclude selected storage locations from MRP planning.  Stock and reservations against these storage locations will therefore also be excluded. 
    You can exclude a material from planning, change the material master MRP type to ND.
    Your best bet, though, would be to set your PM planning process up such that these materials never create the reservation in the first place.
    Regards,
    DB49

  • Exclude QI stocks from MRP

    Dear Experts,
    We have a change requirement where we want to exclude QI stocks from MRP.  That is, exclude QI as available stocks at all areas.  There are a lot of existing stocks for a lot of materials already that are in QI.  Is there any way we can configure MRP to exclude QI stocks?
    Thanks All!

    Manoj,
    The only kind of stocks that can be excluded by config from being considered by MRP are
    Stock in Transfer
    Blocked stock
    Restricted use stock (batches)
    You can select/deselect these in OPPI
    Unfortunately, none of these automatically have a 1 to 1 link with QI stock.  If you performed a transaction to change your QI stocks to one of the above categories, then it could be excluded from MRP.  You also could have some additional options if you are using MRP areas, and all the QI stock is in its own MRP area.
    Quality stock can also be excluded from ATP processing, in OVZ9.  However, this has no impact on MRP.
    It is generally considered unwise to exclude QI stock from MRP processing unless you know the parts will be rejected as unsuitable.  Any other inspection results will cause MRP to become unstable over time.  Consider the following scenario:
    Open PO 100, open SO 100.  MRP is balanced.
    Receive the PO into QI stock.  If this stock were made to be unavailable, then you have 0 stock available, and 100 pc open SO.  Next MRP run will determine a shortage, and will generate another purchase req.  Someone may actually convert the PR to a PO and submit to a vendor.
    Now, the Quality dept completes their inspection, and the QI stock is transferred to unrestricted and available.  Now we have 100 pcs stock, 100 pcs open PR or PO, and 100 pc rqment for SO.  Next MRP run will determine an overcoverage and will suggest cancellation of the PR/PO.
    Rgds,
    DB49

  • Exclude storage locations from the MRP run

    Hi all,
    Is it possible to exclude stock of specific storage location from the MRP run?
    Thanks for your help
    Thomas

    Hi,
    2 things,
    1. In OMIR for the storage location set that this location is excluded from MRP run (if am right the value to be maintained is 1)
    2. In MM02 go to MRP-4 view of the material master, specify plant & the storage location which you want to exclude & in the field SLoc MRP indicator specify that this is excluded for MRP run (if am right the indicator is 1).
    The step 1 ensures that all materials which are extended to this storage location will by default have the value 1. And step 2 ensures the materials already having this storage location view are excluded from MRP run.
    Regards,
    Vivek

  • How to exempt a storage location from MRP run

    Hi all,
    How do I exempt a storage location and all its materials from MRP run.
    I am creating a new storage location and this should not be considered for MRP and  no idoc should be generated if a purchase order or a delivery is created from this storage location( should we stop entering this storage location in BD64 filters or anything more to prevent triggering of the idoc).
    Can somebody please through some light on these issues. 
    Kind Regards
    Chakradhar
    <REMOVED>

    Hi
    You need to set up master data for that material.In Mrp-4 View  set  storage location indicator as 1(one) .In this case your storage location stock will be exclude from MRP .
    Hope this will help
    Dilip

  • How to exclude the stock from MRP in MS04.

    Hi SAP ALL,
                 My client req the stock maintain the for the long term planning purpose under one storage location stock not considered to the MRP. in MS04 T Code.this is issue where did i m setting plz give some detailed explanation
    regards
    raju

    Hi,
    In transaction OMIR, choose your plant & then for the storage location you want to exclude from MRP enter 1 (exclude from MRP).
    After this setting is maintained, whenever a material is created in this plant & storage location, it will have MRP indicator as "1" in the mrp 4 view .
    For materials already in this storage location if the MRP indicator "1" is not maintained in mrp 4 view, please go for a mass change maintenance in the material master & maintain this indicator.
    Stock in the excluded storage location will not add up to the stock which is displayed in the top in the md04 screen. This stock will be displayed separately in the bottom of the screen.
    Please check same with MS04.
    Regards,
    R.Brahmankar

  • Exclude storage location from Availability check

    Hi,
    We have to exclude 4 storage location out of 46 storage locations from availability check in sales order processing.
    Please advice how to do it.
    We can not use MRP area and MRP Groups to control this because of certain reasons. 
    Regards,
    Avnish

    Please check this..
    spro...material management....consumption based planneng....planning...define storage location MRP...
    Here give plant name and enter...
    Against every storage location you ll have indicators for excluding,including the stock....
    hope this clarifies..
    For material availablity check in production order,
    1. you need to delete the storage loation in OX09 (it is possible If no stock)
    2. Or you need to transfer post the materials to a storage location xxxx which you can name as Blocked storage location...
    F Y I....In OVZ9  you can exclude all the storage locations which is not your reequirement..
    katrthick
    Edited by: karthick PP on Mar 26, 2009 12:40 PM

  • QM exclude storage location from QM

    Dear All,
    is it possible in some way to exclude a storage location from QM in a plant managed with QM.
    The case is this:
    We have the material AAA with QM active for good receipt.
    -If the material arrive in st. location 10 we want have stock in Q status.
    -If the material arrive in st. location 20 we want have stock in Free status.
    St location 10 and 20 belong to same plant.
    If it is not possible, do you have some suggestion to solve this case (u.exit?)?
    Thanks in advance. Best regards.

    Tanks,
    but finally we have used another u.exit, EXIT_SAPLQAAT_002.
    This one is called directly in the MIGO and allow to deactivate QM setting X in the parameter NO_INSPECTION.
    Best Regards.
    Alby

  • To exclude Storage location frm MRP run

    Hi Friend s
    In my secnario MRP should not consider the storage location  stock planning
    i using stratgey 11 gross req planning ,
    and  (SPRO), In MRP  -define storage location MRP  per Plant , i set the indicator 1 i.e storage location stock excluded frm MRP
    But still i mrp considers  stoge location stk .
    is there any setting ?
    Regards
    Sandeep

    Sandeep,
    For strategy "11" system automatically will not consider storage location stocks, so no need to define that in SPRO>MRP->Planning-->Sloc MRP/Plant as told by you.
    Couple of checks....i would suggest.
    1. Check whether you have maintained "2" - Mixed MRP indicator in MRP3 view.
    2. Check whether the PIR you have created is having requirement type "BSF".
    Regards,
    Prasobh