Exclusion of target cost in Variance calculation

Hi,
While calculating variance in period end closing for a process order we are getting the errors.
1)     “No standard cost estimate for material 400000020 in plant TSIL on 26.12.2006          Target Costs: Determine Valuation Basis”
2)     “Only remaining var. in version 0 - no target costs for 000001000109          Variances”
We do not want to include the Target cost in variance calculation.
Please advise.
Regards
Aniruddha

Hello Anirudh,
If you choose costing version in variance calculation 0, then system calculates variance based on std. cost est. and actual cost. if you select 1, then system calculates variance based on planned cost and actual cost.
Go to customization settings in variance analysis calculation and change the costing version from 0 to 1.
Please let me know if you require any more clarifications.
Reward points if helpful.
Regards,
Santosh

Similar Messages

  • Production order Target cost Zero - Varience calculation error KV151

    Hi Experts,
    I am having an issue on KKS2 variance calculation, system throwing error KV151 Target cost is 'Zero'
    All pre-requisites are ok including BOM, Rates, Routings etc..
    Process:
    Production order with FERT - valuated material,
    All BOM components in production order are Non valuated stock items, Non-stock items
    Note: Cost Estimat e is for Labor and Overhead only.
    After production order confirmation CO11N, production order Cost analysis displays - Target value ("Zero") and actual value.
    Due to above reason in KSS2 we are unable to calculate variance, system displayed error KV151.
    I cannot settle the production order, guide if I am missing some thing in config. ?
    I appreciate you quick response.
    Thanks,
    RK

    Thanks for your reply Swapvik & Takashi, I have no issues on configuration side very thing looks good.
    Cost estimate - Good
    Variance key - Good
    Production order - FERT (Valuated) - good
    BOM components - UNBW, NLGS only - Good
    Labor rates - good
    Periods - good
    Production order confirmation - Good
    Actual cost - Good
    My Issue is Target cost is zero on cost analysis in CO03 but if I can see target cost in KKBC_ORD report.
    I am unable to calculate variance and settlement.
    I appreciate your response.
    Thanks,
    Raj

  • Routing different from Standard Cost: Scrap Variance Calculation

    Hi,
    We have issue with Scrap Variance Calculation/WIP calculation when the Routing in the production order is different from the routing in th standard cost. When we run varaince calculation we are getting an error message saying that variance can be calculated as quantity structre of the production order is different from quantity structure of the standard cost. I understand that this is standard SAP. But routing changes seems to be pretty common acorss the Industries espcially when the demand is high and the manufacturing happens in different machines.Do any of  you had similar issues and can you share how this can be resolved.
    Thanks,Sasi

    Hi Sasi
    Go to OPR4_KKS AND OPR4_KKS1 and see... I think you can convert this msg into warning message..
    Regards
    Ajay M

  • Product Variance Calculation

    Gurus,
    How do we calculate Product variance?
    What is the procedure / process?
    Where can the effect be seen?
    Edited by: Bhatia on Oct 15, 2008 6:44 PM

    Hi,
    Variance Calculation
    As long the production order is not fully delivered or flagged Technical Complete the remaining order balance is treated as WIP. Otherwise the order balance shows up in variance calculation.
    If a lot-based product-controlling WIP, is valuated at actual costs. The WIP is calculated as the difference between the debit and credit of an order as long as the order does not have the status DLV (delivered).
    In lot-based product controlling the variances are not calculated until the order has the status DLV (finally delivered) or TECO (technically completed). This means that at the time the order has reached this status, the system no longer interprets the difference between the debit and the credit as work in process but as a variance. In lot-based product controlling orders never have work in process and variances at the same time.
    Variance calculation compares the actual costs incurred for the production/process order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    In this way you can find out which variances occurred between the value of the delivery and the actual costs and you can find the reason for the posting to the price difference account for materials with standard price control.
    Variances from production (target version 1)
    Variance calculation compares the actual costs incurred for the production order with the target costs for the production order and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variances occurred between the time the production order was created and the end of the production process.
    Variances from planning (target version 2):
    Variance calculation compares the planned costs for the production order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variance occurred between the time the standard cost estimate was created and the time the production order was created.
    Variance categories:
    The system assigns every variance to a variance category. The variance category indicates the cause of the variance (such as price change, lot-size variance). Variances are updated to the information system and passed on to Profitability Analysis according to variance category.
    You differentiate between variance categories on the input side and on the output side:
    u2022     Variances that occur because of goods issues, internal activity allocations, overhead and G/L account postings are displayed on the input side. Price variances, quantity variances, resource-usage variances and input variances are displayed on the input side.
    u2022     Variances that occur because too little or too much of the planned order quantity were delivered, or because the delivered quantity was valuated differently are displayed on the output side.
    Variances on the output side occur when you deliver using a price that differs from that found by dividing the target costs and the delivered quantity. If you deliver using the standard price, a variance can occur when the order lot size differs from the costing lot size. This is displayed as a lot-size variance.
    For config
    3.1.4.2     Variances & Settlement
    Variance Calculation determines differences between the actual costs incurred on a production order and the standard costs of the material produced. Variances are calculated not at once, but for different variance categories. The variances computed are then transferred to CO-PA.
    3.1.4.2.1     Define Default Variance Keys for Plants
    Use
    The Variance Key is part of the order header and controls variance calculation. The system selects the value set by this step as default value when a material master is created. From the material master the variance key then is transferred to the order when an order for the material is created.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKVW
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation -> Define Default Variance Keys for Plants
    2.     Make the following entries:
    Plant     Variance Key
    BP01     000001
    BP02     000001
    BP03     000001
    BP0X     000001
    3.1.4.2.2     Define Target Cost Versions
    Use
    The target cost version controls various parameters related to calculation of target costs in variance calculation. In variance calculation, target costs are needed as a comparison to the actual costs incurred.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKV6
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation  Define Target Cost Versions
    2.     Choose New entries and enter the following values or copy from default settings of CoArea 0001 to BP01:
    CoArea     TgtCostVsn     Text     Variance Variant     Control Cost     Target Cost
    BP01     0     Target Costs for Total Variances     001     Actual Costs     Current Std cost Est                                
    BP01     1     Target costs for production variances     001     Actual Costs     Plan Costs / Preliminary Cost Estimate
    BP01     2     Target costs for planning variances     001     Plan Costs     Current Std cost Est
    3.1.4.2.3     Create Settlement Profile
    Use
    The settlement profile controls various parameters related to settlement.
    Prerequisites
    Allocation Structure
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     SPRO
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling   Product Cost by  Order  Period-End Closing   Settlement  Create Settlement Profile
    2.     Choose New Entries and enter header data. Then for each new entry choose Details and enter remaining data.
    3.     Overview of data records:
    Profile     Text
    YGPI00      BP Process Order w/o CO-PA
    YGPP00     BP Production Order w/o CO-PA
    YGPI00     YGPP00
    Actual costs/costs of sales     
    To be settled in full     X     X
    Can be settled          
    Not for settlement          
    Default Values     
    Allocation Structure     A1     A1
    Source Structure          
    PA Transfer Struct.          
    Default object Type          
    Indicators     
    100% Validation     X     X
    %-Settlement     X     X
    Equivalence Nou2019s     X     X
    Amount Settlement          
    Var. to co. bsd. PA          
    Valid receivers     
    G/L account     N     N
    Cost center     O     O
    Order     O     O
    WBS Element     O     O
    Fixed asset     N     N
    Material     O     O
    Network     N     N
    Profit. Segment     N     N
    Sales order     O     O
    Cost objects     O     O
    Order item     O     O
    Business proc.     N     N
    Real est. object     N     N
    Other parameters     
    Document type      SA     SA
    Max.no.dist.rls     3     3
    Residence time     3     3
    You have to assign Variance Key in material master for semi-finished and Finished goods in costing 1 tab also.
    To Execute
    KKS1-Collective Variance calculation
    KKS2-Individual Variance calculation
    CO88-Collective settlement
    KO88-Individual settlement
    Thanks,
    Rau

  • Process order variance calculation not taking the GI+Activity confirmation Cost

    Hi,
    Process oder was settled in the Month of June,2014. Accounting document was generated,but system only considered the GR cost. System was not considered  the GI as well as activity cost on variance calculation. Variance posted GR= Variance.
    22nd June,2014 Variance calculated, on 30th WIP entery also reversed with the same amount.
    1st July,Order done untecho and no transactions are posted in the Month of July.
    Now they would like to settle the Process in the Month of July. system is throwing the error " Status DLV/TECHO reversed after settlement period 006.2014"
    Order status was TECO PRT  CNF  PRC  CSER BASC BCRQ CRF No variance calculation status.
    Any one faced any similar issue , please suggest me how to proceed.

    Hi,
    Please check SAP Note 386816 for error KV181.
    In general it is recommended to use the Cost estimate of the Process Order (Planned Cost Estimate) for the WIP at target calculation. In additional please pay attention to SAP Note 386816 which explains this procedure and which prerequisites must be met to calculate WIP at targets or the scrap variance. Even if the group counter of the routing is different you can still calculate WIP at targets but only if the message type of message KV181 is set to SPACE by Customizing settings.
    Hope this will a bit help to you.
    Best regards, Takashi

  • Target Cost in Process Order not calculated

    Hello,
    In Process order, after deliver of FG the target cost is not getting calculated,
    Could you please help me why the target cost is not calculated in process order.
    I have configured all setting for WIP and Variance

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

  • Target cost calculation in an Production order

    Hello
    Can any one guide me , how the target cost was calculated for various activities ?.  
    I believe the actual cost were pulled from the standard cost estimate . We have various activates for Labor / Quality / maintenance  etc..  we want to correct all the cost . Any input will be highly appreciated
    Thanks
    Nic

    Hi,
    You post goods receipt for the order (MB31) and the target cost will be calculated, you may try this if it will help.
    Regards
    Prasad

  • Target Cost in the settled process order become zero after cost deletion

    Dear all,
    User has standard cost estimates created in Jan 2010 that valid until the end of 2010 for every material in the system.  user created a process order in April 2010. Target cost of the order was created based on the standard cost estimate and recipes as well as order qty.    The order was also confirmed and settled in April 2010 without problem. 
    However, after I deleted all old costing estimates before I did a costing run for all materials in May 2010, the old order was resettled and all Target cost is removed from the order.  I guess system try to look at April costing estimate but it is not there since it was deleted before I created the new costing estimate in May.  Therefore, all varainces are throwed into remaining variances since the target cost become zero.
    Other than mark the settled order for deletion or keep all old costing estimates,  I am just wondering is anyway in the configuration to prevent the system to recaculate the target cost again for the settlement so I can avoid the problem happens?
    Thanks.

    Hi,
    Target costs are only calculated after goods movements have occured on the order, the Target Costs are then calculated during the Variance calculation.
    Target costs will only be calculated after the first goods receipt has been posted to the order. Also you have to ensure that the information to calculate target costs exists on the system in particular in OKV6.
    This estimation is based on the customizing for the Target cost version in transaction OKV6 as in turn will the "real" calculation of the Target costs via the variance calculation.
    So in OKV6 the Target cost will be based on preliminary costing on the order, an alternative cost estimate or the current standard cost estimate. Importantly if the choosen option is not fulfilled e.g. no current standard cost estimate, the target costs will not be predicted or calculated.
    regards
    Waman

  • Target cost in KSS1

    I am checking KKS1 report(testrun for period 7 2011), i noted
    the variance % column not reflecting right % , may i know why? For example
    for process order 100028687 the variance % compare with actual cost should
    be  8.6% but  shown as 0%  please guide me.

    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    In you case it seems that target cost is not calculated and reason in any of the three mentioned above...
    Regards
    Sarada

  • Cost center variances

    Hi All,
    Could you please help me in finding out
    - below problem is for settling cost center variances (KSS1) and not regarding production order variance.
    1) Where is target cost version (used for cost center variances) assigned in the controlling version '0'.
    I could not find any option for mentioning target cost version in controlling version '0'.
    2) How are cost center variances allocated to CO-PA.
    If they are done through assessment, where is the settings for assigning value fields for each variance category.
    3) Is there any CO posting done by system during cost center variance calculation (or) is it just classification of cost center balance into variances and no postings in CO?
    Thanks in advance for the time and help.
    Regards,
    DSK

    Hello DSK
    1) There is no target cost version for cost center. The amount left in cost center is not called as variances but as under/over absorption. This is the difference between actual costs posted in the cost center and the costs actually charged to production orders.
    2) The variances can be taken to COPA through COPA assessment cycle where you enter the cost center as sender and the respective value fields as receiver. The variance category refers to production variance categories and to cost center.
    3) There is no such thing as cost center variance calculation and no entry for this as such.
    Refer help.sap for more details.
    Sangram

  • Actual Costs , Planned Costs and Variance

    Hi,
    I know that there is a standard function module that gives the actual costs , tha target costs and variance, K_KKB_KKBCS_ORDER_REPORT. But is there any Funcion Module  for calculating the Actual and planned costs and variance?  or could the same FM be used for the purpose?

    OK

  • Target cost version 0

    Hi,
    currently we are using target cost version 0 to calculate production variance. But to get correct production variance in relevant variance category it is needed to have current standard cost updated in material master. 
    But if we skip updating standard cost it'll not present the target cost and variance categories all variance included in remaining variance category.
    We need to change target cosing version 0 to get any updated standard cost when it calculate production variance. But its not possible as target cost version 0 embedded with current standard cost.
    Pls advice and give clear idea of target cost and target cost version if somebody having a good idea on this.
    Thank you !

    Hi,
    Please find below link for your needful.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/ba6242446711d189420000e829fbbd/content.htm
    Regards,
    Santosh

  • Target Cost and Actual Cost

    Hi All,
    When is the target cost and actual cost gets populated and from where does the data comes from liek labour,machine,overhead cost comes?
    Thanks in advance

    Dear Friend,
    speaking from controlling point of view, target and actual costs will be flown from "costing variant planned" and "costing variant actual" respectively.In above mentioned varinats, whats the process has to be followed to calculate  material costs,activty costs,overhead costs etc will be defined. These variants will be assigned in order type dependent parameters OPL8.
    Target Costs - In standard cost estimate(ck11n),target cost will be calculated  in the following way
                              -material cost from material master and BOM
                              - activity costs from routing( for this u need to plan the activity costs in KP26)
                              - other costs from the definitions of planned costing variant.
                       - after running the standard cost estimate,u need to mark n release(ck24).
    Actual Costs - material costs frm goods issues (via goods mvmts thru MBIA,MB1B etc) against
                          production/process order.
                              - activity costs(as per the price u plannned in KP26)through  operation confirmation in
                                COR6N/CO11N.
                              - any other costs like overheads,cost center issues etc as per the process defined
                                in 'actual costing variant'.
    Hope this will clear your doubt.
    Rams.

  • Difference between the planned cost and the target cost

    Hello guys,
      I am really confused between the planned cost and the target cost.As Per the sap help target cost is cost required to produce certain quantity of material.And planned cost even carry the same definition.
        So is there any difference between these two cost.Are they same?

    Jitendra,
    Genarally in CO we will define Target cost is getting calculated in the Production order based on the "Standard Cost Estimate" after GR. Planned costs are calculated based on the current costs.
    Example:
    Assumption: Assembly Material A with Standard Price, Component B and Component C is maintained with Moving average
    Material A Cost 1EA = (component B = $10 + Component cost C = $20+ Activity Price $1) = $31, this is the standard cost estimate for the material.
    Now I create a production order on 15th of the month, and the Moving average price for component is now $20 due to subsequent GR with higher price. Now the planned cost for the order would be (20201)=$41, whereas the Target cost would be still $31.
    Hope I was able to clarify,
    Regards,
    Prasobh

  • Target cost calculation in Process Order based on Variance Calculation

    Hi all,
    I have a question on Target cost calculation in Process Order. My understanding is, the Target Costs gets calculated when the confirmation and GR is made for the Process Order.
    But if the confirmation/GR is not done, whether the target costs gets calculated for only the activity types after the Variance Calculation (KKS2).
    I have two scenarios. In one, the target costs got calculated for the activity types without the confirmation/GR after the Variance calculation.
    In another scenario, the target costs are not getting calculated for the activity types without the confirmation/GR if I try to do the variance calculation in KKS2.
    SO i want to know which scenario is correct?
    Can anyone answer this question?
    Thanks and Regards,
    Brijesh

    Hi,
    In general, the target costs are calculated once you deliver the order.
    Target costs for the components and the activities are updated only once you deliver the order and the target cost for the finished product gets updated when you do the variance calculation.
    Consider your scenario number 1 - you said the target costs got calculated for activity types without confirmation / GR after variance calculation.
    Now, if the order is not having any status like PDLV, DLV or TECO it will not calculate the variances in the first place.
    Your second scenario is correct - without GR the system does not calculate any target costs. Also it will not calculate any variances because the order status is still not DLV.
    Best Regards,
    Sameer

Maybe you are looking for

  • Instalação de EHp3 + ultimo Stack (15) + últimos SP de HR (44)

    Amigos, bom dia, Estou realizando um projeto de instalação de EHp3 + ultimo Stack (15) + últimos SP de HR (44) disponíveis hoje para um ECC 6.0 montado sobre Solaris SPARC 10 e Oracle 10g. O problema é o seguinte, montei um servidor de teste e realiz

  • Error while starting of Console

    Dear All,              I am getting given below error message while starting Console. Start Failed :2 Invalid Credentials. tell me the solution.

  • PU12 Transaction: Mutilple Payroll Area Issue

    Dear All, I am going under very strange issue with PU12 transaction. This transaction runs fine and export payroll data if a person is hired only in one Payroll Area. Like, if a employee E123456 is hired under Payroll Area - 99  and if this is still

  • Can an officejet 6500a be upgraded for duplex printing

    I have an Officejet 6500a without the duplex option. Can I upgarde this printer by simple buying and installing the duplexer? Many thanks ...

  • Java in-game components

    I have always wanted to create a game in java but I will not use Swing components for obvious reasons. Thus I have decided to create my own in-game components. Many will be simple like buttons, checkboxes and so on. I have some questions before start