Execution of multiple goods movements in one operation

Hi,
Does anyone know of any SAP standard functionality for executing several movememts of materials in one operation?
For example, is it possible to execute first mvt type 321 for a material, directly followed by a 301 - in one transaction (without posting material with 321 and then use another transaction to do the 301)?
Of course the number of material documents and accouting documents should be the same as if you executed with 2 transactions.
Is this something we need to configure or program? We dont use RF in the warehouse.
Regards,
Ola

Hi,
The several movements of materials in one operation can be executed in MIGO transaction,but the 321 movement is not defined for the MM movement type.
It cannot be done in any MM movement type,it should cleared with QM side only.
So the rest of any movement can be excuted in single operation.
But in QM view they can do in single operation say if 10 stock was in quality,they can move 5 to unrestricted (321), 2 piece to degrade material ,material to material transfer (309), 1 piece to scrap (551)
1 to vendor return (102).So in QM point they can do in one operation many movements for particular material in quality stock.
Regards,
Raj

Similar Messages

  • Change duration of multiple still images in one operation

    Hello Folks.
    I am trying to change the duration of each image in a sequence of still images.
    Program: Adobe Premiere Elements 7
    Mode: Standard Definition 4/3 ratio
    File types in use: MOD, AVI, PNG
    Problem: The product manual states: "To apply the new default length to all still images in your project, delete them from Project view and reimport them into your project."
    Question: Is there a way to select a group of still images and then apply a new duration value to all of them in one operation?  An Adobe salesperson told me that this is possble before I purchased the program, but I cannot figure out how this is done. I switched to Adobe from another product in order to get this feature. Now that I need it, I cannot figure a way to get it to work. Time Stretch is not available when I select multiple images.
    Thank you,
    Brian

    Brian,
    Unfortunately not. PrPro CS4.2 has just added a way to change the Duration of previously Imported stills, but so far PrE does not allow for this, unless it is new to PrE 8, but I have not read of this.
    As noted, the method is to set the Edit>Preferences>General>Default Stills, and choose the Duration in Frames. Then Import the stills. If they are in the Project, that setting has already been applied, so one must delete them from the Project Panel and re-Import them with the new Duration.
    Now, one can obviously change the Duration on a one-by-one basis in the Timeline, but that can be tedious, if there are many stills. If I were doing this, I would make sure to have the Info Panel open and nearby, Window>Info.
    Good luck,
    Hunt
    PS - if PrE 8 HAS added the post-Import Duration change, I hope someone steps up with that info.

  • ?? burn multiple iMovie movies onto one dvd with iDVD

    I understand how to burn a single iMovie project onto a dvd by using the share menu to share with iDVD. But how can i burn multiple iMovie projects with iDVD onto one disc??

    You can share the first movie from iMovie, but all the others will need to be exported from iMovie as movies and dragged into the iMovie project.

  • Re: Change duration of multiple still images in one operation

    I have done this in Premiere CS6. Make sure your selection Tool is selected. Click and drag to select the multiple slides that are ALREADY placed in your timeline that you want to change. Right click on your selection (make sure it's a regular mouse cursor and not a red editing tool) and click "Speed/Duration." Change the duration by clicking and dragging the yellow numbers. You can also type it in if need be. Keep in mind that it is in Hours:Minutes:Seconds:Fractions Seconds. Be sure that "Ripple Edit, Shifting Trailing Clips" is checked otherwise you will get gaps between photos if cutting down the time or nothing will happen if you are increasing the duration. Click OK.

    asheebee
    Are you in the wrong forum?
    You have posted in the Premiere Elements Forum, not Premiere Pro Forum, commenting with CS6 information on a 2009 Premiere Elements question in 2014..
    There is no "Ripple Edit, Shifting Trailing Clips" in Premiere Elements.
    Please review and consider.
    ATR

  • Multiple movies in one session in L9?

    From the web page "Flexible video display options let you view synchronized QuickTime movies within the interface or on a separate monitor using output options like Digital Cinema Desktop."
    Does that mean multiple QT movies in one session? I'd kill for that feature, PT has had it for years and it's a huge time saver. Anybody know?

    Nope, looks like still only one movie per session. That's a big disappointment, especially after having to go back to Logic after being able to do it in other apps.

  • Function Modules for goods movement

    Hi Expert,
    I need FM Modules for goods movement from one bin to other bin and for Storage location to other storage location.which movement type we have to use for BIN to BIN and Sloc to Sloc.
    How to find the stock of a material with respect to bin level.
    -RK

    Hello,
    Hello have alook at below FM's:-
    CALL FUNCTION 'MB_CREATE_GOODS_MOVEMENT'
    CALL FUNCTION 'MB_POST_GOODS_MOVEMENT'
    Regards,
    Nikhil

  • Goods movement in a retail using document splitting by profit center

    Hello Gurus,
    I am in a retail implementation, our requirement is to make a goods moviment from one store to another (where stores are profit centers). But they want to have zero balance document spliting by profit center. (balances by store)
    Does any one know how could the document finally be posted if the original movement is:
    1000 goods  40                   profit center 1
    1000 goods         40            profit center 2
    Thanks in advance,
    answer will be rewarded!
    Alex

    Hello Aravind
    Pls check this link
    http://help.sap.com/saphelp_erp2004/helpdata/EN/87/3da04028f40160e10000000a1550b0/content.htm
    Maybe of some help.
    Reg
    suresh

  • COOIS confirmation vs document goods movement

    Hello Guru,
    I have question with regards to my production order, when check COOIS for Confirmation and in Documented Good Movement there is a difference, upon checking in Confirmation in COOIS i found out the detailed of all the confirmation and even the canceled confirmation was been recorded there but in the Documented Goods Movement there one loss cancellation not recorded on it? how this happen? how can i check this one?
    Thanks

    Hi,
    Are you using Backflush? What is the delivered quantity shown in Production Order?
    I had the same problem few days back. Pls refer to the thread below and if it matches your requirement, you may need to report the issue to SAP.
    Not updating GR reversal
    As per thier reply, the SAP system could be accessed by some external system. They have sent a patch to implement, which would clear the redundancy in the data.
    I am still working on it. Will let you know the results if your requirement is same.
    Pls revert.
    Regards,
    Rohit.

  • Is there a way to move multiple Calendar items from one date to another?

    Hello. I have far too many Calendar items every day in my iCal. Until I finally pare them down to a reasonable level, I need to "reschedule" all of my unfinished ToDo items and reminders, to another day, later in the week.
    There doesn't seem to be any "Select All" feature available.
    Is there a way to move multiple Calendar items from one date to another?
    Thanks in advance!

    Still no ideas? Apple, please come up with a fix. Thanks.

  • New GL - Goods Movements in only one ledger.

    Hi all,
    we have a scenario where we have New GL active and use the leading ledger for IFRS and other ledger for local gap.
    For some material types, IFRS considers it as an inventory material but in local gaap it is consider an expense. And for a legal perspective, the inventory account must have no postings.
    Is it possible to have goods movements for only one ledger?
    Thanks in advance,
    Diogo

    Hi
    You are suggesting
    For eg in Leading ledger
    Rawmaterial    Dr
    Rawmaterial - Freight cost Dr
    Vendor Cr
    Entry in non leading ledger shall be:
    Rawmaterial Dr
    Freightcost expenses Dr
    Vendor Cr
    you are suggesting the following manual entry at non leading ledger:
    Freight cost expenses Dr
    Rawmaterial - Freight cost Cr
    First I feel that GL for Rawmaterial - Freight cost will not allow manual posting as automatic check is active in GL master.
    Second how a multi billion dollar company manage each accounting entry for freight manually.
    Regds
    Joy

  • Goods movement in QC confirmation for inprocess operation

    Dear Friends,
    I am doing inprocess inspection for routing operations. After results recording, I get the window where I am entering yield.
    If I go to confirmation tab, I can enter the activities and qualntity. But ther I am not getting goods movement tab.
    I want assign batch no. to material in the goods movement tab.
    How can I get it?
    Please help me.
    Waiting for reply!
    Thanks!
    Kiran

    No Inputs?????

  • Problem with goods movement during operation confirmation

    Hello,
    While doing the operation confirmation,the goods movement are not posted for the components attached to that operation i.e i am not getting the quantity of the components in the "goods movement" tab while confirming.
    check points done: 1) Final confirmation tick is activated during ope. confirmation.
                                 2) Backflushing is activated for material(componenets that areattached to that operation).
    please let me know what is the reason for not getting the qty displayed in the "Goods Movement" tab
    Thank you.
    Regards
    Santosh

    hi
    Normally if you activated the backflush for the material in the order,the material wont be displayed in the goods movement tab unless you activated the All materials in the parameters for confirmation in the intial screen of IW41
    kindly check
    regards
    thyagarajan

  • Good Movement at the confirmation of an operation

    Dear All,
    I tried to make good movement when I maked an confirmation for an operation.
    I configured whit TC: OPK4 automatic good movement and whit TC: OP67 I choosed option automatic good movement for control key.
    However, when I maked an confirmation (TC: CO1F), the system didn't propose the material from BOM, for issues, or the finished good to get in stock.
    And an additional question: if I have many operations on the routing and each of them have the same control key (PP01, for example) the system cannot accept any automatic good movement.
    What can I do in this case?
    Thank you very much for the answers.
    Regards,
    Marian

    Hi,
    You are trying progress confirmation right...
    As per my knowledge for production order confirmation you could findth egoods movement...
    in CO15 or CO11N...
    For th e second question if u have N number of operations then you could confirm operation wise in CO11n and for first operation goods issue and for the final operation goods recipet will happen
    Regards,
    sravanthi
    Edited by: Sravanthi683 on May 21, 2009 10:34 AM

  • Burning multiple movies to one DVD

    I want to burn 8 short movies to one DVD. Do I have to use a DVD RW or is there a way to burn all 8 to a DVD-R?

    You probably only have a single-layer drive so you
    will be limited to a maximum playing time of about
    120 minutes in Best Quality mode. We recommend
    Verbatim or Maxell DVD-R for single-layer discs.
    BTW, iDVD compresses everything to mpg-2 so the
    playing time of your content in minutes is the
    important factor - the size of your original files in
    MB doesn't come into play.
    F Shippey
    thanks for the tip on type of DVD, but my immediate problem is that when I burn to a DVD, I can only do one movie. I am looking for a way to select all of them vs 1 at a time. I tried the advanced & edit DVD contents but I still have the problem that the program will only burn one movie at a time & then because it is DVD-R, I can't add another. I need to be able to put all 8 on at once (or at least one after another). Is there a way to "combine" them for burning?

  • Confirmation of Production Order without all Goods Movements

    Hello experts!
    I've tried to do a confirmation of one material that had only one level BOM with one material, but, when I try to do the Goods Movement in CO15, only the component appears. To another materials the goods movements was done for the two materials.
    I've changed routing, BOM, material record... but I didn't have success.
    Any ideas?
    Regards,
    Rodrigo.

    Dear
    You might have kept Backflashing Indicator -1 in MRP2 view  and while doing CO15-In goods movement tab -You will find BOM compoenets with movement type -261 .But your requirement is to carry out the Auto GR-101 while confirmation posting .
    Please do the following :
    1.Goto -OPJK-Define Production Scheduling Profile -Here for that scheuling profile which have been assinged in Work Scheduling view -Mark the Auto GR active .
    2.In the routing  or in the Production Order -Operation Overview screen -Goto Operation Details -Slect the last operation -Assing the Operation Control Key which has Auto GR active like SAP Stanrda PP03 .Please check in OPJ8-Slect the Operation Control key -Hit the details information -Check the Auto GR Marked .Based on this while you will do CO15 , GR-101 (MIGO-101) will happen .
    Hope it helps
    Regards
    JH