Hi,
Any one tell me, its this possible?
We have one repository ( OWB 10 R2 ) and two projects named dev_project and test_project.
We want to copy or (export /import) the mappings from dev_project to test_project, how to do this? It seems export and import can be done if the servers are different (also it is possible to recover from the back up to the same server and same project.)
Thanks in advance
-NB

I don't use 10gr2, but with 9.2 it is possible to do this, but you need to modify the MDL file before importing it.
** Before doing this, I'd recommend you export everything from your design repository to be safe **
Export the object(s) from DEV_PROJECT to an MDL file. Then open the MDL file in your favorite text editor and rename the project from DEV_PROJECT to TEST_PROJECT. Then import the MDL file back into the repository matching by name (NOT UOID).
I'd recommend you not do this, however. Why do you need a seperate project for test and dev? Why not create another runtime repository connection in your project so that you can deploy to both the development and test environment from the same project?

Similar Messages

  • Understanding File Import Images VS File Import Folders into a Project

    Hello,
    When I select the "File>Import>Images" command, images go straight into my project, no album is created.
    When when I use the "File>Import>Folders into a Project..." command on a folder containing subfolders, it will map the folder to a Project and subfolders to albums. OK.
    However, when I use the "File>Import>Folders into a Project..." command on a folder with NO subfolders, images are put in an Album anyway. Why is that?
    Is it possible to avoid the creation of an album and have images straight in the Project?
    Thanks,

    MacDLS wrote:
    Take into consideration that you're using a feature in a way other than what was intended.
    You believing that that's how it should behave doesn't make it so.
    You're right. Me alone is nothing. But if a high % of A2 users think like me, then maybe this feature needs some polishing.
    The REALLY simple work around is to delete the album. The images won't go with it, and it's faster than retyping the name.
    Good, that's the workaround I needed. For some reasons I was under the impression that deleting the album would delete the the images as well. I guess I'm still not used to that project-album concept.
    You could hit Command + Delete on a hundred Projects and do less work than you've done on this one thread.
    BTW: You submit feedback by choosing Aperture>> Provide Aperture Feedback not by posting it on a U2U forum. There are Apple moderators here but not Application Engineers.
    Sure, that's how I always submit feedback to Apple.
    Thanks.

  • I want to import one imovie project into another one.  In other words, I have created a short sequence in iMovie 11 on one computer, and I want to import it into a project that I am working on, on another computer.

    I want to import one imovie project into another one.  In other words, I have created a short sequence in iMovie 11 on one computer, and I want to import it into a project that I am working on, on another computer.  I copied the project files onto a hard drive, and then connected that drive to the Mac that my main project is on, but when I select "import" the files are faint gray -meaning I can't select them.  Help!  I want to transfer a sequence of shots from one iMovie 11 project on one computer, into another iMovie 11 project on another computer.

    Tell me it ain't so!
    I wish I could.  The research you've done is correct.
    Wether you copy and paste or rebuild the Project from the other computer, you're going to need to get your Evnets copied from the other computer.
    The Prjoject files only contain pointer back to the original media.
    Matt

  • Import iPhoto into iMovie project library

    import iPhoto into iMovie project library 10.0.2

    In iMovie your iPhoto Library should show up in the Library panel as the top listed Librar., Double click on it and all your events from iPhoto will appear. Photos and videos will be there.

  • Why is it impossible to import pics into existing projects in Aperture 3.6 ? It forces me to create a new project on every import. Tried to change that in preferences but no luck.

    Why is it impossible to import pics into existing projects in Aperture 3.6 ? It forces me to create a new project on every import.
    Tried to change that in preferences but no luck.

    It is working for me.  Two ways to import into an existing project:
    Select a project and view it in the browser in split view. If you drag image files from a folder directly into the filmstrip, the dragged image files will be added to that project.
    Or select a project in the library, before you open the Import panel. Then you can switch the destination project in the Import Settings  from "new Project" to the selected project.
    Have you tried these methods? Where does it not work for you?

  • Why does dragging an imported video into a project reduce the file size by half?

    I used a Canon Vixia HV40 to import 1 hour of HD video filmed using 24F and cina mode.  My import and project properties were as follows:widescreen (16x9, 24F, cinema, import size = full, original size.
    The specifications for the imported file are as follows/:
    Size: 22.12GB
    Dimensons: 1920 x 1080
    Codec: Apple Intermediate Codec, Linear PCM
    Color Profile: HD(1-1-1)
    Audio Channels: 2
    Total Bit Rate: 47,113
    When I drag the imported file into a new project, the resulting .mov file has the following specifications:
    Size: 9.67GB (approx half the size)
    Dimensions 1920 x 1080 (same)
    Codec: H.264, AAC (different)
    Color Profile: HS(1-1-1) (same)
    Audio Channels: 2 (same)
    Total Bit Rate: 20,607 (approx half)
    What causes the file size reduction and bit rate reduction?  Is it a result of the different codec?  Is there any corresponding loss of video quality that results from the conversion?
    Thanks for your answers in advance.

    Thanks a lot for your quick and detailed response!
    Maximum image quality and file size are not the same thing, for a start.
    Yes, but with JPG's they tend to be correlated, aren't they?
    When you view a photo in iPhoto it's a composite of the original and the decisions recorded, and applied live as you view.
    Oh, I always thought iPhoto makes a copy of the orginial and modfies that ...
    If you want to use that photo for something then you have to export it. This make a new file with your photo in it. When you export you have a lot of options - including ones that will make the filesize bigger than the original.  This User Tip
    https://discussions.apple.com/docs/DOC-4921
    has details of the options in the Export dialogue.
    Ah, that is cool. That solves my problem.
    If you use drag and drop from the iPhoto Window that's a form of exporting too -but you have no options there. You get the iPhoto Preview. That's a 'handy-good-enough-for-most-things version of the shot. If you want  more options use the export command.
    That's what I tripped over. (I used the email feature from within iPhoto for a quick sharing ...)
    Thanks, G.

  • Importing Data into MS Project Professional 2013 from Excel workbook, can it be done?

    Hi all, I am trying to get data in from several large work plans done in Excel, into MS Project 2013 Pro. I am familiar with the Import Wizard, but in this case, there is nothing to map from the Excel files it seems. Does that mean that I have to edit the
    Excel files and make sure there is a column called Name to key from? Or do I do something else so I don't have to cut and paste or retype all of this? Well, as always, thx (and thank the heavens u are here). 
    Cheers,
    Jigs
    Jiggy Gaton, Trainer and Media Consultant for Nepal and S. Asia

    Jiggy --
    I think it would help you if you exported a Microsoft Project 2013 file to an Excel workbook so that you can see exactly WHAT data your own Excel workbook should contain.  Please try this:
    Open an existing Microsoft Project 2013 file.
    Click File > Export > Save Project as File > Microsoft Excel Workbook and then click the Save As button on the Export page.
    In the Save As dialog, navigate to the folder where you want to save the Excel workbook file, and then click the Save button.
    In the Export Wizard dialog, click the Next button.
    On the Data page of the Export Wizard, select the Project Excel Template option, and then click the Finish button.
    If you see a warning message about a missing filter, simply click the OK button, as this is a bug that will not affect the exported data.
    Now, open the resulting workbook in Microsoft Excel.  Pay special attention to the data shown on the Task_Table worksheet.  Notice in row 1 how every column has a heading that describes the data.  Notice that the column containing the Task
    Name information is not called Task Name; it is simply called Name.
    What you will need to do is to configure your own Excel workbook to look like what you see in the Excel workbook that you just exported.  Then try importing your Excel workbook data using the Import Wizard, and let us know if you have follow up questions. 
    Hope this helps.
    Dale A. Howard [MVP]
    Well, I followed this procedure and the results are problematic. First, there is always errors on import, and no matter what's selected, the import works but with problems...
    Multiple import errors of the same type, clicking Yes, No, Cancel produces the same results: 
    Then, unpredictable results on import, most of the time it looks like this: 
    The crossed out text is problematic. I have no idea why it does that, or how to fix. Well, thx for your help!
    Jiggy Gaton, Trainer and Media Consultant for Nepal and S. Asia

  • GarageBand project won't import correctly into another project

    I created a long podcast project using GB 3.04. The project consisted of one voice track. I decided to break it into two projects so that I could make it into two episodes. I created a new project and dragged part one to it. This worked just fine -- I was able to import other audio files and create my finished episode. However, when I created a new project for the second episode and dragged part two to it, the track was truncated to a fraction of its size and it contained no sound. The original of part two plays normally when I open it, but several attempts to import it as a track have produced the same result. Is there some setting that I accidentally tripped, or is the project file just corrupt? I don't want to have to re-record the track, but I've resigned myself to the possibility. Thanks.

    Sorry, guess I didn't explain myself well. The original GB project consisted of one voice track that was around 45 minutes long. I decided that I didn't want the podcast episode to be that long, so I split the track region into two regions. Using the Edit -- Copy command, I created a separate GB project and pasted the second of the two regions into it. I tested the new project to make sure that it played properly, then saved it, re-opened the original, and deleted the second region (since it was now in its own project file). I named the original "part 1" and the new project "part 2". I then created a 3rd project file, to which I dragged the part 1 file and added music, imported mp3s from other podcasts, etc. This went off without trouble. However, when I attempted to do the same thing with part 2, I ran into trouble. I dragged the file for part 2 into a new project file, but instead of 18 minutes of voice recording, I get 3 seconds of dead air. If I open the file for part 2, it plays normally. I don't think I did anything differently with the two regions, but it wouldn't be the first time I've changed a setting or something without realizing it.
    Thanks for your interest.

  • Importing metadata into second project

    Hello,
    In order to keep things clean in the development project I want to create another project and point it to our test environment. When I try to export an existing project and import it into the new one it tells me that the objects already exist in the repository and it doesn't import. Is there another way to copy mappings, tables ect to another project within the same design repo? I realize that I will need to setup new target modules, locations, ect.
    Thanks for your help!
    Jaycie

    Thank you for your help. I did what you said and renamed the project throughout the mdl file, but I am still getting the following error:
    PROJECT with Unique Object ID (UOID) <F649716A0ED631D1E030010AD4C97030> already exists, so PROJECT with physical name <HPDW_T> and business name <HPDW_T> not imported.
    Because it keeps the uoid the same it won't import.
    Any other suggestions would be greatly appreciated.
    Thank you.
    Jaycie

  • Export - import to a different tablespace ??

    I have exported a schema from 8174 from production as the user itself.
    exp user/user ........
    I am trying to import it into development.
    Only one table i am importing it from the dump.But this table structure is already existing in a tablespace different from production.....
    say if t1 is in tbs1 -- Prrod.
    t1 is in tbs2 -- dev.
    so while import the data is going into this tbs2... and not tbs1 of dev.
    The default tablespace of user is tbs1.
    So how can i import it intot tbs2?
    Please help me ...

    Is t1 in development (the target database) already in the appropriate tablespace?
    If not, correct that by doing:
    alter table t1 move tablespace tablespace_where_t1_should_live;
    Then do the import with "ignore=y".
    That ought to take care of it.
    -Mark

  • Issues importing pictures into the project I want

    When I import a photo it imports into the project I want but also creates a second "new" project in the same folder, how do I get it to only import where I want?  I appreciate any help. 

    Hi Ulrich
    The picture size does not matter, but rather a setting in Administration > System Initialization > General settings > Display TAB. On this tab you will find a setting with a drop down called "Ext. Image Processing". Set this to full and the full quality of any pictures will be used, but of course resized to fit the field. Bear in mind that images are not embedded in the tables but only the file name of the image is stored in the table.
    Kind regards
    Peter Juby

  • Importing Video into Flash Project ?

    Hi, I want to ask you about how can I import video into my Flash Project and make it possible to view ?
    I tried to choose embed FLV but the sound quality is quite shity and the video quality too. Furthermore, It expands the timeline which is too long because my video is quite long too. It said that it can be at least 16000 Frames to run.
    Now I choose Import -> Import Video -> Load External ..... and then I put it on one scene. The thing is that when I test it, it looks like I have to expands the timeline too so that I can play the videos fully. And It will slow down the computer so much when I want to export. Is there any way I can play the video only by just creating one keyframe ?
    Please help me.

    i choose Load -> External and it gives me some FLVPlayback in the library too ... But how I can make it relate to the previous scene and it can play the whole video and then back to the first scene...
    First scene is where people can choose some option that I made of ...
    A is where I link to the scene 3 of my project
    B comes to Scene 4
    C comes to Scene 5
    What I'm stucking right now is how can I made the C choice for people to choose and they can see the videos. I tried to drag the FLVPlayback to the scene 6 and it shows some result. But I think if I want to watch the whole video I need to expand the timeline as much as possible and I really don't want that. Is there any actionscript code or some tips that I can make it possible? Sorry because I'm a newbie so I don't understand your words. Can you explain it more ?

  • Importing TIFF into FCP project

    Hi everybody,
    I am importing Tiff into a FCP project.
    I have all my clips listed in the order they were shot to go into the FCP project.
    If I select more than one at a time to import within FCP, the Tiff are put in any order.
    Would anyone know if there any way to import more than one TIFF at a time in such a way they appear in FCP in the order they were created ?
    Thanks in advance
    Bernard

    The numbering works, just keep in mind - as Jim noted earlier - you must have the same number of digits in each name. Sequences of less than 99 should use 2 digits (01-99), over 100 but less than 999 = 3 digits (001-999) , over 999 but less than 9999= 4 digits (0001-9999) and so on.
    Why is this? Try this experiment, name a series of files in the sequence of 1,2,5,11, 21,101 When you import that into FCP, it will be ordered: 1,11,101,2,21,5.
    However, if you name them 001, 002, 005, 011, 021, 101 they will order themselves as you would expect.
    I don't know how you are acquiring the images, but some scanning software allows you set up a common name + sequence number and automatically increment it after each scan. This can be a great timesaver.
    have fun.
    x

  • Seperate server log for different projects on same domain

    Hi All,
    Could someone help me initiate code to seperate server log of domain for different projects running on the domain.
    For example, If I have two projects 1,2 in the same domain, then I should get two server log files for each project.
    Regards,
    SunnyPhani

    iCal Server sends invitations to internal users too if you remove the email addresses of your internal users under "Info" in Workgroup Manager.
    So the Open Directory does not have an entry for the users with your internal domain, which makes iCal Server see the user as an external one.

  • CS3 Layers disappear when importing map into InDesign

    I have an Illustraor .ai file of a map with many layers and when I import it into my InDesign document
    some of the layers disappear. When I open the map in Illustrator they are all turned on but in InDesign some seem as they are turned off or transparent. Very frustrating...any help is appreciated!

    Thanks so much for your responses. Although I don't complete understand what the issue was becasue I am no Illustrator expert I did find a solution. I found that there were multiple layers within a layer and also many of those layers had paths/compound paths. So I pulled the layers within out and made new separate layers for them all and removed unnecessary compound paths. So now I have many layers instead of a couple layers with multiple layers within. Confusing I know...but it worked!
    Thanks again for your input.

Maybe you are looking for

  • Font substitution after upgrade from 46c to ERP2005

    In 4.6C systems in SAPSCRIPT I can chose HELVE font in various sizes from a drop down list. In ERP2005 systems I can only choose a font family HELVE. I can then type size 9pt. In print preview everything is okay however, when printing to a  printer t

  • Sap ISU and CRM

    We are implementing SAP ISU with Billing and Invoicing, next step would be the implementation of CRM for Utilities.  In a part we are using the installation guide of Best Practices for Water Utilities, which presuppose the implementation of CRM. My q

  • Is there a test suite out there for testing AWT core functionality?

    Hi all, I am searching for some kind of test suite for testing AWT core functionality. It's obvious that these test aren't automatically ones like classic unit tests. I think more about a suite of mini applications that are bound together and their r

  • Bluetooth is not working in philips SPA4500B AND S...

    CONNECTION OF BLUETOOTH NOT WORKING WITH SKYPE AND PHILIPS SPA4500B PLEASE HELP  OTHERWISE IT IS WORKING NORMALLY

  • Work schedule display in capacity leveling cm25

    Hello, In our company we have created a work schedule (tcode OP4A) and have associated to a work center (tcode IR02). However, capacity leveling (tcode CM25) doesn't display the work schedule associated to our workers in the graphical planning table.