EXTENSION OF NEW PLANT(DEPO)

Dear all
We have two plants( Manufacturing and spares)
To extend new plant(for depot) with new excise registration,in MM side, what are all configuring  setteings required along with CIN settings
Please guide me
Is this come under Rollout Project? or Enhancement Project

hi
It will be rollout
Steps involved will be like
1) Define plant ( By copying from std plant)
2) Assign to company code
3)Create storage locations
4)Extend material to that plant
5)Maintain J1ID settings
also refer following
http://www.sap-img.com/materials/procedures-for-copying-one-plant-to-another.htm
Vishal...

Similar Messages

  • Abap dev for new plant

    Dear all,
    We acquired new plant, and we are inegrating that new plant which is not in sap, into our sap system.
    and lots of customizations have to be done.
    I understand that on the mm front new plants creation, assignments to cocode, BA etc happen.
    I am quite sure about abap front.
    What developemnts would be needed on abap front:
    like extension of all teh materials to the new plant.  I think this can be handled through LSMW.
    what else abap developments do i expect.

    This will depend on, when and where the data related with plant is required.
    As per my understanding the ABAP development which summarize the data at plant level will be impacted.
    In case , you have hardcoded values on the basis of plant , then you have to consider the new plant also.
    Get all the Z reports related with plant information and check. Its will be easy if you view the modification log and naming convertion.Hope it help you.

  • Mass Extn. of materials to new plants(MM17 or any other T Code)

    Hi can you guys advise me on the following:-
    I havve materils A,B,C,D and so on which are let us say present in plant P1, P2,P3 and P4.
    My requirement is to do a mass extension of these materials to new plants which could be say P1A,P2A,P4 and say P3
    Kindly advise.
    I tried MM17 but could not complete the same as it the field WERKS of MARC does not come inthe search fields
    Thanks in anticipation
    Rajeev

    Hi,
    Use MMZ1 t.code for extension of material.
    Regards,
    Biju K

  • Reg:T-CODE for open and close period for materials(new plant).

    hi sap guru's
    T-code for following process
        can anybody send me , how to create calendar to new plant . and what is the T-code to be use for open and close period of materials for new plant.
    thanks
    sakthi..

    Hi Sakthi,
    I am assuming that you are asking about the factory calendars which are assigned while difing the plant.
    Factory calendars are created through transaction "SCAL".
    Opening and closing of MM periods can be done through transaction MMPV.This is based on the company code.Before using MMPV ,you can look the last opened period in the transaction MMRV.
    Reward points if it helps.
    Regards
    Karan

  • How to add a new plant from a different R3 into the existing new GL design

    Hi Experts,
    We have a scenario where we have a BI system already functional and the the FI reports like balance sheet is already available on the Portal.
    This flow is based on standard business content for new GL concept
    Now a new plant has been acquired and that plant already has R/3 and it's own G/L accounts.
    Now we have to build 2 reports:
    1 - The balance sheet for the new plant.
    2 - Consolidated balance sheet for the complete organization including the new plant G/.L accounts.
    DS: Leading Ledger Balances (0FI_GL_10)
    0FI_GL_10 --> 0FIGL_O10 --> 0FIGL_C10 (for Totals)- 0FIGL_V10
    0FI_GL_10 --> 0FIGL_R10 (Remote cube) --> 0FIGL_V11
    How best can we merge this new plant?

    Hi,
    SEM-BCS or BI-BPC NW 7.0N is meant for similar kind of requirements. You'll probably need to get a functional guy involved for mapping the GL accounts from the new company to your existing one and have journal entries for inter-company transactions. After doing the same you can then consolidate both the data and have a common output.
    search about BPC or BCS and you'll find out more. If you still need to do it in existing BI setup then get someone from FI and set the mappings of GL Accounts from both set the business rules and create a new cube to load the consolidated data.
    Hope this helps
    Regards
    Raj

  • Error while configure new plant

    Dear Friends,
            I have  configured new plant - 8888 in company - 1000, and while creating a sale order for that plant,  i am getting the below mentioned error msg, guide me to solve this....
    " No add. company data maint. for 1000 8888 - please maintain J_1IMOCOMP ".
    Thanks & Regards
    T.Arulvanan.

    Hi,
    Please chech whether you have assogned the plant to the distribution chain(i.e. the sales org+ dist.channel). Only then the plant becomes a delivering plant and allows you to create sales orders.
    Regards,
    Raghav

  • Creating a new plant and its effects/changes required in FI/CO

    Hi Experts,
    My client is going to create a new plant in SAP so I would like to know as to what effects does it have in FI/CO.
    New plant is proposed to use functions FI, CO, SD, MM-WM and QM
    I am aware that it needs to be assigned to company code and certain account determination may change depending on the way transactions take place in new plant.
    Other than above, I would like to know if there are any specific points on which I need to concentrate and take care to ensure a smooth flow in FI/CO and no break up of existing system.
    Thanks,
    GAN

    HI,
    Below points you have to look.
    1.Assigning new plant to company code and then assignment of purchasing organization to plant.
    2.Vital steps:-Need to active your valuation area(new plant) in OMWD t.code with valuation grouping code.
    3.Maintain MRP Controller/Controllers
    4.Assign sales organization, – distribution channel – & new plant
    5.Active quantity & value updation for new plant for all material types
    6.Use LSMW or BDC with MMZ1 t.code for material ( old material or used material) uploading to new plant.
    7.All info record need to be created with LSMW
    8.Creation of any valuation types & MRP data
    9.For new plant Excise Reg. number need to be assigned in Maintaining Plant Settings(
    SPRO ->> Logistics general ->> tax on Goods Movements->>India ->>Basic setting ->> Maintain Plant Settings)

  • Creation of new plant and the impact of business

    Hi to all
    i am creating a new plant, and would like to know the impact of the plant, what are the changes to be made in the customization, i want to know what are the chages required, and let me know after unit testing and integration testing what activity to be performed, as i am at go live stage and in the production client how to extended the master data,  what is data migration how it can be done,
    thanking you

    Hi there,
    As an SD consultant, these are the things you need to take care.
    Assign the plant to the company code in OX18.
    You need to assign the new plant to the sales org / distribution channel in OVX6.
    Then assign the shipping point to plant in OVXC. If WH is active for your plant, then assign warehouse WH to plant & storage location in LE assignment.
    Reg the master data, you need to assign the material master to the new plant. Also maintain the MRP profiles, plant specific data in the MM01.
    Maintain the shipping point determination in OVL2 & storage loc determination in OVL3 (OVL3 if required)
    Check with MM, PP & FI if they need to maintain any plant specific configs. There are some configs from their end for sure. For eg for production orders, purchase orders, movement types etc.
    Reg the testing, you need to ensure that plant gets proposed automatically when a new sales order is created. Also maintain the relevent plant specific condition records.
    Similarly when PGI is done, it should update the transfer postings in MM & FI w.r.t plant.
    Even tough your project is in final stages, you have to do a regrious testing when a new plant is created. Testing cannot be compromised for time lines. It will lead to serious production issues if tsting is not properly done.
    Regards,
    Sivanand

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

  • Creation of new Plant in productive system

    Dear All,
               I have to create 3 new plants. the system is already productive from the last one year.
    can anybody guide what will be the effects if i create new plants and send the transport to the production system.
    what need to be looked for side effects if any?
    pl give your valuable suggestions.
    Thanks and regards
    Ajay

    If you create new plants - there is no adverse effect but you have to make sure that the plant you create is copying by the existing.
    other things if you have any custom reports based on the plant then the new plant should be included, authorization needs to be consider if any basd on the plant,
    etc

  • Manual for creation of new Plant in SAP

    Hi Members,
    I need to test in quality finance related activities, creation of Profit center, Cost center, Standard Heirarchy, etc.. Does anyone help me with the manual for role of Finance guy in creation of new Plant..
    Rgrds,
    Ravi

    Hi Ravi,
    Please find the below link for steps to create plant with screens.
    http://www.saponlinetutorials.com/how-to-create-plant-in-sap-mm-define-plant/
    BR, Srinivas Salpala

  • Creation of a new plant

    Hi Gurus,
    While creating a new plant in real time, is advisable to copy a standard plant or define a new plant ? Please give reasons.
    When a plant is copied what are the various parameters that are copied to the target plant ?
    Thanks & regards,
    Surender

    Surender,
    SAP recommends creation of plant by copying. Generally when a new plant is created it should be copied from any of the existing plant which functions similar to the new plant.
    The reason for this is when creating we may miss to update all the required configuration and all the configuration tables with links would not get updated. This also reduces time of setting plant as you need to just change/add configuration where ever required in the new plant.
    But if you are a fresher trying to test in your test system... create it in create method so that you will understand in the hardway as what all needs to be configured, it will be a good learning which you will not forget. Please dont try this when you are working with a client system as this make give you lot of trouble and need lot time to resolve issues.
    Regards,
    Prasobh
    Regards,
    Prasobh

  • Unable to Define New Plant

    Hi,
    I need help regarding creating New Plant. I used the following steps
    IMG> Enterprise Structure> Defiintion> Logistics Genral> Define, Copy, Delete, Check Plant
    1.   Execute
    2.   (Double Click) Define Plant
    3.   New Entries
    4.   Give Plant Name
    5.   Country Code
    I press F4 and search for DE for Germany but its not there. If I select any other like US, CA or GB. The field value remains null. Can someone tell me what I am missing? Please advice.
    Thanks
    RA

    i think u r trying to input value in the county code feild on the screen of define plant
    if that is the case  then
    i must tell u that county code is used in us for taxsation purpose
    and this field is not country code rather it is county code
    so u may leave the county code field blank
    Edited by: baxter jas on Jan 5, 2008 6:12 PM

  • Extending the existing functional locations to a new plant?

    Hi Sapiens,
    The following is my concern:
    Q1) I have a set of functional locations(roughly around 5000 records) assigned to say Plant A.
    I would like to extend these existing functional locations to Plant B. I am not permitted to do this using LSMW. I should execute this operation in one shot.
    How to accomplish this?
    Q2) After attaching all the functional locations to Plant B, i should replace the first 4 characters of the functional location structure with the Plant Code itself. Again not through an lsmw. How to accomplish this in one shot?
    Please let me know the procedure of doing it with some guidelines.
    Thanks in Advance,
    Vijaya

    Hi
    1. You can extentd to the other plant with SCAT ,BDC etc
    2. But You can not replace the first four letters from the FL with the New plant code.Remember this is a master data
    Regardas
    Jignesh

  • Excise tab in not appearing in GR (new plant configured)

    Hi Experts,
    Excise tab is not appearing while GR posting.
    I have configured a new plant in Sandbox server for testing purpose. Have done all required settings as under:
    - New Plant configured
    - Complete Excise related configuration done in Logistics General-> Tax on Goods Movement
    - PR and PO created successfully. PO  showing correct excise duty, cess, hcess, CST component etc.
    - Material and vendor excise details maintained properly in J1ID
    I guess I have missed excise related config somewhere in SPRO
    please help !

    Hi,
    #Did you have Separate Excise Registration Number for new plant! check & define  in following path:
    SPRO ->> Logistics general ->> tax on Goods Movements->>India ->>Basic setting ->> Maintain Excise Registrations
    ##For new plant, Excise Reg. number need to be assigned to new Plant , check Excise Reg. number assigned to new plant
    SPRO ->> Logistics general ->> tax on Goods Movements->>India ->>Basic setting ->> Maintain Plant Settings)
    ###Check Excise Group created & assigned to new plant in following path:
    SPRO ->> Logistics general ->> tax on Goods Movements->>India ->>Basic setting ->> Maintain Excise Groups)
    For above setting also select check box of EI Capture and select check box of Post EI in MIGO
    Regards,
    Biju K

Maybe you are looking for