External operation in routing

Hi
In routing if I maintain controlkey with external operation, I have to enter the info record details.
(I have to create info record without ref to material, the pur req/Pur ord created will be account assigned).
When ever I create an order the system will generate pur req for external opeation with ref to info record and it wil be always send to the vendor which i have maintained in info record.
My requirement is, I have 5 vendors who can do the same processing with different cost and lead time. I need to select the vendors.
Please let me know how to achieve this.
I cant go for Quota arrangement,since material number is not involved.
I dont want to create different routing with different info record details.
Regards
S.Senthil

Hi ,
In Your Scenario what i feel is you can create one routing in which u can mainatin vendor info record which is commonly used.Create a production order,but before releasing  it,u can change purchase info record by making the customised setting as below.
Go to OPL8,for particular order type and plant combination,maintain order type dependent parameters in which in planning tab -purchase requistion -try to put 2 or 1 and test (1-never it will not create,2 -purchase requistions will be created after release,3-Immidiately when order is created)
Hope it will solve ur problem
Edited by: Girish  Adaviswamy on Mar 20, 2009 7:18 AM

Similar Messages

  • Error while creating external operation in Routing

    Hi Freinds,
    I am creating an external operation in a routing and I enter the purchasing info record which is created for the material.
    But when I try to enter this info record in the external operation then I get the Error: "Enter info record without Material"
    Already info record is created for this material then what could be the problem. This is stopping the routing creation .Please help.
    Regards
    Shailesh Nadkarni

    >
    shailesh nadkarni wrote:
    > Hi Prasobh,
    >
    > Thnks for the quick response but can you throw somelight between the difference in Inforecord with Material and Inforecord without Material. Thnks....
    Shailesh,
    If the material is procured by means of subcontracting process, then we need to assign in the material master MRP2 view with special procurement key 30, create the BOM for the material, which would contain the components which would be Issued to the vendor. In this case you would be performing all the transaction with referance to the Output material number, so an Inforecord of SubContract category needs to be created with referance to the Output material, where you Issue the components and you can recieve your material.
    In case of operation subcontract the PR or Purchase order would be with account assignment to the production order and not with referance to any material, so there wont be any referance to any material number (Product), you can Issue components for processing, but when recieving it is again not with referance to any material but operation delivery.
    Hope i was able to explain, what you wanted.
    Regards,
    Prasobh

  • External planned operation in routing

    Hello,
    I have a scenario in my company. In the routing, an operation (heat treatment/machining) needs to be carried out by the vendor. We issue the goods (Material X) from WIP & receive goods (material X) after electroplating. Then we continue with other manufacturing process. 
    Please tell the configuration steps.
    Thanks,
    Murthy.

    Hi,
    External Processing of Operations
    Purpose
    An externally processed operation is not carried out within your own organization, but is assigned to a vendor, who then does the work.
    This type of processing is particularly important for subcontracting. It can also provide a company with a feasible alternative to in-house processing, if capacity bottlenecks occur.
    If certain components are required to carry out an external operation, you can also provide these components for the vendor (see Provision of Components).
    Prerequisites
    An operation can only be processed externally if its control key allows or prescribes external processing.
    Since an external operation has to be sent to a different company, additional data needs to be maintained on the External processing tab page. You can maintain the data in the routing or in the production order.
    Process Flow
    When you create an order, the system creates a purchase requisition for an externally processed operation.
    When a purchase order with reference to a purchase requisition is created, all data necessary to process the material externally is transferred to the purchase order. After the material has been processed, the vendor delivers the material back to stock.
    Result
    The goods receipt of an externally processed material causes the status of the operation to be updated:
    For partial delivery, the status is: EOPD (External operation - partial delivery)
    For final delivery: EOFD (External operation - final delivery)
    After the goods receipt, the material can be processed further in-house, if required.
    Subcontracting Steps:
    1. Define all the materials in your plant (subcontracting and packaging etc).
    2. In the material master MRP 4 view there is one field in which you can mention that this material is not relevant to MRP planning, use this field for subcontracting material so that it will not be planned in MRP runs ( generally use this field for re-order point planning).
    3. In the BOM for the subcontracting material put the special procurement key as Subcontracting and do not keep relevance for costing.
    4. If you're using packaging material of your company and want to capture the cost of these materials in the subcontracting production order then put relevance for cost.
    5. Define alternate BOMs for each customer.
    6. Generally the routing will be the same but materials will change, define different prodcution versions for each alternate BOM and assign to the routing.
    7. Define the activite types for packing and mixing in the work center and assign them to the cost center, use these for your routing.
    8. Whenever you recive a sub-contracting order, use the relevant production version depending on the customer.
    9.Please use control key PP02 (customizing in OP00)in routing and maintain
    info record for subcontracting vendor
    Hope this will help you.
    regards
    radhak mk

  • Schedule lines for an external operation in a production order

    Hi All,
    I have an external operation defined in a production order and a scheduling agreement is assigned to it in the Routing operation details.  Now, i want to generate schedule lines when a production order created but the system always generating a purchase requisition.  Do we need something to be configured in the background?  Please help!
    The idea is to have the goods receipt done against the same agreement always.
    Regards,
    Sravan

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • PP Internal and External  Operation

    Hi,
           I am marked one of my operation( say 40 th operation) in routing as 'Internal and External operation'. This operation is done both internally as well as externally.How I instruct system 60 Pc is processed externally and 40 Pc is processed internally incase of 100 PC of order qty.? More over how to confirm both of them???
    Edited by: Velmurugan S on Apr 29, 2008 7:44 AM

    Hi,
    I am not sure but it seems both the types are possible in this case. If you apply a control key with this setting, you may be able to either process it internally or create a PR against it.
    Note that its OR and not AND. So you may be able to process in one of the way and not both.
    For better understanding please check it in testing and tell us the results.
    Sumeet

  • External Operations in Standard Cost

    Hi All,
    Currently when we run standard cost rollup,we are not adding any external operations costs to product and once production process is complete,it is settling as a variances.how can i include external operations cost in cost component?
    every production order external operations  costs is different and we have one primary cost element to post external operations cost.
    any help is appreciated.
    Thanks,
    Rau

    Don't solve my problem ecause this is my question.
    I want that this field "Planned Delivery Time" is compiled by Default value. Is it possible.
    In my opinion I hope that in Work Center for externa Operation, for example, there is a parameter that allows me to have a default value into the Field. Or in Master data of material.
    My user want that they create a routing and insert the work center about external operation, the system put authomatically the value into the "Planned Delivery Time".
    It's a request, but I don't find a standard solution.
    David

  • External Operation Processing

    Dear all,
    I'm using a external control key, I have an external service I want to perfom. How come I don't have a place inside the routing to indicate the service that I want like PM task lists? Also how is the purchasing department supposed to understand and the production people how would they know which cost element (GL Account) to throw in, it's too technical for them since each service is related to a certain cost element.
    Do you have a workaround solution for this?

    Rafik,
    You can use external operations control key like the standard one "PP02", here in the purchasing view you can assign the GL account / Inforecord details, based on these details the external operation PR would get created.
    Regards,
    Prasobh

  • External Operation but without entire Procurement Cycle

    We have an operation in the Production Order, where a process is done by a vendor. However this is handled such that the Vendor collects materials across several production orders on a regular basis. The invoicing is also done late, perhaps monthly. Because of this, we find that modelling the operation as an External Operation is difficult since the PO would stay open and the Production Order cannot be closed until all the administration work is completed.
    We would like to capture the external costs of the operation, as a form of immediate 'Confirmation' for that operation and posting into interim costs. Later, when the physical goods have arrived and invoiced CO can reconcile those costs against these interim costs.
    Is it possible to set an Operation as External yet not have to go through entire Procurement cycle?

    Dear
          if vendor is doing first operation, Create a semi finished material with special procurement 30 subcontracting key in material master MRP2 view  and maintain BOM of components which are sending to vendor and routing with external procurement.
    Open another semi finished material for in house production and make BOM of component received from vendor i.e. subcontracting semi finished.
    Result of above given procedure, there will be two documents without interlink (purchase order and production order). then you can open production order as per material available quantity and close whenever you desire and similarly for purchase order.
    if vendor is last operation, procedure will be vise versa of above procedure.
    Thanks
    Muhammad Ashfaq
    Edited by: Muhammad Ashfaq on Jul 21, 2011 6:23 AM

  • BAPI_ROUTING_CREATE for external operation

    Hi,
    I am using BAPI_ROUTING_CREATE to upload operations, and this method is working well as long as all my operations are in-house operations (PP01). But, when I want to upload external operations with control key PP02 or ZP02, I get an error "Cost element is not defined in the system" ( I am entering info-record, purchase org, cost element in addition to the fields for activity number, workcenter and so on during this upload).
    But, when I create a routing manually using CA01, and enter the same data for external operation, I am able to save the routing with the exact same cost element.
    Could you please help me with this error? Why am I not able to pass the same information using BAPI for external operations. Is there any other field I need to use?
    Thanks.

    Hi,
    Since you say the cost element exists & its possible to create via CA01. Add the below code before passing the value to your BAPI.
    CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
                EXPORTING
                  input  = itab-cost_elem
                IMPORTING
                  output = itab-cost_elem.
    Where itab is the name of my internal table & cost_elem is the field.
    Check & revert if the above resolves the issue.
    Regards,
    Vivek

  • External operation without material supply

    Hi, i want to send only the parent material (header material) for some operation at subcontractor for operation 20. pls advise how to maintain the bom and send to vender and further steps? thank u in advance.

    Hi,
    Pl. find below steps for external processing. I got this from one of my friend.
    1. For a production material (1001), one raw material (2001) is assigned.
    2. Production process of 1001 is having four operations 10, 20, 30 and 40.
    3. In this 10, 30, and 40 are internal operations and 20 is external operation (sub-contracting).
    4. To address this, we created a dummy material (non-valuated) and named as 1001-20 (Finished product number + Operation to be performed).
    5. This 1001-20 should form part of the component in BOM of 1001. That is BOM of 1001 will have components as raw material 2001 and this dummy material 1001-20. In routing, assign this dummy material 1001-20 to operation 20.
    6. During BOM creation, you should remove costing relevancy for the item 1001-20.
    7. In routing, operation 20 is created with a work center (which is external operation work center) with exteranl operation control key.
    8. In operation details, for external processing, assign the info record of external processing.
    9. Info record of external processing has to be created for vendor with relevance to the operation to be performed externally with vendor. (We are using material group field in the external processing in routing operation).
    10. When create production order with above set up, system will create Purcha Req for external operation. This has to be converted to purchase order.
    11. Now, this dummy material should be kept as 5000 or 6000 in stock using 561. When Purchase order is raised, required quantity has to be moved to vendor using 541.  When we do goods receipt the stock with vendor shall come down. With this, we can monitor the material (with dummy material number) stock with vendor (please note we can see only quantity and not value) .
    12. When we do GR for external purch order, we receive only the operation performed. (So, coversion cost to vendor shall be paid).
    13. After ensuring GR is done, order confirmatin of operation 0020 has to be done. (here we capture the quanttiy and also the valuation of material in production order).
    Madhava

  • External operation ID

    Hi,
    Where can we find External Operation ID in the Routing Operation details (CA02 or CA03)?
    Thanks

    Hi S0007029117,
    Well try the T-Code CC04 which is a product based structure will helps you find out it.
    Hope it helps you.
    Regards,
    Madhu.G

  • External Operation Job Log

    Hello all,
    I can't seem to find additional information on this. I have written an exteranl operation in c# and I can run it from the portal without any issue. I know that standard error is supposed to be captured in the job log, however I can't seem to figure out how to write to standard error from a c# console application. Console.error doesn't seem to cut it.
    I am using ALUI 6.0 sp1, but I dont' think this has changed much over the years. Has anybody written a c# external operation and been able to write to the job log?
    Thanks,
    Berney

    You could just make it write to stdout and then redirect stdout to stderr like this: "dir 1>&2". I put that in a bat file in the scripts directory and then made the bat an external operation. It wrote to the job logs like this:
    Mar 3, 2009 11:40:55 AM- Starting to run operations (1 total) for job 'stdout dir test ext op Job'. Will stop on errors.
    Mar 3, 2009 11:40:55 AM- *** Job Operation #1 of 1: ExternalOperation [Run as owner 'Administrator']
    Mar 3, 2009 11:40:55 AM- Java Version: 1.5.0_12 from BEA Systems, Inc.
    Mar 3, 2009 11:40:55 AM- OS x86 Windows 2003 5.2 as SYSTEM
    Mar 3, 2009 11:40:55 AM- External Operation Agent for stdout dir test External Operation is starting...
    Mar 3, 2009 11:40:55 AM- Original Script is: "test.bat"
    Mar 3, 2009 11:40:55 AM- Scripts home is: E:\bea\alui\ptportal\10.3.0\scripts
    Mar 3, 2009 11:40:55 AM- Appending E:\bea\alui\ptportal\10.3.0\scripts to test.bat.
    Mar 3, 2009 11:40:55 AM- Full Path to script is: E:\bea\alui\ptportal\10.3.0\scripts\test.bat.
    Mar 3, 2009 11:40:55 AM- Operation has timeout of 0 ms.
    Mar 3, 2009 11:40:55 AM- stdout>
    Mar 3, 2009 11:40:55 AM- stdout>E:\bea\alui\ptportal\10.3.0\scripts>dir 1>&2
    Mar 3, 2009 11:40:55 AM- stderr> Volume in drive E is New Volume
    Mar 3, 2009 11:40:55 AM- stderr> Volume Serial Number is 4CFC-EB07
    Mar 3, 2009 11:40:55 AM- stderr>
    Mar 3, 2009 11:40:55 AM- stderr> Directory of E:\bea\alui\ptportal\10.3.0\scripts
    Mar 3, 2009 11:40:55 AM- stderr>
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM <DIR> .
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM <DIR> ..
    Mar 3, 2009 11:40:55 AM- stderr>12/18/2008 07:59 AM 5,049 AnalyticsRunJobs.bat
    Mar 3, 2009 11:40:55 AM- stderr>10/08/2008 01:35 PM 2,034 BulkSubscriber.bat
    Mar 3, 2009 11:40:55 AM- stderr>10/08/2008 01:35 PM 3,577 SavedSearchMailer.bat
    Mar 3, 2009 11:40:55 AM- Total Memory = 33554432 bytes, Free Memory = 9573312 bytes, Used Memory = 23981120 bytes.
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM 8 test.bat
    Mar 3, 2009 11:40:55 AM- stderr> 4 File(s) 10,668 bytes
    Mar 3, 2009 11:40:55 AM- stderr> 2 Dir(s) 17,469,964,288 bytes free
    Mar 3, 2009 11:40:55 AM- *** Job Operation #1 completed: Process completed successfully; Command line: ""test.bat"".(282609)
    Mar 3, 2009 11:40:55 AM- Done with job operations.
    I don't think much has changed with this in the portal 6.x world, but it looks like stderr is definitely captured in wci 10.3. If there's a problem with an older version, start a support ticket to investigate a possible bug.

  • Auto-Reaction Method - External Operating System Command

    Hello ,
    I am trying to run a script (test.cmd) on a monitored java system out of solution manager via ccms auto-reaction method, but without success.
    I have created a RFC Connection to the java system in transaction sm59, defined an external operation command in transaction sm69 (/usr/sap/test.cmd) and an auto-reaction method using that command. But when I test the command in transaction sm49 with the RFC connection as target destination, the command is executed on the local CEN system (SolutionManager system) instead of the monitored java system. I have no clue where's the problem???
    Thanks for any help (points, points, points)
    Mirko

    Hi Anand,
    can you please send me that doc too pleae.
    [email protected]
    I really appreciate your help.
    Thanks,

  • Operations in Routing

    Can I have two operations in routing?In one operation operation number can be 10 for other it is 20.For operation 10 i hv to show consumption of sfg & for operation 20 i hv to show production of FG.i will confirm by co11n first for operation 10 & then for 20.Is it right?for automatically good recipt for operation 20 which control key will be used & at the time of confirmation it will show movement type 101.Plz reply.

    Dear ,
    Find belwo the answer :
    Can I have two operations in routing?
    Yes .You can have .For operation 10 -Please assing the Control Key PP01.You can assing the same in Work centre Default tab so that it will be automatically picked up in Operation 10 .In Co11n , You can confirm the same .
    For operation 20 which u  hv to show production of FG-Assing the Cpntrol Key PP03-Auto Good recipet Active  so that in CO12 /CO11N , you can keep the Operation Number 20 -Final Confirmation -Hit the Good Movement tab -Check the Movement Type 101 ,Storage Loaction -either Raw or FG as per your business requirement and then Save .
    However , you can use Back Flash opetion for SFG in FG production order .For that you need to have the below set up :
    Backflash can done based on the following set up :
    1.In material master MRP2 view of the item , Backflash field should be kept -1-Alaways back Flash
    2.In work Center where the routing operations are done , -Goto-Basic Data View -Back Flash Indicator -to be marked .
    3.In routing Componenet Alocation -Item Line -Back Flash Indicator to be ticked once assinged to a particualr operation .
    Priority will be always Work centre even you keep the Material master MRP2 view kept always back flash .
    Hope this will solve your problem
    Regards
    JH

  • External operation storage location

    Hi,
       I am generating a purchase requisiton for an external operation from a production order. This purchase req is a std purchase req and account assignment is F (production order). The line item does not have a storage location due to which the ME59N fails. Does anyone know how I can get the strorage location for this external operation purchase req to populate and how I can get the ME59N to work for purchase reqs of these kinds ?
    Thanks

    Hello
    I'd like to suggest you to read carefully the following note:
    503497 - Subcontracting and MRP areas
    The following information provided on this note confirms that the storage location is not necessary for subcontracting, therefore, this field is empty:
    The most important point to understand the system behavior is the fact that the withdrawal of the (subcontracting) component is generally carried out during the goods receipt for an SC procurement proposalfrom the subcontractor stock that is managed at plant level from an inventory management point of view and that has no reference to a storage location at all.
    This causes that subcontractor requirements can never enter a storage location MRP area, since you can later not post the withdrawal from this MRP area.
    Thus SC-requirements always enter the SC segment of the plant MRP area or the SC-MRP area.
    The SC MRP area in turn is supplied by stock transfer reservations from the plant MRP area or via third-party order processing through procurement proposals with goods receipt directly to the subcontractor. A supply through the materials planning from a storage location MRP area is not possible.
    For the above reason, SC-requirements do also not carry any storage location, since the storage location does not have any control function at all for SC-requirements:
    You cannot and you should not determine a storage location MRP area (see above), and the subcontractor MRP area is determined via the vendor of the procurement proposal, thus it is independent of the storage location.
    See also Note 376050 on this topic that makes a modification available which prevents the deletion of the storage location in the subcontractor requirements, so that you can use, for example, customer-specific reports to analyze the storage location.
    You may consider the modification from note 376050, which prevents the deletion of the storage location from the subcontracting requirements, however, this is generally only relevant for displaying the storage location and this is not used for processing the item.
    BR
    Caetano

Maybe you are looking for

  • My HP Pavilion a6357c with Windows Vista 32-bit freezes until the system warms up

    Any time I start the computer up when it hasn't been used, the system fails to boot.  It will freeze up in the process where I have to hold the "ON" button down to shut it down and then attempt to reboot.  the system will freeze just about anywhere i

  • How to run Oracle workflow in windows 7 os

    Hi, Am new to oracle workflow. I have installed oracle workflow successfully in my laptop. After installation I dont see any shortcut's in my desktop. Can any one sugess me how to run oracle workflow. Steps to begin from basic level. Thanks Balaji

  • Where is the file in exportpdf

    I exported the file (pdf to be converted to Excel), clicked save, hourglass turns for moment then nothing.  Where do I access my file?

  • Setting Node value in a DOMtree

    Hello Techies, I am trying to create a DOM Tree. I had create Node's for the DOM Tree. I want to know how to set the Values to these Nodes. Element root = null; DocumentBuilderFactory factory = DocumentBuilderFactory.newInstance(); DocumentBuilder bu

  • Dynamically populating a JMenu

    I'm new to Java, but was hoping someone could point me in the right direction for populating a menu with items as it is about to be displayed. This would be a cascading menu off a JMenu off a JMenuBar. I have figured out how to populate the JMenu, bu