External procesing in Production Operation - Pur.Requisition type NB

Hello,
In my external process using external operations in PP-Order, the purchase requistion created upon saving the prod.order is of document type NB (estandard).
How can I Change this document type of the Pur.Req in this case.
Thanks for any reply
Aart

Setup to be done in OPJP

Similar Messages

  • Subcontract PP Operation - Set Requisition Type

    All-
    I'm working to find where purchase requisition type is contained for external subcontracting within a PP operation.  Currently, the requisition being generated by the operation is for a standard PO type.  I'm assuming that it is possible somewhere to alter this to instead produce a requisition for a framework PO.
    Can anyone advise on where this setting is located?
    Thank you in advance,
    Ehren

    Milton-
    Thank you for the reply.
    However, I'm not seeing how this allows for tailoring of the PReq type for only a subcontract operation of a PP order.  This looks to control the overall assignments for an order which needs to be maintained at it's current setting of PReq Standard.  99% of the production order operations utilize standard requisition type and should not be altered.
    Again, this is for a single subcontract routing:
    External processing for subcontract requisition is active within the operation.  This is the requisition that absolutely needs to be framework type.

  • For new document type for pur. requisition

    Dear cons
    We have created two series of purchase requisition i.e. - ph-1, ph-2 for project. For ph-1 pur Requisition we have created WBS element. Also for ph-2 we have created separate WBS element. When we create a pur. Requisition for ph-1 if we entered WBS element of ph-2 the system is accepting which is creating a problem. Our point is that system will only accept WBS element of the respective phase. That means for ph-1 pur. requisition the system will accept only ph-1 WBS element not ph-2 WBS element. So pl. give some idea so that we can solve the issue. So where can we make the setting so that the issue can be solved.
    thnks
    nrp

    Hi Nirupama,
    You can control this though authorization
    Find out the authorization object for docuent type and account assignment
    And assign allowed wbs for doc type , take basis help on this
    BR
    Diwakar
    reward if useful

  • Procurement of external services in production orders

    Dear Sirs,
    We need to procure external service in production order as is done in maintenance order using a control key like PM03, it means, we need to create, automatically, purchase requisition with item category D (service). Therefore transaction COR1 (production order creation) doesn't allow to use any kind of control key which has T430-SERVICE flagged.
    Do you have any idea how to solve this?
    Best Regards,
    Carlos Daniel

    Please update the control key that you are using for this activity under -
    IMG>Production>Capacity Requirements Planning>Routing data>Define control key
    Here, you have to flag the check box " Schedule Ext. Operation" & maintain the " Ext Processing indicator"
    Thanx!!

  • MRP Issue: Planned orders Vs Pur Requisition

    HI All.
    I have a query on MRP.
    We run Total planning for a plant in a night batch job  The parameters for variant are as below
    Planning Run Type: NETCH
    Creation Indicator for Pur Req  2.
    Planning Mode 3 Delete & recreate order proposals
    Scheduling type Lead time scheduling
    For example MRP runs on 19th Jan & for a given material, a planned order is created as the lead time 10 day & the requirement date is 15 Feb.
    Now as normal proedure, when the opening date in the planned is reached, MRP should delete this planned order & create a Pur Requisition. But this is not happening even though we have used the planning mode 3 (delete & recreate order Proposals)
    There is no planning file entry for the material after the initial MRP run. Is this the reason that the target material is not picked up in the planning.
    Any suggestions on this.
    Regards
    Vineet

    Hi
    If Requirement is 15 Feb System Calculates and Gives the proposal for 05 Feb. As you may know there is one more Schedule Margin Key  and itu2019s a buffer time before and after Procurement prosal. May be its affecting your Openeing period. Please Check the Paramaters in Material Master 1. Schedule Margin Key,2. GR Processing time, Lead Time  and planning time Fence(During this Period System Doesnt Allow Automatic changes,,
    rewd if usefull !!
    BV

  • Consumer endpoints and remote operations/input message types formation

    Hello,
    Couple of questions;
    1) In case of a BC, a consumer endpoint (i.e. a proxy for an external consumer) doesn't need to be activated with the NMR -- is this understanding correct?
    2) Moreover, as the SU for this component defines a "consumes" element in the jbi.xml , but the operation is not specified in the jbi.xml (but will be specified, in a configurtion artifact that goes inside the SU, as I understand).
    Now, how would the BC dynamically form an NMR message that conforms to the operation input message type of the service it's consuming ? The BC will know about the remote operation and it's input message type only upon SU deployment..
    Hope I am articulating my question clearly..

    A binding component (BC), when dealing with a newly received request message from an external service consumer, must map the message to a particular service and operation (as defined by JBI's WSDL-based services model). How this mapping is performed depends on the nature of the protocol the BC handles, as well as the implementation of the BC.
    To answer your specific questions:
    1. Only provided services are activated, by the provider. Consumers (including a BC acting as a proxy for an external consumer) need only discover the service (at design- or run-time) in order to use it.
    2. The SU jbi.xml exists to help design tools which wish to recompose service assemblies. The "consumes" element gives tooling information about static service dependencies of the SU. (This avoids requiring that the tooling have deep knowledge of the contents of the SU itself -- composition can be done using any SUs, regardless of how they were created.)
    Recomposition of a service assembly is accomplished by matching service types, not individual operations.
    3. The BC can create a NormalizedMessage (and a MessageExchange the will hold it) using three sources of information:
    - The message from the external consumer
    - BC configuration information (from SUs deployed to it)
    - Service metadata (WSDL), as published by the service provider.
    Note that in some protocols the message from the external consumer is not sufficient to determine which service and operation are required. In such cases so-called trading-partner data are needed, as part of the BC's configuration data (from SU deployments), to map an inbound request message to the service and operation needed.
    So, to answer your final question (and hopefully I understand it correctly), in general the BC needs to be configured to create the external endpoint to which the external consumer can send messages. Depending on the nature of the BC, it may also need additional data about mapping messages to JBI's service-and-operation model of services. Dynamic mapping is certainly supported.
    In typical binding components, the BC only "learns" of a new external endpoint that it must expose when a service unit is deployed to it. However, JBI does not restrict BC's to only using this mechanism. A BC could use a different mechanism, but this in general complicates administration and component portability.
    Does that answer your questions?

  • Error in schedulinq parallel sequences with flow production operations

    We have a routing with a standard sequence with operations in wich we have set "Continuous flow prod"
    and "Min. Send-Ahead Qty=1".
    We have a parallel sequence as well with operations set in the same way "Continuous flow prod"
    and "Min. Send-Ahead Qty=1".
    When you run the transaction "MD11" to create a planned order for the item the scheduling of the operations is correct
    as regard the standard sequence,the system, correctly,  schedules the operations overlapping
    them according to lead time set in the operation details.
    But the last operation of the parallel sequence is scheduled to finish the whole lot before the operation
    following the "return operation" . The system doesn't overlap this operation. In this way the
    last item of the last operation (in the parallel sequence) isn't finished at the same time
    with the last item of the "return operation" (in the standard sequence) as we like it would be.
    We have set "Backwards scheduling" type on customizing and we use the "Alignment key= 2 "
    for standard sequence and in the parallel as well. We have also tryed to set "Alignment key= 1"
    in the parallel sequence but the results are howewer not correct.
    In conclusion the schedulation of  continuous flow production operations
    doesn't work properly between operations belonging to parallel sequences.
    Could you suggest me what to do?
    Thank you.

    Hi,
      I tried with 5 ops 10, 20, 30 ,40,50 ( same work center  wc1)
      Set up time 1, Process time 1min for 1 pc
      set the continuous flow prodn i at op 20 with min send ahead qty 1
      Also a parallel seq was created with 3 ops op20 ,30 , 40 .
      set up time was 2 min for all work centers( same work center wc2) and proc time
      time is 1 min for  1 pc
      In that set the  continuous flow prodn at op 20 with min send ahead qty 1
      sceduling type was forward
    .Alignment key was 2 for both std seq and parallel seq .
      After scheduling found that op 20 in std seq starts at 6.14am and op 40 ends
      at 6.47 am where as in parallel seq op 20 starts at 6.11 am and op 40 ends at
      at 6.47 am which is correct.( branch op is 20 and return op is  40)
      The three minutes late start in op 20 of std seq  is due to 3 minutes extra time
      defined for three  work centers setup time.
      I also tried with alignment key 1in both std seq and parellel seq.
    Kindly check that you have maintained the continous flow prodn radio button
    in the same operation in both std seq and parallel seq.
    Regards,
    S.Nandhakumar

  • Pur requisition manually or through MRP

    Dear Friends
    Please sapre some time for my querries
    1   How do I know that a particular Pur requisition was made manually or through MRP?
    2   How to insert company logo in Printout of Purchase order?
    3    How we can check that what are the documents generated (hit) through any transaction?  Like, when we do MIRO, what are the accounts hit?
    Regards
    Sanjeev

    Hi,
    1 How do I know that a particular Pur requisition was made manually or through MRP?
    To check this whether the PR is created Manually/ MRP there is a tab in PR item details Contact Person there you find the Creation Indicator--R(Manual) , B(MRP) like that.
    2 How to insert company logo in Printout of Purchase order?
    In SE78 you need to include the LOGO into sap then for your smartforms which is designed for PO you have to upload to smartforms. Usually this will done by technical consultant. take help from him to include the logo to the Print out of PO.
    3 How we can check that what are the documents generated (hit) through any transaction? Like, when we do MIRO, what are the accounts hit?
    To check the accounting document.
    there is a transaction FB03 which shows the details of Accounting document for the reference document.
    Or after posting the MIGO/MIRO in the display mode of the document you can check the follow on documents.Here you can find all the G/L accounts which hit.
    hope you understand.
    rgds
    Chidanand

  • External Service Failure: There was no Content-Type header

    We have developed a web service using WLW and deployed it to weblogic 8.1 (install from scratch), we manage to invoke the service successfully. However, when we deploy it to the weblogic 8.1 server installed through PeopleSoft PIA , we keep getting the 'External Service Failure: There was no Content-Type header' error.
    Does anyone know what are the differences for the weblogic installed through PeopleSoft PIA or how we can get around the error? Thanks!

    Hi Jerioon,
    Which Master Page and Content Type did you use when you created a new page layout with Designer Manager?
    Whether you could provide a screenshot about this issue.
    In addition, here is an article about creating a page layout with Designer Manager, please take a look at:
    http://www.learningsharepoint.com/2013/03/03/create-a-custom-page-layout-in-sharepoint-2013/
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • Mapping with Scd operator set to type 2 reading source records two times

    Mapping with Scd operator set to type 2 reading source records two times.Records selected count being displayed at the end of execution is double the source record count.This possibly is affecting the performance of the mapping.
    Is this a bug in scd type 2 operagtor in OWB 11gR2.How to rectify this umwamted double loop through the source data selectiom?

    Hi Roelant,
    I think it is important to be aware that although Paris - 10gR2 - is not actually buggy (in this respect!), it is really quite idiosyncratic in exactly how it processes SCDs.
    I followed up on your and Mark's comments, and did an in depth analysis of this topic. It is at http://www.donnapkelly.pwp.blueyonder.co.uk/documents/OWB_10gR2_SCD.pdf
    My conclusions are perhaps of interest to anyone considering doing SCD processing with Paris.
    I'll be doing a follow-up this weekend, and publishing a sort of 'how-to-do-it' guide.
    Cheers,
    Donna
    Message was edited to add the words: "in this respect"

  • I have CS4 web Premium -  I am trying to look at the Adobe Cloud option for the 2015 compable product.  However...under my registered produst only Acrobate is listed...I also have the subject Adobe product.  When I type in the serial # from the oriinal ad

    I have CS4 Web Premium -  I am trying to look at the Adobe Cloud options for the 2015 compatible products.  However...under my registered products...only Acrobat is listed...I also have the CS$ Web Premium Adobe product.  When I type in the serial # from the original Adobe CS 4 dvd's package I get a "product already registered"...but I can not find it's registration on any Adobe page and it doesn't show up under registered products on the Adobe Cloud page(s)
    Since it's registered...how/where do I find this verification...
    Thanks   TRinAz
    Message was edited by: Tim Rogers - spelling

    You will have to contact support by web chat to figure out any such issues.
    Mylenium

  • Purchase requisition type while converting planned order

    When We convert planned order to purchase requisition in MD04 how the system picks the  Purchase requisition type ?What configuration needs to be done in Spro

    Dear
    Please check the following
    Basically , document type selection for PR depends on the planned order profile -SPRO-MRP-Procurement Proposal-Planned Order Profile .
    Check in
    1.OMDV -Conversion of planning run -Purchase Req item -Order Type -It should be NB
    2.Or else , check in OPPR-Carry plant parametrs MRP group -Scehdel/documets type .-NB.
    MRP checks in MRP group level.
    Regards
    JH

  • Product Attributes and Set types Tables

    Hi,
    In which Table does the Product Attributes and Set types stores in CRM?
    Can anybody tell me?
    Thanks

    Hi,
    I am not able to get you can you explain it clearly by taking this example
    I have created the Product Called Monitor
    For that Monitor i have maintained the following attributes like
    Monitor Size like 15 or 17 or 21inchs
    Monitor Type like Flat or LCD Type
    I have created the Set type for that.
    I have assigned those things to Product.
    What are the tables are involved in this process can anybody help me out regarding this?
    Thanks

  • External definition and used them as Data Type Templates

    hi all
    how to Develop external definition and used them as Data Type Templates .
    Thank u
    Swari

    HI
    External Definitions: If a definition of the message structure exists in wsdl, xsd, dtd formats, we can use it in the integration repository by importing it as an external definition.
    External Definations:
    An external definition enables you to import a local WSDL, XSD, or DTD file to the Integration Repository and specify which parts of the schema to extract as the description for a message. You can use these extracted message schema as:
    Output or input messages in message interfaces
    Source or target structures for message mappings
    There is a series of standard schema for describing the message structure at runtime. WSDL (Web Service Description Language), XSD (XML Schema Definition Language), or DTDs (Document Type Definitions) are often used to describe message schema. If a description of the message structure already exists in one of the above formats, you can use it in the Integration Repository by importing it as an external definition rather than re-entering it manually using the data type editor.
    Have a look at
    http://help.sap.com/saphelp_nw04/helpdata/en/43/ce49ef1019087ae10000000a1553f6/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/ba/d4c23b95c8466ce10000000a114084/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/26/9e97b0f525d743882936c2d6f375c7/content.htm
    cheers

  • Production order default settlement type

    Hi,
    After creating a production order, manually we are maintaining settlement rule by entering catogory and settlement receiver and
    after pressing enter automatically the settlement type proposed is PER, but we want system to propose FUL,
    pl suggest.
    Regards,
    Santhosh

    HI Santosh
    Please check you own thread for the same issue.
    Re: Production order default settlement type
    either close the previous one and then raise second issue.
    Regards
    Anupam Sharma

Maybe you are looking for

  • Can I delete a whole disk folder from my Time Machine backup drive?

    I temporarily mounted a drive (let's call it "Mumble"), forgetting to exclude it from Time Machine's list of disks to ignore. I caught this oversight after Time Machine had done just one hourly backup, and Time Machine is no longer backing it up, i.e

  • Apply request values from a region on an event from another region

    Hi, I am quite new to ADF and that's my first question/post here (and as a matter of fact pretty much anywhere), so i hope i manage to make my problem clear enough. First i am using ADF Faces + ADF BC using JDeveloper 11.1.2.1.0 with the integrated W

  • Preview crashing with large photos on iMac 5K

    Not sure if this is a Yosemite Beta (10.10.3 - 14D105g) problem, or if it's the base model iMac 5K, but when I try and view these 'High resolution comparisons: Canon 5DS R vs the world' that I downloaded, either Preview crashes or my machine reboots.

  • % if () {%   %} if() {% %}% Why  does Error occur?

    Hi, can somebody help me to understand why does error occur in this example? <% if (k.equals("1")) {%> html tags <%} if (k.equals("2")) {%> html tags <%}%> If there is only one condition it works, but if tere are two, the second condition lead to the

  • Open iweb website in other program?

    Hallo guys, I've been using iweb and now I just bought a new macbook pro and iweb isn't there anymore. 1) I heard downloading isn't possible; 2) I've tried to install from my old disk, from my macbook white 09, but it wouldn't allow me to install. 3)