External Requirements from One R/3 client to Multiple EBP clients

Hi
We have a scenario where in , the Purchase requisitions generated from R/3 has to be sent to two different EBP clients on the same server.
But, we are able to send the PR to one EBP client only, but not the other.
Is there any settings where we need to maintain, such a way that, at the time of transferring the PR, one need to maintain the EBP client..?
We are on SRM4.0 and R/3 4.7

Hi Muralidhar,
One R/3 PR can only create one SRM SC.
When defining a transfer profile in R/3, you define the target SRM RFC destination, where the client is defined uniquely.
If you "duplicate" this flow to create 2 separate SC in 2 SRL clients, which one will be leading ? I mean they will have 2 different lifecycle, and at the end, both you try to fullfill original PR (by creating 2 PO ??).
For your exotic need, you have to change standard R/3 code to send the same PR to 2 SRM clients.
After this, up to you to garanty the consistency of the process (no support from SAP).
Rgds
Christophe

Similar Messages

  • External requirement from non SAP system created in SRM 7.0 Extended Classi

    Hello SRM Gurus:
    Has anyone created an external requirement using XI ExternalRequirement_Create_In (http://sap.com/xi/EBP).  We are getting a E001 "No company code could be determined for backend  for product##".  I traced the error to FM 'BAPI_SCEC_CREATE' in class "CL_BBPX_EXTERNAL_REQUIREMENT".  What I found is that it check the attributes for BUK and updates a table with the backend EEC system.  Then it checks if any of the entries match our external non SAP system in our external requirement and since it is a non SAP system none do.  Then it sets a return error code.
    I configured our non SAP system in the SLD and in SPRO under "Define System Landscape" as a non SAP system.
    We are running external classic scenario.  We just want to created a shopping cart from an external non SAP system.  Source the shopping cart in SRM and create the PO in SRM/ECC.  We are not using a product master but creating "describe requirement" in our external system.  Our product categories are replicated from ECC and the same codes used in our external non SAP planning system.
    If I change the external planning system to the ECC backend system, the external requirement is created in SRM but when I source it and convert it to a PO, it returns a backend error that the external requirement number does not exist in ECC.  Therefore it appears all of our data from our external system is correct with the exception of how to deternine the backend company code
    According to SAP this should be possible using XI.
    Has anyone been successful doing this or can you please advise any OSS notes or documentation explaining how to do this.  Please advise if you need additikonal info.
    Thanks in advance.
    Bert

    Dear Poster,
    As no response has been provided to the thread in some time I must assume the issue is resolved, if the question is still valid please create a new thread rephrasing the query and providing as much data as possible to promote response from the community.
    Best Regards,
    SDN SRM Moderation Team

  • How do I force smart mailbox to only show me mail from one mailbox while also showing multiple senders?

    How do I force smart mailbox to only show me mail from one mailbox while also showing multiple senders?

    It would help to post what you've tried. It does, indeed, appear that -h is the switch, and the man includes several examples, so if you've followed the examples and it's not working then that hints that you should pass it back to Apple.
    You also don't say how you're implementing your change. Are you invoking slapd manually, or are you editing /System/Library/LaunchDaemons/org.openldap.slapd.plist ?
    You should be doing the latter, and I'd expect to see something like this:
    <array>
      <string>/usr/libexec/slapd</string>
      <string>-d</string>
      <string>0</string>
      <string>-h</string>
      <string>ldap://x.x.x.20/ ldap://127.0.0.1/ ldapi://%2Fvar%2Frun%2Fldapi</string>
    </array>
    (note the inclusion of ldap://127.0.0.1/ as an entry - you'll need to run on localhost as well the .20 address since all the local services will look to localhost)
    You might also need an ldaps URL if you're using SSL but let's walk before we try to run

  • External requirements from ERP to SRM with ExtendedClassic scenario for PPS

    Hi all,
    We are having SRM 7.01 system with ERP ehp4, and we have to do PPS ( Public sector Procurement) as part of our implementation,for that we need to activate Extended classic Scenario.
    My question is whether we can have external requirements ( Material PR and Service PR) from ERP can be processed in the srm system.
    Please help.
    Regards,
    Raju

    Hi
    We can use either the CPPR functionality which requires PI/XI to be in place or maintaining the T160PR and T160EX tables in ECC and running the report BBP_EXTREQ_TRANSFER to push the PR's into SRM. In SRM we have to maintain the entry channel to bring the PR's into SOCO.
    R/ Reddy.

  • Delete old external requirements from Sourcing cockpit

    Hi,
    Is there anything to delete the old External requirements and shopping carts from the Sourcing Cockpit (BBPSOCO01)????? Today i have 500 items in the bbpsoco01 then i want to delete the old requirements and complete requirements (with follow on document), but i don´t know how???
    Thanks.

    Hi Claudia,
    When you enter the Carry out sourcing . To complete the shopping cart you need to click the Complete Item button that is present in the Actions  section of sourcing cockpit screen. Once you click on that button the shopping cart will disappear and you wont be able to create a PO from that SC.
    If you dont find the button on the sourcing cockpit search screen please refer this following note:
    Note: 787785 Actions are missing in 'Find' tab.
    Thanks,
    Pradeep

  • How to move the dock from one display to another with multiple monitors?

    Sometimes the dock will switch from one monitor to another just by clicking in the dock area of the second montor. Other times it does not.

    I found out that I have to keep moving downward on my trackpad after the cursor hits the bottom of the screen. It works now.

  • Adobe Bridge CC : metadata copy from one field to another for multiple files

    So I am using Bridge CC for managing audio files and have many many MP3's that I need to copy or move one field of metadata to another.
    ie:  copy "Audio Artist" field to "IPTC Core Creator" Field
         move "IPTC Core Description" to "Video Log Comment" field
    Is there a script I can add that will let me select multiple files, and have it copy or move all the info from one of these fields to another?
    Thanks
    Scott
    [email protected]

    Scott, I did have a go at this but I can't get the right path to the logComment in the XMP…
    Coping artist to creator works fine… If I find the solution I will post back…

  • How to transfer the requirement from one plant  to many plants(STO)

    hai gurus,
    My scenario is as follows:
    1) Plant "A" is Receiving plant.
    2) Plant "B" ,Plant "C", Plant "D" is three production plant.
    3) All the above 4 plant under same company code 1000.
    4) Now plant "A" gets the requirements and pass on to all the three production plants, which
    is based on forecast.
    5) How the requirement to be passed on from plant "A" to all the three production plants namely B/C/D
    under sap
    6) After production of fert under 3 production plants the final products is transferred to the plant "A"
    ware houses which is situated near by plants of B/C/D.
    7) Only one fert material( Fert 1) is common for all three plants produced based on the capacity at all three plants.
    8) Remaining fert material is plant specific, that is for Example Fert 2,3,4 produced only in plant" B"
    Fert 5,6,7 produced in plant "C" and Fert 8,9,10 produced only in plant "D".
    How to map into sap
    waiting for the positive reply
    Regards,
    sekar chand

    Hi again,
    For more details on stock transfer from alternative plant in MRP, see also the attached link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm
    Regarding FERT1, you can place sales order, but it will not trigger requirements in the manufacturing plant. Also, because all plants are in the same CC it is not a good idea.
    If you are willing to do some manual/external work in determining how much of FERT1 will each manufacturing plant produce, then you can just manually create STOs accordingly. These STOs will generate MRP requirements in the manufacturing plants.
    Regards,
    Mario

  • How to achieve New Window requirement from One Web Template?

    Hi Experts,
    I've a WebTemplate contains 2 Graphs. Each graph have one Zoom Button. My requirement is, When I click the Zoom button that corresponding Grpah should display in a New Window. I've finished all the above requirements.
    Since, I have One Mandatory field, I'm always getting the Variable Screen in a New Window while I clik the Zoom Button.
    I need to avoid this "Rerun" feature in New Window.
    Kindly suggest me how to achieve this..
    Full points will be given.
    Thanks
    Jay Jay

    Hi Thanks.
    Even I'm also trying for the same scenario only.
    Actually I have 2 Web Templates.
    In First Template I have 2 Charts and 2 Zoom buttons for each.
    While I running the 1 Template, i give an Value in the  Variable screen of First Web Template.
    If I click a Zoom button of 1st Chart, It should open a New window with the Second Web Template. And Second Web Template should automatically take a First Template's Variable screen Values.
    (Since, U have an Mandatory field in Second Template u were not faced this requirment.)
    Even I tried with "TRANSFER_STATE". It is not taking the First Variable Screen's input values.
    Kindly help me in this issue.
    Thanks in advance.

  • Move iTunes library on external HD from one Mac to another,

    I have 2 MacBook Pro's both running Lion, one (17") has my iTunes library through an external hard drive.  I would like to move the iTunes library on the external hard drive to the other Mac, 13" also running Lion.  Can anyone help?

    Export it as a QuickTime movie.
    If you want to move it in an Editable format then you'll need to copy the Library that contains it over to the other machine.
    Regards
    TD

  • Can you use apps from one computer/iTunes accounts on multiple iPhones?

    Hello All!
    I have been using a 3G since they were released on and syncing it to one computer and one iTunes account. My wife now wants an iPhone as well. I know what Apple's policy is on music and video, but what about app sharing. *If the phone is synced with the same computer and uses the same iTunes account (on the iPhone to login), will she be able to free access to all of the applications I have previously downloaded or will she need to pay for all non-free apps?* I couldn't find an answer in the Apple knowledgebase (except for the iPhone software itself, not the 3rd-party App Store apps).
    I would appreciate a quick answer, as we're thinking of picking one up tomorrow. I'd appreciate the help and thanks in advance Happy holidays!
    Jim

    Thanks all! I'm glad to have that answered. Apple said they couldn't answer it! Love those tech/sales support people for iTunes!!!
    Happy Holidays!
    Jim

  • Passing a value from one page to another with multiple projects?

    Hi,
    I am trying to do something and I am not quite sure what I may be doing wrong. Situation is this:
    I have 1 project which is our Model, deployed into a .jar and imported successfully into the main project. No problems with this.
    I also have another project for editing profiles, in it it contains a taskflow running off of page fragments to accomplish a CRUD design. This is also deployed and imported into our main project successfully. It has a parameter value that should be detected upon entry into the pageflow called inEntityID.
    I have our main project application which has both imported .jar files into the library.
    I am using the unbounded adfc-config Flow to make sure that the pages can see each other. They can.
    If I use no data being sent from my main page to my edit page I can see both the main page fine and what would be a working region that is displaying the task flow from our editing project. If I attempt to send a value from my main page to the edit page it will not show up.
    ADFC looks like so: MAIN goEdit>EDIT
    Code snippet from my button which gathers data from the main page table to send to the edit page via action goEdit
    <af:commandToolbarButton text="Edit Entity"
    id="ctb3" action="goEdit">
    <af:setPropertyListener type="action"
    to="#{pageFlowScope.sendID}"
    from="#{bindings.PseLegalEntityId.inputValue}"/>
    </af:commandToolbarButton>
    PseLegalEntityId is the value that I have named which is an attiributevalue from my mainPageDef which links to the primary key that I want to send to edit.
    The paramenter that I have set in the region is set as such: Task Flow Binding Parameters : id* inEntityID | Value* #{pageFlowScope.sendID}
    I am using Jdeveloper 11.1.1.2.0
    Any insight on what I may be doing wrong would be helpful. Thanks in advance,
    PSP

    Is more information needed to answer this? if so let me know which.
    Thanks,
    PSP

  • External Requirements and local Product Categories

    Hi all,
    please could you assist:
    We are running SRM 7 with several ECC backends in ECS.
    We would like to transfer ext. requirement from one backend to SRM (via BBP_EXTREQ_TRANSFER).
    No problems so far.
    Prerequisites:
    Product categories should only be maintained local in SRM (no r3MATCLASS).
    Idea for Solution:
    Use of BADI PRODUCT_CUSTOMER2 and BBP_DOC_CHANGE_BADI to use the internal product category for replicated materials and for the Inbound external requirements
    Questions:
    If we now transfer an external requirement from ECC to SRM (including a product), how does SRM behave (STANDARD)?
    Is it mandatory to obtain the replicated product in SRM including the backend product category?
    That would mean, we have to replicate the product categories from ECC as well and could not map the incoming requirements to "our" SRM interlanl product categories?
    Any experience concerning standard SRM checks for external requirements?
    Thanks and best regards
    Andreas

    Problem solved
    We have just mantained local product categories.
    Replicated products (from ERP) are automatically switched to these local categories

  • External Requirment

    Hello SRM folks,
    We are on SRM Server 5.5 and ECC 6.0. I'm trying to transfer the external requirements from ECC to SRM. During that I am getting the following error in SRM
    1. No logical system for FI is maintained. Inform system admin.
    Message no. BBP_PD055
    2. Document type for determined backend system missing
    Message no. BBP_PD249
    I have correctly maintained the logical system definition of backend system in SRM ( define backend system) and in ECC (SALE ->  Logical system).  In SRM  the entry are as follow
                              ECC 6.0                           SRM 5.0
    Log sys               ECSCLNT400               SRSCLNT400
    RFC dest             ECSCLNT400              SRSCLNT400
    Sytm type            ERP1.0                       EBP_ONE
    RFC                       X              
    Local                                                        X
    FI valid                  Real Time                  No validation
    Sys Land....          ECSCLNT400            EBP_ONE
    RFC (Dialog)        ECSCLNT400
    Please suggest
    Thanks

    Any help please .....  here is the issue in details
    We are on SRM Server 5.5 and ECC 6.0. I'm trying to transfer the external requirements from ECC to SRM. During that I am getting the following error in SRM
    1. No logical system for FI is maintained. Inform system admin.
    Message no. BBP_PD055
    I have correctly maintained the logical system definition of backend system in SRM ( define backend system) and in ECC (SALE -> Logical system). In SRM the entry are as follow
    Log sys (ECC 6.0)    ECSCLNT400      
    RFC dest                 ECSCLNT400  
    Sytm type                ERP1.0
    RFC                         X
    FI valid                      Real Time       
    Sys Land....              ECSCLNT400  
    RFC (Dialog)               ECSCLNT400
    Log sys (SRM 5.0)            SRSCLNT400
    RFC dest                          SRSCLNT400
    Sytm type                         EBP_ONE
    Local                                        X
    FI valid                             No validation
    Sys Land....                      SRSCLNT400
    Please suggest
    Edited by: Amit Jain on Feb 28, 2008 4:26 PM

  • How to move set of FND Message from one server to another server

    Hi,
    I am having a request need to transfer all customized FND MESSAGES from one server(developing server) to another server (client server). Tell me the possible ways to do this in Oracle R12.
    Thanks
    Vivek
    Edited by: 912882 on 4 Aug, 2012 2:54 PM

    This is a two step process. but for this you need to ensure that all your custom messages were created in custom application say XXC
    download all the mesages by typing the below command from the developing server unix box
    FNDLOAD apps/$CLIENT_APPS_PWD 0 Y DOWNLOAD $FND_TOP/patch/115/import/afmdmsg.lct XXC_CUSTOM_MESG.ldt APPLICATION_SHORT_NAME='XXC'once this command is successful you will get the definition and data in file XXC_CUSTOM_MESG.ldt.
    Place this file in the main server unix box and run the below command :
    FNDLOAD  apps/$CLIENT_APPS_PWD 0 Y UPLOAD $FND_TOP/patch/115/import/afmdmsg.lct XXC_CUSTOM_MESG.ldt - CUSTOM_MODE=FORCE

Maybe you are looking for