EXtractor for Capacity planning

HI, I cant find any extractor for manufacturing capacity planning, data are stored in tables KBED + KBKO  on R3 side. Have You any advice
Thanx

Hi,
Check with 2LIS_04_* datasources.
Thanks
Reddy

Similar Messages

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • Any good table for Capacity Planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    Dear
    Please find below SAP tables for CRP :
    CRHD         Workcenter Header Data
    CRCA         Workcenter Capacity Allocation
    CRCO         Workcenter Cost Center Assignment
    CRHH          Hierarchy Header
    CRHS           Hierarchy Structure
    CRTX          Workcenter Text
    KAKO         Capacity Header
    KAZY          Intervals of Capacity
    Regards
    JH

  • Tables for capacity planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    >
    harvey wu wrote:
    > HI all,
    >
    > Is there any table for capacity planning?
    > we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    > Thanks!
    >
    > Harvey
    Hi Harvey,
    Kindly check if the Below tables satisfy ur requriement
    KBED      Capacity Requirements Records
    KBEZ      Add. data for table KBED (for indiv. capacities/sp
    KBKO      Header Record for Capacity Requirements
    Reg
    Dsk

  • Bandwidth Utilization Avg or Max for capacity Planning best practice

    Hello All - This is a conceptual or Non-Cisco product question. Hope you can help me to get this best industry practice
    I am doing a Capacity planning for the WAN Link Bandwidth. To study the last month bandwidth utilization in the MRTG graph, i am seeing  two values
    Average
    Maximum.
    To measure how much bandwidth my remote location is using which value i have to use. Average or Max?
    Average is always low eg. 20% to 30%
    Maximum is continuous 100% for 3 hour in 3 different intervals in a day and become 60% in rest of the day
    What is the best practice followed in the networking industry to derive the upgrade size of the bandwidth by using the Utilization graph
    regards,
    SAIRAM

    Hello.
    It makes no sense to use average during whole day (or a month), as you do the capacity management to avoid business impact due to link utilization; and average does not help you to catch is the end-users experience any performance issues.
    Typically your capacity management algorithm/thresholds are dependent on traffic patterns. As theses are really different cases if you run SAP+VoIP vs. youtube+Outlook. If you have any business critical traffic, you need to deploy QoS (unless you are allowed to increase link bandwidth infinitely).
    So, I would recommend to use 95-percentile of maximum values on 5-15 minutes interval (your algorithm/thresholds will be really sensitive to pooling interval, so choose it carefully). After to collect baseline (for a month or so)  - go and ask users about their experience and try to correlate poor experience with traffic bursts. This would help you to define thresholds for link upgrade triggers.
    PS: proactive capacity management includes link planning for new sites and their impact on existing links (in HQ and other spoke).
    PS2: also I would recommend to separately track utilization during business hours (business traffic) and non-business (service or backup traffic).

  • Selection profile sets for capacity planning

    Hi,
    Could you please explain me in details about different sets in selection profiles configuration (work center set, order set, capacity category set, initial set) thorugh OPA2  and how they are related to sets in OPD1 configuration (Object, filter sets).
    Does these sets will effect capacity availability check calculations or they only for different display options for user.
    Please provide if there is any detailed document available since I have a problem where CM01 list is not matching with overall profile used for capacity availability check while creating orders.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • Pp and pm integration for capacity planning

    Dear ALL,
    Just now i started integration testing between pp and pm.
    As we know PM equipment is work centre for PP.Suppose there is 1 machine MAC-1 for which i created maint. order  also i ticked Sys. condition in MO and by using  the same  machine , Prd.dept is created Prod. Order.
    But as per std. scenario , SAP should show that this  capacity is not available for pp but in our case it is not happening and capacity is available  here.
    I would like to know is there any thing  missing from my side.
    Awaiting for your valuable suggesation.

    In Equiment Bom, enter PP workcenter. When you make MO it will not give you an alert. But while your leveling your capacity MO will appears that Work Centre will be on Maintenance from --- to date.
    If it helps, kindly give points.
    Regards,
    RM

  • Question for Capacity Planning

    We are planning a large expansion of users and regions and therefore, data in our application. I am trying to figure the most important items that need to be covered for this move from an oracle architecture standpoint. So far I have:
    # of users currently connect
    # of new future users
    # of current transactions per day
    These should help with things like # of processes and cursors and PGA size.
    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed. If someone can point me in the right direction or maybe give me some ideas of other things I should be looking at, it would be much appreciated
    Thanks

    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed.Maybe because this doesn't really exist ...
    See following AskTom thread: http://asktom.oracle.com/pls/ask/f?p=4950:8:12270935817190372191::NO::F4950_P8_DISPLAYID,F4950_P8_CRITERIA:14258091776835
    and Oracle9i Database Performance Planning: http://download-uk.oracle.com/docs/cd/B10501_01/server.920/a96532/toc.htm

  • Assigning Control profile in Overall profile for capacity planning

    Dear all Hi,
    While creating the order iam getting the error as contrrol profile attached to overall profile is not suitable.
    Please can you help me in finding in which transaction do we assign control profile to over all profile.
    Thanks in advance.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • Precision for Capacity Planning for Response Group Lync 2010

    Hi,
    does anyone have
    information on the following points:
    Concurrent calls connected to IVR or MoH
    480
    60 --> I think that each FE can support 60 simultaneous calls on the MOH
    Concurrent anonymous sessions (without IM)
    224
    28 --> I think that each FE can support 28 simultaneous calls on different RGS/agents
    Active agents (formal and informal)
    1200
    1200 - -> It's the maximum of actives agents for RGS. But does I have to count 3 connections if a person is active for 3 RGS?
    Thanks for your help
    Marc

    Concurrent calls connected to IVR or MoH > 480 that mean per enterprise pool it support 480 simultaneous call to IVR but enterprise pool must contain at least 8 Front End.
    Concurrent anonymous sessions (without IM) > 224 same as previous, that mean enterprise pool support 224 simultaneous call on different agent.
    Active agents (formal and informal) > 1200, It's the maximum of actives agents for RGS and yes, you will have 3 connection for 3 RGS.
    Each hunt group is associated with a different Response Group application queue, but each queue is associated with the same agent group comprised of three agents. The total number of possible active agents on this Enterprise Edition pool is three (1 agent
    group x 3 unique agents in that group).
    Also you can refer below link
    http://technet.microsoft.com/en-us/library/gg412754.aspx
    http://blogs.technet.com/b/nexthop/archive/2012/09/24/lync-server-2010-response-group-application-frequently-asked-questions.aspx
    Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question, please click "Mark As Answer"

  • Colour Coding for capacity planning

    Hello Everyone,
    Please tell me is there any way where we can show different colours in CM25 transaction.
    means my orders are showing in red colour lets say if my order crosses the finsh date of my last operation is should show in different colur..?
    is it possible in any config setting or do i need to go for development.
    Best Regards,
    Ramansingh Thakur

    Hi,
    thanks for your quick response
    Lets say if my production order quantity is showing in red colour now my client wants that watever quantity is confirmed it should show in green colour.
    is it possible..??
    Best Regards,
    Ramansingh THakur

  • Extractor for Planned order

    Hi Experts,
    I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
    Please let me know any standard extractor available or any extractor need to enhance.
    Thanks
    sai

    Hi Sai,
    Take a look at 2LIS_04_P_MATNR and see if it is usefull:
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    Else it seems that you should create a generic extractor directly on the table according to this thread:
    Re: Extractors for Planned orders and Proces Orders
    Hope this helps.
    BR
    Stefan

  • Capacity Planning for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • Machine capacity planning and efficency

    Dear Guru,
    I have number of machines and i want there individual capacity and efficency can we see that by any report or any tcode to see all capacity of machine.What is capacity leveling.
    Is thee any configuration for capacity planning.
    Thanks in advance

    Hi, the following configuration steps involved in the capacity planning: SPRO --> IMG --> PRODUCTION --> CAPACITY REQUIREMENT PLANNING Capacity Requirements Planning: 1) Define time units 2) Define Capacity Category 3) Set up Capacity Planner. 4) Define parameters 5) Define Standard value key. 6) Define Move time matrix. 7) Define Setup matrix. 8) Define Control Key. 9) Define Shift Sequence. 10) Define Key for performance efficiency rate. 11) Define Formula parameters. 12) Specify Scheduling type. 13) Set up Production scheduler group 14) Select Automatically. 15) Define Scheduling parameters for Production orders 16) Define Scheduling parameters for networks. 17) Define Reduction Strategies planned/ production orders. 18) Define Reduction Strategies for network/process orders. 19) Define Control Profile. 20) Define Selection profile. 21) Define time profile. 22) Define Evaluation profile. 23) Define Strategy Profile. You can follow these above configuration steps in capacity planning Yes you need to active your all work center for the finite scheduling at the bottom of capacity view. Use all standard SAP configurations, Capacity Leveling Profile. Define time profile in OPD2. Define the strategy profile in OPDB Define the Overall profiles in OPD0. Then only you need to to active your all work center for the finite scheduling at the bottom of capacity view in work center.(CR02) Then run MRP with scheduling- 2 Lead time scheduling and capacity planning.(MD02) You will get your capacity requirement in CM01, or CM25/CM21. In rem you can use MF50. -
    OR refer below steps Capacity Planning Evaluation: Use this procedure to Evaluate the Capacity of a Work Center (Resource). The same transaction will be used for finding out the Capacity Overload on the Work Center Select Logistics -> Production -> Capacity Planning -> Evaluation ->Work Center View ->Load and go to the Capacity Planning Selection screen (CM01) Through capacity planning : Standard overview :System will show week wise overload in Red Color. If there is no overload then system will show in the normal color. Date wise Capacity can be overviewed. If there were capacity overload, system would show with Red Color indication and Percentage overload can be viewed. Through capacity planning : Standard overview: Details: Date wise, planned process order wise capacity requirement. Through capacity planning : Standard overview: Graphical: Yellow Color indicates capacity lying un-used. Red Color Bars is the indication for Capacity Overload and Blue Color Bars indicate for Capacity available Use this procedure to Level / Schedule the Capacity of a Work Center Capacity Planning - Levelling/Scheduling: Select Logistics ->Production->Capacity Planning -> Levelling -> Work Center View and go to the Planning Table (Graphical) screen (CM21) Key Points u2022 This would be used for Shop floor production scheduling u2022 Capacity Scheduling is mandatory for correct results of Master Production Schedule and Material Requirement Planning For settings: Define formulas for resources: (OP54) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formulas for resources. For formula parameters for Resource/workcentre:(OP51) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formula parameters for resources-> Standard Value u2013 Define Parameters (OP7B) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Parameters Define standard value key(OP19) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Standard Value First configure the below settings in the capacity Planning. 1) Define time units Path : SPRO ->Production-> Capacity Requirements planning ->Master Data-> Define Time units (OPCF) 2) Define Capacity Category Path : SPRO ->Production ->Capacity Requirements planning->Master Data-> Capacity Data ->Define Capacity category. 3) Set up Capacity Planner. Path : SPRO ->Production ->Capacity Requirements planning -> Master Data->Capacity Data -> Set up Capacity Planner 4) Define parameters Path : SPRO->Production ->Capacity Requirements planning -> Master Data ->Work Center Data->Standard value ->Define Parameters (OP7B) 5)Define Move time matrix. Path : SPRO -> Production-> Capacity Requirements Planning -> Master Data-> Work Center Data -> Define Move time Matrix (OPCN) 6) Define Setup matrix. Path : SPRO -> Production ->Capacity Requirements Planning -> Master Data -> Routing data -> Define Setup Time Matrix 7)Define Control Key. Path : SPRO-> Production-> Capacity Requirements Planning -> Master Data ->Routing data -> Define Control Key(OPCG) 8) Define Shift Sequence. Path : SPRO -> Production-> Capacity Requirements Planning -> Operations -> Define Shift Sequences (OP4A) 9) Define Key for performance efficiency rate. Path : SPRO-> Production -> Capacity Requirements Planning -> Operations-> Available Capacity-> Define Key Performance Efficiency Rate (OPDU) 11) Specify Scheduling type. Path : SPRO ->Production ->Capacity requirements Planning->Operations->Scheduling ->Specify Scheduling Type (OPJN) 12) Set up Production scheduler group. Path : SPRO ->Production->Capacity requirements Planning -> Operations -> Scheduling -> Set up Production Scheduler Group (OPCH) 13) Select Automatically. Path : SPRO -> Production -> Capacity Requirements Planning ->Operations->Scheduling ->Task List Type-> Select Automatically (OPJF) 14) Define Scheduling parameters for Production orders. Path : SPRO -> Production ->Capacity Requirements Planning-> Operations->Scheduling -> Define Scheduling Parameters for Production orders (OPU3) 15) Define Reduction Strategies planned/ production orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies->Define reduction strategies planned-/production order 16) Define Reduction Strategies for network/process orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies-> Define reduction strategies for network/process order 17) Define Selection profile. Spro->Production->Capacity requirements Planning->Evalution->Profiles-> Define selection profiles Hope clear to u. Regards Alok

Maybe you are looking for

  • Problème pour installation EL 11 sur portable HP I5

    Bonjour, Dans le cadre de l'opération Adobe/FPF, les memebres du club ont fait l'acquisition des produits EL. La mise à jour pour passer de EL10 à EL 11, pose problème sur deux machines portable HP et seulement sur ces machines... Le produit s'instal

  • GUI_DOWNLOAD unknown_dp_error

    Hi I have a file download some data using GUI_DOWNLOAD. When I download to C:\ on my laptop, it works fine. But when I do the same to a server location I get unknown_dp_error. My server location looks like : WAPRDFSFIN01\Finance\Accounts Payable\SAP

  • General Settings for Material Management

    Hi, under Material Management in SPRO under General Settings for Materials Management 1. Set material block for goods movements Lock Exclusively and (ii) Late lock 2. Set Up Material Block for Invoice Verification Set Up Material Block for Invoice Ve

  • Using People Keyword Tags

    I upgraded from Elements 8 to Elements 11, but am having trouble with the organizer. My "people" keyword tags seem to have disappeared. My other tags show in the right panel, when I display "Media", but when I display "People" there are tiles with my

  • Searching for an app for ipad

    is there an app for ipad that will allow me to draw on photos?