F-92 posting error- Cost centre locked for revenue posting

Hello,
While I am trying to post F-92 (Asset Retirment), I get the following error:
"Cost center AR011001 in controlling area 1000 is locked for revenue postings on 25.11.2009."
How do I go ahead?
Thanks,

Hi Eli,
Thanks for the quick response.
I am aware I can remove the lock indicator in the cost centre master data.  We had earlier uploaded cost centre master data through LSMW .
My question is  once the lock is removed , we will be able to go ahead and post to the cost centre .The Gl account used here is CLEARING REVENUE ACCOUNT FIXED ASSET and when we assign the cost centre with lock indicator we get the message
"Cost center AR011001 in controlling area 1000 is locked for revenue postings on 25.11.2009"
Would like to know the impact (apart from effect on reporting) once the lock indicator is removed.
Thanks,

Similar Messages

  • Cost Center Locking for Direct Posting

    Hi all,
    I am getting an error reading something like this:
    "cost center is locked for primary posting.".
    Can any tell me how do I address issue? Is changing the cost center in the control tab of change cost center node in img guide the only way? If i do that, do I need to explicity activate it? And most importantly, which of the 6 check boxes prevents(if at all) from being directly posted.
    Thanks,
    Vivek
    PS: Good and fast replies shall be rewarded

    Hi Vivek,
    Execute Transaction code <b>KS02</b>, input the affected cost centre to change the master data. Click on the "Control" tab and uncheck the box "Actual primary costs". Save your changes. With this amendment, you would no longer have the error message during posting.
    Normally, if the check box is checked, this is what would happened.
    Lock Indicator for Actual Primary Postings
    Indicator defining whether a cost center is locked for posting with direct costs.
    If the indicator is <b>checked/active</b>, <b>no primary costs can be posted to the cost center</b>. You may, however, still use the cost center for evaluations such as summarization, etc.
    I hope the above helps.
    Do not forget to award the points please.
    Regards,
    Jacob
    Message was edited by:
            Jacob Taiwo

  • Locked for revenue posting

    Hi,
    when i am trying to post a invoice i am getting a message :"Cost center 100000 in controlling area 1000 is locked for revenue postings on 01.11.2007."
    how to remove the lock?
    gayani

    Hi.
    go to KS02 and in the control tab take the rvenue posting tick out...
    Cheers
    PK

  • Error :- Cost Center locked for Primary Postings.

    Dear ,
    All Experts.
    While posting in SRM creating shopping cart I got this error
    Cost center CA00/10010005 locked for primary postings at this time
    Could any one please tell me how reolve this issue ?
    Currently if I go to cost center master data Control Tab - All options are tickd.
    And cost center category is S - Sales.
    Experts guidance will be great on this.
    Regards,
    Sharvari Joshi.
    Moderator: Please, avoid asking basic questions

    Dear,
    Ajay.
    Thanks for your quick reply.
    1 ) There is option given
    1 ) Actual Primary Cost
    2 ) Plan Primary Costs
    Which one to untick ?
    2 ) what is locking logic ?
    Select = Lock
    Unselect = Unlock
    Is it ?
    Regards,
    Sharvari Joshi.

  • Internal Order not allowed for revenue posting

    Hello all,
    I have a problem, while doing migo for subcontracting materials(movement type 105) following error has occurred:
    Message no. KO014:Order 5000012 cannot carry revenues
    Steps i have followed:
    Step-1: In transaction MB1B materials are transferred to stock with subcontractor with movement type -541(Transfer posting to stock with subcontractor from unrestricted.-use stock) and with reference to scheduling agreement number. (A material document is generated).
    Step-2: Creation of Subcontracting Challan through T-code-J1IF01 with reference to material document generated in step-1 above.
    Step-3:  Goods receipt through T-Code-MIGO with movement type 103(Goods receipt for purchase order into GR blocked stock) with reference to scheduling agreement number mentioned above. (A material document number is generated)
    Step-4: Release of GR blocked through T-Code-MIGO with movement type 105(GR from blocked stock) and with reference to material document generated in step-3 above.
    When the material document is checked, system does not give any error but at the time of posting the same system displays the following message:
    Order 5000012 cannot carry revenues
    The above order is an internal order and is assigned to Stock Change Account (a primary cost element) in OKB9 (Default account assignment).

    Hi
    Go to T.code KO02 and check in the Control data tab if your Internal Order is blocked for Revenue Posting or not.
    Regards
    Hari

  • System Still posting Secondary Cost after locking everything in master data

    Hi
    My question is i am putting a cost against service order through confirmation of activities. This service order has work centre and work centre has cost centre assigned to it to calculate cost but the cost centre is blocked for every kind posting but after confirmation system is still posting to calculate cost against that cost centre. If i try to put cost directly against that cost centre in journal system will stop me to do this but for secondary posting (although it is blocked for that purpose as well) it is still posting through the scenario i have explianed enough. Can anybody explain me how can i stop that?
    Thanks in advance

    Hi,
    To alter the effect of this indicator so that sender cost centers are also locked against allocation, change the type of messsage GM 155 from I (information) to E (error). Go to OBA5 and change the message control.
    Regards,
    Eli

  • Goods Receipt of BOM material- cost centre required for components

    I have created a subcontracting PO with a BOM material.
    When trying to post a Goods Receipt the components of the BOM material are required to have a cost centre assigned to them.
    The profit centre for the BOM material and components are the same. The BOM material does not require a cost centre to be entered in the Goods Receipt as the Profit Centre is allocated to account assignment tab.
    Why does the profit centre assigned to the components not default in the account assignment, why is the system asking for a cost centre?

    I receive this error when trying to post the material document:Field Cost Ctr is a required field for G/L account 1000 7023000200
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "7023000200" in company code "1000" linked to the field selection for posting key "81".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.

  • Restrict GL / Cost Centre combinations for users/roles?

    Hi,
    Please could someone advise if it is possible to restrict Cost Centre and GL Account combinations during PO creation for specific users/roles?
    For example:
    Valid Combinations:
    CC A1  GL 99
    CC B2  GL 88
    Scenarios:
    Create PO with A1, 99   -> Allowed
    Create PO with B2, 77  -> Not Allowed
    I've found a related post, but not exactly my requirement - any other thoughts?  Or has anyone done this themselves?
    Authorisations - User Profile for purchasing - restrict by cost centre

    Use the user exit MM06E005 to control the CC and G/L for user dependent.
    to do that - ask ABAPer to create the custom table for user, CC and GL combination and let teh user exit read the combination from the table and give a error or warning based on your requirements.

  • Validation to post against cost centre OR WBS (but one is required)

    I am trying to set up GL accounts so that although cost centre or WBS element is optional, I need to ensure that ONE of these is selected before the item is posted.
    I think this means I need to use a validation on the line item, but please could you let me know if you have come across this in the past, and how I should set up the validation.
    Many thanks
    Anna

    The fact that Controlling is activated, When you create a cost element for that G/L account, it will be, by default mandatory to enter a cost object (like cost centre/WBS element etc) before it can be posted. There is no separate validation required.

  • Revenue & expense posting- use cost centre OR wbs

    Hi All,
    Could you please suggest me if we are making posting for expense then whether to use cost centre or WBS.
    and if we are making posting for revenue then which one to use.
    I want to know where we should use cost centre & where we should use WBS.
    Regards
    Deepak

    Hi Deepak
    Cost Centers are org units in Controlling area which are used to posts periodic costs which are later absorped onto the products using product costing. In the end, you wish to have minimal or zero Over/Under absorption at the cost center level for periods under consideration.
    WBS are task oriented objects and are to be created for specific purpose only (logn term projects, Asset Accounting etc)
    For costs, you can use both cost center and WBS, depending on the nature of the expenditure. eg: Electricity, labour would normally be posted to cost center whereas expenses for specific purpose (training, Asset etc) would be charged off against WBS initially and later settled to respective receivers as maintained in the settlement rule.
    For Revenue, Cost centers receive only statistical postings, whereas real posting can be to IO, WBS, PSG etc.
    In case of WBS, real posting can be made to WBS.
    Hope above information is helpful. Let me know if you need any further inputs
    Regards
    Mustafa

  • GR Posting Error: Acct. 110000 for trans./event key BSX, postable directly

    Hi Gurus,
    I am getting an error "Acct. 110000 for trans./event key BSX, postable directly" while posting GR for a PO.
    Please help me to resolve this.
    Thanks & Regards
    Ram

    Hi,
    Check your material accounting key and for posting key BSK same is not maintained in auto posting for FI.
    Ask to FI person for maintaining the GLs for this key in automatic posting config.
    Regards
    Chetan Mistry

  • Error in Setting lock for Master Data Load

    Hi Team,
    I encounter the following error while uploading the Masterdata
    "Lock NOT set for: Loading master data attributes
    Attributes of characteristic 0BPARTNER are locked by terminated change run 465451241"
    I Performed the following steps
    1) Checked if any active jobs (change run jobs) running in the system. But no jobs running.
    2) RSATTR->infoobject list-> no infoobject found
    3)Tried after sometime ,but load continue to fail
    Could anyone help to solve the problem
    thanks
    Bala

    Hi Bala,
    Check in SM12 if there are any locks exist with the change run number?
    First check if there are any Master data loads running related to it?
    Check in the Attribute change run screen if there are any change run steps are running?
    Once after checking the above if no locks exist and no master data is running then check the below steps
    1. Run RSA1 transaction
    2. Tools -> Apply Hierarchy/Attibutes Change(or direct transaction RSATTR)... menu option
    3. Click at "Monitor and Start terminated Change Runs" button (at the bottom of the screen)
    4. Click "Reset Status" button at Run ID 465451241
    NOTE: this is not recommended, to unlock the locks better to wait till the locks get relased.
    If still the error message persists then we can use a FM in se37 in serious cases which was not recommended by SAP...
    Use RSDDS_AGGR_MOD_CLOSE in se37 and execute--->there give ur failed change run no(465451241) beside I_CNSID and execute...
    It releases all the locks by that change run....and continue with your further work/jobs...
    Regards
    KP

  • OKB9 Settings for Revenue Element

    I have a requirement to assign the Sales Revenue cost element to a profit centre.
    In my case under one company code, I have 3 profit centres.  So the sales revenue cost element has to be assigned to these 3 profit centres separately.  But I am confused how to assign the this single revenue cost element to all these profit centres.  Currently from sales module, the error is happeneing for want of assigning CO object while doing the sales postings.  If we assign cost centre also in OKB9, another messge is coming 'cost centre is blocked for revenue postings'.  I can make the cost centre open for revenue postings.  But cost centre is not normally used for revenue postings, right ?  What is the standard practice for solving this issue ?

    The following options are available to you
    a. The sales order and therefore any entry posted as a result of it (goods issue, billing, payment receipt), by default picks the profit center from the material master (costing view or sales org view).
    b. The default profit center can be overwritten in the sales order (and therefore in all subsequent entries) by using the sales order substitution rule.SPRO - Controlling - Profit Center Accounting-Profit Center Accounting-Sales Orders-Sales Order Substitutions-Define Substitution Rules and Assign Substitution Rules.
    c. The last option is to use an FI susbtitution rule (OBBH) but this is normally used for direct FI postings and I am not able to think of any scenario in sales processing where you will want to use this.
    Rgds
    Shivram.

  • Posting error..mid month cost cenre chenged

    Hi All
    One employee transferred (18.04.2011) mid month. So i have changed position (cost centre also), then employee have one cost centre in 01.04.2011 to 17.04.2011 and from 18.04.2011 onwards in another cost centre. While doing posting (PC00_M99_CIPE) system is showing below error.
    u201CBalancing field "Profit Centre" in line item 009 not filledu201D Message no. GLT2201u201D
    Here, line item 009 is /559(bank transfer wage type)
    Thanks and Regards
    Madhu Bijjala

    Hello Madhu,
    Please check with the Finance team.  Some of the settins related to cost center and profit center needs to be changed.
    Check the below thread for your reference.
    Balancing field "Profit Center" in line item 001 not filled
    GLT2201 - Balancing field profit center in line item 001 not filled
    Hope this helps.
    Best Regards.
    Karan.

  • Cost Centre Error

    Hi All,
    Can anyone help me the possibilities for the error given below:
    "Error: Cost Centre is blocked against revenue postings on 30.04.2007"
    Pls reply asap.
    Vinay

    Hi
    Normally cost centers are used for capturing and analysing costs incurred on a particular cost center or group of cost centers
    So generally only the costs are posted on costs centers and revenues are not allowed to be posted
    This control is there on the cost center master data in Control Tab
    If you want to post the revenues also to cost center remove tick on Actual Revenues and post entry.
    But even in that case you can only post revenues on cost center as a statistical posting. So u need to give a real CO object for capturing revenues for eg. COPA Segment etc.
    Hope this clears your error
    Regards
    Ram

Maybe you are looking for

  • Index Organized Tables

    what is logical rowid in IOT?are they stored somwhere physically just like physical rowId's what are secondary indexes? what it means by leaf block splits?when and how it happens? and the primary key constraint for an index-organized table cannot be

  • Boot Camp

    Hi Guys, Just update my OS LION X seeing that improve Boot Camp for Windows 8. How i could install Windows on Mac? I do not know that Apple Mac could installing to Windows, Apple look so cheap after uncle Steve Job gone that now Apple can installing

  • IDOC-XI-Proxy(CRM) scenario

    Hi Xi experts.. I am new in XI with ABAP background. I have give a project in XI to design and implement  a scenaio. The scenarion is this one: ECC5 to XI then XI to Proxy(CRM). In functional specs of this following diagram is mention : ECC5(ALE)-->I

  • Problems playing a mpeg-file

    Hello, years ago I had substandard films digitalized and put on disk. Now I thought I could take bits from those films and make it into a short movie using iMovie...as a little Christmas surprise for the family. But not only can't I open the file in

  • List of Sales Orders

    Hai all, 1. I want to know the list of sales orders that are billed and the list of sales order that are rejected? 2. How to block a sales order totally(Shall we have to reject each item or is there any provison at the header level So that I can reje