F&R order proposals

Is it possible for F&R order proposals to be converted into purchase requistions in SAP ERP?

HI,
Check this link,go thro the
Direct transfer of order proposals at the end of the document
[http://help.sap.com/saphelp_scm70/helpdata/en/d8/387c882c144c08b31ca1a7ea60f72d/content.htm]
[http://help.sap.com/saphelp_scm70/helpdata/en/77/9822fc0bcb48d5a26c8b07670f0c8d/frameset.htm]
murugan
Edited by: Murugan mgl on Jul 31, 2009 1:08 PM

Similar Messages

  • SAP F&R - Order Proposals not getting generated

    Hi Experts,
    I am currently on SCM 5.0 system. For a location-product on uploading the consumption data, the forecast gets generated but no Order Proposals are getting generated at all. When I look at the Source of Supply, the delivery dates for the location-product are appropriately displayed.
    The scenario is basically Vendor -> DC -> Store i.e. V111 -> R601 -> R611 for the product FR11. The time series of supplying location is displayed for FR11-R611 in CADE while FR11-R601 is not displayed. I suppose, this may be, why the OPs are not getting generated. How do we generate time series for FR11-R601 i.e. for V111 (vendor) ?
    Also, When i try to run a location status check on R611, /FRE/FU_CL_FRP_SAFOUT_CRIT comes out with a fatal error with the remaining others in an INITIAL state. How do we resolve this issue.
    Thanks & Regards
    Prashant

    Hi,
    I was able to solve both the issues with a change in the Forecasting Frequency profiles where the reference day for start week was on "FRP Location Activation Date". I changed it to Calendar date and checked the forecast and it worked with the Order proposals also generating. Also, the location status check out for the mentioned location was in "OK" state.
    Also, a second methodology applied to overcome the problem was to go to SAP Menu -> F&R Processor -> Administration, from there go to the location tab where the locations had a deactivation date of 31.12.2009. I extended the date and then there was no need to change the forecasting frequency profiles.
    Regards
    Prashant
    Edited by: Prashant Kedare on Mar 3, 2010 9:38 AM

  • Maximum no. of order proposals per deadline exceeded

    Hi PP gurus,
    When I am running MRP through T Code MD42, the error :Maximum no. of order proposals per deadline exceeded is coming.
    In the material master Lot Size is Fixed order quantity (FX) wit Fixed lot size 65, when  I am changing this to >80 , MRP Run is executing without any error. Pls. come with your views reg this
    Note :In OPPQ Max no of proposals is 50 and in OMDV No of planned order is 500.
    Anupama

    Hi Datta...
    I have the same problem, when I want to run MRP there is a message error "Maximum no. of order proposals per deadline exceeded". I was maintained forecasting and MRP on material master for this material.
    I try to change the value of max no. of proposal of 50 to 80. And the problem is fix..
    My question, Why I must increase the value? And how the fixed value that I must set in SPRO?
    Thx u

  • Limiting Order Proposals

    We have a business scenario where we will only intend to produce over a period of time a particular quantity that are customer has committed to buy.  There may be multiple process orders over the course of weeks or months to make this quantity.  Materials are procured by vendors based on that quantity, and not tracked in SAP. 
    However there are circumstances where forecast or sales orders may exceed this committed quantity, and planned orders generated by the MPS run can then exceed committed quantities. 
    There is a need for this to be flagged for the planner for followup to either reduce the demand or to expedite additional materials with the vendors.
    Is there any way for the system to keep track of historical and planned production and to generate an exception message if order proposals exceed committed quantity, prevent MPS from creating planned order proposals beyond committed quantity, or to prevent conversion of planned orders to process orders when they would cause the committed quantity to be exceeded?

    Hi,
    It looks as if you are doing material allocations per customer.
    There's a specific functionality for this, check it up.
    After you have defined the allocations, you then can use the atp logic against these allocations.
    This will lead close to what you are looking for, since if a customer has used all of its allocation the system will not commit any further, even if there is stock available.
    Hope this helps a bit; I know that there's some work to do to make this work.
    Regards,
    Mario

  • SAP F&R: Release Order Proposals automatically

    Hi,
    I am not able to find the necessary SPRO Customizing settings in SAP F&R 5.1 wherein I can define the order proposals to be released immediately after the forecasting run. It would be great if someone would be able to guide me through.
    Best Regards
    Prashant Kedare

    You need to work on Exception management to supress some messages , Further more there are some standard inbuilt checks which we cannot bypass through configuration. I would suggest you to use BADI -Method FU_OPM_BADI_001_CHECK_ORDER.

  • Troubleshooting Maximum No. of Order Proposals Exceeded

    Hi PP Gurus,
    Can any of you tell me the best way to troubleshoot the above problem after an MRP run?  When I run MRP in the background - MDBT I occasionally get an error in the log saying "Maximum no. of order proposals per deadline exceeded" for one or more materials.  I have found I can track this down using CO46 and showing only transaction with exception group 8 (terminations) but I have to run this one MRP Controller at a time and I have around 20.
    Any suggestions for a simpler method.
    Thanks,
    R

    Dear,
    Please refer my reply from this link,
    Maximum no. of order proposals per deadline exceeded
    Regards,
    R.Brahmankar

  • Firming of order proposals

    Hi,
    I learnt from the books that the order proposals falling within the PTF are firmed and no automatic changes are done during the planning run. There are 4 firming types. Can you explain from the end user point of view what is firming and how do we do manual firming?
    Sridharan

    Hi,
    Firming Planned Orders and Components 
    Planned orders created automatically by the planning run are continually adapted to suit changed requirements situations. If you want to prevent the planned orders from these automatic changes, you can firm them. Firmed planned orders are no longer changed by the planning run, that is, the order quantities and order dates are not changed. You can only change firmed planned orders manually.
    Firming Planned Orders
    When manually creating or changing a planned order, the system automatically proposes the firming indicator. If you do not want to firm the planned order, you can cancel this indicator.
    If the planned order has been firmed, the system will no longer make any automatic changes to either quantities or dates in the planned order at material level. However, the components of the planned order material may be adapted if the bill of material has changed.
    Firming Components
    Any manual changes which you make to the date or the quantity in the planned order are automatically passed on to the components by the system. If you want to ensure that no further automatic changes can be made to the components of the planned order material, you can set the firming indicator for components when processing the planned order. If the firming indicator is set for the components, the planning run will not re-explode the BOM.
    The firming indicator is automatically proposed by the system when you manually change or create material components in the processing function of planned orders. The indicator for firming the components can only be set if the planned order is also firmed.
    You can also firm individual components to prevent automatic changes to quantities and dates. You set the firming indicator for individual components in the screen for processing components.
    Firming Type 
    The firming type determines how order proposals are to be firmed and scheduled within the planning time fence during the planning run.
    The following firming types exist:
    Firming type 0:
    u2022     Order proposals are not firmed automatically. With this firming type, no firming is carried out, instead, the materials are only provided with the indicator for MPS. Thus, they can be planned in the special planning run for MPS.
    Firming type 1:
    u2022     Order proposals that move into the planning time fence are firmed automatically as soon as their date lies at least one day before the end date of the planning time fence. The date of new order proposals that are created in the planning time fence is rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed.
    Firming type 2:
    u2022     Order proposals that move into the planned time fence are firmed automatically so soon as their date lies at least one day before the end date of the planning time fence. Within the planning time fence no order proposals are created by the system.
    Firming type 3:
    u2022     Order proposals that move into the planning time fence are not firmed automatically. The date of new order proposals, created within the planning time fence is rescheduled out to the end of the planning time fence.
    Firming type 4:
    u2022     Within the planning time fence, no order proposals are created automatically by the system, that is, the system does not solve the shortage.
    Hope it will be Helpful.
    Regards,
    Vijay.

  • No of order proposals to be limited

    I have a material and for this material requirement is 500 and in the material master min and max lot size is 1. When i do MRP run system is creating 500 orders. Where can i control this means system should not create more than 200 orders. Upon knowing this users will increase the min and max lot size and do the planning run again.

    HI,
    You can maintin maximum number of procurement proposal in Plan parameters / MRP group level parameters for MRP->Error Handling.
    MRP will be terminated if procurement proposals cross this limit. DO check in Sandbox.

  • Automatic Creation of Planned Order in PPDS Horizon

    Dear Experts,
    Kindly answer my following query.
    I have created PIRs before/inside my PPDS Horizon (its also falling outside horizon as SNP horizon is shorter than PPDS Horizon). If I check the PIRs created by me in /SNPAPO/RRP3, it also shows me planned orders corresponding to them. However, if I create PIR outside PPDS horizon then system is not automatically creating the planned order.
    Kindly let me know which master data/configuration setting is responsible for automatic creation of planned orders within PPDS horizon.
    Best Regards
    Rinju
    Edited by: Rinju Mukherjee on Sep 26, 2010 10:05 AM

    Dear Rinju,
    Check in Product Master PPDS view the Planning procedure maintained? if it is balnk check in the heuristic, the palnning procedure maintained.
    Since automatic planning procedure(3) is maintained, that is the reason it is creating order proposals, it self.
    Sree

  • MRP Issue: Planned orders Vs Pur Requisition

    HI All.
    I have a query on MRP.
    We run Total planning for a plant in a night batch job  The parameters for variant are as below
    Planning Run Type: NETCH
    Creation Indicator for Pur Req  2.
    Planning Mode 3 Delete & recreate order proposals
    Scheduling type Lead time scheduling
    For example MRP runs on 19th Jan & for a given material, a planned order is created as the lead time 10 day & the requirement date is 15 Feb.
    Now as normal proedure, when the opening date in the planned is reached, MRP should delete this planned order & create a Pur Requisition. But this is not happening even though we have used the planning mode 3 (delete & recreate order Proposals)
    There is no planning file entry for the material after the initial MRP run. Is this the reason that the target material is not picked up in the planning.
    Any suggestions on this.
    Regards
    Vineet

    Hi
    If Requirement is 15 Feb System Calculates and Gives the proposal for 05 Feb. As you may know there is one more Schedule Margin Key  and itu2019s a buffer time before and after Procurement prosal. May be its affecting your Openeing period. Please Check the Paramaters in Material Master 1. Schedule Margin Key,2. GR Processing time, Lead Time  and planning time Fence(During this Period System Doesnt Allow Automatic changes,,
    rewd if usefull !!
    BV

  • Order proposal in MRP

    Hello experts,
    when I run MRP, I want ONLY ONE PLANNED ORDER for the material for a fixed quantity.  Even though the shortfall is more, I want only one planned order for a fixed quantity.
    I have tried FX.  But I get multiple order proposals with a constant quantity.
    Kindly help.
    Regards
    Tom

    Hi,
    I don't think your requirement can be solved in standard SAP. As I checked lot sizing procedures I saw that SAP concept is to avoid material shortage - your requirement is against this.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/fe/819b9f643b11d3b4e40004ac160649/frameset.htm
    If you want to get one planned orders, you should use period lot sizing procedure - in this case you would get only one for the specified period. But at the same time to get fixed quantity makes no sense since requirement may vary from time to time...
    Fixed lot size can't help as described by you because you get several PldOrd with fixed lot size if the requirements are higher than the fixed lot size defined by you.
    You can only terminate the planning run if more than one procurement propsal should generated by the system (MRP > Planning > MRP Calculation > Define Error Processing in the Planning Run).
    You can specify a threshold value for the maximum number of order proposals for the fixed lot size in Customizing for MRP in the IMG activity Define error processing in the planning run. If this value is exceeded, that is, if too many procurement proposals are created for a date and for a material, the material is provided with a termination message.
    Rounding down would be the best if it was possible to round down the quantity.
    Well, I have doubts whether you can solve this in standard system.
    (Maybe if you describe the business process experts can suggest you a workaround or something.)
    Regards,
    Csaba
    Edited by: Csaba Szommer on Feb 17, 2009 11:25 PM

  • Scheduling firmed planned order

    Hi all,
    I have follwoing situation:
    In the MF50-planning table firmed (as customized in REM-profile with parameter "Allways Firm")
    planned orders are created manually also in the past/backlogs.
    The MRP/program RMMRP000 is updating the production dates of these FIRMED orders to the actual date/today. Because of this the planned order is shown on the actual date in the MF50 instead of the original planned production date in the past..
    Usually the MRP doesn't consider firmed orders regarding their quantities and basic-/production-dates. In our case the MRP is changing production dates what is not expected.
    Do you have ideas about this ?!
    Thanks,
    markus

    Hi,
    MRP-type is customized with firming-type '2-Automatic firming and order proposals rescheduled out'.
    Firming indicator has not been changed after creating the planned order in the MF50/Planning table; this has been already checked in MD04/MD13.
    Further ideas ??
    Regards,
    markus
    Edited by: Markus Krauss on Aug 5, 2010 8:55 AM
    Edited by: Markus Krauss on Aug 5, 2010 9:37 AM

  • Deletion of Planned Orders

    Dear all,
    At the end of every week, we want to delete all the planned orders available in system.  I tried COHVPI, but there is only two mass processing functin available, Convert Planned Orders and Material Availabilty Check.
    So, can any one tell me which transaction code I can use?
    Thanks and regards,
    Devang

    Hi
    There is afunctionality called "Roll forward period"
    The function of this:
    To automatically update the master plan, you can set the system so that firmed planned orders that were scheduled before the roll forward period can be deleted during the planning run. With this function, all planned orders, for which there are no longer any requirements, are deleted.
    For this you have to have some config settinglike:
    In step "check MRP types", you can maintain the indicator "Delete out-of -date planned orders" which is used to set the system so that firmed order proposals, that lie beforethe roll forward period, are deleted in in the planning run. At the same time, new planned orders are created that are adjused to the current situation. (Or depending on the fixing type the old order proposals are displaced to the end of the planning time fence.)
    This is available in the IMG step:
    Production >MRP>planning>MRP calculation>Define planning timefence& roll forward period.
    Pl. try this & come back.
    Regards
    YMREDDY

  • Max no of planned Orders

    Dear Gurus,
    Can anyone tell me the spro setting or where maintain the maximum number of planned orders that can be generated through MRP for a material for a day.
    Regards,
    Srini

    Srini,
    Check the no. of order proposals you have define in OPPQ.It must be between 40 and below 80.That is why When you have tried with fixed lot sizes 10(4000 order proposals),100(400), 500(80)  for the reqt. of 40,000,the MRP run is terminated.
    When you tried with fixed lot size 1000, you get 40 planned orders(40,000/1000) and this figure of 40 must be equall or less than the no. of order proposals you have defined in OPPQ.
    Please note that whenever the no of order proposals that will be created exceeds the number defined in OPPQ,the MRP run will be terminated.
    So if you want the MRP run should create order proposals for 10,100,500 fixed lot sizes, then increase this number in OPPQ
    I hope it is clear to you now.Reward the points.
    Thanks
    Ravindra

  • Reg.MRP Run without sale order

    Dear Experts
    We are in need of MRP run without sale order. I have created Finished product material (T-Shirt) and assigned components to that and then I ran MRP, If I do so, MRP is exploded but result is not satisfied some non components are displayed.
    What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
    Pls help what is the configuration for MRP run,
    Thanks
    Rajakumar.K

    Hi Raja,
    One of your requirements isn't available in R/3.
    What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
    Standard MRP will create Dependent requirements (demand elements).  MRP will create order PROPOSALs (purchase reqs or planned orders)(supply elements).  MRP can be immediately followed by an additional program that will convert planned orders to Production orders.  All these things are possible.
    However, MRP will not check for the availability of components, and then selectively create production orders.  Availability check, which is not part of MRP, is usually performed at a later part of the production order cycle.
    Regards,
    DB49

Maybe you are looking for

  • Music will not add to iTunes (MP3 Format)

    I'll try to make this quick. About a month ago my hard drive was over flooded with MP3's. I decided to get an external 250GB Hard drive. I moved all of my files over to the external hard drive. iTunes "lost" the connection to those files. Rather than

  • Guest Wireless and URL re-direct failure

    Hi, We have a successful guest wireless service with authentication via a Cisco NAC server.  One MAC user is having difficulty accessing the authentication URL (https://1.1.1.1/login.html) - this is using either Safari, Firefox or Google Chrome brows

  • In Numbers, I want to make 3 rows 50 columns into 3 columns 50 rows.

    In just a simple Numbers 09 spreadsheet, no charts, I'm trying to convert the rows and columns to columns and rows to more easily work with the information without scrolling across the page.  I would be able to see the information on one page and mor

  • Budget of 1200 for new Camcorder...Noob on FCE here

    I need some assistance. Leaving for Disney World with my daugther and I want to take video. I use FCE dabbling around from little clips I Have shot with my canon still. But now I want a camcorder. So my question is this ? With about 1200 to spend...

  • Blockrecover error

    Hi all, I´m trying to recover a block. The RMAN try to read the "/oracle_4/oradata/devdb/archive/log170316_1.ARC", but this file doesn´t not exist in this directory because this is into backup performed by RMAN. I got the following error: channel ORA