F110 aborted in midway through processing

Hello.
While running F110 this morning, it aborted and some document were cleared and others didnt clear. 2 things I can possibly do and I need everyone's input on the best solution.
I can either processes the document with clearing document number and have then generate checks and Re- run the ones with no clearing document number or Cancel the entire payment run, which I'd rather not do.
Any advise out there please on the best possible solutions. Keep in mind that this payment runs contain a lot of document please.

Hi,
We have faced a similar issue in my last project.
We did the following and the run went well.
EDIT---PAYMENTS--AFTER TERMINATION-----DRAW UP AGAIN.
Thanks
Aravind

Similar Messages

  • Syncing stops midway through process

    New iPod Nano, 5th Gen for Christmas, latest version of iTunes...
    I'll start to sync and everything will seem to go fine... "syncing song 1 of 320" or something to that extent, but (long) before it finishes all of the songs. If I hit the sync button again, it'll start up again- usually continuing where it left off, but will once again stop early.
    For me to bring over my full music collection, I have to sit there for an hour each time constantly watching and hitting the synch button repeatedly each time it stops.
    Ideas?

    Is this Mac or Windows?
    i

  • Premiere Pro CC 2014 Stalls Midway Through Render

    I've recently added the CC 2014 suite to my computer, and for the most part it's good and solid.  However, whenever I try to output a file from Premiere Pro CC 2014, either as a direct export or via Media Encoder, the program simply stops rendering midway through the process.  It doesn't actually freeze up or fail to respond, as I can easily stop the render altogether without having to resort to task manager.  It simply stops as any random point and then the estimated render time begins to climb, and it doesn't stop climbing.  It doesn't matter what settings I use, custom or preset, MOV, MP4, AVI...h.264, mpeg...codec or container does not matter.  The results are the same.  I even tried changing the Preview File Format, nothing different there either.  Tried a complete uninstall/re-install (made sure to use the cleaner tool).  No luck.
    As someone who relies pretty heavily on NLE's to cover his freelance work, this is pretty disconcerting.  For now, my only fix was to step back to the previous version of CC, but I don't view that as a long term solution.  Anyone have any ideas?
    For clarity, here are my system specs:
    Motherboard: Asus Z97-Pro
    CPU:  Intel i7 4790k (with Corsair H110 Liquid Cooler)
    RAM: G.Skill Ares series 1866 - 32GB
    GPU: EVGA GTX 780 - 3GB
    Primary Drive: Intel 335 Series SSD - 240GB

    You say it stops at random points every time. Are they really random, or is it at the same general area on your timeline? There may be a piece of media there that is preventing it from finishing. This has happened to us several times throughout our editing process for our documentary and it is almost always a image file that causes this issue. Generally replacing it or converting it to another format will help in our case.

  • How to print of a crystal output on paper through process Scheduler in PeopleSoft.

    Post Author: rajaumareddy
    CA Forum: Charts and Graphs
    while printing crystal through process scheduler in PeopleSoft it giving Error as Runstatus. and i given in Printer destination.
    Could u help me to find solution.
    1. what are process scheduler setup.
    2. Is there any Sever side setup (Default server)

    Srinivas, Thanks for your quick reply.
    This is smartform, and sending the output as pdf, except the the first page on which I have the text to be printed on the email body. In this email body text I have to display an email.
    when user clicks on the email should open an outlook with the email id in the TO. Hope this helps.
    Thank you,
    Surya

  • HT201263 iPod touch gone into recovery mode midway through updating to iOS 6.1 - Help!!!

    I tried to update my iPod touch (latest generation) to the new iOS system. Midway through the 30 minute download of the new software, an alert popped up telling me that the ipod connected was in recovery mode and needed to be restored in order to contiue. So I clicked restore, and the download started again. Once again, the same thing happened midway through. The download continues, and at the end of it it just disappears and my iPod stays on the connect to itunes screen (the one with the usb lead and itunes symbol). I've tried everything on the apple support pages but have had no luck at all. I've only had the iPod for a month now and have had no problems with it up til now. I know there's often problems caused by updating, but after spending hours searcing online for a solution I've yet to find anyone with the same problem, and therefore no solution. Any help would be greatly appreciated!!

    Maybe if you try restoring to a previous version first, and then restore from backup.
    This may help you find out how to roll back to the previous version:
    https://discussions.apple.com/message/19639988#19639988
    ~Lt. Leviathan

  • Loading through Process Chains 2 Delta Loads and 1 Full Load (ODS to Cube).

    Dear All,
    I am loading through Process chains with 2 Delta Loads and 1 Full load from ODS to Cube in 3.5. Am in the development process.
    My loading process is:
    Start - 2 Delta Loads - 1 Full Load - ODS Activation - Delete Index - Further Update - Delete overlapping requests from infocube - Creating Index.
    My question is:
    When am loading for the first am getting some data and for the next load i should get as Zero as there is no data for the next load but am getting same no of records for the next load. May be it is taking data from full upload, i guess. Please, guide me.
    Krishna.

    Hi,
    The reason you are getting the same no. of records is as you said (Full load), after running the delta you got all the changed records but after those two delta's again you have a full load step which will pick whole of the data all over again.
    The reason you are getting same no. of records is:
    1> You are running the chain for the first time.
    2> You ran this delta ip's for the first time, as such while initializing these deltas you might have choosen "Initialization without data transfer", as such now when you ran these deltas for the first time they picked whole of the data.Running a full load after that will also pick the same no. of records too.
    If the two delats you are talking are one after another then is say u got the data because of some changes, since you are loading for a single ods to a cube both your delta and full will pick same "For the first time " during data marting, for they have the same data source(ODS).
    Hope fully this will serve your purpose and will be expedite.
    Thax & Regards
    Vaibhave Sharma
    Edited by: Vaibhave Sharma on Sep 3, 2008 10:28 PM

  • Incorrect data after activating the request through Process chain.

    Dear SDN chaps.
    Today morning. I encountered a strange issue in DSO..
    I have DSO which is updating from the AL11(application server) flat file.
    While i am loading it to PSA there were no issues and after loading it to the DSO there is no issue and its passing through the routine and the data is populating properly in NEW data Table .But after successful activation of  the request through process i am getting the wrong records in active data table.
    Then i deleted the request and reran it manually i mean triggered the DTP and ran the manual activation surprisingly accurate records are coming through manual process..
    I am just wondering why it is not working through process chain and why it is showing incorrect records through process chain execution and how it is showing accurate records through manual uploading process..'
    Could some one please help to come out from this..By the way mine is SAP BI 7 SP20 &SP05 for BW 7.01
    Thanks
    K M R
      

    Hi Pra
    Thanks for your response..
    We are doing PSA deletion and then we are uploading the data to PSA as well as DSO.
    Now the issue is not in the part of loading we are facing the issue in Actiation of request if i am executing the activation through process chain it is sucess but the values are incorrect. If i am doing the manual activation it sucess with correct data.
    Even i tried with a new chain but still i am facing the issue.
    Surprise thing is in new data table the data is perfect in both the ways like manual upate and Process chain update only during activation i am getting incorrect record in the active data table..
    Appreciate your help on this....
    Thanks
    K M R
    Edited by: K M R on Jul 9, 2010 11:09 AM

  • How to call program through process chain

    Hi Gurus,
    I am in the position to execute the abap program through process chain, I have used  abap program as process type in process chain(First time I am using this process type).when I am executing the process chain, the abap program is not executing.Eagerly anticipating your reply.
    Regards
    Shiva

    Hi
    I managed the execution of rscrm jobs in PC as follows:
    1. Execute query through RSCRM_BAPI transaction
    2. goto sm37 and copy the Jobname (the active one)
    3. Create following progromm
    *& Report /WST/RSCRM_START *
    REPORT /WST/RSCRM_START .
    parameter: l_bid TYPE sysuuid_c.
    CALL METHOD cl_rscrmbw_bapi=>exec_rep_in_batch
    EXPORTING
    i_barepid = l_bid
    4. Execute Programm and fill the Parameter with the Jobname
    5. Save as a new program variant and use in PC as a normal program
    I hope that helps.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    regards
    ashwin

  • Problem in Activating Hierarchy Attribute change run through process chain.

    Hi All,
    I have the problem in Hierarchy change run processw running through process chain..and also process chain completes successfully without any error..
    Even hierarchy change run  completes successfully the hierarchy objects are not activating,
    so daily when i have to activate hierarchy objects manually..
    and what i did was in one attributechange run process i have included 10 hierarchy object is it correct or else i have to separatly create 10 attribute change hierachy proceess in the process chain.. pls through some lights on this issue
    With regards,
    Hari

    Hi venkat,
    Yes.. i already include the save hierarchies process in process chain...
    my main problem is hierarchy infobject are not activating  using process chain and also even process chain is not giving error message.. and in which log table the hierarchy objects are maintained (such as run time, date , status etc..).
    IS there is any other settings to be made in process chain..
    with regards,
    hari

  • HT1725 I've purchased an entire album but some of the songs stop playing midway through. How can I rectify this?

    I've purchased an entire album but some of the songs stop playing midway through. How can I rectify this?

    Welcome to the Apple Community.
    Try deleting the problematic file (electing to remove original file if/when prompted) and then re-downloading the file from the iTunes store.
    You can re-download content purchased from the iTunes store (availability varies depending on location) using the purchased option from the Quick Links section in the top right corner of the iTunes homepage in your iTunes application on your computer.
    You can re-download content purchased from the iTunes store (availability varies depending on location) using the purchased option at the bottom of the screen of the iTunes app (or video app) on your iOS device.
    If the problem re-occurs, select the content which is causing a problem and use the 'Report a problem' button in Your Purchase History using your computer.

  • Error in the Source system while data loding through Process Chain

    Hi,
    I am facing issue while data loading for certain extractors through Process chain. Load of 0BPM_WIHEAD, 0BP_LOGHIST, OBPM_OBJREL, 0BPM_DEADLINES(there are 2-3 more extractors) is getting failed daily with message Error occurred in the source system and if we repeat the same it is getting executed successfully.
    Regards,
    Javed

    Hi..
    It means that the extraction job is failing in the source system..
    Please check the Job log in the source system  --> Copy the request nimber --> In the source system go to SM37 --> Give * then the request number......execute --> Check the Job log..
    Look there may be multiple reasons behind this....
    1) Connection problem : Go to SM59 and test the connection, If you don't have the access in SM59...then go to RSA1 --> Source Systems --> Right click --> Connection Parameters --> Connection Test
    2) Or may be work processes are not available and due to which jobs are failing due to time out...
    In both the cases you can check with the Basis Team if they can suggest something....or you can change the process chain scheduling time if possible, and schedule it in such a time when less no of jobs are running..
    Regards,
    Debjani..

  • Broadcasting through process chains

    How to broadcast reports to indivdual mailboxs in the company through process chains. say current data should be broadcasted into individual email account every time a new sales order or purchase order is created or by the end of the day , it should automatically trigger the mail with the report. can anyone help on this.

    Hi,
    Here see the blog details.
    The goal of information broadcasting is to distribute the right information, in the appropriate format, to the right people, through different channels, at the right time.
    With the BEx Broadcaster, you can precalculate queries, query views, Web templates, reports and workbooks and broadcast them by e-mail or to the portal. In addition to the precalculated documents in various formats (HTML, MHTML, ZIP and so on) that contain historical data, you can also generate online links.
    Accessing the Broadcaster
    The broadcaster can also be accessed via the Portal through the delivered BI Role.
    You can determine the Scheduling for Information Broadcaster
    Based on a data change event triggered by a process chain.
    Based on a pre-defined time point.
    Freely definable scheduling.
    Steps to Schedule Information Broadcaster based on a data change event triggered by a process chain
    Create the Query in the Query Designer.
    Execute the report in the BEx Web Analyzer.
    Click on u201CSendu201D to create the settings for broadcasting.
    The Broadcast Wizard takes you through a series of prompts where you supply the key information required to develop a broadcast. At any time you can leave the Wizard and use the standard settings dialogs which offer more settings.
    Then schedule the broadcast. If you start the Broadcaster for a query (or template or workbook) that gets data from an InfoProvider that will be selected in the process chain, you can select the InfoProvider for Scheduling.
    Create the process chain and include the event data change, include process type "Trigger Event Data Change (for Broadcaster), itu2019s available under "Load Process and Post -Processing".
    The Process Chain is created including the process types: (1) Start (2) Execute InfoPackage (3) Delta Data Transfer Process (4) Activate DSO (5) Trigger Event data Change.
    When you create the Variant for the Event Data Change, using checkbox we can indicate when the Broadcast should trigger.
    As soon as that InfoProvider is affected by a Process Chain, the Broadcasting is triggered.
    After successful activation you can now schedule your chain. Press button u201CScheduleu201D or menu u201CExecution -> scheduleu201D. The chain will be scheduled as background job. You can see it in SM37. You will find a job named u201CBI_PROCESS_TRIGGERu201D. Unfortunately every process chain is scheduled with a job with this name. In the job variant you will find which process chain will be executed. During execution the steps defined in RSPCPROCESSCHAIN will be executed one after each other. The execution of the next event is triggered by events defined in the table.  You can watch SM37 for new executed jobs starting with u201CBI_u201D or look at the protocol view of the chain.
    You can monitor the Broadcaster from the SOST transaction.
    Note:
    Depending on authorizations, end-users can schedule their Broadcasting Settings.
    Only for those queries which are checked "Execution with Data Change in the Infoprovider" while you schedule, will be triggered by process chain event.
    You may wish to refer the Note on Settings for Information Broadcasting- 760775
    Hope this help you
    Regards,
    Rakesh

  • Archiving Infocube through Process Chain...

    Hi All,
    I need help in creating process chain for archiving infocube.I am able to archive infocube manually but not getting through process chain.
    Is it possible to archive infocube through Process Chain?If yes then please give steps to create process chain for archiving.
    Thanks in advance.
    Bandana.

    Hi,
    It is possible to Archive data from an infocube via process chain.
    Have a start process followed by Archive data from an infoprovider. Here the trick lies in the variants used for the archive steps used to make the chain.
    Create a process by dragging the "Archive data..." process and give name for the variant and use this variant for writing the archive file, choose your archive process (the same archive process u have created to archive data from the infocube) , as this is write phase do not check "Continue Open Archiving  requests" chk box, and choose "40 Wirte phase completed succesfully option" from the options in Continue Process Until target status.Now enter the required selection conditions. In case u want to reuse this chain give a relative value under 'Primary Time Restriction tab' and save this variant. This is your variant 1.
    Now drag the same 'Archiving process' and create a variant and in this process u need to select "Continue Open Archiving  request" and choose the option from the dropdown list '70 Deletion phase confirmed and request completed' this variant for deleting the data from the infocube. This is your variant 2.
    So now have a Process chain with Start >Archive Process with Variant 1 ( to write the archive file) > Archive Process with Variant 2 ( to delete the data from the cube).
    Thats it !!
    Regards
    Edited by: Ellora Dobbala on Apr 8, 2009 5:28 PM

  • 50 Parallel Processing through Process Chain

    Hello Experts,
    Here is what I am trying to do.
    I want to create Process Chain which run 50(for ex.) Abap Program in parallel. I can create one by one through Process Types and select 'ABAP Program' and drag in the chain which is really very time consuming and tidious.
    Does anybody have better approach to do that ?? Any table where I can create all this parallel steps and put it in a chain ?? or copy each step and put it in parallel in chain ??
    Quick reply will be appreciated.
    Points are guaranteed for Right Resolution.
    Thanks in Advance.

    Hi "Believe in Jainism",
    Do you need to execute other process chain steps after executing the 50 abap programs? If not, why not just do the following:
    1) Create an ABAP program
    2) Inside the ABAP program, use the SUBMIT statement to execute the 50 ABAP programs in a background task.
    If you need to execute steps after the 50 abap programs, you can try to create a custom process type that executes the 50 ABAP programs in a background task and then monitors the statuses and then terminate only once all of these programs have executed successfully or if 1 has failed.
    Hope this helps.
    P.S. If you don't mind, may I ask why do you need to execute 50 ABAP programs in parallel?

  • PSA Deletion through Process Chain

    Hi Experts,
    Currently I am working on the BW3.5 version. I would like to delete the old PSA req through Process Chain. I need some clarification. Please provide me your suggestions.  Thanks in advance.
    1)In SAP-BW 3.5 version, there is only one process type u2018Deleting Requests from the PSAu2019 is available to do this activity. This process type can delete the requests from the PSA only or Will it delete PSA and Change Log tables!!!!! In the SDN threads, some people said it delete the PSA requests only and some said  it delete the PSA requests as well as Change Log.
    2)Currently we are having six process chain and each has master & transaction data load(Data load through PSA).
    Similarly I am planning to create six PSA deletion process chain which includes master & transaction data deletion. Here I am got little complication on finding Object Name(PSA Table Name).Please refer the screen shot.Is there any short cut to find full list of Object Name(PSA Table) which is currently available in the Process chain every day load.
    3)On the request selection, i prefer "Only sucessfully booked/updated req.". I did not select"Only those req with errors,that are not booked in a data target". Please share your view on this selection preference.
    http://img818.imageshack.us/img818/3963/psa1.jpg
    Thanks,
    RR

    Hi Murali,
    Thanks for the response. I do understand about the identifying the data source & PSA retention period(days). Let me elaborate my question little more. Thanks.
    1)In SAP-BW 3.5 version, there is only one process type u2018Deleting Requests from the PSAu2019 is available to do this activity. This process type can delete the requests from the PSA only or Will it delete PSA and Change Log tables!!!!! In the SDN threads, some people said it delete the PSA requests only and some said it delete the PSA requests as well as Change Log.If i am not mistaken, In BW 3.5 PSA deletion will leads through Change Log also.Am i right?
    2)Currently we are having six process chain and each has master & transaction data load(Data load through PSA).
    Similarly I am planning to create six PSA deletion process chain which includes master & transaction data deletion. Here I am got little complication on finding Object Name(PSA Table Name).Please refer the screen shot.Is there any short cut to find full list of Object Name(PSA Table) which is currently available in the Process chain every day load.In the very day process chain, we are having many stages in master & transaction load. So I can go through info pkg level and find the data source,then i can identify the PSA table name. But is there any other simplest way to find the PSA table name.
    http://img818.imageshack.us/img818/3963/psa1.jpg
    3)On the request selection, i prefer "Only sucessfully booked/updated req.". I did not select"Only those req with errors,that are not booked in a data target". Please share your view on this selection preference. May i know that which option is optimal on normal business process. If i did not select both options, then will that delete all the request in PSA!!!
    Thanks.
    RR.

Maybe you are looking for

  • Mac book pro 2009 having trouble detecting drive

    I just got this macbook pro and put a 320 wd hard drive in. Problem is it doesn't always detect the new drive when I boot up and if I go to unmount it to format it stopps detecting it. I am 90% sure it's the hard drive cable I just wanted advice befo

  • Printable CD

    A possibly silly question, but is there a method with Canon Easy Photoprint EX to print a CD with only a photo, and not with all those supplied layouts? (Using a Pixma Pro 100) Thanks Solved! Go to Solution.

  • Web ADI and Autopost

    Currently, we are setup in GL to autopost all GL journals. I am trying to troubleshoot a Web ADI issue and for a particular user, I'd like to have the uploaded spreadsheet data stay in the interface table rather than post to GL. I believe there is so

  • "And the beat goes on...." Lost all playlists and 8.0.2 takes away features

    Upgrade to 8.0.2 has been a disaster-beware out there. Lost all playlists and have yet to get an answer on how to fix that problem so am just going to create new playlists(could be a good thing). The latest f...up is that 8.0.2 seems to have taken aw

  • How to measure the slope of a triangle wave

    Hi everyone, I'm looking for a way to measure the slope of a triangle wave, which changes every half cycle of the wave. I have the triangle wave out of phase by 90 degrees so that it models the behavior of a cosine wave, and essentially all I want is