Facility creation
Dear ALL,
Pls find the requirement & confirm is it possible in SAP TR?
1. I have bank gurantee in company & i would like to bring all in SAP.
2. Bank guarantee will have lcertain limit for the amount.
3. i am considering the business partner as bank & these bank guarantee i am receving from vendor so i want to assign vendor while creating the transaction.
4.Finally i want to know the utilisation for the same.
Problem Faceing:
1. where to assing vendor/customer in transaction level.
2. In which T- code facilitator should be created?
3. i am check utilisation i T- code TM_60A but unable to get the out put.
Kindly assist at earliest.
Regards
Pramod
Hi,
You can use the product type facility and use facility obtained. In this case you can assign your business partner i.e. your bank a credit line.
While creating a transaction, under administration, you can give that facility number, so that this transaction will be treated as a drawing against that facility or against that borrower.
Kindly check about facility in help.sap for more information. Detailed explanation is given there.
Regards,
Ravi
Similar Messages
-
BADI FTR_CUSTOMER_EXTENT Implementation for Facility creation - TM_61
Hello Experts
I am trying to add new tab in the create facility transaction and I feel that the right BAID to do this is FTR_CUSTOMER_EXTENT. I am not able to update the new values in the screen to the database table. I check in the forum and there are many questions for the same but there is no clear answer for the same. Request your help in letting me know how this can be achieved.
I have also checked the same Function Group FTR_CUSTOM_BADI_SAMPLE but still I am not clear as to how I can achieve this.
Thanks in advance
Vijay VHello Claudia,
I finally solved the problem, and I hope my solution may suite your problem.
The bigger problem I had was pass the data from the screen to the BADI itself, so I created a function group following the FTR_CUSTOM_BADI_SAMPLE in which I developed the objects.
Those are the steps I followed:
I enhanced the structure VTBFHA with the custom field I needed;
I created an implementation for the FTR_CUSTOMER_EXTENT
in EVT_APPLICATION_START method I called a function module (copied from the FTR_CUSTOM_BADI_SAMPLE_START) in which I started the subscreen I draw in new tab. (Please note that by doing this I now have the interface if_open_trtm_customer_data always at hand). Follow the instruction of the sample code or the http://scn.sap.com/thread/1534252 thread)
in the PBO of the subscreen I retrivied the custom data via GET_CUST_DATA of the IF_OPEN_TRTM_CUSTOMER_DATA interface and pass the data in my screen fields. In order to do that I called a function module developed in the same function group, so that the interface is ready to be used.
in the PAI of the subcreen, once the data is entered I pass the new data via SET_CUST_DATA of the IF_OPEN_TRTM_CUSTOMER_DATA interface, again developing a FM within the function group of the EVT_APPLICATION_START custom function module I used.
I am sure there must be a better solution, but it owrked pretty fine for me, so I hope this my help you as well.
Moody -
To provide "variant creation facility" in a Molule pool program
Hi
I have develope a molude pool screen with some input fields.
now I want to provide " variant creation facility" as in standard reports.
I will enable "SAVE" button on the status bar. but I have no idea how to provide
variant creation facility same as in standard reports.
please help me .
Regards
KakoliHi,
I doubt if it can be achieved by standard solution or FMs. But i have an idea. Check the feasibility of implementing it.
Provide 2 buttons. One for saving the variant, other for selecting the variant.
Create a Ztable with variant name as the key field and rest of the screen fields as non key fields. Now, on clicking the save button, update this Ztable with all screen field values. On clicking the get variant button, query this Ztable and provide a popup with available variants. If a variant is selected, populate the values from Z-table to screen.
But can we handle table control with this approach!!!!??? I hope no.
Thanks,
Vinod. -
Downpayment facility in PO creation itself in EHP 4
I am on EHP 4. In this EHP 4, i can give downpayment (DP) percentage in PO itself.
There are three DP Category:
1. Mandatory downpayment
2. Voluntary downpayment
3. No downpayment
I selected 1st option. When i did MIRO, i thought that the amount mentioned in downpayment percentage will be credited to Vendor downpayment special GL instead of vendor account.
But my entire vendor was credited. Let me know then what is the use of this downpayment facility.Hi meenu,
I think it is just a symbolic representation which is nothing to do with the document posting, here is the SAP Library link and they had mentioned Business add "Enhancement for Processing the Purchase Order" which has to be checked what exactly i does in the Mandatory part..
http://help.sap.com/erp2005_ehp_04/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
I am also working with EHP4 and i don't find any difference in using the M or V indicators on down-payment, may be while executing ME2DP you can restrict the voluntary down payments
thanks and regards
Praveen.J
Edited by: Aspire FICO on Aug 18, 2010 1:16 PM -
Problem with SLD and Creation of JCo
Hello everyone!
I have a problem with the SLD and the Creation of JCo on the Portal, in trying to create the JCo always tells me that the name used there in the SLD, being that the facility is new.
Who performs the installation, set in the SLD the ECC 6 PRD, delete it to see if I could create a JCo but still the error again when creating the ECC 6 PRD in the SLD I said that already exists and can not create it.
I found a forum which recommended re-import the cimsap .... .... zip and zip CR_Content which would clean everything, I managed to import the zip cimsap ... but in trying to raise CR_Content gives me the following message "All incremental updates of the selected aggregate import for export SAP_CR line have already been loaded before. You require a newer import to update your current content SAP_CR version 4.11." .
I recommend, do the installation again, reload the cimsap.zip and CR_Content.zip a copy homogeneous.
from already thank you very much
Text of error to create JCo destination
Failed to process request. Please contact your system administrator.
[Hide]
Error Summary
While processing the current request, an exception occured which could not be handled by the application or the framework.
If the information contained on this page doesn't help you to find and correct the cause of the problem, please contact your system administrator. To facilitate analysis of the problem, keep a copy of this error page. Hint: Most browsers allow to select all content, copy it and then paste it into an empty document (e.g. email or simple text file).
Root Cause
The initial exception that caused the request to fail, was:
java.lang.NullPointerException
at at com.sap.tc.webdynpro.serverimpl.wdc.sl.SystemLandscapeFactory.checkStatus(SystemLandscapeFactory.java:991)
at at com.sap.tc.webdynpro.services.sal.sl.api.WDSystemLandscape.checkStatus(WDSystemLandscape.java:469)
at at com.sap.tc.webdynpro.tools.sld.ButtonBar.onActionGoForward(ButtonBar.java:505)
at at com.sap.tc.webdynpro.tools.sld.wdp.InternalButtonBar.wdInvokeEventHandler(InternalButtonBar.java:280)
at at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87)
... 28 more
See full exception chain for details.
System Environment
Client
Web Dynpro Client Type HTML Client
User agent Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; Trident/4.0; .NET CLR 1.1.4322; InfoPath.1)
Version null
DOM version null
Client Type msie7
Client Type Profile ie6
ActiveX enabled
Cookies enabled
Frames enabled
Java Applets enabled
JavaScript enabled
Tables enabled
VB Script enabled
Server
Web Dynpro Runtime Vendor: SAP, build ID: 7.0017.20081210091801.0000 (release=NW04S_17_REL, buildtime=2009-01-12:09:43:27[UTC], changelist=52884, host=pwdfm114), build date: Tue Apr 28 19:28:39 CLT 2009
J2EE Engine 7.00 patchlevel 48199.450
Java VM IBM J9SE VM, version:2.2, vendor: IBM Corporation
Operating system Linux, version: 2.6.18-92.el5, architecture: amd64
Session & Other
Session Locale en
Time of Failure Fri Aug 28 11:43:53 CLT 2009 (Java Time: 1251474233677)
Web Dynpro Code Generation Infos
sap.com/tcwdtools
No information available null
sap.com/tcwddispwda
No information available null
sap.com/tcwdcorecomp
No information available null
Detailed Error Information
Detailed Exception Chain
java.lang.NullPointerException
at com.sap.tc.webdynpro.serverimpl.wdc.sl.SystemLandscapeFactory.checkStatus(SystemLandscapeFactory.java:991)
at com.sap.tc.webdynpro.services.sal.sl.api.WDSystemLandscape.checkStatus(WDSystemLandscape.java:469)
at com.sap.tc.webdynpro.tools.sld.ButtonBar.onActionGoForward(ButtonBar.java:505)
at com.sap.tc.webdynpro.tools.sld.wdp.InternalButtonBar.wdInvokeEventHandler(InternalButtonBar.java:280)
at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87)
at com.sap.tc.webdynpro.progmodel.controller.Action.fire(Action.java:67)
at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.doHandleActionEvent(WindowPhaseModel.java:420)
at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.processRequest(WindowPhaseModel.java:132)
at com.sap.tc.webdynpro.clientserver.window.WebDynproWindow.processRequest(WebDynproWindow.java:335)
at com.sap.tc.webdynpro.clientserver.cal.AbstractClient.executeTasks(AbstractClient.java:143)
at com.sap.tc.webdynpro.clientserver.session.ApplicationSession.doProcessing(ApplicationSession.java:321)
at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessingStandalone(ClientSession.java:713)
at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessing(ClientSession.java:666)
at com.sap.tc.webdynpro.clientserver.session.ClientSession.doProcessing(ClientSession.java:250)
at com.sap.tc.webdynpro.clientserver.session.RequestManager.doProcessing(RequestManager.java:149)
at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doContent(DispatcherServlet.java:62)
at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doPost(DispatcherServlet.java:53)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:760)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:853)
at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.runServlet(HttpHandlerImpl.java:401)
at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.handleRequest(HttpHandlerImpl.java:266)
at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:386)
at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:364)
at com.sap.engine.services.httpserver.server.RequestAnalizer.invokeWebContainer(RequestAnalizer.java:1039)
at com.sap.engine.services.httpserver.server.RequestAnalizer.handle(RequestAnalizer.java:265)
at com.sap.engine.services.httpserver.server.Client.handle(Client.java:95)
at com.sap.engine.services.httpserver.server.Processor.request(Processor.java:175)
at com.sap.engine.core.service630.context.cluster.session.ApplicationSessionMessageListener.process(ApplicationSessionMessageListener.java:33)
at com.sap.engine.core.cluster.impl6.session.MessageRunner.run(MessageRunner.java:41)
at com.sap.engine.core.thread.impl3.ActionObject.run(ActionObject.java:37)
at java.security.AccessController.doPrivileged(AccessController.java:207)
at com.sap.engine.core.thread.impl3.SingleThread.execute(SingleThread.java:102)
at com.sap.engine.core.thread.impl3.SingleThread.run(SingleThread.java:172)Hello!!
The "SLD" with which I am working up to Portal, the "ECC" installs itself as "ABAP.
Who did the installation and initial configuration, do not leave any documentation about it.
Now I need to create the systems and "JCo" necessary to enable them to implement the "ESS", but errors are presented above.
Some days ago I managed to update the CR_Content, which allowed me to create the "JCo" but at the time of the test, says' com.sap.mw.jco.JCO $ Exception: (103) RFC_ERROR_LOGON_FAILURE "name or password incorrect .
I managed to also create the portal systems, "System Administration -> System Configuration -> Content Portal" and to test it fails on "Test Connection with Connector", which as noted is associated with the connectors "JCo".
For the creation of the system, I think I should create something in the Visual Administrator ", but within the documentation that I do not see anything about it.
thanks for your help! -
Creation of New T-Code for mass maintenance of SA
SAP currently does not have a facility to mass-maintain schedule agreements. The business alone has over 16,000 schedule agreement lines. Manual maintenance is very time consuming.
There are some key items of data that can require amendent for a particular vendor. The new program would permit the maintenance of:
Planned delivery time EKPO-PLIFZ
GR proc Time EKPO-WEBAZ
Firm Zone EKPO-ETFZ1
Trade off Zone EKPO-ETFZ2
Binding Grp EKPO-KZSTU
Conf Control Key EKPO-BSTAE
Vendor Material number EKPO-IDNLF
Stock type EKPO-INSMK
Creation profile EKPO-ABUEB
approach from my functional consultant:
basically i want to update the fileds on a screen of tcode : memasspo (mass maintenance of purchase orders )
if i select pur ord item in the initial screen,
it allows me to enter pur doc values and item values
after that
if i select fields symbol button on left side
and i can select fields which i have to be updated in the right side in the Popup screen
if i choose fields they will come along with pur doc and item in the screen
My question is :
pur doc and item values with additional fields data is available in the flat file that should be updated
pl let me know the approach to upload whether i go for eigther BDC or BAPI
Note :
i can update for newly added fields in the user defined SAP Screen itself for porders
but if i enter the purchasing doc as scheduling agreement no it wont allow you to update
i need to update for Scheduling agreements ?
<removed_by_moderator>
Thanks in advance
Edited by: Julius Bussche on Sep 3, 2008 9:56 AMHi Hariprasad,
If restricting certain fields using field selection option is not suitable for you, you can go ahead with the option Screen Variend
Also refer the link
[https://wiki.sdn.sap.com/wiki/display/Snippets/Transaction%20Variant%20-%20A%20Step%20by%20Step%20Guide%20for%20Creation] -
Creation of bidder in Statergic souring
My business scenario is linke this
I need to get an RFI and then RFP and then RFQ followed by contract creating in SRM which will have to be distributed to ECC as Scheduling agreement.
1. From Statergic sourcing role if i create a business partner it is creating partner id in SRM. if i treat him as bidder i need to give his user id and password. I guess presently sap is not having the facilit of sending user id and pwd to the partner (who in the case is prospects in Souricng) how this situation can be over come
2.In creating new transtion type it is working fine but the transaction types of folow-on document is not working suppose if i have a transcation type as RFI and i want to have follow on document type called RFP and RFQ. The system should allow me to create RFP and RFQ as subsuquent document if that is the case we shuld have a tab called transacation type as a drop down pleae clarify on this
3. when i try to create new data type in question it is created and not reflecting in further action. I guess the data type is pointing to difernt table than that of the actual one
Regards
SridaranHi all,
Thanks for the quick response. My question was slightly different.
I am very well aware of the fact that the Bidder/Vendors created in SRM has to be linked to the Org structure, and also that we need to create Contact persons for them.
Basically when we can create Bidders/vendors and also their corresponding contact persons in 'Manage Business Partner' transaction, which would create a 'Bidder Master data' with a bidder number and a 'business partner master data' with a bp number( If I am right, CP creation and SU01 User linking will be automatically taken care of ).
Now my question was that, can I go and create a business partner with transaction BP, linking him to Org structure and also to a user id, and make the BP work fine in Bidding.
As Disha suggested, can I just create a BP, CP for the BP and a SU01 user for the BP alone? Will that alone be sufficient?
If yes, then after creating the BP, how do I create a CP for the BP and link the User to the BP?
Thanks,
Steve -
Creation of purchase order in MRP
Hi All,
Is it possible to create purchase order as an output of MRP? If yes, then how?
regards,
MohitHi Mohit,
SAP has not provided such facility of directly creating the Purchase Order in MRP run, intentionally, so as to
1. Provide an Authorization Level over the P.O. creation
2. Provide a chance to change the Planned order or Purchase requizition before PO creation
3. As this is a procurement proposal that is directly linked with the vendor, quantity and Price, it has to be created very carefully.
I hope you got it.
with regards,
gnk -
Automatic creation of Warehouse No. data in the material master
Hi all,
I want the automatic creation of Warehouse No. data in the material master record at the time of the first goods receipt is allowed.
Similar to the way where we can do the same for Storage Location by clicking on Create SLoc. automatically in the plant parameters settings.
can it be done..plz guide.
Regards,
SandeepHi Deepak ,
Such facility is not available for Warehouse .
Regards
Ramesh Ch -
Auto PO creation from PR through ME58 problem.
Hi experts.
We are providing facility to our client auto po creation from PR through Me58 transaction code.
I am facing amazing problem is that it is working fine in development client , not working in Quality and Production client , exactly problem is that ME58 u2013 Ordering Assigned Purchase requisition & Process Assignment Create PO , Purchase order cannot be created, PR shift in document overview , it means user want to drag and drop in purchase order then system create PO , this problem I am facing in Quality & Production , but it is working fine in development server there is no need to drag and drop , immediately after Process assignment Create PO , system directly convert PR into PO just only need to check and save PO. I compare everything with development & quality data including material master , source list and everything still I am unable to understand where is the problem , is there any customization settings related to auto po ? pls. suggest any solution to solve this issue.
KumarHi,
Config setting.
Settings for Automatic PO creation is:
1. Select the Automatic PO check box/option in Purchasing view of material master
2. Select the Automatic PO option in the purchasing data view of Vendor master
3. Maintain Purchase info record
4. ME56- Assign the vendors to PR's
5. ME58- Create PO via assignment list(PR-> PO)
6. ME57- Assign and process PR's
7. ME59N - Create PO automatically via PR
Above step by step procedure is involved in the Automatic PO creation.
SAM -
Process m000 died, ksvcreate: Process(m000) creation failed
Yesterday I couldn't have any client connection to the XE database. Logged in as sysdba and was unable to do any select statements. I bounced the listener but still no client connections were possible. A look at the alert log reveals the following:
Mon Jul 31 14:00:24 2006
Process m000 died, see its trace file
Mon Jul 31 14:00:24 2006
ksvcreate: Process(m000) creation failed
This was repeating itself every minute and no trace file was created, even though it mentioned checking the trace file.
Mon Jul 31 17:57:32 2006
Errors in file /usr/lib/oracle/xe/app/oracle/admin/XE/bdump/xe_ora_12104.trc:
ORA-27140: attach to post/wait facility failed
ORA-27300: OS system dependent operation:invalid_egid failed with status: 1
ORA-27301: OS failure message: Operation not permitted
ORA-27302: failure occurred at: skgpwinit6
ORA-27303: additional information: startup egid = 201 (dba), current egid = 200 (oinstall)
While logged in as sys or system, I was unable to shutdown the database with immediate or abort option. I have to kill the pmon process.
Can someone help me with an explanation as to why this happened?
Thank youその前後にORA-xxxxのエラーメッセージはないんでしょうか?
接続要求に対して最大プロセス数の設定が極端に小さい場合に同様の現象になることもあるようです。
パラメータを見直してみてはいかがでしょうか。 -
Install hangs in "Clone Database Creation"
I try to install Oracle 11g on my computer. The installation pass all the checks and completes installing the files, then go to "Oracle Database COnfiguration Assistant".
In the "Database Configuration Assistant" dialog, it displays the progress bar to 46% and said "clone database creation in progress", and then the whole progress hangs for 8 hours without any changes. So I think the installer is dead.
I shutdown the installer and computer. Then restart. Then stop all the Oracle services, then call the deinstall to deinstall everything, remove all the registry entries and installed files.
I then restart computer and reinstall Oracle, but the installation hangs on the same progress again. I repeat this for several times. But always cannot complete the installation.
I think maybe there are some problems in cloning the database, so I check the log file, which is appended in this article. One problem is that the creating time of the log is about 8 am, but when I wait to 16 pm, the progress is still hangs and the creating/updating time of the log file is still 8 am, means Oracle does not update for about 8 hours.
The computer environment: Lenovo T500 laptop with WIndows XP(SP3) installed.
Log file:
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0641: "EXECUTE" requires connection to server
SP2-0640: Not connected
Database closed.
SP2-0640: Not connected
Database dismounted.
ORA-28056: Writing audit records to Windows Event Log failed
OSD-792246492: Message 792246492 not found; product=RDBMS; facility=SOSD
O/S-Error: (OS 1502) ??????????????????
ORA-01081: cannot start already-running ORACLE - shut it down first
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0641: "EXECUTE" requires connection to server
SP2-0640: Not connected
SP2-0641: "EXECUTE" requires connection to server
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
ERROR:
ORA-28056: Writing audit records to Windows Event Log failed
OSD-216442576: Message 216442576 not found; product=RDBMS; facility=SOSD
O/S-Error: (OS 1502) ?????????????????? ORA-28056: Writing audit records to
Windows Event Log failed
OSD-216442576: Message 216442576 not found; product=RDBMS; facility=SOSD
O/S-Error: (OS 1502) ??????????????????
specify password for SYS as parameter 1:
specify password for HR as parameter 2:
specify password for OE as parameter 3:
specify password for PM as parameter 4:
specify password for IX as parameter 5:
specify password for SH as parameter 6:
specify password for BI as parameter 7:
specify INPUT metadata import file as parameter 8:
specify INPUT database backup file for tablespace EXAMPLE as parameter 9:
specify OUTPUT database file for tablespace EXAMPLE as parameter 10:
specify OUTPUT log directory as parameter 11:
Sample Schemas are being plugged in ...
ERROR:
ORA-28056: Writing audit records to Windows Event Log failed
OSD-216442576: Message 216442576 not found; product=RDBMS; facility=SOSD
O/S-Error: (OS 1502) ?????????????????? ORA-28056: Writing audit records to
Windows Event Log failed
OSD-216442576: Message 216442576 not found; product=RDBMS; facility=SOSD
O/S-Error: (OS 1502) ??????????????????
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0641: "EXECUTE" requires connection to server
SP2-0640: Not connected
SP2-0641: "EXECUTE" requires connection to server
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
SP2-0640: Not connected
Edited by: 1006616 on 2013-5-18 下午3:081006616 wrote:
The event log problem is not fatal. It will popup a warning said cannot write into the event log, and I click "Ignore" to continue. But the installation still hangs at 46%. I try to purge the event log, and try again. The install will still hangs.
ORA-28056: Writing audit records to Windows Event Log failed
you are entitled to your opinion, regardless of how misguided it may be.
You don't have to convince me, about your reality.
If you want Oracle to install correctly, you need to make sure that NO errors get thrown.
Only you can fix what is wrong on your system. -
Dear all;
In this scenario after creation of PO it is possible to change the PO, but Our client requirement is not to change PO after creation .how this is possible ,is there any special configuration for that ?
Thanking You;
Regards;
Joydeep Mukherjeehi,
in standard their is no that facility for normal p.o but you can restrict that at enduser level don't give that authorization to that enduser for this you have to consult your basis person.
other wise you have to restrict through relese startgy for p.o
for configration of relese startgy go through this link
http://www.****************/Tutorials/Workflow/POReleaseStrategy/page1.htm
http://www.sap-basis-abap.com/sapmo017.htm
Thanking you. -
Network wise PR creation in CJ20N (PS)
Hi all,
I have one requirement regarding PR creation through CJ20N. In PS scenario, under one project there will be number of WBS elements and under each WBS element number of network will be there and under each Network there will be number of activities. We will add materials under these activities. There are two type of PR creations by releasing networks in CJ20N, they are
1) Network wise PR creation - through the network PR number will be same and line items will be different.
Example : P->W->N->A1-> M1 ---> PR1/1
M2 ---> PR1/2
A2-> M3 ---> PR1/3
M4 ---> PR1/4
2) Material wise PR creation - for every material, PR number will be different.
Example : P->W->N->A1-> M1 ---> PR1/1
M2 ---> PR2/1
A2 -> M3 ---> PR3/1
M4 ---> PR4/1
Through customization, we can create Network-wise PRs or Material-wise PRs. But my requirement is to create Activity-wise PRs, in which PR number will be same with in an activity and it will differ with another activity under same network.
Example : P->W->N->A1-> M1 ---> PR1/1
M2 ---> PR1/2
A2-> M3 ---> PR2/1
M4 ---> PR2/2
For this, there is no option in customization. Please let me know is this possible through enhancements/BADIs? or is there any other way to do?
Thanks in Advance,
Siva Sankar.Dear All,
We had a similar requirement in one of our client, the details are as follows:
Client’s requirement was to generate plant wise number range for Purchase Requisition created in Project System though T-Code CJ20N. Standard SAP don’t have any facility for plant wise document type or plant wise number range for Purchase Requisition created in Project System.
Plant wise document types and its number ranges are already defined in system but as per standard settings of PS system - PRs created from project system are considering only for one document type i.e. maintained in the configuration. There is no facility to select document type as per plant in CJ20N in standard SAP.
We have implemented two user exists EXIT_SAPLCOZF_001 & EXIT_SAPLCOZF_002 for attaining the specified functionality.
Please let me know if this is useful to you, I will update the complete solution in the thread.
Regards,
Dhaneshwari -
Remove/delete duplicate cash flows on facility
Hi all
Due to a error in SAP std, for a facility a number of duplicate commision flows are created when drawing a contract against a facility. The issue is solved with the implementation of SAP note 1389873 so no more duplicates are created. Is there a way that I can remove/delete/reset a spesific cashflow manually? I would like to avoid to have a it removed directly from the table(s)Hi,
OK, since SAP given solution for avoiding creation of new flows, it should work with change mode of transaction as well. Try to reset the flows in trasaction if the flows are still scheduled. You cannot seperate flows with same date & update type from activity posting/marked as posting. TBB1_LC can be used for marking flows as fixed. Also, there is a function for reversing flows from Cash flow tab of transaction for money market products. Please check that as well.
And finally, the possible solution will be reverse the entire transaction and create a new one instead.
Regards
Prasad AV
Maybe you are looking for
-
TS1550 Unable to complete backup. An error occurred while creating the backup folder.
Running OS X 10.8.5 Trying to backup to Passport Time machine. Has worked fine until a few days ago. Don't want to tinker too much as am not that savvy. TIA for any help. Di
-
How to display things in english instead of Chinese?
I am a Chinese and when I install 11gR2, i chose both Chinese and english languages. and when I operate on oracle, certain things like error code displays in Chinese. I want it in english, so how can I fix it? anyone has any idea?
-
Discovering oracle databases in the network
I was wondering if there is a possibility, to discover with occi all available servers in the neighbourhood. I noticed this feature already in the sqldeveloper tool from oracle , so there must be a way. I stumbled so far on nothing in the documentati
-
SessionBroker login fails with Oracle XA
Hi all, I am trying to use oracle XA with sessionbroker. I register the session with the session broker and when i try to login it gives "No suitable driver" error. Without using session broker, when I get the session, it is working fine. sb = new Se
-
Unable to Export Attriute Data on Form To Excel
My requirement is to export data from PO Summary Result Screen to an Excel. This can be done using FILE->Export functionality provided by Oracle, however when doing so the attribute columns comes as "[ ]" . I need to display them as an individual col