FG and SFG - costing

Hi Experts,
To meet some client requirements and with some restrictions on material ledger, we are considering to have SFG and FG at moving average prices. Yes I have read and understood OSS note 81682, but I think the issues mentioned there can be overcame with the following solution. Can anyone of you review and tell me the loop holes if any.
1.     Every SFG and FG will be confirmed and taken into stock @ existing MAP. This will be taken into a specific  batch.
2.     Everyday a scheduled program will be run to pick up the production orders with at least 1 qty confirmed. Do the TECO for the production order, settle it through KO88 and remove the TECO status to REL status. So that when I settle the production order the variances will flow only to the quantities existing to the production order. Or it will apportion the variance to inventory and P/L based on the quantity in stock relevant to the particular production order only.
3.     To ensure that only correct raw material quantities are flowing into the production order, back flushing is activated at all levels.
With this solution if one production order is partially confirmed and consumed to the next level before settling the same, those items will move at existing MAP. Also activity price variances will  have to be monitored regularly and changed prospectively for the next period.
Best Regards
Vimal Vijayan

Hi Vimal
I would still say it is half hearted approach...
Majority share of expenses like Salary, electricity, Depreciation, etc are booked at month end... So, true variances can be calculated only after month end....
With your approach - What you will be inventorizing is Variance based on actual material cost + overhead at Standard rates... I hope you would agree on this
Before going with this approach - Take the approval of your Business people in Finance... Else, you may come at the receiving end in future
br, Ajay M

Similar Messages

  • Material ledger and standard cost estimate

    Hi Gurus,
    When standard cost estimate is done in a scenario, where  material ledger is activated, does the entire stock get revaluated andl post a credit in my P/L? Is it possible  to keep my inventory(FG and SFG) at periodic unit price ie at the actual manufacturing price over a longer period say 3 years? Please fill this gap in my understanding.
    Best regards
    Vimal

    Hi Vimal,
    Material ledger uses the standard price as 'preliminary price' always during the current month, independent of the question if a new standard price was estimated and released.
    But: After period end, when the actual price is calculated the posting will adjust the inventory and P/L accounts to the actual price, with posting date in the recent period.
    That means if you have a material that was manufactured once and then consumed over a 3 year period, and during that period you calculate the same material in a standard cost estimate with changing results, that would mean: Looking back at any month during the 3 years the consumption and stock values will be valued at the actual price of manufacturing. But during the currently open period it will always be valuated at the price of the last released cost estimate.
    I hope I understood your scenario correct...
    Best regards,  Udo

  • SFG cost at Transfer Price

    Hi,
    We want to arrive SFG cost at Transfer Price in another plant. Can anyone please help me with the process steps for the same. Please note that we don't want to activate Material Ledger for the same. Just want to capture transfer price in another plant. Can anyone please help as this is an urgent issue.
    Regards,
    Varsha

    Hi,
    The two plants in question are in the same company code?
    If they are in the same company code I think you will need to use the transfer price functionality in PCA and a separate cost component to capture the delta profit.
    Regards
    Ali

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

  • Report for extracting the actual and planned cost from service orders

    HI all
    we are creating a report in BI for Module - Customer service . LIke , the report is all about how many complaints created in the system and how many completed technically and what is the cost involved for each complaint .
    Like we want the comparision between the planned cost and the actual cost .
    Now to give the logic to the BI Team for planned cost and actual cost , please suggest the flow of logic or table flow to arrive the planned and actual cost
    thanks in advance

    Hi Marthand,
    I am not sure which datasource your are using. In this case, you can use the 0VALUETYPE to differencitae between th eplan and actuals. Normally Plan which is budget will have value 050 and for actuals will have 010. For costs, you will have one key figure and at the reporting level, you will have the costs restricted by the value type for plan and actual to make comparisons.
    Hope this helps.
    Regards,
    Srinivas

  • Report for production order with actual and target cost for each

    Hi
    Is there any report that gives me the list of all production orders in a month with its respective actual and target costs?
    I can use COOIS to get a list of production orders, then double click on the prod order, then click on goto and then to cost analyis.. but can i avoid going through all this and get a report with the details i need?
    thanks in advance

    Thanks a lot for that.
    I'm a little confused with the columns in the report.
    Which columns should I keep for my requirement? -
    Production Order
    Total Target Cost
    Total Actual Cost
    Total Actual Qty
    Total Target Qty
    Thanks

  • PIE chart report for planned, Actual and variants cost

    Hi Gurus,
    Is there any report provides information of Plan cost, Actual cost and Variants cost for sales order or production Plan in PIE CHART format or any other chart diagram.
    Regards,
    Ram Krishna

    Hello,
    Go to relevant S_ALR* report.
    For example execute
    S_ALR_87013611
    Settings ==> Options
    Office Integration => Microsoft Excel
    Remove Worksheet Protection
    ignore the warning message.
    Go to insert tab on the MS excel.
    Select the report data.
    Click on pie chart.
    You will be able to see the pie chart.
    Regards,
    Ravi

  • Inventory Report-Replacement path for Base UOM to Case and Standrad Cost

    Hi, We have a Scenario as below:
    Question1:
    We have a multiprovider contains 4 infocubes and 2 Master Data objects
    a.Demand
    b.Inventory
    c.Sales Orders
    d.In Transit
    Master Data objects
    a. Material (contains Base UOM to Case as Key Figure Attribute and also Base UOM as an attribute)
    b. Material Location (Contains material as an attribute and also Standard Cost as a Key Figure attribute)
    At the report level two formula variables are defined with replacement path for showing the Base UOM to Case and Standard Cost in columns.
    We have 4 reports on this multiprovider. There is a dialy sales report which gives the following details
    Material, Location, MRP Controller, CalDay, Base UOM, Actual Sales(AS), Dependent Demand(DD), Consumption Qyt(CQ), Base to Case UOM, Standard Cost
    In this report for all the records the Base to UOM and Standard Cost column is coming with values which is nothing but the replacement path on the material master key figure attribute. Though this report is on the multiprovider all the major keyfigures (AS, DD and CQ) are coming from a single cube( this is an observation from myside).
    We have another report which is the Inventory Report with the following details:
    Material, Location, MRP Controllder, Calday, Base UOM,      Unrestricted Inventory(UI), committed Inventory(CI), Back Order Qty(BOQ), In Transit by Sh/Rec(ITS), In Transit Pipeline(ITP), On Order Qty (OOQ), Current Inventory Position (CIP), Quality Inspection Stock(QIS), Block Stock(BS), Base to Case UOM, Standard Cost
    Now in this report for all the records the Base to Case UOM and standrad cost is not showing up. Is there anything which needs to be done in order to get the Base to Case UOM and standard cost for all the records.
    Question2:
    When Non-Cumulative and Cumulative key figures are combined at the multi provider and also at the report level, will there be any problem?
    Regards
    Vijay

    Hi,
    I think you can proceed with virtual characteristics for this.In the code you can truncate the time and you can display on the date:
    Regards
    Prasad

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Why we use different clearing account for GR/IR and planned cost clearing a

    My client ask for using same account for GR/IR account and all planned cost clearing account.
    i try to convince it should be different accounts but he needs a logical answer.
    Why we use different clearing account for GR/IR and planned cost clearing accounts?

    Dear friend.
    u just tell him while doing GR it will debited n  while doing IR it should get credited.hence we  need to take diff G/L account or same account.
    regds
    nasir

  • How to calculate the Current APC (Acquisition and Production Cost)

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”.
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
    Please help me.
    Thanks in advance,
    Satish

    Hi,
    you'll find the logic in fm FI_AA_VALUES_CALCULATE
    A.

  • T Code for Date wise FG and SFG Created

    I want to check how many FG and SFG are created in each month? Any one knows the report or table in which  I will Get this DATA?

    ASK ABAP to copy MM60 to create a Modified report and add the cloulmn created on Table Mara field ERSDA and also ask him to add in the selection parameter the same so when you will run it for month it will give you for that period and by material type too the ouput with created on date in output too.
    Regards
    qsm sap
    Edited by: qsm sap on Jul 10, 2010 3:43 PM

  • ERS and delivery costs

    Hi guys,
    We have following two problems in case of ERS vendors.
    1) We have certain delivery costs also in purchase order.  The same vendor will receive material payment and freight related payments.  In MRRL transaction, we select "Selected goods items + Planned del costs"  and run MRRL.  But after this also, amount excluding freight amount is posted in the invoice and delivery cost is not being picked for invoice.  How to get material cost + delivery cost also in one invoice
    2) In another scenario, we have different freight vendor.  For this we are configuring ERS for delivery costs also.  But the problem is in configuration we have to mention the vendor code in "Specify Automatic Settlement of Planned Delivery Costs".  Can we give vendor code as "  *  " here?  Or is there any other way of doing configuration without mentioning vendor code and it is applicable for all vendors ?
    Please suggest the solution for the above two problems.

    Hi Pankaj,
    Thanks for ur reply.  This will work.  But my problem is with this, we have to include all the freight vendors in configuration.  But we do not know how many vendors are there for the company.  If any new vendor is created, who has to enter this in the configuration..
    Is there any other way of making this functionality applicable for all vendors.
    Other problem is in our PO we have basic rate and 3 to 4 delivery costs,.  We have made 103 and then 105 and run ERS run and arranged payment to material vendor (it is same for both material and freight)
    But for some reason we are making return delivery against material document with 105 movement.  When we run MRRL for this, it will generate credit memo for the quantity returned to vendor.  But delivery costs are also added.  We want to avoid delivery costs in credit memo and it should only take material cost
    How to acheive this?  Please help me out

  • Goods and delivery cost processing at one instance through MIRO

    Hello,
    Is there any possibility of doing bill wise MIRO for both goods and planned delivery cost in a single screen apart from refering PO and option goods+planned delivery cost?
    The scenario is; vendor is common for both goods and delivery cost,organization want to pass MIRO bill wise for goods and delivery cost at same instance.
    Regards

    Hi
    The scenario is; vendor is common for both goods and delivery cost,organization want to pass MIRO bill wise for goods and delivery cost at same instance.
    If vendor is same we can do it for multiple Po at same instance in MIRO,what Mr, Bijay Kumar said ,follow this
    Regards
    Kailas ugale

  • Reversing A/P Invoice posted with wrong date and inventory cost adjustment

    Here's the situation:
    We had a PO dated 9/1/09 for items with a cost of $14.50, a Goods Receipt was entered 9/15/09 for the items with the same cost on the PO of $14.50.  Somehow the order got lost in the mix and the AP invoice wasn't entered until today, with a posting date of 1/21/10 and the cost was corrected per the original vendor invoice to the right amount of $19.33.  The invoice was actually dated 9/15/09.  This resulted in hitting the vendor, purchases clearing and the inventory account (for the cost adjustment) in January 2010 when it should have occurred in September 2009.
    The inventory itself has come and gone in the time between the GR and when the invoice was done with the incorrect date.  Normally I would try to reverse the transaction with a Credit Memo and start over, however since the inventory side happened so long ago, I don't see any way of easily going backwards.  I thought about doing service CM/invoice but what I am most concerned about is having the inventory valuation occur properly at the correct time.  I'm not sure how to go about this.
    Using SAP B1 2007A PL42 with moving average inventory.
    Any thoughts would be appreciated.

    Nicole,
    I am afraid you may not have ability to do the adjustment based on historical date that long times ago.  You know, the moving average has limited calculation based on current quantity and cost.  There are no options to go backward especially new year is coming.
    Thanks,
    Gordon

Maybe you are looking for

  • No direct postings possible for G/L account

    While using t/r code MB1C system issue as error " NO DIRECT POSTING POSSIBLE TO G/L ACCOUNT" (because it is a reconciliation acount). Please help. Thanks in advance Swaroop

  • How to install hp c4588 for leopard?

    Its a wifi printer which has been paired with my home wifi network. For a while I used it with the HP software but now I want to use Image Capture. So I uninstalled the HP software and removed the printer from System Preferences. I have given it a na

  • IPhone photos not showing up in places

    I recently upgraded to iOS4. I OK'd the camera to store the GPS tag from where the photo was taken. When I pull it up in the photo library, it gives the correct location of the photos I have taken, so I know it's working. ...But it's not showing up i

  • Sync contants with categories?

    how do you get your contacts to be in certain categories in the iphone. all the categories show up in my phone from entourage but there are no contacts in the categories... does anyone know how to solve this?

  • How to post GI of items used in plant maintenance

    Dear gentlemen I created material type FHMI. Now, the question is: suppose I want to post a tool issue to an employee. Later, this employee would have to bring this tool back to the storage location. What movement type should I use? Regards, Carlos P