FI full cycle implementation question
Hello All
Can someone give me their insight on a full cycle implementation in FI module or production support. I would like to know what are the typical tasks, project cycle, etc involved in it. I am preparing for interview and this will be my first project. I wanted to know what really happens in a project. Any help will be greatly appreciated.
Thank you
Smitha
Hi,
Below steps are the the highlevel plan for the BW implementation
1. AS IS process - Study of the existing process.
2. To be process mapping - What will be the new process.
3. customizaiton in SAP & query development - Customizing the cubes and ODS
4. Unit testing - Testing of each and every module and reports
5. Full testing - Full system testing. In this step all steps are integrated so, it is also known as Integration testing.
6. End-user training - Training for the Power user (first line users) by the SAP Consultants. They will in turn train to other users.
7. Go-live
8. Support for initial month-ends. -
9. Post implementation support....
Hope this helps..
Regards
Ganesh
*Assign points if this helps
Similar Messages
-
Question about full cycle charges and battery life
So I've had the new iPad since day 1 and absolutely love it, though recently I've noticed that my battery life doesn't seem to hold up as well as it has in the past. I've done three full cycle charges since getting it however during my latest one I accidently brought along my iPod wall charger and not the one that comes with the iPad. My iPad was fully discharged and I plugged it in assuming that in the 7 hour window I had that it would be fully charged within 5 hours, but this was not the case due to me having the wrong charger. After about 7 hrs of charging it was only at around 60-70% so I had to unplug it, bring it home, then plug it in once more using the correct charger. Probably a fairly obvious question but does this not count as a full cycle charge because I unplugged it? Should I perform another full cycle charge even though this most recent one was not even a week ago. I know you're supposed to completely discharge your battery as few times as possible so it worries me having to do it again so soon.
About battery life, I've noticed lately that my iPad battery seems to be depleting quicker than normal, and was hoping that perhaps this was caused by being overdue for a full-cycle charge which I may have flubbed as seen above. I'm aware of a majority of the little tips and tricks to prolong battery life however I'm not so knowledgeable on the "do's and don'ts" of charging the actual iPad so any information on that would be helpful. I should also note that unfortunately I accidently left by iPad in a hot car for a little over an hour and was tremendously devastated knowing what this can do to the battery, so could this be the main cause for a seemingly weaker battery?
Thanks for any feedback!The quickest way (and really the only way) to charge your iPad is with the included 10W USB Power Adapter. iPad will also charge, although more slowly, when attached to a computer with a high-power USB port (many recent Mac computers) or with an iPhone Power Adapter (5W). When attached to a computer via a standard USB port (most PCs or older Mac computers) iPad will charge very slowly (but iPad indicates not charging). Make sure your computer is on while charging iPad via USB. If iPad is connected to a computer that’s turned off or is in sleep or standby mode, the iPad battery will continue to drain.
Apple recommends that once a month you let the iPad fully discharge & then recharge to 100%.
How to Calibrate Your Mac, iPhone, or iPad Battery
http://www.macblend.com/how-to-calibrate-your-mac-iphone-or-ipad-battery/
At this link http://www.tomshardware.com/reviews/galaxy-tab-android-tablet,3014-11.html , tests show that the iPad 2 battery (25 watt-hours) will charge to 90% in 3 hours 1 minute. It will charge to 100% in 4 hours 2 minutes. The new iPad has a larger capacity battery (42 watt-hours), so using the 10W charger will obviously take longer. If you are using your iPad while charging, it will take even longer. It's best to turn your new iPad OFF and charge over night. Also look at The iPad's charging challenge explained http://www.macworld.com/article/1150356/ipadcharging.html
Also, if you have a 3rd generation iPad, look at
Apple: iPad Battery Nothing to Get Charged Up About
http://allthingsd.com/20120327/apple-ipad-battery-nothing-to-get-charged-up-abou t/
Apple Explains New iPad's Continued Charging Beyond 100% Battery Level
http://www.macrumors.com/2012/03/27/apple-explains-new-ipads-continued-charging- beyond-100-battery-level/
New iPad Takes Much Longer to Charge Than iPad 2
http://www.iphonehacks.com/2012/03/new-ipad-takes-much-longer-to-charge-than-ipa d-2.html
Apple Batteries - iPad http://www.apple.com/batteries/ipad.html
Extend iPad Battery Life (Look at pjl123 comment)
https://discussions.apple.com/thread/3921324?tstart=30
New iPad Slow to Recharge, Barely Charges During Use
http://www.pcworld.com/article/252326/new_ipad_slow_to_recharge_barely_charges_d uring_use.html
Tips About Charging for New iPad 3
http://goodscool-electronics.blogspot.com/2012/04/tips-about-charging-for-new-ip ad-3.html
Prolong battery lifespan for iPad / iPad 2 / iPad 3: charging tips
http://thehowto.wikidot.com/prolong-battery-lifespan-for-ipad
In rare instances when using the Camera Connection Kit, you may notice that iPad does not charge after using the Camera Connection Kit. Disconnecting and reconnecting the iPad from the charger will resolve this issue.
Cheers, Tom -
Can more than 1 full life cycle implementations be done for a company?
Hi there,
Can anybody please tell me if its possible to do more than 1 full life cycle implementation for a company with multiple company codes? From my understanding, SAP life cycle is ASAP methodology, starting from project preparation to go-live. So if I'm implementing sap for 1 company code, I'll be completing 1 full life cycle implementaion. Now if i do the same for another company code, for the same parent company, will that be considered as 2 full life cycle implementation? Kindly help. I'm not so clear about this full life cycle implementation concept.
Would really appreciate your gekp.
Awaiting response,
FieonaHI,
Well I think It is possible but there are two cases.
If the implementation is in some company code having same business as the company in which initially SAP was implemented and all the business processed are same then in that case it would be called Rollout. In rollout you would only create the Organizational data that is enter prise structure and master data for that company but there will be no new process configuration as all the running process are already there.
How ever if you talk about the group lets say has two three completely different business for ex AUto mobile and Power and you implemented it initially in Automobile. Now you want to implement in Power generation sector then definately it would be a fresh implementation. In this case the most important is that you will prepare new BBP as all the business process are different. A complete new documentations, new master data , org elements and a different realization phase and testing phase would be there.
Please correct If I am wrong. -
How can I get the "Full cycle SAP project experience"?
Hi,experts
I'm a beginner of PI and familar with java,now i have got good acquaintence of PI architecture and familiar with ESR and ID in PI,but now i'm confused with the development aspect of PI expert...one thing is that full cycle sap project experience is a must,but how can i get that while i just always repeating the boring creation of PI objects and do the mapping,routing tasks etc...Hi Rajesh,
If you started working with new implementation project then you will get a chnace to involve in all phases like Blue printing,analysys,realization,development testing.
Creation of obejcts in ESR or ID its not a big deal,but when you are working with complex landscape then you feel to elanr and many newthing in PI how to achieve the requirement using Writing some good UDF and using node function ...Adapter Modules or JAVA Mapping or XSLT Mappings..and many.
When you get in to SAP PI project,when you started development first you will start analysing the functional document and then you will start preparing techincal specification,then mapping specification then development,testing..these all tasks happend in pahse by phase.after completion of development then you wl tesing the interfaces ,preparing test cases...
we can say full lide cycle implemenattion prijects invloves above all tasks.
Regards,
Raj -
Is full cycle when you charge fully? Or is it the times when the battery life goes under 50% Very confused. Also how often should i fully charge my mbp to keep the battery healthy? Lastly under how much battery percentage should i charge? Sorry for many question. Thank you
This article has the info about Battery Cycle Count.
http://support.apple.com/kb/HT1519
Best. -
Window inheritance problem, implementation question
This is a multi-part message in MIME format.
--------------F5AF60803BB8EFA34C8D4288
Content-Type: multipart/alternative;
boundary="------------24CDBE5DFBEC0C4205C15C80"
--------------24CDBE5DFBEC0C4205C15C80
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
Hi!
I have a window inheritance and implementation question. I'm using
Forte 3.0.J.1.
I have a super (base) window with a PushButton on it. I want to
handle the Click event of the button in this super window therefore
I create an event handler.
<MyBtn> : PushButton
I create a sub window inheriting from the previous super window.
I put some data widgets on it and group all of them (the inherited
button as well) into a GridField. When I set the mapped type of the grid
the name of the inherited PushButton widget changes:
<MainGrid.MyBtn> : PushButton
When I run the application I get a SystemException with the
message:
Attempt to register an event on a NIL object (qqds_C_FieldWidget, 10).
Traceback:
SuperWindow.EH at line 0
SubWindow.Display at line 5
C++ Method(s)
UserApp.Run at offset 105
It is quite understandable that in runtime there is no widget called
<MyBtn>
and the event handler of the super class fails.
But what I don't know : after specifing a mapped type of a GridField why
changes
the name of those widgets that haven't got mapped type e.g.: PushButton,
PictureButton etc.
How to solve this situation?
I made a sall example which i send in attachment.
Thanks for any help and advice in advance...
Attila Racz Lufthansa Systems
Hungary
BUD LSYH
E-mail: [email protected] .-``'.
Tel.: (36 1) 431-2910 .` .' Mazsa ter 2-6.
Fax : (36 1) 431-2977 _.-' '._ H-1107 Budapest,
Hungary
--------------24CDBE5DFBEC0C4205C15C80
Content-Type: text/html; charset=us-ascii
Content-Transfer-Encoding: 7bit
<!doctype html public "-//w3c//dtd html 4.0 transitional//en">
<html>
<tt> Hi!</tt><tt></tt>
<p><tt>I have a window inheritance and implementation question. I'm using</tt>
<br><tt>Forte 3.0.J.1.</tt><tt></tt>
<p><tt>I have a super (base) window with a PushButton on it. I want to</tt>
<br><tt>handle the Click event of the button in this super window therefore</tt>
<br><tt>I create an event handler.</tt><tt></tt>
<p><tt><MyBtn> : PushButton</tt><tt></tt>
<p><tt>I create a sub window inheriting from the previous super window.</tt>
<br><tt>I put some data widgets on it and group all of them (the inherited</tt>
<br><tt>button as well) into a GridField. When I set the mapped type of
the grid</tt>
<br><tt>the name of the inherited PushButton widget changes:</tt><tt></tt>
<p><tt><MainGrid.MyBtn> : PushButton</tt><tt></tt>
<p><tt>When I run the application I get a SystemException with the</tt>
<br><tt>message:</tt><tt></tt>
<p><tt>Attempt to register an event on a NIL object (qqds_C_FieldWidget,
10).</tt>
<br><tt> Traceback:</tt>
<br><tt> SuperWindow.EH
at line 0</tt>
<br><tt> SubWindow.Display
at line 5</tt>
<br><tt> C++ Method(s)</tt>
<br><tt> UserApp.Run
at offset 105</tt><tt></tt>
<p><tt>It is quite understandable that in runtime there is no widget called
<MyBtn></tt>
<br><tt>and the event handler of the super class fails.</tt><tt></tt>
<p><tt>But what I don't know : after specifing a mapped type of a GridField
why changes</tt>
<br><tt>the name of those widgets that haven't got mapped type e.g.: PushButton,</tt>
<br><tt>PictureButton etc.</tt><tt></tt>
<p><tt>How to solve this situation?</tt>
<br><tt>I made a sall example which i send in attachment.</tt><tt></tt>
<p><tt>Thanks for any help and advice in advance...</tt><tt></tt>
<p><tt>---------------------------------------------------------------------------</tt>
<br><tt> Attila Racz
Lufthansa Systems Hungary</tt>
<br><tt>
BUD LSYH</tt>
<br><tt>E-mail: [email protected]
.-``'.</tt>
<br><tt>Tel.: (36 1) 431-2910
.` .' Mazsa ter 2-6.</tt>
<br><tt>Fax : (36 1) 431-2977
_.-' '._ H-1107 Budapest, Hungary</tt>
<br><tt>---------------------------------------------------------------------------</tt>
<br><tt></tt> </html>
--------------24CDBE5DFBEC0C4205C15C80--
--------------F5AF60803BB8EFA34C8D4288
Content-Type: application/x-zip-compressed;
name="Inh.zip"
Content-Transfer-Encoding: base64
Content-Disposition: inline;
filename="Inh.zip"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--------------F5AF60803BB8EFA34C8D4288--import javax.swing.JOptionPane;
public class Test{
public static void main(String[] args)
String newItem = "Item";
float newSerial = 4234;
float newCode = 3424;
int newBase = 1000;
boolean YesWarranty = true;
boolean NoWarranty = true;
Machinery test1 = new Machinery(newItem, newCode, newSerial, newBase, YesWarranty, NoWarranty);
JOptionPane.showMessageDialog(null, "Item: " + test1.getItem() + " Serial: " + test1.getSerial() + " Code: " + test1.getCode()
+ " Warranty: " + test1.IncludeWarranty() + " No Warranty: " + test1.ExcludeWarranty()+ " Base: " + test1.getPrice());
}Tested with this and it seems to be ok?
Changed my final code too because it seemed to always add the 10% whether YesWarranty was true or false, so made it
if (TrueWarranty==true) //There is a warranty, it returns the base price plus 10%
return (base+((base/100)*10));May have posted here too early if it does work, but there is another part so if ive trouble with that il be back :P
Edited by: dave_the_bear on 16-Nov-2010 07:17
Changed base to double and used the *0.1 method -
Purchase full cycle process with T-Codes and screen shots
HI GURUS,
will anyone mail PO Full Cycle with screen shots? And t-codes
1. PURCHASING REQUISITION
2. REQUEST FOR QUOTATION
3. QUOTATION
4. PURCHASE ORDER
5. GOOD'S RECEIPT
6. INVOICE VERIFICATION
7. PAYMENTThe typical procurement cycle for a service or material consists of the following phases:
1. Determination of Requirements (MD02 / ME51N): - Materials requirements are identified either in the user departments or via materials planning and control. (This can cover both MRP proper and the demand-based approach to inventory control. The regular checking of stock levels of materials defined by master records, use of the order-point method, and forecasting on the basis of past usage are important aspects of the latter.) You can enter purchase requisitions yourself, or they can be generated automatically by the materials planning and control system.
2. Source Determination: - The Purchasing component helps you identify potential sources of supply based on past orders and existing longer-term purchase agreements. This speeds the process of creating requests for quotation (RFQs), which can be sent to vendors electronically via SAP EDI, if desired.
3. Vendor Selection and Comparison of Quotations (ME41 / ME47 / ME49): - The system is capable of simulating pricing scenarios, allowing you to compare a number of different quotations. Rejection letters can be sent automatically.
4. Purchase Order Processing (ME21N): - The Purchasing system adopts information from the requisition and the quotation to help you create a purchase order. As with purchase requisitions, you can generate Pos yourself or have the system generate them automatically. Vendor scheduling agreements and contracts (in the SAP System, types of longer-term purchase agreement) are also supported.
5. Purchase Order Follow-Up: - The system checks the reminder periods you have specified and - if necessary - automatically prints reminders or expediters at the predefined intervals. It also provides you with an up-to-date status of all purchase requisitions, quotations, and purchase orders.
6. Goods Receiving and Inventory Management (MIGO): - Goods Receiving personnel can confirm the receipt of goods simply by entering the Po number. By specifying permissible tolerances, buyers can limit over- and under deliveries of ordered goods.
7. Invoice Verification (MIRO): - The system supports the checking and matching of invoices. The accounts payable clerk is notified of quantity and price variances because the system has access to PO and goods receipt data. This speeds the process of auditing and clearing invoices for payment.
Rebate Process:
1. XK02 - Changing a Vendor Master Record (Activate "Subsequent Settlement" and "Sebseq. sett. index" in Purchasing view)
2. MEB1 - Creating a Rebate Arrangement
3. ME21N - Creating a Purchase Order
4. MIGO - Processing the Goods Receipt for the Purchase Order
5. MIRO - Processing the Incoming Invoice on the Basis of a Purchase Order
6. MEB4 - Creating an Interim Settlement
7. MEU2 - Creating a Business Volume Comparison
8. MEB2 - Creating a Final Settlement
A centrally agreed contract is involved if:
A single purchasing organization procures for an entire corporate group, or
A reference purchasing organization makes a contract available to other associated purchasing organizations, enabling the latter to issue release orders against this contract
Centrally Agreed Contracts are created in same transaction ME31K, but here is some difference in maintaining the pricing conditions and partner functions.
Maintaining Plant Conditions
1. When maintaining the centrally agreed contract, choose Edit > Plant conditions > Overview.
2. On the overview screen that then appears, enter the desired plant and choose "Overview" icon Plant prices.
3. An item overview screen appears, starting from which you can maintain conditions.
Choose Item > Conditions to access the condition maintenance screen.
4. Return to the overview and repeat the process for all plants for which you wish to store plant-specific conditions.
5. Save your input.
Maintaining Partners
You can maintain the different partners either in the vendor master record or individually in the contract. If the partners have been maintained in the vendor master, they are suggested in the contract.
Maintaining partners in a contract
1. In the contract, choose Header > Partners.
2. The Data Retention Level: Partners screen appears. Enter the plant and/or vendor sub-range, and choose ENTER. The Maintain Partners screen appears.
Note
To see which partners have already been maintained, select the desired item and choose "Display" button Level.
3. Enter the desired partner and return to the item overview for the contract.
4. Save your input.
Maintaining partners in the vendor master
1. Choose Extras > Different data on the Partner Roles (partner functions) screen in the vendor master record.
2. On the Create Different Data screen, enter the plant or vendor sub-range and select Partner Roles.
3. Click "Enter" button. The Change Vendor: Partner Roles screen appears.
4. Enter the desired partners and click "SAVE" button to save your input.
Then create Release orders (in ME21N) w.r.t. Centrally Agreed Contrat -
Perform Full Cycle Count - No Data Found
I am trying to initialize a full cycle count for all items in a subinventory. I have a recent ABC compile set and a new cycle count setup. A, B, C and D classes are all set to count 1x per year. I have verified that all items from the compile are no in the cycle count. I submitted a "Cycle Count Scheduler" request and ensured that it completed. I then set all the parameters in the "Perform Full Cycle Count" request and set to save to file. After it completes and I view the output, the file says "No data found". My only recourse is to dump all items from Material workbench and use Data Load to enter them in ( a bit tedious for 900+ items). Is there anything I need to be doing different?
You mention that you have done the ABC setups.
But in Cycle count setups, have you defined a cycle count schedule?
And more importantly, in cycle count classes, have you entered the frequency at which each class should be counted?
Last but not the least, what is the last count date (on the serial and schedule tab)?
If it is today, you will have to wait till tomorrow.
Hope this helps,
Sandeep Gandhi -
1 End-2-End Life Cycle Implementation
Hi,
Provide me with the detailed information about 1 End-2-End Life Cycle Implementation.
How it is done?Hi,
It is not possible to explain 1 End-2-End Life Cycle Implementation.
Refer to this weblink for understanding what is SAP Implementation.
http://en.wikipedia.org/wiki/SAP_Implementation
Also refer to this book
Sams Teach Yourself SAP in 24 Hours
http://www.amazon.com/exec/obidos/ASIN/0672328224/sapinformation0e
Please let me know if you need more information.
Assign points if useful.
Regards
Sridhar M -
hi Frnds,
i want to know abt the process in implementation phase & wht is 1 life cycle implementation?
any doc reg this mail me <u>[email protected]</u>
points will be awardedHave a look at this:
/thread/172255 [original link is broken]
Regards -
Scheduling agreement full cycle??
Hii
Can anybody explain me step by step with transaction code for Scheduling agreement.
Full cycle with account transaction and accounting documents being generated in system , with vendor payment transaction.
One by one transaction - full cycle .
thanks
SAP-MMHI,
1. SAP Menu u2192 Logistics u2192 Materials Management u2192 Material Masteru2192 Material u2192 Create General u2192 Immediately
In order for you to be able to generate both forecast and JIT delivery schedules, the JIT delivery schedule indicator in the Purchasing view of the material master record must have the value 1.
2. Change vendor master record in such a way that when ascheduling agreement with release documentation is created for plant 1000 for e.g.,the release creation profile ABCD is defaulted from the vendor master record.
a) SAP Menu u2192 Logistics u2192 Materials Management u2192 Purchasing u2192Master Data u2192 Vendor u2192 Purchasing u2192 Change (Current)
You can define the release creation profile in the plant-specific purchasing data (Alternative Data). The field is located among the default values for the material.
3. The agreement begins as of today's date and is valid for two years. The agreement is valid for plant 1000. The target quantity is 100,000 pc. You have negotiated a price of 78 EUR per pc. Deliveries are received into storage location 0001. Before saving the scheduling agreement, branch to Additional Data and verify that the release creation profile ABCD and the
JIT delivery schedule indicator have been adopted from the vendor master record and material master record, respectively. In the additional data, enter the planned delivery time of two days.
a) SAP Menu u2192 Logistics u2192 Materials Management u2192 Purchasing u2192Outline Agreement u2192 Scheduling Agreement u2192 Create u2192 Vendor Known
Choose the agreement type LPA in order to be able to send FRC and JIT delivery schedules to your vendor.
Access the additional data via Item u2192 More Functions u2192 Additional Data.
4. SAP Menu u2192 Logistics u2192 Materials Management u2192 Purchasing u2192 Outline Agreement u2192 Delivery Schedule u2192 Maintain
Select the item and choose Item u2192 Delivery schedule.
give the qty and time and date.
Hope Help U !
Regards,
Pardeep malik -
Error : Oracle BPEL Process Manager Full Cycle
{color:#3366ff}Hi,
I tried to deploy the UnitedLoan sample demo on to the BPEL server, I ran devprompt.sh to set the environment path and changed the oc4jadmin password in properties file, and when I tried to open the BPEL console I am getting the following error.
Appreciate your inputs.
Regards,
Chandra
{color}<strong>{color:#3366ff}{color:#3366ff}ERROR DESCRIPTION is as follows,{color}
{color}</strong>
Oracle BPEL Process Manager Full Cycle
An unexpected error has occurred while executing your request. This is most likely related to a defect in the Oracle BPEL Process Manager product. We apologize you can post the error to the OTN forum and we will get back to you as soon as possible.
Attachments:
Build Information:
Oracle BPEL Server version 10.1.3.1.0
Build: 0
Build time: Mon Oct 09 08:44:49 PDT 2006
Build type: release
Source tag: PCBPEL_10.1.3.1.0_GENERIC_061009.0802
Exception Message:
[javax.servlet.ServletException]
Timed out waiting for process load lock.
Failed to obtain load lock for process "UnitedLoan-1.0"; timed out after 60 seconds.
Exception Trace:
javax.servlet.ServletException: Timed out waiting for process load lock.
Failed to obtain load lock for process "UnitedLoan-1.0"; timed out after 60 seconds.
at com.evermind.server.http.EvermindPageContext.handlePageThrowable(EvermindPageContext.java:809)
at com.evermind.server.http.EvermindPageContext.handlePageException(EvermindPageContext.java:756)
at ngDeployedProcesses.jspService(_ngDeployedProcesses.java:213)
at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:453)
at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:591)
at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:515)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
at com.evermind.server.http.ServletRequestDispatcher.unprivileged_include(ServletRequestDispatcher.java:160)
at com.evermind.server.http.ServletRequestDispatcher.access$000(ServletRequestDispatcher.java:50)
at com.evermind.server.http.ServletRequestDispatcher$1.oc4jRun(ServletRequestDispatcher.java:97)
at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
at com.evermind.server.http.ServletRequestDispatcher.include(ServletRequestDispatcher.java:102)
at com.evermind.server.http.EvermindPageContext.include(EvermindPageContext.java:396)
at index.jspService(_index.java:104)
at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:453)
at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:591)
at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:515)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
at com.evermind.server.http.ServletRequestDispatcher.unprivileged_forward(ServletRequestDispatcher.java:259)
at com.evermind.server.http.ServletRequestDispatcher.access$100(ServletRequestDispatcher.java:50)
at com.evermind.server.http.ServletRequestDispatcher$2.oc4jRun(ServletRequestDispatcher.java:193)
at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
at com.evermind.server.http.ServletRequestDispatcher.forward(ServletRequestDispatcher.java:198)
at com.collaxa.cube.fe.DomainFilter.doFilter(DomainFilter.java:131)
at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:619)
at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
at com.evermind.server.http.HttpRequestHandler.serveOneRequest(HttpRequestHandler.java:216)
at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:117)
at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:110)
at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
at java.lang.Thread.run(Thread.java:595..hi.did u fix it or went for re-install..we got similar error...and found that some jar files are found at more than one classpath directories ...we moved them out..e.g., common-logging???.jar...we removed and it worked just fine...give it a try...
-
PP Full cycle with t-codes and enterprise structure?
*Hello Guru's,*
*Will anyone share your expertise with PP Full cycle process with t-codes, and its enterprise sturcture and integration points with SD,MM, fico, WM and PM etc,.Hi,
Pls. go through the following links:
http://www.sap-img.com/sap-pp.htm
http://help.sap.com/saphelp_erp60_sp/helpdata/en/ba/df293581dc1f79e10000009b38f889/frameset.htm
You will get all details related to PP module.
If any specific doubt come back.
Regards,
Tejas -
Oracle BPEL Process Manager Full Cycle
Hi there -
I am using the SOA suite v 10.1.3.3.1 and deployed my process using jDeveloper BPEL designer. I created a test process for a simple manager approval, deployed it, and approved/denied it in the worklist. It worked fine. I created a new process (a human task for a manager to approve a request), deployed it, went to the worklist and received the above error. The error began when I went to approve/deny. It stated that "An error occured while processing your request". When I dug a little deeper, this was the entire error message below. Any ideas? How do I troubleshoot this more?
Thank you for your help and suggestions.
Error while evaluating the routing slip http://soadev:7778/orabpel/sandbox/ProcardService/1.0/ManagerReviewAndApprove/ManagerReviewAndApprove.task. This routing slip is used by workflow sandbox_ProcardService_1.0_ManagerReviewAndApprove.
If you need more information, please check with your administrator with the following exception-identifier: "2008/03/20_11:10:34:693_jstein"
Here is the error from 2008/03/20_11:10:34:693_jstein:
Oracle BPEL Process Manager Full Cycle
An unexpected error has occurred while executing your request. This is most likely related to a defect in the Oracle BPEL Process Manager product. We apologize you can post the error to the OTN forum and we will get back to you as soon as possible.
Attachments:
Build Information:
Oracle BPEL Server version 10.1.3.3.1
Build: 0
Build time: Fri Nov 30 03:12:29 PST 2007
Build type: release
Source tag: PCBPEL_10.1.3.4.0_GENERIC_071130.0200
Exception Message:
[javax.servlet.ServletException]
Cannot find work items.
An attempt to fetch the work items using the where condition " wi_state = ? AND fault_name LIKE ? " from the datastore has failed. The exception reported is: ORA-00904: "FAULT_NAME": invalid identifier
Please check that the machine hosting the datasource is physically connected to the network. Otherwise, check that the datasource connection parameters (user/password) is currently valid.
sql statement: SELECT * FROM admin_list_wi WHERE ci_domain_ref = 1 AND wi_state = ? AND fault_name LIKE ? ORDER BY wi_modify_date desc
Exception Trace:
javax.servlet.ServletException: Cannot find work items.
An attempt to fetch the work items using the where condition " wi_state = ? AND fault_name LIKE ? " from the datastore has failed. The exception reported is: ORA-00904: "FAULT_NAME": invalid identifier
Please check that the machine hosting the datasource is physically connected to the network. Otherwise, check that the datasource connection parameters (user/password) is currently valid.
sql statement: SELECT * FROM admin_list_wi WHERE ci_domain_ref = 1 AND wi_state = ? AND fault_name LIKE ? ORDER BY wi_modify_date desc
at com.evermind.server.http.EvermindPageContext.handlePageThrowable(EvermindPageContext.java:866)
at com.evermind.server.http.EvermindPageContext.handlePageException(EvermindPageContext.java:813)
at ngActivityList.jspService(_ngActivityList.java:611)
at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:462)
at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:594)
at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:518)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:65)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:623)
at com.evermind.server.http.ServletRequestDispatcher.unprivileged_include(ServletRequestDispatcher.java:160)
at com.evermind.server.http.ServletRequestDispatcher.access$000(ServletRequestDispatcher.java:51)
at com.evermind.server.http.ServletRequestDispatcher$1.oc4jRun(ServletRequestDispatcher.java:97)
at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
at com.evermind.server.http.ServletRequestDispatcher.include(ServletRequestDispatcher.java:102)
at com.evermind.server.http.EvermindPageContext.include(EvermindPageContext.java:453)
at activities.jspService(_activities.java:427)
at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:462)
at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:594)
at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:518)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:65)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:623)
at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:370)
at com.evermind.server.http.ServletRequestDispatcher.unprivileged_forward(ServletRequestDispatcher.java:259)
at com.evermind.server.http.ServletRequestDispatcher.access$100(ServletRequestDispatcher.java:51)
at com.evermind.server.http.ServletRequestDispatcher$2.oc4jRun(ServletRequestDispatcher.java:193)
at oracle.oc4j.security.OC4JSecurity.doPrivileged(OC4JSecurity.java:283)
at com.evermind.server.http.ServletRequestDispatcher.forward(ServletRequestDispatcher.java:198)
at com.collaxa.cube.fe.DomainFilter.doFilter(DomainFilter.java:131)
at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:370)
at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:871)
at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:453)
at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:302)
at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:190)
at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
at java.lang.Thread.run(Thread.java:595)Does the BPEL console not work at all? Or are you trying to view an BPEL process instances that is not in the dehydration store anymore?
Marc -
Oracle BPEL process Manager Full Cycle Error
Background introduction:
This is my first time install SOA, Database Server and JDeveloper in my laptop (I am not sure whether they can be installed in one machine). It seems like the installation didn't pass the Web Services Verification. I hope this won't influence other services in my SOA.
Problem:
When I put my username and password in the BPEL Manager Console window, it let me passed it. And then there is a box let me put in the Domain.
Then this error jump out:
I hope some one can help me on this.
Oracle BPEL Process Manager Full Cycle
An unexpected error has occurred while executing your request. This is most likely related to a defect in the Oracle BPEL Process Manager product. We apologize you can post the error to the OTN forum and we will get back to you as soon as possible.
Attachments:
Build Information:
Oracle BPEL Server version 10.1.3.1.0
Build: 0
Build time: Mon Oct 09 08:44:49 PDT 2006
Build type: release
Source tag: PCBPEL_10.1.3.1.0_GENERIC_061009.0802
Exception Message:
[java.security.AccessControlException]
access denied (com.collaxa.security.DomainPermission minimax.net read)
Exception Trace:
java.security.AccessControlException: access denied (com.collaxa.security.DomainPermission minimax.net read)
at java.security.AccessControlContext.checkPermission(AccessControlContext.java:264)
at java.security.AccessController.checkPermission(AccessController.java:427)
at com.collaxa.security.OC4JSecurityService.checkAccess(OC4JSecurityService.java:16)
at com.collaxa.security.SecurityService.checkDomainAccess(SecurityService.java:26)
at com.collaxa.cube.fe.util.ServletUtils.getLocator(ServletUtils.java:95)
at index.jspService(_index.java:76)
at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:453)
at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:591)
at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:515)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
at com.collaxa.cube.fe.DomainFilter.doFilter(DomainFilter.java:108)
at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
at oracle.security.jazn.oc4j.JAZNFilter$1.run(JAZNFilter.java:396)
at java.security.AccessController.doPrivileged(Native Method)
at javax.security.auth.Subject.doAsPrivileged(Subject.java:517)
at oracle.security.jazn.oc4j.JAZNFilter.doFilter(JAZNFilter.java:410)
at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:619)
at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
at com.evermind.server.http.HttpRequestHandler.serveOneRequest(HttpRequestHandler.java:216)
at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:117)
at com.evermind.server.http.HttpRequestHandler.run(HttpRequestHandler.java:110)
at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
at java.lang.Thread.run(Thread.java:595)looks like olite might have not been started? or some critical error happened..
have you checked to logs. or tried starting olite manually from commandline (developer prompt - start_olite.bat)
hth clemens
Maybe you are looking for
-
How to get multiple row values in one text box while clicking one row from grid?
hi friends, i am working on flex4 web application i am using one datagrid ,it have two records(bills),one button and one text box. ex: customername salesrepname receipt no amount venkat raj
-
Display won't turn on even though my Macbook Pro detects the display
I've had a long running issue with this but now rather than intermittantly, it just won't work at all. I have a 17" Mackbook Pro running Lion and an older style aluminium 23-24" cinema display (the boxy one). The problem also exited under snow leopar
-
Hi Experts, What is the best way to check what are the logical systems connected to ECC and what are the logical systems connected to APO? Regards Manotosh
-
When using AirPrint is it possible to select double sided printing
I am trying to use AirPrint to print from the Pages app on iPad Air running IOS 8.1.1. Is it possible to select any of the printer options, such as double-sided printing, when doing this? Many thanks
-
What are the configuration files ( list them) in DCM repository
DCM Reference Guide says that Configuration information for OHS,OC4J, OC4j applications,OPMN,JAZN are stored in repository. Can any one give me the list of configuration files it is storing? Or How to list them.