FI MM integration _ Non valuated GRN

Hi
In FI MM integration if you acquire an asset through PO the asset value gets captured automatically.
For single asset - One PO one asset - there is no problem - at the time of MIGO (Goods receipt) the GRN becoems "valuated" and asset get the value automatically.
For multiple account assignement - One PO - MORE THAN ONE ASSETS - the GRN becomes "non valuated " (automatically- the field is grayed out). The account document will not be generated. The asset value will be captured on the MIRO date.
1) Would it be a good practice? Ideally asset value date should be GRN date ..
2) If anyone has worked on this - pl. guide me as to how can i valuate the GRN for multiple account assignment.
regd
Vedavatee

Yes Veda,
When you have multi account assignement in PO, GRN Non-valuated option automatically de-activated (greyd out).
ME23N - Item data - Delivery - GR Non-Valuated
This is Standard SAP behaviour.
At the time MIRO, the entry will post as per the Account assignment given in PO - Splitting structure.
There is no other way to do it.
PO - Multi account assignment - GRN Non-valuated.........This is right approch as of today
You are correct, go ahead
Thanks

Similar Messages

  • GRN of Non Valuated Materials

    Hello Experts,
    Please explain me the inventory management of Non Valuated Materials.
    How the GRN of such materials is done.
    What are the documents generated for goods movement related to non valuated materials.
    Regards,
    MM

    Dear,
    Please explain me the inventory management of Non Valuated Materials.
    Non-valuated materials are managed on a quantity basis, but not by value
    How the GRN of such materials is done.
    GRN of these materials will be done in normal way with mvt 101, only difference will be there won't be any accounting document generated at the time of GRN.
    What are the documents generated for goods movement related to non valuated materials.
    Once you do GRN for Non Valuated Materials then there will be only material document created, there won't be any accounting document generated.
    Hope it helps.
    Utsav

  • Different GR/IR account for service entry and GRN for non-valuated material

    Hi,
    Our requirement is GR/IR account while doing service entry and GR/IR account while doing GRN for non-valuated material (UNBW) should be different.
    Though we maintain valuation class for material group (Transaction OMQW), system is picking only the valuation class maintained for blank entry in transaction WRX under OBYC setting.  The system is ignoring the respective valuation class G/L account.  Also if we maintain valuation class for service masters, then also while doing service entry sheet system is picking only the valuation class maintained for blank entry in transaction WRX under OBYC setting
    Had i missed out any other setting.  Pls help.
    Regards

    Hi,
    In OBYC, please maintain a GL for valuation class 3200 for services and a GL for val class 3300 for Non-valuated material in WRX.
    Regards
    Ram

  • GR non valuated check box in PO

    Dear All,
    Our client has created a PO for Asset (Acct Assignment A) and Multiple acct assignment given in item detail.
    After making GRN found that Accounting entry is not there.
    When checked in PO GR-non valuated check box is checked.
    After cancelling GRN and try to save the PO,again tick appears automatically.
    When i check the Account assignment in SPRO, GR non valuated check box is not checked.
    How to remove  GR non valuated tick in PO?
    Regards

    Venkat,
    I wrote the same issue to SAP and sap has confirmed that system will not generate the accounting documents at the time of MIGO for multiple account assignment.
    Incase of multiple account assignment category, the Cost proportion will not be appearing at the time of MIGO. It will get updated only at the time of Invoice verification.
    Just post the MIRO and then compare the account document at the time of MIRO with the single account assignment and multiple acc.assignmnet PO.Hope it will help.
    If you want i can forward that response from SAP to u.
    Edited by: Manish Kumar Agarwal on Jun 16, 2009 2:02 PM

  • Multiple account assignment with non valuated gr

    hi,
    For multiple account assignement - One PO - MORE THAN ONE ASSETS - the GRN becomes "non valuated " (automatically- the field is grayed out). The account document will not be generated. The asset value will be captured on the MIRO date.
    pls explain why system behave like this?
    regards
    sumit simran

    Hi,
    Yes for asset GRN always non-valuated
    check following sap not also
    Note 9175 - No value update is performed for goods movements
    check setting of OMS9 for asset A you will get clear idea
    check following link also
    [Asset PO;
    Regards
    Kailas Ugale

  • "Taxes for SEZ" and "Opg Stock of Material for Non Valuated Project Stock"

    Hi Guru's,
    Need two clarifications specific to SEZ:
    a. When an SEZ unit buys any materials from a DTA unit, and if the supplier issues ARE1 form then there is no Excise duty charged on such purchase. Similarly VAT is also exempt and CST is exempt if the SEZ unit issues Form I. However in case the SEZ unit is not NEF +ve after 5 years, then all these benifits taken on ED, CST, VAT etc needs to be paid back to the Govt.
    Hence how is it possible in SAP to capture all these benfits (ED,CST,VAT) in the MIRO Invoice posting stage, so that the details are available when needed?
    b. We are using Project Systems and the project is non-valuated. So in our case all material which we buy for Project is consumed at the GRN stage and there is no valuated inventory.
    However for "Annual Performance Report" it is mandatory to give the Opening stock of material.
    Can anyone throw some light how this can be calculated when we the Project is non valuated?
    Regards,
    Prasad

    Hi,
    This is little difficult to manage a material as valuated and non valuated. To make it non valuated you have to use a material type which is managed only on quantity basis and not on value basis like non valuated stock. Then you can do a material to material transfer posting. I haven't checked this scenario. For more info on this please refer these links:
    http://help.sap.com/saphelp_dimp50/helpdata/en/4c/227bb446e611d189470000e829fbbd/content.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227bdb46e611d189470000e829fbbd/content.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227ba746e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227be846e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_di471/helpdata/en/4c/227b8d46e611d189470000e829fbbd/frameset.htm
    Regards,
    Atal

  • Intrastat - Inbound/Outbound of non valuated materials used in production.

    Hello everyone,
    I've found several threads and very useful posts (ex: Re: PO Creation of free goods for intrastat reporting)  regarding similar issue, but the solution proposed was manual input, therefore not answering totally to my client requirement.
    I am actually performing maintenance activities and there is this new business process, I have been searching for the correct understandind of this process regarding intrastat here and I haven't found.
    So i will describe the process hoping that someone can give me some hint:
    Vendor A
    Customer B
    Raw Material R
    Finish Product P
    Service S
    1. So we ( Vendor A ) receive raw material from our Customer B (+mov.type +)
    2. We ( Vendor A ) with a production order process the Raw material R into Finish Product P.
    3. We ( vendor A ) send the Finish Product P back to the Customer B.
    4. We ( Vendor A ) then issue an invoice for the Service S to the Customer B.
    5. It can occur that we Vendor A, can send back the Raw material R which was not manufactured back to Customer B (with a mov type.)
    So thiswas the scenario and how the process is beeing done, and the client understanding is:
    - As far as i understood, (please correct me if i am wrong) the Raw Material R must be declared (Quantity and statistic value) in Purchasing Intrastat, in the transactions where the Vendor A receives the raw material and as well in the case that they send it back to Customer B.
    - Regarding the Invoice from the Vendor A to Customer B, the Raw Material R is incorporated in the Finish Product P, therefore I've been told that, the Statistic Value determined in the invoice in this situation has to include the cost value of the raw materials R.
    My issues in MM are the following:
    1 - If Raw Material R is non valuated, how can i maintain its statistic value to be declared, in inbound as well outbound? as an Info-record?
    My issues in SD are the following:
    1 - If the Statistic Value GRWR can be for example 102% calculated over the net value, and if the cost value of Raw Materials R are to be included, so i would have to add them somehow to the statistic value.
    In this case the question comes up, where do i maintain the value of the raw materials R, and how to add it to the statistic value automatically ?
    Regarding what is implemented in this client, they have SD intrastat running, but not MM intrastat was implemented.
    Feedback would be highly appreciated!!
    Thank you in advance.

    Hi Sergio,
    I have this exact same requirement but on a bigger scale.
    The complexities are:
    1. The raw material which client use, that can be either supplied by customer or can be procured by client. Remember, customer's raw material and my externally procured raw material is exactly same in all properties.
    2. There are many customers who send same exact raw material.
    Requirements:
    1. Client wants to use same material codes (for raw materials and even for finished products) for normal production cycle and for Job work cycle. Master data needs to be the same, and data need to be separated at transaction level.
    2. Whatever raw material client gets from customer, its statistical value should be entered at the time of goods receipt.
    Please suggest if preference processing can handle this.
    Thanks & Regards,
    Vishal

  • What is diff b/w valuated and non valuated

    hi
       can anybody tell me what is difference between valuated salesorder and nonvaluated saled order stock
    thanks
    prasad

    Hi,
    While creating the Sales order, system explore the BOM for that FERT. Say, I add one more extra component in sales order which is not been maintained in BOM or which has not been valuated for Std cost estimate for that FERT material. This extra component is call it as Non-valuated sales order stock. All other, valuvaed materials are valuated sales order stock.
    Hope, it helps!

  • Storage Location for NON valuated material in MIGO

    Hi friends ,
    I have created a purchase order for NON-Valuated material (UNBW) with Account Assignment "K".I did check the material type UNBW configuration where only Value Update is checked for my Plant.
    Now at the time of MIGO , system is asking for Storage lcoation (mandatory) and after MIGO system also updates quantity in Storage Location entered in MIGO.
    while in normal cases (like ROH material type) , if we create Account Assigned PO ( like K) , system neither ask for Storage lcoation at the time of MIGO , nor system updates Qty at any storage location.
    As per my understanding , if we create Purchase Order with account assignment K , system updates value in consumption and doesn't update Qty in stock (although material is stockable) .....which is simply like immediately issue of material to cost center.
    Therefore wondering why system is updating Qty for NON-VALUATED material.
    Does non valuated material means , POST value to Cost center (for account assignment K) and Update Qty in stock ?
    Like in case of Account Assignment , value gets charged to WBS and qty gets updated as special stock "project"
    All replies are welcome .....
    Regards
    Shrey

    By definition UNBW's are ony qty updating and have no value assoicated with them. Since the system needs to stock this qty somewhere it by deafult asks for a Sloc.

  • Difference between Valuated and Non valuated Sale order stock

    Hi All,
    Can anybody tell me the difference between the above said subject with the steps involved in each scenario.
    That is valuated sale order stock and Non valuated sale order stock in Product cost by Sale Order.
    With Journal entries at each step and whether any WIP or variances at Production order level and sale order level and all the financial entries related to them
    Thanks in Advance,
    Ravi Kumar

    Hi Shail,
    Thans for your inputs,
    But I wanted to know it in more detail. In what scenarios they are used with financial entries in both the cases.
    I will give you my scenario. It goes like this,
    My client is in pipe coating business, who receives pipes from customers and does only coating work(which is considered as service) and despatches it to the customer. this process is carried on the basis of work order(Sale order).
    Now Production order is created and work is done on that with reference to Sale order for that particular customer.
    So the pipe which my client receives should be non valuated stock as it will not be a raw material to them and the cost incurred on it is booked on production order like chemicals as raw material consumption, activity cost etc.
    now in this scenario just tell me how and at which stage FI entries get generated at Production order and Sale order level, and also at wat level Standard cost estimate should be created i,e at production order level or sale order level(sale order cost estimate).
    Will there be any entries at goods isssue and GR against production order. If no then how the COGM account will get hit.
    Please tell me this scenario in both cases Valuated sale order stock and Non valuated sale order stock with financial entries in Sale order costing.
    Thanks & Regards,
    Ravi Kumar

  • "GR", "GR non-valuated", and "IR"?

    Dear Gurus,
    What determines whether we can change the "GR", "GR non-valuated", and "IR" indicators in the purchase order?
    Thanks...

    hi,
    Settings:
    1. PO field settings
    2. Account assignment settings
    Regards
    Priyanka.P

  • Use of GR receipt , IR receipt and GR - non valuated options in PO

    I want to know what is the use and effect of GR receipt , IR receipt and GR - non valuated options in PO.
    Pls help.

    Hi
    GR-Non valuated:
    Set the indicator if goods receipts involving this material are not to be valuated. The valuation of the purchase order item will then take place at the time of invoice verification.
    This indicator must be set in the case of multiple account assignment for example.
    IR receipt:
    Specifies whether an invoice receipt is linked to the purchase order item.
    You can not do LIV if this indicator is set.
    If the indicator is not set, the goods are to be delivered free of charge.
    Goods Receipt;
    Specifies whether a goods receipt is linked to the purchase order item.
    You can not do GR if you set this indicator.
    If GR indicator is set, GR-non valuated Indicator also need to be set.
    Cheers!
    ***reward If Useful (RIU)

  • Very Urgent--- How to Convert Non Valuated stk into Valuated

    Dear GURU'S
    Actually for a material A when i see the stock in MM03 in accounting tab i see less stock then when i see in MMBE
    i.e in MMBE if i select Material A and Plant B(Which is depo in my case) i see stock as 39
    but for same material MAterial A and Plant B ,if i see in MM03 --in accounting tab i m able to see less stock i.e only 1
    ============================================
    Well the problem is In MM03 I cud see only valuated stk i.e qty as 1
    And in MMBE for a partiocular material for a particular plant the stock was 39
    i.e Here i am getting Valuated + Non valuated stock
    i.e i am getting difference of 25
    =====>>>
    To get into the root cause
    I have gone to MB5B where i can get all the transaction that has been done on this material with movement type also i got the intial stock ,Goods recpt ,Goods  issu and total stock
    No for a particular material
    In MB5B it is showing
    Stock on 01.01.2005    =  38
    receipts total               = 238
    Issues total                  =237
    Stock as on 18.02.2008 = 39(which is equal to Stock in MMBE)
    =============>This is for valuated +Non valuated stock
    Where as if i want to see only valuated stock it was showing
    receipts total      = 238
    Issues total         =237
    Stock as on 18.02.2008 =1  (which is equal to stock in acctg view in MM03)
    ====================>This is only for Valuated Stock
    ======================================
    Now how to solve this :
    The initial qty(38) which has been posted it was at the begining that is at the start of the project
    And the people who have posted it ,it was non valuated
    that is the reason it is showing difference in MM03 and MMBE
    First thing
    How can i see on which date this initial stock has been posted
    Second Query
    How to convert this non valuated stock into Valuated stock
    So that the quantity in MMBE and MM03 gets matched
    Willl award 10 Points if my problem gets solved
    THANKZ IN ADVANCE
    REgds
    Shailesh

    Dear friend
    Actuallly i have checked the history of that particular Item in MB51
    I have gone through all the documents created for this material
    Now this material also exist in DEPO which is located at chennai and plant is at mumbai
    So Initially in the year-2006(31-10-2006) whater documents are created i.e STOP has  been created and delivery has been made (Mov type-601)
    are non valuated stock ,means they have been posted without any valuation
    But from year 2007(01.02.2007) the documents whiohc have been posted are valuated
    i.e is the reason when i am executing transaction MRN9 to check the history of valuated stock
    I cant see non valuated stock
    Well now how to do the valuation of this stock which have been posted in year 2006 so that
    In MMBE and MM03 there is no difference of stock
    Plz hepl
    regds
    shailesh

  • PO with Account Assignment P and NON Valuated Material

    Hi ,
    As per my undersatnding if I create a PO with Account Assignment "P" , system consumes it immediately and stock doesn;t get updated in any storage location.
    But
    If I use Account Assignment "P" with "NON valuated" stock , system is asking for Slocation at the time of MIGO and also updates Qtys in Storage location , although cost is being booked to consumption account.
    Could u pls help to understand the logic for this ?
    Regards
    Shrey

    Hi,
    PLease read this para from SAP help .. it is useful to undestand your scenarion
    Goods Receipt of Non-Valuated Materials  
    Use
    If the stock of a given material is only managed on a quantity basis, an account assignment must be defined in the purchase order. However, this account assignment does not result in the goods receipt being posted to consumption/usage. Instead, it results in the costs being debited to the account assignment object.
    The goods receipt is posted to the warehouse stock, thus increasing the unrestricted-use stock of the material.
    *It is not possible to post goods receipts of non-valuated materials directly into consumption/usage. You have to post the goods receipt into the warehouse first and then enter a goods issue.*
    Regards
    Krishna

  • Sales Order -Valuated, non valuated

    Hi,
    I am getting an error while saving a sales order containing Variant Configured Material. The Error description is " Sales Order is non valuated".
    Where do we make the config settings regarding valuation of a Sales order?i.e.valuated or non valuated? Is this valuation of Sales order  controlled at item category level?
    Regards

    Hi Mrinal,
    Following links may help you :--
    http://help.sap.com/saphelp_470/helpdata/en/90/ba6cba446711d189420000e829fbbd/content.htm
    http://help.sap.com/saphelp_40b/helpdata/en/90/ba6cba446711d189420000e829fbbd/content.htm
    http://help.sap.com/saphelp_pserv464/helpdata/EN/90/ba6db1446711d189420000e829fbbd/content.htm
    http://www.siliconlabs.fi/files/SL_SD_ACCT/SL_SD_Accounting.html
    Thanks & Regards
    Rajesh

Maybe you are looking for

  • [solved] dhcpcd: timed out after reinstalling arch

    Hi erveryone! After reinstalling arch I can't connect to my wireless network anymore. Typed: wpa_supplicant -B -Dwext -i wlan0 -c /etc/wpa_supplicant_vienna.conf dhcpcd wlan0 Got: dhcpcd: wlan0: waiting for carrier dhcpcd: timed out wpa_supplicant_vi

  • Details of purchasing organization based on vendor number

    Hai experts, i want to write a report to extract "the address of supplier and details of purchasing organization based on vendor number" : For Supplier Address, i can use EKAN & EKKO table : for details of purchase organization means ???? please help

  • Problems with sharing in Mac os lion

    I can't share my library in Mac os lion

  • EM logon fails for Oracle App Server (10.1.3.1.0)

    I am trying to logon to the Enterprise Manger 10g Grid Control. My OS is HP-UX 11.11 I am receiving Invalid/Password. I have change this password twice and still receiving the error. Does anyone know what's going on with this Application? Please Help

  • ADF 10.1.3.4 Memory Leak

    I can re-produce a ADF memory leak in jdeveloper. The problems seems to be when I am running the application locally in the memory profiler, the memory usage keeps growing until the application halts with a outofmemoryexception. The main problem seem