Filter to fill in area with NOT ALIGNED dots?

Excuse the caps. It's to prevent this topic to be filled out by forum racers mentioning the halftone filter and allow real answers stand out.
Hi, I'm a graphic designer, illustrator user since '89, and I need a filter that would work as the 8-ball frame does with balls, but in 2D version with circles/dots.
t would be like the stochastic screen, but with different dot sizes, and they should touch each other, not just guessed. I think one of the blindness test is made that way. Some has some spacing between the dots though, but it could be fixed as far as the spacing is fixed.
Something I don't need is definitely the halftone filter, or any other in which the dots overlap or are randomly spaced. The random value should be size, not spacing. Spacing should be cero, none, (from edges) and location (spacing from center) should depend on container's shape and surrounding circles/dots.
It could be Illustrator, Photoshop, or any other software that exports as such.

Can't follow your description. See if this thread is what you're talking about:
http://forums.adobe.com/message/3179098#3179098
JET

Similar Messages

  • How to fill bean area with values from database

    i have a bean area in form which act as acombobox autocomplete , i want to fill it with dynamic values from database , any help will be appreciated.
    http://forms.pjc.bean.over-blog.com/article-16369664.html "this is the example i'm working on"
    Best Regards.

    An example with the EMP table:
    DECLARE
      cursor cur is select empno,ename from emp;
    BEGIN
      -- initialise the ComboBox twin values --
      for c in cur loop
       if c.empno is not null then
        Set_Custom_Property('BL.BEAN',1,'ADD_TWIN',c.empno||','||c.ename);
       else
        Set_Custom_Property('BL.BEAN',1,'ADD_TWIN_NULL',c.empno||','||c.ename);
       end if ;
      end loop;
      Set_Custom_Property('BL.BEAN',1,'ADD_TWIN','[END_DATA]');
      Set_Custom_Property('BL.BEAN',1,'SET_ALIGNMENT','right');
    END;Francois

  • Filling large areas with sky

    I created a panoramic view of a bridge, but the merging of the five photos produced a blank section of sky.  Did the same at the bottom of the picture too, but I just cropped that out.  Is there good way to fill such a large area and produce a result that is realistic and believable? I've attached a screen clip to this post.  This isn't an important picture, but I'm experimenting with the panorama feature in Photoshop Elements 6.
    BTW, any special features in PS7 that make it worth the upgrade?

    Sorry to hear it didn't work out exactly like you were wanting.
    If you're fond of the rest of the sky that's in your image, you may just have to take a bit of time learning to use the Clone Stamp.  (It took me about 3 hours to learn it initially, and each time I start a new project I usually have to spend a good 15 or 20 minutes testing Clone Stamp out with the new project before I can really get work done.)
    Alternatively, if it's a really large area that's missing sky in your image, you could just copy and paste a different section of your sky to fill in that area. You might then wish to clean up the borders around that with one of the Healing Brushes and/or the Clone Stamp.
    For the copy/paste, you'd be making a selection (maybe with the Lasso tool, or another selection tool) of the part of the sky you want to copy, go to Edit > Copy, then go to Edit > Paste, and use the Move tool to move the bit that just got pasted to the part that's missing sky.
    You might want to check out "Making selections" and "Moving and copying selections" in the Help.
    You may also consider just replacing your sky entirely.  Check out something like these (or, again, do a web search):
    http://video.about.com/graphicssoft/Replace-a-Dull-Sky.htm
    http://www.youtube.com/watch?v=pE7520fziRs

  • Dynamically fill area with words from list

    hello all,
    i would like to fill the entire area of a flash movie with
    words.
    the movie starts out blank, but as time goes on the visible
    area fills with words from a pre-written list.
    ideally, the height and width of the words is randomized
    within a range i determine.
    i wouldn't mind being pointed to a tutorial that shows how to
    fill an area with randomly-sized rectangles, that might help.
    eventually, i want to be able to control the speed of the
    area being filled with an input device (mouse or external sensor)
    but first things first!
    am using flash 8.
    thank you,
    aya.

    You may want to check this out. It fills a space with words
    and keeps filling the empty space. I'ts open source so you can take
    peak inside.
    http://www.levitated.net/daily/levEmotionFractal.html

  • Resource Durations (Start /finish) are not align with activity durations

    Gurus,
    My Resource Durations (Start /finish) are not align with activity durations and hence the Budgeted % are going crazy. Any idea?

    hi,
    the default start/finish dates for resource assignments are the activity start/finish dates. if for any reason you changed that, you can check and reset both Original Lag and Remaining Lag to 0 for all/ some of your resource assignments by adding the columns in the Resource Assignments window and performing either a fill down or a Global Change operation. let me know if you need help with any of these.
    best of luck.

  • Hdr photos not aligning with original non-hdr image iPhone6

    Why are hdr photos not aligning with their original non-hdr source image in iPhone6? I've found that when I overlay the two in gimp, there's a misalignment of several pixels. Previously with my iPhone4 on iOS7 both the original image & its corresponding hdr version always aligned perfectly so I could easily make adjustments between the two versions to create the final image I wanted. Has anyone else noticed this discrepancy?

    I figured out the answer.
    It turns out I had accidentally enabled the 'chrome' filter on all of the pictures I was taking. The icon with the 3 overlapping circles at the bottom right in the camera app were in color, indicating I had a filter on. Another thing I was not aware of oops.
    That is why my pics all seemed to have extra contrast. The chrome filter was close enough to the original that I thought it was actually HDR, being unfamilar with how HDR should look.
    If I had set something like black and white as a filter I would have realized what was going on sooner.
    I also figured out that HDR was actually saving both of my photos. Scanning through my library I found a few duplicate images. As mentioned above, the HDR version has a little rectangular icon with 'HDR'.
    Sorry for the confusion and I hope this helped somebody!
    Thank you for your courage

  • Subcircuit pins do not align with grid and will not connect

    I have two identical subcircuit symbols.  One is just fine, but the other has pins that do not align with the MS grid, and one that will not even connect.  MS12.0.0.
    This one is fine:
    This one pins are off grid.  The circled one will not connect.
    Solved!
    Go to Solution.

    Hi,
    I have been experimenting a bit with this. One thing you can try is open the Symbol Editor, select the pin which is not connecting and then from the spreadsheet view, change the Shape to Zero-length Pin. Then try to see if you can connect the pin in the design. It will not appear as a line but you should still be able to connect to it.
    If this does not work, you can open a service request and we can try to see how to resolve the issue.
    Hope this helps.
    Regards,
    Tayyab R,
    National Instruments.

  • Graph Data does not align with the axis label

    Hi,
    The graph data does not align with the axis label when
    datetimeaxis is used.
    http://livedocs.adobe.com/labs/flex3/html/help.html?content=charts_displayingdata_04.html
    (in the using parseFunction property example) when you hover on the
    line graph the values do not align on the labels. Is this a bug?
    Can somebody help me with this.
    Thank you,
    Gautam.

    Hi All
    Thanks for looking into it.
    Actually we have just added a field GJAHR (was missing in the extractor) so that it takes data accoring to fiscal yr. Actually we had a issue that the Business area for a particular vendor 'X' and doc no 'Y' was showing incorrectly (similar to that of yr 2008) but it changed this yr and the extractor was still picking Business Area for yr 2008.
    So we added GJAHR field so that it takes correct Business Area. we have checked in R/3 Extractor checker and it shows correctly.
    But that change has not reflected in BW yet even after replicating datasource.
    I hope i have made you all understand the situation.
    Thanks for your help
    Ishi

  • Cant use colours in AI free version.stroke and fill options are not active either

    cant use colours in AI free version.stroke and fill options are not active either

    In the Trial version of Illustrator try this:
    In the top right of your screen, choose 'Essentials' from the workspace menu.
    Then from the same menu, choose Reset Essentials.
    Next, click the Selection tool in the Tools panel (strip on the left side of your screen, it is the black pointer at the top).
    Click on the object you want to change the stroke and fill colour for. Does it display with little handles around it (this is called bounding box)? E.g. can you tell it is selected?
    You should see the Stroke and Fill options in the Control panel (top horizontal strip above your document), if the object you've selected is a path. But if for instance you selected as a placed photo, you won't see the Stroke and Fill options.
    If possible take a screenshot of what you are trying to do, and we can be of more help hopefully.

  • ICal Week view, Date is not aligned with the Time(schedule) of each date

    Well, just like it says over there (`` ). I've recently been to China for a business trip, and I suppose the different time zone may have had something to do with the problem. Now I'm back home, changed the time zone back to normal, still the iCal shows in the weekly view that the Date on the above is not aligning with the Time and schedule. Any suggetions would be grateful!!!

    Hi,
    i omit the scheduling maergin key in material master,
    the result of MRP is
    BASIC DATES
    Finish 15.10.2009
    Start 14.10.2009
    PRODUCTION DATES
    15.02.2010 14:33:25
    14.10.2009 07:00:00
    scheduling type i planned order is still "backwards"
    so in MD04 it is say that the goods is available at 15.10.2009 same with requirement dates.
    this seem not right.
    it seems that order finish date is not adjusted by lead time scheduling on "today scheduling".
    Is there a way so order finish date is adjusted by lead time scheduling on "today scheduling" ????
    Best regards,
    Freddy Ha
    Edited by: Freddy Halim on Oct 14, 2009 10:01 AM

  • I have a question about the calendar on the ipad2. I have multiple calendars in different colors. Some of the events are filled in with color. Others are just listed with a colored dot in front of the event. Any ideas why events ar showing up differently?

    I have an ipad2 and my question is about the calendar. I set up multiple calendars with different colors. Some of the events show up in filled color. Others only show with a colored dot in front of the event. I can't figure out why some show up one way and others show up differently? Any thoughts?

    On mine the ones that show on a coloured background are all-day events, the ones with dots and just timed events.

  • Read Only Display of Radio group and Text area with counter not working

    Hello,
    I am using Apex 3.2, with 10g for the database
    I have this form, with fields that will set to read only when status = 'closed'
    All of the fields display as read only except for 2. I cannot figure out why this is not working correctly.
    1st field is Issues that is a text area with character counter, with a sql query behind it, that is set to null unless the query is pulling in the data.
    2nd field is Status which is a radio group that will not display as read only when status = 'closed'
    I have other fields on the form with the same format and they change to read only when the status = 'closed', I have even copied the pl/sql expression from one field to these fields and it still doesn't work correctly. I have also tried javascript for an on load event, which works, but once I click on the save button, it disables all of the page items, which works correctly, but I purposely forget to enter information, to make sure the validations are firing correctly, which it does, but the script disables everything, not allowing me to correct the errors. The javascript is firing on the on page load event.
    Any help on this is greatly appreciated.
    Mary

    Dung,
    That API seems to have a bug, it returns true/false/null, so you could use 'return not nvl(htmldb_util.current_user_in_group(p_group_name => 'APP Admin'),false)' to get a false value.
    Unfortunately there's another problem: using the read-only attributes for checkbox or radiogroup item makes them hidden. My suggestion would be to create another item that has disabled="disabled" in the HTML Form Element attribute in the item definition and display that item or the non-disabled item alternately, using conditions based on the current_user_in_group logic.
    Scott

  • Planning area data not matching with backup cube / PSA

    Hi friends,
    while loading data from planning area to backup cube , for the key figure ( result of a macro),the data in planning area is not matching with PSA as well as with cube.
    At the same time Data is matching at total level but not at disagregated level. And many times it disagregate in equal Proportion in cube/psa.
    Pls its urgent.
    Pts for sure.
    Vishal.
    9326179903

    make sure you have replicated the extraction of the data source. This is needed to ensure your backup cube gets the current data as in the planning area
    if you got to /SAPAPO/SDP_EXTR then you can see this button
    you can set this up as a program scheduled to run before the updation of your cube
    As for the disaggregation, test at what level you are choosing your characteristic? ( i suppose you can choose the level)
    Are you extracting at a detailed level or at the aggregated level
    Is your macro saving the data into a Keyfigure or is it an auxilliary KF or something?

  • GR and GI for the Subcontracting PO are not aligned

    Hello,
    We face an issue were the posting dates of the
    GR(101 mvt) and GI(543mvt) for the Subcontracting PO are not aligned (GR takes
    the posting date as the next day and GI as the current date).
    We did an initial analysis and found that it is
    the user time zone that leads to the different posting date. The user who does
    the GR has a time zone setting of UTC+8 maintained in her user profile.
    Whenever the user does a GR for the Process Order after 18:00CET, system
    proposes the posting date for GR asthe next day. But GI picks the current date.
    As per subcontracting scenario, the GI(goods issue from subcontracting stock)
    happens whenever we do the GR. We understand that time zone has an effect on GR
    posting date but the question is why GI posting date is not affected? Is it a
    standard SAP behaviour?
    Procedure -
    We create the Process order via COR1 transaction,
    In the master recipe we have maintained the control key for the subcontracting
    operation.
    Purchase Requisition will be created from the
    Process Order. This PR is converted to Subcontracting PO via ME21N. The
    delivery and PGI is done
    via ME2O transaction. We have a custom transaction
    to do the GR similar to MIGO transaction.

    Hi Manikumar,
    Empty the Personal time zone for the specific user & test the same. As by default, system time is maintained in UTC time zone.
    Thanks,
    Nihar

  • Dashboard widgets are not aligning - what gives?

    I have several weather widgets (different cities in the world) that run in Dashboard.
    Each time I start up my computer and run the Dashboard, the widgets have moved up/down - basically out of alignment.
    This began a few weeks ago and I can't figure it out. I line them up each time into a neat grid, and then after a startup, they are all out of line.
    Anyone else have this happen? Any ideas how to fix it?
    I have screen shots that I can email if anyone wants to see them.
    Leopard 10.5.7 on an iMac 2.8, 4GB RAM.
    Thanks

    Trashed both the plist files that resided in ~user/Library/Preferences.
    Restarted and the widgets are not aligned in the grid that I set them to.
    Arrrrggghhhh ... this is really irritating. Not life-threatening, but irritating.

Maybe you are looking for

  • I cannot get an answer from Verizon on this issue

    My data usage has been rather annoying. it jumps from 0.90gb to 2.90gb and back. And I keep getting these text messages whenever the usage goes over 2gb. The real usage is 0.90gb. I tried asking verizon CS via phone and email through My Verizon but c

  • Setting a price condition through a BAPI

    Hi, I have the following problem - I am trying to set a condition on an item in a quotation using the BAPI_CUSTOMERQUOTATION_CHANGE. The error that I get back is "Requirements are not fulfilled for condition PN00". When I try to set the condition man

  • Link for SAP BW BestPractice

    Hi Bw Experts            Can Anyone give me the link to SAP BW Best Practice Thanks Lakshmi

  • Adobe download manager and Dreamweaver CS4

    Hi everyone, I'm new to Adobe and new to web site design and development. I'm in the process of trying out Dreamweaver CS4 but during the free trial download, I'm contantly asked to download/buy Adobe download manager. Do I need to have this applicat

  • Mail opens and shuts immediately

    I tried all options in the support email.  Thanks so much but even so, mail refused to stay open.  Also checked emails via safari, nothing troublesome there.  I'll call tomorrow.   Thanks again.