Finish date is not correct
Hi,
I am facing a problem in Production order finishing date.
BasicDates Scheduled Confirmd
Finish 01/14/2010 24:00 01/14/2010 16:30
Start 11/05/2007 00:00 11/05/2007 15:52 00:00
Release 11/05/2007 10/19/2007
I checked all the masters and found ok.
Can you please help me analysisng this.
Thanks
Hi,
Check in your work center whether factory calender has been assigned or not.
If not assign factory calender 01.
Regards,
nandha
Similar Messages
-
Collective orders header order basic finish date is not changing
Hai all,
I am working on collective orders. The header order has Basic finish date as 17.05.2011 . Now i have changed this date to 10.05.2011 and re scheduled the order . But again system changing the Basic finish date to 17.05.2011. how to solve this.
In the outline dates also i have given finish date 10.05.2011 it is remaining the same but order Basic finish date is not changing and schedulded dates are also not changing. can anybody help.Hi gurus,
In a collective order suppose the lead order is having three child orders. Kindl
If one of the child order is partially confirmed is the entire collective order can be rescheduled.
If one of the child order is Fully confirmed is the entire collective order can be rescheduled
Can any body help me out -
Why the basic finish date is not adjusted in planned orders
Hi, all.
Can anybody help me to understand:
"Why the basic finish date is not adjusted in planned orders during
forward scheduling, but in production order basic finish date is adjusted?
It is look like non-coordination between groups of developers.
And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
Am I right, or SAP have it's own logic.Hi,
Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels. -
I am using Labview 6.1 and my operation system is Windows 98. The date/time properties is configured in the Windows (time and date in the control panel is correct). I generated a waveform using Basic Function Generator.vi and saved this using the Export Waveforms to Spreadsheet File.vi. When I opened this file the date and time was wrong. Only the delta t was correct and it did not show the date neither the time, only a float number. How can I adjust the correct time?
Actually, the date/time is correct, it is expressed as seconds since January 01, 1904.
In order to print the string version of the date/time from your file, you will need to write a utility that converts the date/time to a string or series of strings in whatever format you wish. This can be done by reading the first line (I assume that is the line with the time on it), formatting the date/time into a string, and writing over this information in the file.
The waveform VIs were meant to be used internally to read and write waveform data. Any use beyond that should require you to add formatting and other information/data as necessary. -
Keyfig data is not correct in acube
hi to all
through the flat file , i am loading a data , i have taken time in , and time out as a keyfig , time in data is not coming properly , 80511and it is coming 22:21:51, working in a 7.0
help me
thanksShalini,
should 85011 be read as 8:50:11 AM ??
I think the format for time is hhmmss - please use the right formats in the flat file.... try giving the same as 085011 and check
Also what is the infoobject you are using and any conversion exits you have used here ?
Arun
Message was edited by:
Arun Varadarajan -
Credit memo net due date is not correct
Hi experts,
In most cases the net due date of customers credit memos (posting key 11) is correct based on payment terms but sometimes itu2019s not (e.g. payment terms 30 days end of month but net due date is the same as document date).
Any ideas why?
I checked payment terms in customer master data and in FI and they are the same.
Thanks for your help,
BenThe general rule is that the due date of a credit memo is the baseline date.
There are 2 exceptions: if you put the number of an invoice in the field BSEG-REBZG (Number of the Invoice the Transaction Belongs to), the due date of the credit memo is the due date of the invoice.
2nd exception: if you put the constant 'V' in this field REBZG (you can do it thru a substitution rule), the due date will be calculated the same way as for an invoice.
You can see this in the documentation of the data element REBZG:
A special rule applies to credit memos which have a "V" in this field.
The due date is determined in the same way as for an invoice. If the field is empty (containing neither a document number nor a "V") the due date is the baseline date for payment. -
By defoult delivery date is not correct
Hi,
when i try to create a sale order by defoult date of delivery is in past. what is problem with that? and how i can make it correct. i means when i try to create sale order defoult date as current date.
KhanYou can check the configuration of your sales document in VOV8 under Requested Delivery Date; Lead time in days and Propose delivery date.
Cheers.Sidi. -
Read the title. I can download app from my pc and itunes
but not from iPhoneOnce you've purchased an App, it's yours for life. You can however, hide it. To do so, on your iPad, open this link and follow the directions:
http://www.trickyways.com/2011/10/how-to-hide-unhide-apps-from-app-store-purchas es-on-ipad/ -
Scheduled finish date for process orders not updating in BW
We are having problems with the scheduled finish date (GLTRS) for process orders. When the process order is already released, changes done in R/3 on the scheduled finish date will not result to a delta hence data in BW is not updated. Table AFKO, where data is coming from, is always updated with the changes though. 2LIS_04_P_MATNR is used in extracting the data.
Has anyone experienced the same problem? We are looking for possible ways on how to have a delta whenever there are changes on the process order even after it is already released.
Any help would be greatly appreciated...Hi Donna,
If I've understood your problem correctly, you can increase the load frequency as Sriee has pointed out.
If you want latest data frequently and if you are on BI 7.0 then you can look at Real Time Data Acquisition(RDA)
Regards,
Tom. -
Hi to all.
Does anybody know how to save your cmos settings to a floppy or CD?
Is there a program that can assist with saving the cmos settings to floppy or CD?
Is there anyway to perform saving the cmos settings within the BIOS to floppy or CD?
I really don't want to go into the BIOS and write down all that info.
I have an HP Pavilion 553w that is 7 1/2 years old, running windows xp home edition version 2002 sp3, 2 gbs of ram, AMD athlon(tm)XP 2100+ 1.73 GHZ, bios version/date Phoenix Techologies, LTD AM35308, 10/07/2002 (Phoenix-AwardBIOS CMOS Setup Utility) SMBIOS 2.3, BIOS Core Version V6.0, BIOS Revision 3.08 10/7/2002.
I know my computer is ancient and I probably should have updated my BIOS, as it is out of date.
Also, after starting up my computer I noticed my time and date is not correct and as of lately have to adjust the time and date to the correct time and date.
I did some research and came across some possible reasons:
1. RTC battery (CMOS battery) may need reseating on motherboard.
2. The battery has become corrupt.
3. BIOS version may be out of date.
My computer is really taking longer than usual to startup and images of icons take longer to display, which may be a sign of the symptoms I listed above.
My computer doesn't have any malware whatsoever, clean as can be.
Any help or advise will be truly appreciated.
Jboman
This question was solved.
View Solution.Jboman,
There is not need to save CMOS settings unless you changed the default BIOS settings. A bad CMOS battery will not preserve the settings.
HP DV9700, t9300, Nvidia 8600, 4GB, Crucial C300 128GB SSD
HP Photosmart Premium C309G, HP Photosmart 6520
HP Touchpad, HP Chromebook 11
Custom i7-4770k,Z-87, 8GB, Vertex 3 SSD, Samsung EVO SSD, Corsair HX650,GTX 760
Custom i7-4790k,Z-97, 16GB, Vertex 3 SSD, Plextor M.2 SSD, Samsung EVO SSD, Corsair HX650, GTX 660TI
Windows 7/8 UEFI/Legacy mode, MBR/GPT -
Timescaledata Start Date and Finish Date not both inclusive
From testing a bit with Time Scale Values in Visual Basic I noticed that when specifying Start and Finish dates for accessing Time Scale Data those dates were not both inclusive. The fact is that specifying a Start Date for Time Scale values will return
data for which dates are greater or equal to the Start Date Specified but when also specifying a Finish Date the Time Scale values returned are only the ones that are less than the Finish Date specified not the ones less or equal as one would expect since
the Start date is Incllusive. This is true for actual work with Microsoft Project 2007 and 2013 unsing Visual studio 2013. Has anyone experienced such a behavior? Is this a intended Behavior? Please see following code snippetJaques,
In my example, the ass.start and ass.finish are the start and finish dates respectively of the assignment. Since the resource is assigned full time for the whole duration of the task, the assignment start and finish are the same as the task start and finish,
namely, Dec 1, 2014 and Dec 7, 2014. If you only want data for specific days, say Dec 4, 2014 and Dec 5, 2014, then the syntax would be:
Set TSV = ass.TimeScaleData("12/4/14", "12/5/14", pjAssignmentTimescaledWork, pjTimescaleDays)
The result will be 7h and 8h respectively.
If you want to print out the date along with the hours for each day in the Immediate Window, the following modification to the macro will do that:
Sub testtimescale()
Dim ass As Assignment
Dim TSV As TimeScaleValues
Dim val As TimeScaleValue
Dim i As Integer
Dim Da As Date, St As Date, Fi As Date
For Each ass In ActiveProject.Tasks(1).Resources(1).Assignments
St = ass.Start: Fi = ass.Finish
Set TSV = ass.TimeScaleData(St, Fi, _
pjAssignmentTimescaledWork, pjTimescaleDays)
Da = DateValue(St)
For Each val In TSV
Debug.Print Da & " " & val / 60 & " hours"
Da = DateValue(Da + 1)
Next val
Next ass
End Sub
John -
Export Project and Change the Duration Cause the Finish date error
I use VB.NET to create a MS Project Instance and use this Instance to add task, and set task's Name, Start and Finish, the Project file is created successfully, and the Duration value will be automatically generated by Project, but if I change the Duration
value in Project, the Finish date isn't correct, for example, if I set the the Start is "10/21/2014" and Finish is "10/31/2014", the generated Project file has a Duration value is "9 days", and if I change the Duration value to
"2 days", the Finish date will be changed to "10/21/2014", why this problem happen? I have no idea about this problem.when you set Start is "10/21/2014" and Finish is "10/31/2014", the generated Project file has a Duration value is "9
days" because it is taking Saturday and sunday as non working days.
By default in Project server calendar both Saturday
and Sunday are non workng days. If you want to make these day as working day you have to configure the calendar once you will do it then it will display duration value as 11.
When you change the value then after changing value click on Calculate button so that project server can calculate value correctly it is not required to click on Calculate
all the time but some time project server takes time to reflect the chnages but if you will publish the project it will calculate correctly and display proper finish date ( I
change the Duration value to "2 days", the Finish date will be changed to "10/21/2014 as 10/23/2014)
kirtesh -
ICal Week view, Date is not aligned with the Time(schedule) of each date
Well, just like it says over there (`` ). I've recently been to China for a business trip, and I suppose the different time zone may have had something to do with the problem. Now I'm back home, changed the time zone back to normal, still the iCal shows in the weekly view that the Date on the above is not aligning with the Time and schedule. Any suggetions would be grateful!!!
Hi,
i omit the scheduling maergin key in material master,
the result of MRP is
BASIC DATES
Finish 15.10.2009
Start 14.10.2009
PRODUCTION DATES
15.02.2010 14:33:25
14.10.2009 07:00:00
scheduling type i planned order is still "backwards"
so in MD04 it is say that the goods is available at 15.10.2009 same with requirement dates.
this seem not right.
it seems that order finish date is not adjusted by lead time scheduling on "today scheduling".
Is there a way so order finish date is adjusted by lead time scheduling on "today scheduling" ????
Best regards,
Freddy Ha
Edited by: Freddy Halim on Oct 14, 2009 10:01 AM -
Basic date is not same with schedule dates
Hi,
I have a problem in MD04 stock requirement list.
Planned order basic date and schedule date is not the same.
The schedule date finish at year 2010 but basic date still end ad 2009
in MD04, the date display is basic date.
Why the basic date is not adjusted?
in configuration i had choosen adjust basic date in scheduling planned order.
In material master in house production time is not updated because we use lead time scheduling
Please kindly help
Best regards,
Freddy HaHi,
i omit the scheduling maergin key in material master,
the result of MRP is
BASIC DATES
Finish 15.10.2009
Start 14.10.2009
PRODUCTION DATES
15.02.2010 14:33:25
14.10.2009 07:00:00
scheduling type i planned order is still "backwards"
so in MD04 it is say that the goods is available at 15.10.2009 same with requirement dates.
this seem not right.
it seems that order finish date is not adjusted by lead time scheduling on "today scheduling".
Is there a way so order finish date is adjusted by lead time scheduling on "today scheduling" ????
Best regards,
Freddy Ha
Edited by: Freddy Halim on Oct 14, 2009 10:01 AM -
Actual finish date and % of completion in Open Ps
I am unable to download Actual finish date and % of completion while downloading project from SAP PS to MS Projects using Open PS.
From SAP Note 1332046:
07.Question: After downloading a project from SAP PS into MS Project, why is the Planned Finish Date in MS Project different when compared to project in SAP PS?
Answer:
When downloading projects with actual data, the actual work that has been completed by an activity element on an activity in SAP is assigned to the resource of a task in MSP.If there is remaining work and if the actual finish date in SAP PS is before planned finish date, the remaining work
will be equally distributed till the planned finish date. If there is remaining work and if the actual finish date in SAP PS is on or after planned finish date, the remaining work will be equally distributed till the forecast finish date for the activity. If a forecast finish date is not
available for the activity, remaining work will be equally distributed till the forecast finish date for the activity element. If a forecast finish date is not available for the activity element also, then MS Project does the allocation of remaining work.That is, if the actual finish is on or
after the planned finish and there is work remaining, while entering confirmations in SAP a forecast finish date should be supplied so that when downloading the project to MSP, the remaining work will be scheduled properly.
I do not understand. If we must mark the final confirmation it shouldn't be remaining work. I still do not understand why my finish dates do not fit with the actual finish date in SAP.
Maybe you are looking for
-
Passing Bound values to templates containing choice tags
I have a template which loads a DataObjectList into a <choice> tag. The values im passing in, to be used for the column name: are not being interperted correctly. The tag is using them as values to be rendered. i.e. 'output text'. The value are actua
-
my iPhone 4 is no longer chargeable. Whenever I connect it to the charge, the charging icon appears on screen but even if I leave it for a night on charge the charge icon will remain on the screen but there will be zero percent of battery. I tried fi
-
Hi All, I'm sure it's simple but I can't figure out what is going wrong with my xy-graph. I read a timestamp as a string from a waveform data file and convert it to a timestamp format. I then plot data vs time. The timestamps look correct but the plo
-
The ArrayList of Beans That I Created Is A Null
I have a bean. The bean has only one property. I populate the bean from fetching data from the database. Because more than one record should be picked up from the database (the data table is created by me, there should be a number of records to be pi
-
Uninstall and reinstall setup disc
I have a HP Officejet 6600 - something has happened and I can't seem to get it fixed. I go to print a report from my computer and it will not print what I wanted to print. It prints page after page after page of numbers. I've cleared the que and c