Fixed component of the production order
Dear Gurus,
i need of fixed reservation of the batch at the production order.
I can fixed the component only in the production ordere ( CO02- batch Assignment ) or are there other transaction , where for production order i can fixed the batch of the component?
Thanks a lot
Daniele Pistilli
PP TEAM
Dear gurs
excuse me for the explication , i have for a component two bacth :
111
222
and i need of fixed in the production order the batch for example the bacth 222 .
Now i run the transaction CO02 and in the view of the component select the single component and whit the buttom batch assignment reserve the quantity.
The system setting the status F in the stock /requirement list.
I would want to know if there are other methods in order to reserve the batch component in the production order , other transaction .
Thanks a lot
Daniele Pistilli
Similar Messages
-
Determine a component in the production order
Hi,
To determine if a component in the production order is relevant for the paint dispatch list:
For a Production Order, after retrieving all the components (children) of the header material utilize function module CLSE_SELECT_AUSP. Pass the following information under the import parameters:
Function Group: CLSE
Function Module: CLSE_SELECT_AUSP
Import Parameters:
KLART = 001 (Hard-coded) (ZERO, ZERO, ONE)
OBJEK = (Component number from production order Item) – RESB-MATNR
MAFID = O (Hard-coded) (The letter O)
KEY_DATE = (BOM Explosion Date) – CAUFV AFKO-AUFLD
Returns:
Table = T_AUSP
Field = ATWRT
T_AUSP-ATWRT
Then the following logic should apply:
IF T_AUSP-ATWRT = OPTPNTD THEN this component (RESB-MATNR) is relevant for the dispatch list.
can any body explain the meaning of this
all replies will be rewardedHi,
i got the solution i came to know the meaning of it
thanks -
Scrap Quantity component in the production order
Dear gurus,
in the material master of a component i insert the scrap % ( view mrp4) = 10 %.
The field is read by planning Mrp and explosion of bom , but when i inseert this component in the production order manually the system don't read this % and the field "scrap quantity in the component detail of the production order is blank.
Are there a setting for uograde this field ( in the production order ) when i insert MANUALLY the component in the production order?
Example:
1) material master of the component > scrap % (view MRP4 ) = 10 %
2) production order created
3) insert this component quantity 100 pc and the system after read the material master insert 110 pc , and upgrade the field automatically 10 % (as material master)?
Thansk a lot
Daniele Pistilli
PP TEAMHi Danielepistilli,
Well there is a lot of difference is there: see you are creating production order for header material which is FG. If you maintained component scrap in material level it will be dependent on BOM quantity which you maintained for the header material.
For example say component x quantity is 50 in BOM. How it will calculate when you run the MRP.
component scrap % is 5% then:
===> (5/100) * 50 + 50
Formula is: Percentage of scrap quantity x original quantity + original quantity
So ===> 52.5 quantity should be come for component
So, the order quantity for the header material will not take this quantity or scrap but if you see individually in MD04 screen for X material you can find this quantity ok.
I hope it clears your doubt and helps you any queries please revert me back.
Regards,
Madhu.G -
Production Order - Modify field Material Provision Indicator for component in the production order
Good afternoon,
I have a component in the bill of material, that has the option Material Provision Indicator activated.
When i create the production order, the component automaticaly is activated with the Material Provision Indicator option.
However, in the production order, this field isn't possible to modify, because is closed.
Anybody knows way the modify this field? Configure to open?
Thanks.
Kind Regards,
António PinhoHello Amar,
I am also getting the same error while Releasing Production Order and Costing (CO11N). This error is related to EHP7 in our case.
Please try one of the following solution and see whether the error is gone or not.
1. Implement the SAP Note 1317551 - Error AD_SUBCON 141 / 143 / 144 (T417)
OR
2. Complete the customizing of Material Provision Indicator (T Code OICO) as per the attachment.
Regards,
Prashant Karanjgaonkar -
To issue the component to the Production Order
Hello All,
I have assigned the component to the Operation of Production Order from Different plant(say 1100) of Same company code(1000).
I want to issue that material from that plant to this plant (say 1000) of Production Order.
So my question is the correct method of directly issuing the component to this Production Order of different plant.
ShailendraHi HAdkar
The correct procedure is .
You have to assign special procurement key 80 in material master for which you want to procure from plant 1100. The material master of procuring material should exist for the plant 1100. While running MPR the procurement proposal will be automatically created in the 1100 plant. From 1100 plant you do stock transfer to your storage location. Then finally do GI for the header prod order in you plant.
This is the procure in SAP. Eventhough both the plants exist in the same compound.
Regards
J . Saravan -
Component addition in Production order.
Iam doing Sales order Mrp. After that planned order is converted into production order.
Bom components appear in pegged requirements.
In production order change mode I delete some components and refresh MD04. Components disappear from pegged requirement. It is ok
Now In production order change mode I add some components and refresh MD04. Components does not appear in pegged requirement.
I do MRP again but Components does not appear in pegged requirement.
How to get components in Pegged requirement list??Hi,
Why requirement for new component does not get added when MD50 is carriied out??
While running MRP using T-code MD50, The system will explode BOM and it will do the net reqmt calculations. Since the newly added component is not part of the BOM, that is the reason it is not considered.
After doing Plant level MRP requirement for that component gets generated but it does not appear in pegged requirement of header material??
When you add the component in the production order, it will create the reservation. In the next MRP run only this reservation will be considered and it will plan.
Regards,
V. Suresh -
How can read BOM component date before save the production order??
Hi Experts,
In our company, we need to develop a program to read the BOM component data of the production order
before we save the production order.
That for example ,when we create and release a production order , before we save the production
order,we want a porgram to read the BOM component data. If some component data can meet our
requriement (may be if there is material requirement quantity>100 EA),then the system will pop up a
small dialog box to remind us.
There is user exit PPCO0007 and PPCO0007.But it seems they only can read the head data of the
production order before we save the production order. And the BOM component data of the production
order are saved in the RESB(Reservation Table).So if we do not save the production order,all the BOM
component data are not saved in the RESB table.
So how can slove the problem??
How can read component date before save the production order??
Are there any other user exit we can use???Hi Just wanted to check am I right that you are trying to check if you have enough Materials Available before you release or Save the order right ? if this is your business objective then when you create order you have material availability tab which checks and gives error if shortage is there. Please let me know if is this wht you asking for ?
-
In the production order for 1 of the component material no 261 movement
Hi SAP Gurus,
In the production order out of 8 components for 1 of the component material 261 movement is not happening ( Not getting backflushed) Please give some input on this issue.
Thanks and Regards,
SHARAN.Hi Dhaval,
In MRP2 view the backflush indicator has been set. But in the parent material BOM setup this material itself not there I informed the user about this, please refer the below user comment ( In BOM the material:Q7829-60184 is appearing and mat:Q7829-60140 not there in BOM, in production order for both the materials 261 movement not happened ) Please give your input on this issue.
Hi Sharanappa
We just did a PCO roll PCO #4619999R3 on Tuesday 30th Dec.
From Q7829-60140 to Q7829-60184
All options for Q7840A, Q7829A, Q7830A (except #ACJ, already completed), Q7831A.
That's why you are not able to see the part in BOM
How can we rectify this from here?
Thanks and Regards,
SHARANAPPA. -
Open the reservation for the Production order
Hi,
I have post the GI for Production order MB1A with movement type 261 from 100 peaces components. I would like to cancel a partial quantity of components from this posting (about 30 peaces). After cancel it the reservation for the production order has to be open for 30 peaces of components.
I've canceled it through MB1A and mtype 262 but the reservations weren't open and in the PO (component overview there is always the sign"the Final Issue for This Reservation").
Which T.code and mtype could I use.
Thanks
DedeHi,
Have you cancelled the movement (of 30 pieces) by selecting the "with reference" option from the menu?
If not, then reverse the current cancellation document. Then again cancel the 261 movemtn by selecting the with refernce button from the menu. It will sove the problem.
Check & revert.
Regards,
Rohit. -
How to create a manufactured component in a production order network
Hi,
I've been facing problems to create a subnetwork in a production order. I want to add a manufactured component at a production order network.
Does anyone know any BAPI or FM to solve this problem?
Thks,I tried to use the below FM sequence, but I just create no-manufactured compenents. However this tried was failed too, becaus a couple of fields was missing when I go to CO02 transaction.
CO_XT_COMPONENT_ADD
CO_XT_ORDER_PREPARE_COMMIT -
How to check the Production order exits
Hi Experts
Modification to processing of Command Orders & Tickets
We require a modification to the processing being performed on sales data originating from the Command Concrete system and potentially from other systems yet to come online (e.g. Pinkenba Cement plant).
The Sap process involved is ZINT_INBOUND_POLLING and within that, ZINT_CSTPORD_ROUTINES.
The problem
Currently there is an assumption that every sales order (and its deliveries) will include a product which is made to order, i.e. for which a production order will be required.
In ZINT_CSTPORD_ROUTINES, a check is made to identify the production order linked to the sales order. If there is no such production order (usually because of the customeru2019s credit status) then processing of the ticket is terminated.
This assumption would fall down if an order was to be raised (in Command) on which there is no concrete material. For example, if we sold a bag of pigment or a screed to a customer. In this case the item would be sold from stock and there would be no need for a production order.
The solution
In the routine which checks for the existence of a production order, modify the code as follows:
Inspect each item on the sales order
If (and only if) there is at least one item with a category of u201CZTACu201D then check for a production order, otherwise process the order in the usual manner.
---- ZINT_CSTPORD_ROUTINES -
*& Form process_inbound_data
Create prod. orders from ticket data extracted from the COMMAND
system. Note that large portions of the code in this routine
have been copied from the retired ZPPU_COMMAND_PRODUCTION
interface program. This was done (1) because the old code works
and (2) to save development time.
-->T_ZINT_IDATA Internal table of interface data
-->T_ZINT_PARAM Internal table of interface parameters
-->T_ZINT_MSLOG Internal table of messages
-->P_ZINT_ID Interface ID
-->P_ZINT_TY Inteface type
-->P_ZINT_IS IDOC group for interface
-->P_ZINT_DL Flag: delete IDOC group when complete
-->P_ZINT_AL Flag: run in standalone mode
-->P_ZINT_NW Flag: do not log warning messages
-->P_ZINT_SQ Interface sequence number
<--P_ZINT_RC Return code (<>0=>error)
form process_inbound_data tables t_zint_idata structure zint_idata
t_zint_param structure zint_param
t_zint_mslog structure zint_mslog
using p_zint_id type zint_id
p_zint_ty type zint_ty
p_zint_is type zint_is
p_zint_dl type zint_dl
p_zint_al type zint_al
p_zint_nw type zint_nw
p_zint_sq type zint_sq
changing p_zint_rc type zint_rc.
program is continuing .............
I WANT TO WRITE A CODING HERE **********************
CHECK IF PRODUCTION ORDER REQUIRED
IF NOT THEN GO TO PERFORM UPDATE DATA
if production order required then check
for each item on sales order item list
with item category = 'ZTAC' then
return true
next
end function
if there is no production code
these has to be check from VBAP TABLE field VBELN and PSTYV (ZTAC,ZTAN Etc)
select * from Vbap WHERE VBELN = '00000269951' and VBAP.PSTYV = 'ZTAC','ZTAN' Etc
No production order?
elseif lva_prodord is initial.
clear v_messg.
call function 'CONVERSION_EXIT_ALPHA_OUTPUT'
exporting
input = lva_filemat
importing
output = lva_filemat.
No production order found - log a warning message.
concatenate 'Production Order not be found for'
'Command order' lva_cmdord
'Material' lva_filemat
'Customer' lwa_02-customer
into v_messg separated by space.
perform write_log_entry
tables t_zint_mslog
using 'E' 'ZINT_CSTPORD_ROUTINES'
'FIND_SAP_PRODORD'
v_messg
p_zint_nw
lwa_01-ticketnumber. " RJS
continue.
endif.
Production Order WAS found... Continue creating IDOCS
lwa_hdrlevel-postg_date = lwa_01-ticketdate.
Obtain the storage location parameter value.
read table t_zint_param with key zint_fn = 'LGORT'.
if sy-subrc ne c_noerr.
perform write_log_entry
tables t_zint_mslog
using 'E' 'ZINT_CSTPORD_ROUTINES'
'PROCESS_INBOUND_DATA'
'Parameter LGORT is missing from ZINT_PARAM'
p_zint_nw
lwa_01-ticketnumber. " RJS
exit.
endif.
loop at l_it_05 into lwa_05
where ticketnumber = lwa_01-ticketnumber.
clear lwa_gm_item_create.
lva_filemat = lwa_05-material.
if lva_filemat eq lva_prodmat.
concatenate 'Command ticket-' lwa_05-ticketnumber
into lwa_hdrlevel-conf_text.
lwa_hdrlevel-conf_quan_unit = lwa_05-unitofmeasure.
lwa_hdrlevel-yield = lwa_05-quantity.
check whether the confirmed value + current delivery value is equal *
the production order qty. If the production order value is less
than the total delivered value, set final conf indicator and clear
reservations
lva_wemng = lva_wemng + lwa_05-quantity.
if lva_wemng < lva_psmng.
lwa_hdrlevel-clear_res = c_false.
lwa_hdrlevel-fin_conf = ' '.
else.
lwa_hdrlevel-clear_res = c_true.
lwa_hdrlevel-fin_conf = 'X'.
endif.
move: 'Z1BP_PP_HDRLEVEL' to t_idoc_data-segnam,
lwa_hdrlevel to t_idoc_data-sdata.
append t_idoc_data.
clear lva_formmat.
lva_formmat = lwa_05-material.
lwa_gm_item_create-material = lva_formmat.
lwa_gm_item_create-plant = lwa_03-plant.
lwa_gm_item_create-ref_date = lwa_01-ticketdate.
lwa_gm_item_create-prod_date = lwa_01-ticketdate.
lwa_gm_item_create-move_type = '101'.
lwa_gm_item_create-spec_stock = 'E'.
lwa_gm_item_create-sales_ord = lva_saleord.
lwa_gm_item_create-entry_qnt = lwa_05-quantity.
lwa_gm_item_create-entry_uom = lwa_05-unitofmeasure.
lwa_gm_item_create-orderid = lva_prodord.
lwa_gm_item_create-move_mat = lva_formmat.
lwa_gm_item_create-move_plant = lwa_03-plant.
lwa_gm_item_create-mvt_ind = 'F'.
clear t_idoc_data.
move: 'E1BP2017_GM_ITEM_CREATE' to t_idoc_data-segnam,
lwa_gm_item_create to t_idoc_data-sdata.
append t_idoc_data.
else.
clear: lva_loggr,
lva_formmat.
lva_formmat = lwa_05-material.
select single loggr into lva_loggr from marc
where matnr = lva_formmat
and werks = lwa_03-plant.
if sy-subrc ne 0.
clear v_messg.
No logistics handling group - log a warning message.
concatenate 'No logistics handling group for material'
lva_formmat
'in plant'
lwa_03-plant
into v_messg separated by space.
perform write_log_entry
tables t_ldata
using 'W' 'ZINT_CSTPORD_ROUTINES'
'PROCESS_INBOUND_DATA'
v_messg
p_zint_nw
lwa_01-ticketnumber. " RJS
clear lva_loggr.
endif.
if lwa_03-satsur eq 'T'.
lwa_e1edl21-lprio = 30.
else.
lwa_e1edl21-lprio = 20.
endif.
else.
if lwa_03-satsur eq 'T'.
lwa_e1edl21-lprio = 10.
else.
lwa_e1edl21-lprio = ' '.
endif.
endif.
lwa_e1edl21-berot = lwa_04-driver.
move: 'E1EDL21' to t_idoc_data-segnam,
lwa_e1edl21 to t_idoc_data-sdata.
append t_idoc_data.
lwa_e1edl55-qualf = '001'.
lwa_e1edl55-refnr = lva_saleord.
move: 'E1EDL55' to t_idoc_data-segnam,
lwa_e1edl55 to t_idoc_data-sdata.
append t_idoc_data.
Loop at materials - create delivery entry for each
loop at l_it_05 into lwa_05
where ticketnumber = lwa_01-ticketnumber.
clear t_idoc_data.
lwa_e1edl24-matnr = lwa_05-material.
lwa_e1edl24-werks = lwa_03-plant.
lwa_e1edl24-vfdat = lwa_01-ticketdate.
lwa_e1edl24-lfimg = lwa_05-quantity.
lwa_e1edl24-vrkme = lwa_05-unitofmeasure.
lwa_e1edl24-lgort = t_zint_param-zint_fv.
clear lva_loggr.
lva_formmat = lwa_05-material.
clear lva_loggr.
select single loggr into lva_loggr from marc
where matnr = lva_formmat
and werks = lwa_03-plant.
if sy-subrc ne 0.
No logistics handling group - log a warning message.
concatenate 'No logistics handling group for material'
lva_formmat
'in plant'
lwa_03-plant
into v_messg separated by space.
perform write_log_entry
tables t_ldata
using 'W' 'ZINT_CSTPORD_ROUTINES'
'PROCESS_INBOUND_DATA'
v_messg
p_zint_nw
lwa_01-ticketnumber. " RJS
lva_loggr = 'BBIN'.
endif.
if lva_loggr is initial.
move: 'E1EDL24' to t_idoc_data-segnam,
lwa_e1edl24 to t_idoc_data-sdata.
append t_idoc_data.
endif.
endloop.
clear: lva_xabln,
lva_vbeln,
l_vbfa.
Matching ticket against a Delivery?
select single xabln vbeln into (lva_xabln,lva_vbeln) from likp
where xabln = lwa_01-ticketnumber.
if sy-subrc = 0.
If found, does this delivery match the sales order?
select * from vbfa into l_vbfa
where vbelv = lva_saleord
and vbeln = lva_vbeln.
exit.
endselect.
endif.
No matching delivery found, or Matching delivery, but for other Sls Ord
if lva_xabln is initial
or ( lva_vbeln <> space and l_vbfa is initial ).
if not lva_saleord is initial.
perform create_delivery_idocs tables t_zint_mslog
using s_idcgp
lwa_01-ticketnumber
p_zint_nw.
else.
concatenate 'Error finding a Sales Order for ticket "'
lwa_01-ticketnumber
'" reprocess the file AFTER'
' the sales order issues have been fixed'
into lva_outtext.
perform write_log_entry tables t_zint_mslog
using 'E'
'ZINT_CSTPORD_ROUTINES'
'PROCESS_INBOUND_DATA'
lva_outtext
p_zint_nw
lwa_01-ticketnumber. " RJS
endif.
else.
concatenate 'Command Ticket "'
lwa_01-ticketnumber
'" has already been processed into delivery "'
lva_vbeln
into lva_outtext.
perform write_log_entry tables t_zint_mslog
using 'I'
'ZINT_CSTPORD_ROUTINES'
'PROCESS_INBOUND_DATA'
lva_outtext
p_zint_nw
lwa_01-ticketnumber. " RJS
refresh t_idoc_data.
endif.
endif.
refresh t_idoc_data.
Write out all messages collected so far
perform update_data tables t_zint_mslog
using p_zint_id p_zint_ty.
endloop.
Write out all messages collected so far
perform update_data tables t_zint_mslog
using p_zint_id p_zint_ty.
endform. " process_inbound_data
Thnaks
RegardsThanks
Thread closed -
Query to show component cost of production order
Need help writing a query to show the component cost of a production order, using moving average valuation method.
I understand the table oinm has all history for an item and its calculated price.
would like to query a production order to show the cost of components at the time of receipt of that production order.
ideas?I have created this query that will work:
SELECT t0.docdate,t0.appobjtype as [Prod/Comp],t0.itemcode,t0.dscription,t0.outqty,t0.calcprice,(t0.outqty*t0.calcprice) as [Trans Value],t0.warehouse,t0.appobjabs as [Production Order] FROM OINM T0 WHERE t0.transtype='59' and T0.[AppObjAbs] =[%0] order by t0.transnum
The prompt is where you enter the production order document number. It will show the calculated cost of components at the time of receipt.
Thanks for the guidance.
Rich -
How to use BAPI_GOODSMVT_CREATE against the Production Order
Hi Friends,
I need ur help very urgently,
I am using the BAPI_GOODSMVT_CREATE (movement code '03') for goods return against the production order (movement type '262').
everything working fine, ie it gets updated in IM/WM.
but when we check in the CO03 transaction for the production order, the qty withdrwan not gets updated in the component overview. still showing the old value. But when we used regular SAP transaction MB1A, it gets updated in CO03 (qty withdrwan in the component overview).
How to solve this issue using this BAPI.
I have attached the code, plese help me is there any other parameter to set for this BAPI.
Thanks in advance.
Shankar
Code:
*Header Structure
st_gm_code-gm_code = '03'. "
st_gm_header-pstng_date = st_gm_header-doc_date = sy-datum.
SORT itab BY aufnr matnr j_3asized.
LOOP AT itab.
itab_afs_gm_itemx-material = itab-matnr.
itab_afs_gm_itemx-plant = itab-werks.
itab_afs_gm_itemx-stge_loc = itab-lgort.
itab_afs_gm_itemx-batch = itab-new_charg .
itab_afs_gm_itemx-stock_cat = itab-j_4kscat.
itab_afs_gm_itemx-stck_type = 'F'.
itab_afs_gm_itemx-move_type = '262'.
itab_afs_gm_itemx-entry_qnt = itab-j_3aerfmg .
itab_afs_gm_itemx-grid_value = itab-j_3asized.
itab_afs_gm_itemx-orderid = itab-aufnr.
itab_afs_gm_itemx-move_reas = itab-move_reas.
APPEND itab_afs_gm_itemx .
SELECT SINGLE etenr
INTO etenr
FROM j_3abdsi WHERE aufnr = itab-aufnr
AND matnr = itab-matnr.
gr_afs-matdoc_itm = '0100'.
gr_afs-sched_line_sku = etenr.
gr_afs-stock_cat = itab-j_4kscat.
gr_afs-grid_value = itab-j_3asized.
APPEND gr_afs.
ENDLOOP.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = st_gm_header
goodsmvt_code = st_gm_code
IMPORTING
goodsmvt_headret = st_gm_headret
materialdocument = mat_doc
matdocumentyear = doc_year
TABLES
goodsmvt_item = itab_afs_gm_itemx
return = bapi_return
afs_goodsmvt_sku = gr_afs.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'Hi Friends,
I need ur help very urgently,
I am using the BAPI_GOODSMVT_CREATE (movement code '03') for goods return against the production order (movement type '262').
everything working fine, ie it gets updated in IM/WM.
but when we check in the CO03 transaction for the production order, the qty withdrwan not gets updated in the component overview. still showing the old value. But when we used regular SAP transaction MB1A, it gets updated in CO03 (qty withdrwan in the component overview).
How to solve this issue using this BAPI.
I have attached the code, plese help me is there any other parameter to set for this BAPI.
Thanks in advance.
Shankar
Code:
*Header Structure
st_gm_code-gm_code = '03'. "
st_gm_header-pstng_date = st_gm_header-doc_date = sy-datum.
SORT itab BY aufnr matnr j_3asized.
LOOP AT itab.
itab_afs_gm_itemx-material = itab-matnr.
itab_afs_gm_itemx-plant = itab-werks.
itab_afs_gm_itemx-stge_loc = itab-lgort.
itab_afs_gm_itemx-batch = itab-new_charg .
itab_afs_gm_itemx-stock_cat = itab-j_4kscat.
itab_afs_gm_itemx-stck_type = 'F'.
itab_afs_gm_itemx-move_type = '262'.
itab_afs_gm_itemx-entry_qnt = itab-j_3aerfmg .
itab_afs_gm_itemx-grid_value = itab-j_3asized.
itab_afs_gm_itemx-orderid = itab-aufnr.
itab_afs_gm_itemx-move_reas = itab-move_reas.
APPEND itab_afs_gm_itemx .
SELECT SINGLE etenr
INTO etenr
FROM j_3abdsi WHERE aufnr = itab-aufnr
AND matnr = itab-matnr.
gr_afs-matdoc_itm = '0100'.
gr_afs-sched_line_sku = etenr.
gr_afs-stock_cat = itab-j_4kscat.
gr_afs-grid_value = itab-j_3asized.
APPEND gr_afs.
ENDLOOP.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = st_gm_header
goodsmvt_code = st_gm_code
IMPORTING
goodsmvt_headret = st_gm_headret
materialdocument = mat_doc
matdocumentyear = doc_year
TABLES
goodsmvt_item = itab_afs_gm_itemx
return = bapi_return
afs_goodsmvt_sku = gr_afs.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT' -
How to settle the production order variance to 3 GL account
dear all
i met a problem in the project ,the customer need see the production order variance category detail for (material,routine,overhead variance) in FI report ,so it need to settle the variance to at least 3 GL account
i don't know how to configure it ,i try to use result analyse like wip ,but go failed
do you have some suggestion
thank youHi ,
Through Standard SAP .. the same it not possible . Standard SAP will post the differences to one GL account ..The variance amount is not segregated..
The way out is to use report KKO0 .( Product Costing Drill Down Reports ) in CO . There are many reports available .. and you can compute the difference in CO Reports and manually make an entry in FI by manually reversing the original variance account and posting it to cost component wise variance accounts ..
To use the KKO0 report.. please perform the following tasks :-
1. Assign cost component structure in transaction OKN0 ( Date Extraction/Product Drill Down) tab.
2. Product Group Type = Material group..
3. Run KKRV after period end every month to collect the data for drill down reporting..
Please revert back for any further clarifications
Regards
Sarada
Sarada -
In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
Thanks in Advance
Regards,
MatHi Mathew,
Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
Thanks&Regards,
kumar
Maybe you are looking for
-
CREATING VIRTUAL DIRECTORY THROUGH jakarta-tomcat-4.1.10
dear friend(s) how to create a virtual directory through tomcat jakarta-tomcat-4.1.10 please help me very very urgent mohd meraj
-
How do i get a work authorization form
how do I get a wowk authorization form to take to the repair centre?
-
Hi All, I have a file to HTTP syncronus scenario. To test the http URL i wrote a java program and tested it standalone from my PC with method POSTand it is working fine( ie i was getting a response). However when i use the same URL in XI(
-
Hi, I'm trying to display a numeric field in an Adobe Form. The issue is that the decimal part of the the field is getting truncated when I view the Adobe Form in Print Preview. The numeric field is of the form -6,213.19. In the form the value appea
-
Populating fields to another PDF file
So I have a pdf that multiple people are using. I want to strip certian info upon submission and copy it to another pdf form. Is there a way to do this?