Fixed Consumption in PPM

Hi,
I have a requirement that the start quantity for the input component is a fixed quantity.
How can I define a fixed quantity for input component for a PPM?
eg. Output Component is O1 and input is I1.
demand for output component O1 is 100.
the fixed quantity for input component I1 30.
1 EA of input gives 1 EA of output O1.
so when planning takes place req for 100 EA of input I1 will be generated, but the starts quantity can be only 30 EA or multiples of 30 as my fixed quantity for input component is 30 EA.
So 120 input component will be used and 120 output comp will be generated.
Can this be achieved using Fixed consumption in PPM or is their any other method.
Thanks & regards,
Sanjog

To me , it looks like having a fixed lot size for input component as 30 should solve the issue. I think you might have tried this already, if yes i want to know what happened.
Kedar

Similar Messages

  • How to define BOM with fixed consumption?

    Dear Experts,
    I have a factor that fixed consumption 10 + 5 x quantity for a child item, how should I define the BOM?
    For instance to produce 1 item, it requires 10 + 5 x 1 = 15
    but to produce 2, then 10 + 5 x 2 = 20.
    this fixed value 10 is predefined but different for every items.

    Thanks. Gordon.
    I can not use a phantom item. a child item has to be one child item. can not be divided into two or more.
    In fact, a child item is a solid steel bar so it can not be mixed as powder or liquid.
    Is there any other way to do this without using SDK?

  • Set-Up Risk Matrix

    Hi Gurus,
    In Industrial hygiene and safety,How to customize IHS--SPRO set-up risk matrix.
    according to the probability and severity.
    in CBIH12 Risk assessment I am unable to see my values.
    how to define the risk matrix please elaborate it.
    Thanks in advance.
    Naveenn
    OUR STRENGTH IS THE SUM OF THE INDIVIDUALS WHO WORK HERE PRACTICE SAFETY ALWAYS.

    Dear Ian ,
    Thanks for your reply .
    Following are the course of events in my testing for the SNP Optimizer :
    (a) I have not selected Discrete Optimisation with Fixed Material and Resource Consumption as 30 days .
    (b) The resource did not have a set up matrix assigned to the resource and the PPDS which was CIF from ECC was having the figure of variable as well as fixed consumption .
    (c) Conversion of the PPDS PPM into SNP PPM with variable lot size generated the variable and fixed consumption figures in the SNP PPM as well ,
    (d) During the SNP Optimiser Run it considered the set up time defined in the fixed consumption and the processing time in the variable consumption leading to giving the right quantity after considering say 0.5 hrs of set up time .
    (e) Now after attaching the set up matrix to the resource the PPDS PPM generated has to read set up from the set up group and key and thus has no figure in the fixed consumption .
    (f) SNP PPM converted from the PPDS PPM as generated in point (e) leads to capturing no figure of fixed consumption in the SNP PPM .
    Request you to review the above points and advice how to set up the master data objects and SNP Optimiser Profile so that even after the set up matrix assigned it should pick up the set up time .
    Thanks and Best Regards ,
    Prashant Kumar

  • KP06-Planning upload

    Hi
    While I am doing an LSMW for Cost element planning through KP06, after entering the data and when I click the default all, the fields names are not displayed.  Am I going wrong somewhere ?

    Thanks to Ajay & Siva.
    Ajay, I will do the importing of your LSMW file and see what happenes.
    I also want to know the excel upload.  Siva, I refered the link and generated an excel file from KP06.  But in the file, the cost centre option is appearing in the header like fields.  Line items have cost element and fixed cost data.  This means I have to use this upload individual for every cost centre ?  I have around 300 cost centres for uploading data.  I give below the template generated.
    Version     0          Plan/Act - Version                         
    Period     1     To     12                         
    Fiscal Year     2010                                   
    Cost Center     231510          Compounding                         
    Cost Element     Plan Fixed Costs     Distribution key     Plan Variable Costs     Distribution key     Plan fixed consumpt.     Distribution key     Plan vbl consumption     Distribution key
    401020     53629778.85     2     0     2     0     2     0     2

  • CTM Planning: How to Handle Min Lot Size Daily Resource Capacity?

    Hello,
    I am facing a situation where the Min Lot Size values require more than a days capacity of the Resource.
    Finite Planning CTM is skipping all demands.
    Example:
    Daily Resource Availability = 24 Hrs,
    Capacity Consumption per PPM = 1000 Kgs / 1 Hour.
    Min Lot Size =  50,000 Kgs
    Capacity requirement for the 50,000 Kgs = 50 Hrs
    Is there a way CTM can plan this?
    Thanks,
    Ran

    Yes the time buckets in CTM profile has nothing to do with this limitation...
    Nor does the infinite/finite setting.
    Basically its a limitation of how the resources are stored in livecache.
    You can not exceed the capacity for which the resource is stored...
    The only workaround is to define the resourcde in weekly time buckets by manually defining a capacity profile.
    I don't like this as every order will take a week...
    I am not aware of any other workaround...
    I have seen other clients take out the minimum lot size for SNP, then when cif transfer the order back to R/3, it is combined to 1 large order...
    Ken Snyder

  • Fixed PPM/PDS resource consumption and fixed PPM/PDS material consumption

    hi experts
    while going through help.sap to find out the meaning of linear optimization i came across two phrases  ""fixed PPM/PDS resource consumption and fixed PPM/PDS material consumption""   i have worked on SCC03 PPM and curto_simu PDS   but i couldn't make out what these phrases means . my perception is that every shop floor  operator is given a target to produce certain number of quantities  per shift on a production line .Does these phrase means that ??  or it has some other connotation. ?? 
    experts can you please provide clarity on those phrases.what does it actually mean ?

    sahu it is even more confusing see  "Fixed PPM consumption is the fixed time required independent of quantity produced."" 
       fixed time of what ??   is it the resource timing or shift timing
    Time required to produced material consumption quantity = Fixed cons + variable cons
    can i say it is the time required to produce a given  lot size quantity ??
    sahu would  you please put it in very layman terms.

  • Continual Consumption : Variable field in PPM from R/3

    Hi All -
    I have a multi-mixed resource and it is used in one of the operations in the PPM. I was manually creating the PPM and testing a few things and I had populated the field " Continual Consumption: Variable"
    How can this field be CIF'fed over from a production version?
    No matter what capacity/scheduling formulas I tried to use on the Work Center, the " Continual Consumption: Fixed" field gets populated in the PPM with " No of indivudual capacities"from the WC. Never the continual consumption:variable.
    What field should I mantain for this to be continual consumption :variable?
    Appreciate your help
    Varun

    Hi Varun,
    If you want input components to get consumed continously use feild Distrubution key in BOM. open bom and double click on component for which you need continous consumption and mention feild distrubution key.
    Only distrubution key GLEI(equal distrubution) can be CIFED to APO.
    If you are talking about continous consumption of capacities try using distrubution formula in workcenter in capacity as well as schduling tab. I am not sure about continual consumption capacity as I never used but we are using continous consumption components.
    Regards.
    Siddharth.

  • Problems with Var. Bucket Consumpt. field in PPMs

    Hi experts,
    I'm trying to manually create a PPM (Production Process Model) into APO (to use it with SNP), however, the value entered in the
    Bucket Consumption (Variable) field disappears when I active the PPM. Someone could tell me what I am doing wrong?
    First, I created a Resource ( using fields of tab 1 Bucket ) with the following data:
    Resource
    Resource: R
    Category (Cat): P - Production
    Location: L
    Time Zone: BRAZIL
    Bucket Dimensn: Mass
    Factory Calendar: BR
    Bucket Capacity: 96000
    Unit: KT - Kilotonne
    Number of Periods: 365
    Period Type: Day
    Days -: 1095
    Days +: 1095
    ie, a resource with a capacity of 96000 Kilotonne per year.
    The PPM I'm trying to create is the following:
    PPM's General Data
    Use of a Plan: S - PPM for Supply Network Planning (SNP)
    Variable (Single Level Costs): 980,00
    PPM's Operations and Activities
    Operation: 0010:Produce
    Activity: 10:Produce
    Components of Activity
    Product          I/O Indicator     Consump. Type     From Date     To Date          Unit     Var. Consumptn
    A          O          E          01.01.1970     31.12.9999     KT     1000
    B          I          S          01.01.1970     31.12.9999     KT     560
    C          I          S          01.01.1970     31.12.9999     KT     180
    D          I          S          01.01.1970     31.12.9999     KT     260
    Mode of Activity
    Mode     Primary Resrce          Location     Unit     Fix. dur.
    10     R               L          D     4
    Resource Mode
    Resource     Location     Unit     Var. Bucket Consumpt.
    R          L          KT     1000 (here is the problem)
    PPM's Model
    Prod. Process Model     Output Product     Date From     Date To          Planning Locatn     Discretization     Maximum Lot Size
    PPM_1               A          01.01.1970     31.12.9999     L          x          9999999
    ie, a PPM to produce 1000 KT of A in 4 days that consumes 1000 KT of R resource capacity.
    The value of 1000 KT in the field Var. Bucket Consumpt. is not allowed. I could only register values between 0 and 9.
    Thanks in advance for help.
    Greetings,
    Francisco Fonseca.
    Edited by: Francisco Fonseca on Jun 26, 2009 1:56 PM
    Edited by: Francisco Fonseca on Jun 26, 2009 1:59 PM

    Hi,
    Its a good practice that when you make PPM manually keep fixed duration as '1 Day' (in your mode of activity).
    One thing i noticed that you made your resource as bucket resource, which is correct,
    but the number you mentioned there (Bucket Capacity: 96000) is not right. What is the unit? It  should be in hours (should be 8 or 9 or ).
    That means in One day the resource is capable of producing goods for 8/9/ Hours. So, make the change there.
    Now in your Mode of activity make fix  duration  1 Day.
    Components of Activity
    Product          I/O Indicator     Consump. Type     From Date     To Date          Unit     Var. Consumptn
    A          O          E          01.01.1970     31.12.9999     KT     1000
    B          I          S          01.01.1970     31.12.9999     KT     560
    C          I          S          01.01.1970     31.12.9999     KT     180
    D          I          S          01.01.1970     31.12.9999     KT     260
    Mode of Activity
    Mode     Primary Resrce          Location     Unit     Fix. dur.
    10     R               L          D     1
    Now in resource: put following value
    Resource Mode
    Resource     Location     Unit     Var. Bucket Consumpt.
    R     L     H          1     
    You will get an output as 8000 or 9000 (depending on your resource capacity per day, ie 8hr or 9 hr  )
    and if you put Variable consumption as 8/9 hrs the you will get 1000 KT per day, in that case you put variable material/product consumtion as 250 KT,
    so you can get 1000 KT per four day. Variable resource consumption responsible for variable output (variable consumption of FG).
    Pls revert if still there is any issue.
    Thanks,
    Satyajit
    Edited by: Satyajit Patra on Jul 2
    Edited by: Satyajit Patra on Jul 2, 2009 11:14 AM

  • PPM: Variable Consumption(core interface

    Hi Experts
    Facing a problem in Variable bucket Consumption of  PPDS-PPM. I am transferring all  PPMs from ECC only. After CIFED, there is non uniformity across bucket consumption values in PPDS-PPM. The values are populated in variable/fixed continious consumption, but we need that the same is to be populated in variable/fixed bucket consumption so as to generate the SNP PPM.
    Plese give ur valuable inputs, it will be highly appreciated.
    regards
    Guru

    Hi Guru,
    Check out the Master data maintained in ECC for both work center and BoM & Routing.  Also check the type of resource maintained in ECC which was used in the PPM.   Once the required corrections are made, re-do the entire ciffing activity and check the values in PPM.
    Regards,
    R. Senthil Mareeswaran.

  • Sandy bridge bootloader power consumption fix

    Have the power consumption fixes been implemented in newer/current versions of the kernel? Or is still necessary to keep the lines in the grub cfg?

    pcie_aspm=force should no longer be necessary. i915_enable_rc6 etc should be included in 3.4 kernel as far as i know.

  • PPM error with bucket consumption

    Hi,
    I am having a bit of trouble with the PPDS PPMs. Every time I regenerate the PPM for a specific product-location and run the PPM Check Plan, I get the error "You cannot use unit for bucket consumption of res..." and "Assign a value to at least one bucket consumption..." so what I am doing to temporarly solve it is to manually fill in the Bucket Consumption field from every resource of every operation contained in the PPM.
    But this is very time-consuming and I would like to find another way to do this. Is there a special configuration from the R/3 side?
    Thank you in advance,
    Fernando

    Hi Fernando,
    If you are creating a PPM directly in APO then you need to follow these steps and maintain the UoM for Variable bucket consumption.This is required to arrive at resource capacity consumption based on the order quantity of the planned/Production order for that specific product.
    But if you don't want to maintain this field manually everytime for all/new codes then you can have a setup where you define the PPM related data in R/3 i.e.BOM, Routing data and Production Version that,when CIFed to APO will automatically create the PPDS PPM with all consumption parameters you setup in routing. Then you can also automate the process to generate a SNP PPM with reference to this PPDS PPM.
    Hope this helps to clarify..
    Regards,
    Digambar

  • Hello I want to say that apple iphone 5 even has problems with battery consumption. Charge my phone in the morning and sometimes I do not get to the full day. If they could fix this problem I would appreciate. I hope answers.

    Hello I want to say that apple iphone 5 even has problems with battery consumption. Charge my phone in the morning and sometimes I do not get to the full day. If they could fix this problem I would appreciate. I hope answers

    Hello!
    I recently just downloaded the 'Waze' app as a backup for my Garmin. I've read a few reviews that seem to rant and rave about how good the GPS app is. It is community driven and maps are constantly being updated by users. Plus it has a few other fun stuff in it (something similar to Gasbuddy where you can owe prices on the map). But like the person above me said, there is lots of useful free GPS apps in the App Store.
    Oh and I may be wrong but I remember reading an article about Google being slower about updating its maps system--ie no turn by turn voice, which many people have had complaints about.
    Happy Searching!
    Ps - if you switch I wouldn't go to Blackberry.

  • Has anybody figured out how to fix the battery consumption with mountain lion (using a MBP 13")?

    I upgraded to Mountain Lion, and yes despite all of the warnings posted in the App Store reviews about the battery life being cut in half, I upgraded my MBP anyway. Chalk this one up to the Black Cloud of "I Told You SO!" My MBP could hold a charge for almost 6.5 hours. Now I'm luck if I can get 3, but in most cases I may get 2.5 hours if I'm conservative.
    Has anyone figure out how to fix this battery problem? Even now after having it unplugged for almost 2 hours...I'm getting the "You are now running on reserve battery power" message. What a freaking joke!
    Any help would be greatly appreciated!

    Open /Applications/Utilities/Activity Monitor.  Click %CPU until the triangle points down beside it.  Make sure it says All Processes in the upper right.  Check for applications taking up lots of CPU time.

  • Resource Consumption

    Hi,
    We are using CTM to create PP/Ds order using PP/DS PPM, we have used Multimixed resource in the PPM definition.
    The number of capacities defined is 3 and available time is 24 Hrs, so total available capacity for a day is 72 Hrs.
    Now when we are planning for demand of 72 KG with throughput as 1Kg per Hr, the system should schedule the order at the start of the day and complete the order in one day assuming that 100% resource capacity is available.
    But when we take the CTM run it is creating a Planned Order which occupies the capacity of one resource for 3 days, i.e. it occupies only 1/3rd capacity and remaining 2/3rd capacity is idle.
    The expected result for me is that the system should consider the total available capacity irrespective of the no of capacities defined for the resource and create one planned order even if it occupies multiple capacities for the same resource
    Can anyone please suggest how I can consider single capacity for multiple resource of same type using CTM and PP/DS PPM.
    Thanks & Regards,
    Sanjog

    Sanjog,
    I have never done this in CTM, but in PP/DS you achieve this with splitting the orders across resources (work centers).
    In ECC, in the routing, in the detail of the operation, set the 'required splitting' flag, and then set the number of splits at three (CA02).
    Re-cif across (in order to eliminate confusion, it is probably best to delete the old PPM in APO first).  Now, in your PPM, you will see in the PPM operation Mode, the Fixed continual consumption is '3' and the variable duration has been reduced to one/third of the original value.
    Rgds,
    DB49

  • Multi-activity Resource: Var. Cont. Consumption and Var. Duration?

    Hi everybody,
    I need to model the situation below:
    The machine A is capable to process 10 m3 of the product P at once. A processing lasts 30 min regardless of the load of the machine.
    For example, an order for 35 m3 of the product is to be executed. So, the machine is started 4 times (4th load is 5 m3) and processing time equals to 2 hours (30 min * 4).
    If there is another order, for example, an order for 5 m3, then the two orders should be combined, that is, the 4th load must be full (residual 5 m3 of the order 1 + 5 m3 of the order 2).
    I can't figure out a proper way to define consumption values in PPM. It's not possible to define both, duration and cont. consumption, as variable values.
    Has someone any ideas?
    Best regards,
    Mikalai

    Hello ,
    To model the scenario you mentioned ,i would suggest following
    1.Go with 'Fixed time-cont consumption ' of resource and 'variable duration' of the activity.
    2.With Fixed cont-consumption the order will consume the resource capacity of ,only the resource on which it gets scheduled. And with
    Variable duration the orders will be generated according to ppm settings(eg.1st order with duraion 105 mins and 2nd with duration 15mins)
    3.Use std PPDS hueristics to generate orders(for eg. MRP hueristics), so that it will generate orders of qty 35m3 and 5m3 .
    4.Use DS hueristics for scheduling so that the two diferent orders are combined to form equal load on the resources.
    Thanks & Regards
    Abhijit

Maybe you are looking for