Fixed purchase requisitions in MD04

Hello experts,
When users launch MRP, the only elements that are changed are planned orders and purchase requisitions. Is there any way to have the same behaviour for fixed planned orders and fixed purchase requisitions??
Thanks in advance.
Laura.

Laura, Let me use 'firmed' instead of 'fixed' in my reply.
1. Firmed Planned Orders:
  There is an option in the MRP type config called 'Roll forward period'. This option can be set with a -/+ sign to delete firmed planned orders either in past or future respectively.
Any planned order rendered useless but still lying in the system just because of the fimed indicator can be deleted with this setting.
A firmed planned order on a maximum can firm the BOM components underneath and there are no follow-up actions/responsibilities/obligations required for planners, if required.
A planning re-run may sort the issue quickly with out further consultations required with shop floor personnel for instance.
Hence the deletion option is made available for firmed planned orders in SAP standard.
2.Firmed Purchase Requisitions:
    Other than manual changes which make the PR firmed, there are other related actions like PurReq release procedure/status which also makes system consider that the PR is firmed and does not allow further changes.  
During Planning run system does a simple source determination and during the purchasing source determination there is an extended set of activities that come into picture.
So the message is a lot of follow-up activities are still possible with respect to a PR and hence in standard we do not have some similar option for PR's like the roll-forward period available for planned orders.

Similar Messages

  • Conversion of Planned Order to Purchase Requisition thro MD04 for Quota Arr

    While converting Planned Order to Purchase Requisition  thro' MD04 for a Quota Arrangement  material, on the screen in the Reference section Purchase org automatically does not default  while for a non Quota Arrangement material it defaults. Need P.Org to automatically default.
    Any suggestions
    Thanks

    Does anybody has no answer?
    I have done some researches and i have found that i have to work on the transaction MD14. I have also tested the next enhancement project
    LMDR2001
    LMDZU001
    but they are not called during the execution of the transaction even if those enhancements are activated.
    Lello

  • MD04 Purchase Requisition generation

    For particular material i want to trigger Purchase
    requisition in MD04.
    For this i  have maintained following settings.
    1. Purchase info record.
    2. Source list for material, Where start and end date is entered properly with MRP '1'.
    3. Sourcelist and automatic PO  is checked in MMR.
    4. Automatic PO is Checked in VMR.
    Problem:    Not able to generate PR for that material in MD04.
    Please let me know what i have missed in the above settings.....

    Dear Kunalc,
    Either there must be some demand for this material/dependent requirements for this particular material,then after running MRP
    through MD02/MD03 the system creates PR,and the same can be checked in MD04.It's not possible to create Purchase Req
    from T.code MD04,it's only to check the stock/requirements.
    Regards
    Mangalraj.S

  • How to convert planned order to purchase requisition

    Hi,
    We have executed MRP run with the option create purchase requisition as '2' i.e purchase requisitios in the opening period.Now the system has created some planned orders and some purchase requisitons.
    Now we want convert the planned orders in to purchase requisitions ,how to convert them in to PR.
    We have MD14 and MD15 transaction codes but don't have authorisation.
    Will the system automatically convert them to  PR in the next MRP run or we have convert them manullay?
    Is it possible to delete the palnned order and re run the MRP with the option of creation indicator as '1' and in this cas whether teh system will consider existing PR(which got created earlier)?
    How to delete the palnned order?

    Hi chinni,
    You can convert the planned orders to purchase requisitions in MD04. to avoid this check If procurement type for the materials is E then, change it to F. Now Rerun the MRP by selecting planning mode as 3 - Delete and recreate planning data and create purchase requisition as u20181u2019. All planned orders will get deleted and purchase requisitions will be generated.
    Try this and revert back for further clarifications.
    regards
    Venkat.V

  • Defaut Item Category 'U' coming in Purchase Requisition.

    Hi,
    I am trying to create a Stock PO from Purchase Requisition through MD04.
    The purchase requisition has Item category "U" by default.
    Hence, whenever I try to create a Stock PO it is giving an error. I can only create a STO for those purchase requisition.
    Immediate help would be highly appreciated.
    Thanks & Regards,
    Sonal Sase.

    Dear
    Create MRP group in OPPR , In the MRP group go External procurement option - Scheduling/document type - Mention your stock PO type in Doc Type SPO column.
    Now assign these MRP group to the material master (raw materials) in MRP-1 view. Now you run the MRP, convert the purchase req. to Purchase order, system will prompt the correct stock PO type.

  • Purchase requisition type while converting planned order

    When We convert planned order to purchase requisition in MD04 how the system picks the  Purchase requisition type ?What configuration needs to be done in Spro

    Dear
    Please check the following
    Basically , document type selection for PR depends on the planned order profile -SPRO-MRP-Procurement Proposal-Planned Order Profile .
    Check in
    1.OMDV -Conversion of planning run -Purchase Req item -Order Type -It should be NB
    2.Or else , check in OPPR-Carry plant parametrs MRP group -Scehdel/documets type .-NB.
    MRP checks in MRP group level.
    Regards
    JH

  • Purchase requisitions with item category "consigment" in transaction MD04.

    Hi,
    I need to configure the system in order to create purchase requisitions where every item category should be "consignment" when executing transaction MD04. What should I do?
    Thanks in advance,
    Luis.

    hi Might
    hope this may help u in some regard
    in MD04 go to collective acess and choose special procurement as consignment and then excute  and remove the setting from set up lists in background

  • Field fixed vendor for purchase requisition (component of project)

    Dear all,
    Could you please indicate us how we can automatic fill the field "Fixed Vendor" (FLIEF) in a purchase requisition comming from a component of an activity (of a project)?
    The field "Desired Vendor" (LIFNR) is filled automatic in the purchase requisition, based on the vendor given on the activity (field: RESBD-LIFNR)...
    We want that both fields (fixed and desired vendor) are filled automatic in the purchase order...
    Thank you.
    Best regards,
    Thomas

    If you have maintained source list(ME01) and "info record"(ME11) for the desired vendor and material combination. It will default as "fixed vendor" in PR. Of course when you copy PR into PO, it is going ot copy the same.
    Regards,
    Mahendra

  • Purchase Requisition disapears on MD04

    Hello All,
    I'm facing a problem regarding to MRP run. I create a Plan Order directly from MD04 pushing the button available by using the Navigation Profile:'SAPPPMRP00', and a MRP type based upon the Re-Order Point (ROP).
    The planned order appears on the list of requirements MD04. I convert to a Purchase Requisition, and it still appears. I change on the PR their Account Assignment and after saving and refreshing the MD04, she disappears. If I re-change the PR in order to have the previous information, she continues to not be shown. The RP exists if I go directly by ME53N and it status remains: Not Edited'.
    As anyone have experienced this particular problem? Can you help me?
    I thank you in advance.
    Regards,
    Pedro.

    Hi all,
    One additional information: it seems that all the PR created manually doesn't appear on the Stock requirement list (MD04).
    I've tried to set '1' on MD03 and it didn't work.
    As anyone has experienced this in order to help me.
    Regards,
    Pedro.

  • MD04 - no release button available when clicking on purchase requisition

    Hi experts,
    A purchase requisition has been created that needs to be released.
    This can be done via ME54 which works fine. Another possibility is via MD04 - click on the purchase req. number. A pop-up occurs and there should be a release-button (green flag).
    My question:
    What might be the problem, if the same user can release a PR by using ME54 but not by using MD04? He doesn't see the release button when he clicks on the PR-number within MD04. 
    I checked the user's roles and profiles which are the same as for another user where both ways work fine.
    Release procedure without classification is used.
    Thanks in advance and regards,
    Ina

    the user uses a different navigation profile.
    assign the purchasing navigation profile in MD04 via menu Environment > navigation profile

  • Fixing of Purchase requisition

    Hi
    I have changed delivery date in Purchase requisition and System has automatically set FIxed indicator in PR when I saved PR. ONce again I have opened PR in change mode and removed Fixed checkbox and save. But still system has not removed fixed indicator which is happenning incase of planned order.
    Is there is any config setting bacuse of which system is setting fixed indicaor automatically  while saving PR though  we  have removed it in edit PR??

    Hi Mayuresh
    U r absolutely right.
    In case of Planned orders The indicator is set by the system as soon as you have manually changed a planned order. However, you can remove the indicator when you change the planned order again
    AND
    In case of Pur Req  The indicator is set automatically if you make manual changes to a purchase requisition that was generated by materials planning and control can not be changed manually
    This is to restrict any changes to Purchase requisitions that likely to happen during MRP by the system automatically. However manual changes to the PR is always possible. If u specify the  problem then we can explore it further
    Regards
    Brahmaji

  • Fixed indicator in a purchase requisition

    Hi,
    I want to uncheck the fixed indication in a purchase requisition programatically.
    Please let me know if there is any BAPI / FM to do the same.
    Regards,
    Chandan.

    Hi ,
             What exactly are you doing to create the purchase requisation .Are you using a Bapi in your program to create purchase requsiation . Can you give some clear picture . Are you mention the G/: Account Check Post Autoamtic Check ... I suppose if you take that check then that will give you problem in GR/IR so please can you clear your requirement as per your scenario .
    Regards
    Shankar

  • Purchase requisitions which created during Sales Order missing in MD04

    Hi Guys,
    I have an issue with MD04.
    Purchase requisitions which created during Sales Order missing in MD04 are not appearing in MD04, but these are showing in ME5A. After MRP Run only PRu2019s are showing in MD04.
    Requirement type used 511 during creation of Sales Order.
    Please advise me if any config/ Master data is missing OR If required any enhancement.
    Regards,
    Purna

    Did you checked for the Firming indicator in PR's?

  • Purchase requisition not getting generated in MD04

    Hi,
         if i have my material with MRP type VB & my ROL is 10. Now if my stock at present is 0.74KG & if i do the MRP run with MD02 then my purchase requisition is getting generated.now i delete the purchase req & try it with MD01 for the whole plant but the same does not happen when i do the MRP run with MD01. my purshase requistion for the same material never gets generated. can anyone tell me what m i missing. following parameters are maintained by me in MD01 & MD02
    Processing key          NETCH
    Create purchase req.    1
    Delivery schedules      3
    Create MRP list         1
    Planning mode           3
    Scheduling              1

    HI,
    Check below threads,
    [MDAB - Planning file entries   |MDAB - Planning file entries;
    [How to use T-code: MDAB and MDRE|How to use T-code: MDAB and MDRE;
    Regards,
    Dhaval

  • Firmed planned order and purchase requisition

    Hi gurus,
    could anyone explain firmed planned order and firmed purchase requisition, please based on the following detail questions.
    1.when planned order was converted into PR, we call it firmed PR, right?
    2.when manually change a PR and save it, we call it firmed PR, right?
    3.are these the only 2 ways to firm PR? if not, what else?
    4. how to firm planned order?
    5. in MRP, the on-order stock is defined as "composed of fixed and firm receipt elements (PO, firm planned orders, firm purchase requisitions), while in MD04, we always see all the PR created by MRP running, are these newly created PR firmed automatically?
    Thanks,
    cookie

    HI,
    Check the link
    http://help.sap.com/saphelp_45B/helpdata/en/f4/7d2ca444af11d182b40000e829fbfe/frameset.htm
    Regards
    KK

Maybe you are looking for

  • Required standard report

    Hi, Please help me in getting the report. Require a report which should have  PO No., Material Code,  PO qunatity, GR quantity  and payment to supplier with respect to GR. Thanks...

  • BPC 7.5 vs BPC 10.0

    Does anybody have any experience in BPC 10.0? Which are the best advantantages of BPC 10.0? Are there any disadvantages? We are very happy with EVDRE functionality in BPC 7.5, and it is substituted in BPC 10.0. For that, we are thinking of making a n

  • ResourceLimitException

    Hello, I'm getting the ResourceLimitException during load testing an application, and I hope to find out why I'm getting it here. Platform: WL81SP5, Oracle 10g (non-XA driver v10.2.0.1.0), Spring 1.2.8, Hibernate 3.1.3. Data Source Settings: Honor Gl

  • How can I  authorize my Samsung Galaxy Tab 4 Nook to accept my ADE e-books?

    I have transferred my ADE e-books onto my new Samsung Galaxy Tab 4 Nook (7").  However, when I try to open them, they ask for authorization (email address and password).  How can I authorize my device so it will recognize information and open my book

  • All videos I put onto iTunes have the same default year.

    Every time I add a video (not bought from the iTunes Store) to my iTunes Library from my computer it sets the year of the video to 2005. I'd rather have no year at all than an innacurate one, so I'd like to know how to stop this. (The next bit is mor