we are having conductor div.n we req Drum to wind a wire coductor these drums having size of std lagging for dispatch but length is varied in coductor for winding.when i wan to fixed the quntity of lagging for perticular drum i used key fixed quntiy but at time conversion from pln order to prod order, system takes only fixed quantity for 10 drums also e.g.1 drum =65 lags & for 10 drum=65 lags after fixed key used.
  But my reqmt is that when i will make prod order at that time the system varies the lagging nos. with propertion to lenth of conductor & that shuld not happen lagging nos. shoul be fixed.So plz tell me the procedure for this thing
thank u
Regards-
jagdish

Hi jagdish
Fixed quantity in BOM means. Always it will create proposal for that particulare quantity only irrespective of the order quantity
For ex if you say for MAT A in BOM the quantity is 1 No and if you tick fixed quantity indicator. The system will always create proposal for 1 No irrespective of the BOM header quantity.
This will be useful to create fixed quantity for a order for inspection or other purpose.
If you want MRP to be exploded as per the BOM header quantity. Use alternate unit of purchase.
Hope this is clear
Regards
J . Saravan

Similar Messages

  • Fixed quantity in BOM during Backflush

    Hello,
    An assembly has a component in its BOM & this component has fixed quantity indicator set in BOM.
    When i execute MFBF for assembly, system do not post GI for  the component (fixed quantity indicator set in BOM).
    Please explain.
    Thanks in advance
    Keith

    Keith,
    This is standard behaviour in SAP.
    The explaination given by SAP is that for a planned order you can perform multiple times of backflush, so it may not make sense to bring up this component for posting the fixed quantity every time.
    So you need to follow a simple procedure to post Setup activity cost and Fixed quantity components. In the intial screen of MFBF transaction you would find a button "Details"(or press F5 button) click on this button "Details" pop-up screen would appear here you need to activate the check box for field "Post ordering Costs" and press enter key or green tick mark, you would be back in the Intial screen of MFBF now if you go to post with correction function you can find the fixed quantiy component also in the list.
    Hope this helps and also clarifies your doubt,
    Regards,
    Prasobh

  • Direct Production - Fixed quantity in BOM

    Dear PP Gurus,
    Need your expert on this question, we have a direct production in a Pharma process. The scenario is that we have a fixed loss quantity in the mixing which we setup in the filling BOM.
    With the direct production, each requirement is pegged to a planned order. There will be two planned order.
    So, one planned order is the actual requirement order and the other is the for the fixed quantity for mixing process.
    Is it possible to consolidate the two planned order quantity in one process order and the additional planned order,can it be delete automatically by MRP run or some method?
    Appreciate for any feedback
    Thanks & Regards
    Pooja.

    Dear Girish,
    In the Mixing material wiht a master data with a special procurement key = 52 (Direct Production) in te material master and select the collective order. = 2 in the MRP 4
    In Mixing, there is a fixed loss of the certain quantity wen the solution passto te next Filling process. In the Filling process, BOM, there a fixed quantity indicate.
    So, usng the Direct Production, the mixing material will be proposed two planned order with different segment.
    The other remain te same.
    By consolidating the fixed quantity and order quantity in one process order, but the fixed quantity planned order is not going to deleted when you run MRP.
    So, the question is there a way to handle this requiremen with the order and fixed quatity, can be consolidate and the additional planned order to be deleted (or manual deletion )
    Appreciate yur assitance
    Regards
    Bee Lee

  • Fixed BOM item

    Hai Friends,
    Query from process industries, My BOM has nearly 10 items. in those 7 materials are fixed quantities and remaining three items are varies from order to order.
    So my client asked for those 7 items which are fixed shouldn't be allowed to change in process order and and remaining three should be allowed to change the quantities as per their requirement in process order.
    For this, I have used to select the check box as fixed Quantity in the item details in BOM for a particular item, but there was no result in process order. is there any customization settings required for this. please give your valuable suggestion.
    Mourya.v

    Hi Mourya,
    Well you can do it through the BOM itself goto item level in BOM and there basic data tab you can find quantity field next to that you will see FIXED QUANTITY.
    If you activated there there will be an icon in the main of BOM page go to extreme corner you will find it will be checked OK.
    I hope this will fulfill your clients requirement. Again try run the MRP by creating the order then you can see the effect what it gives OK.
    Hope helps you any questions pop me again.
    Regards,
    Madhu.G

  • Sales BOM its possible edit the quantity for child items in Sales Order

    Hello friends, this is my issue
    I need to use a Sales BOM but the problem is that the child items in any Document marketing, such as Sales Order, the quantity for that child items it´s possible to edit independant of the father item code, and I don´t want this because allows to users to change diferent quantity for child items versus the quantity of the father item code.
    Thanks in advance

    Thanks Gordon yes I know even with this solution the problem is the with transaction notification is not possible determine that event to block, or if you know how or get some tip, please send me, because I analyze the requirement and I couldn´t develop.
    Tks

  • Fixed quantity not supported for alternative items

    Hi dears,
    I was trying to configure in a Bill of Material a group of components marked together as "Alternative item", having the Fixed quantity indicator set (so the quantity is not in proportioned with the order quantity).
    However, when I do this action I have the error message no. 29485 "Fixed quantity not supported for alternative items", because a fixed quantity is not allowed for alternative items.
    Leaving out the fact that I don't understand for which kind of logic this should be done, do you know if there is any solution to achive the same result (use alternative item and each of them should be with fixed quantity despite th eorder quantity)?
    Thanks and regards,
    Giovanni

    Daily structure relationship step: remove relation
    CLOSING

  • Are there BAPIs or FM  using modification BOM's quantity of line item

    Hi,
    please help me.
    Are there BAPIs or FM  using modification BOM's quantity of line item with ECM number.
    Best Regards.
    Pangyanting

    Hi,
    please help me.
    Are there BAPIs or FM  using modification BOM's quantity of line item with ECM number.
    Best Regards.
    Pangyanting

  • BOM Items Check for Partial order quantity

    Hi
    For weekly shopfloor planning I need to check the material availability for a partial quantity of the order.
    For eg. I have a Production order for 2000pcs but I need to plan for a week only 500pcs. I want to check the BOM items availability for only 500pcs of BOM Header material. Need multiple material - quantity selection option also.
    Is there any customized availability check in standard SAP?
    Regards
    Krishnaraj

    Hi,
    Please check for the indicator "confirm available partial quantity" at Production scheduling profile configuration.
    In OPKP for the plant and production scheduling profile combination --> under material availability check tab --> select the option "confirm available partial quantity"
    It Determines that all components are comitted with the same percentage rate during an availability check.
    When you have set this indicator, if only a partial quantity can be committed for one component, then only partial quantities will be committed for all components during an availability check.
    Example
    Order quantity 100 PC:
    Committed quantity
    Requirement ATP quantity not set set
    Component A 200 PC 300 PC 200 PC (100%) 80 PC (40%)
    Component B 100 PC 40 PC 40 PC (40%) 40 PC (40%)
    Component C 50 PC 200 PC 50 PC (100%) 20 PC (40%)
    Since only 40% of component B can be committed, also only 40% of component A and C is committed when the indicator is set.
    By setting the indicator, you can therefore ensure that orders are always only committed to the extent that they are also to be produced. In the example, 40% of the order can be produced for the requirements date. In addition, the quantities of component A and C that are not reserved can be assigned to other orders, which as a result may then also be produced.
    thanks and regards
    Venkat V

  • CS03 - BOM Item quantity - RC29P-MENGE

    Hi All,
       Could you let me know the table & field name - from where i can get BOM Item quantity field.
    I see it on
    transaction : CS03
    Program name: SAPLJ3AC
    Screen Number: 0830
    Field: RC29P-MENGE 
    But RC29P is structure, i am looking for table to get the data, is there any function module can return directly or do we have separate table, please let me know.
    Thanks
    Satya

    Hi Satya,
    In a CO project, I used the function BAPI_COSTESTIMATE_GETEXPLOSION to read the BOM for the material, the MENGE is under fieldname QUANTITY on table explosion_list.
    And, also used another two BAPI's which gather more detailed information BAPI_COSTESTIMATE_ITEMIZATION and BAPI_COSTESTIMATE_GETDETAIL.
    Hope this help you.
    Regards, Fernando Da Ró

  • Variant Configuration - Manual changes to BOM Items

    Hi All:
    We are implementing Sales ORder (SET) process. Need to have the ability to change BOM Items.
    According to SAP documentation referred in the link below, we have set the flag to allow the manual changes to BOM Items in the configuration profile. We have made sure that in the Material BOM configuration the fixed quantity flag is not set.
    But it is not working. Not sure if we are missing some other settings.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/92/58bfb9417011d189ec0000e81ddfac/content.htm
    Any help would be greatly appreciated.
    Thanks, Raja

    this would happen if you have edited the server.xml manually. if you do edit this file for valid reasons and want to keep the changes
    please run
    asadmin reconfig user admin password secret12 host host.domain.com  port 4848 --keepmanualchanges=true server1
    then deploy your applications, you should be ok

  • Bom  item quanity quanity

    Hi
    I have following requirement for MTO scenario
    There is a component A  in the BOM with quantity 8 pcs.
    Because we have quantity 3  in SO item, we get the purch.req. for 3x8 = 24 pcs, but in real life we need only 8 pcs (Requirement for one So item quantity).

    >
    mayuresh  bhurke wrote:
    > Hi
    >
    >
    > I have following requirement for MTO scenario
    >
    > There is a component A  in the BOM with quantity 8 pcs.
    > Because we have quantity 3  in SO item, we get the purch.req. for 3x8 = 24 pcs, but in real life we need only 8 pcs (Requirement for one So item quantity).
    IN the BOM component , In The item data of A, Check the fixed quantity.
    and Rerun a MRP with delete and recreate the planning data.
    and also check in CS13, by giving requirement quantity 3  and explode BOM after checked the fixed qty in BOM component
    Regards,
    Sundaresan

  • Delivery of Sales BOM Item

    Hi All,
    We are creating automatic delivery from Sales Order.Items in sales order is Sales BOM.quantity is calulated based on sales factors of item.,but when we change the quantity on sales order ,SAP automatically sets the factor values to 1.
    we are getting factors from item master on delivery document,but it is updatinng the quantity of parent item only i.e not updating the child item quantity.
    suppose parent item quantity i set to 5 it still show child item quantity as 1 on delivery.
    how to do this,
    thanks,
    neetu

    This is the bug in SAP B1,reported to SAP and will be fixed in future versions

  • Problem in Partial delivery BOM - items not copied in subsequent delivery

    Hi,
    We are using BOM in Sales order and we have activated delivery group for the BOM header item category.
    When we create first delivery we change the BOM header item quantity in delivey ( all the components quantity change accordingly) and save the delivery.
    Now when we try to create second delivery with reference to the same delivery for the left out qunatity in sales order, system is not copying the components of BOM items ( it is only copying BOM header) from sales order to delivery.
    Please let us know how can we create subsequent delivery with reference to the same sales order and delivery should get all the BOM items from SO to delivery.
    Please let me know if you need further information.
    Thanks
    Venkata Rama Reddy,K

    Hi,
    We already set the delivery group to A, and still having the same result.  We change the BOM header quantity only and automatically the component quantity is updated.
    This happens only if there are two header BOM in the Sales Order.  See example below:
    Bom Header 1 = 100
    Bom Component 1a - 80 (partial delivered)
    Bom Component 1b - 20 (partial delivered)
    Bom Header 2 = 200
    Bom Component 2a - 150
    Bom Component 2b - 50
    When creating outbound delivery, initially all the materials are copied to the outbound document.  If we want to delivery only Bom Header 2, then we will delete the Bom Header 1 line item.
    Upon deletion, the status of the component becomes fully delivered in the SO, but the Bom header is still partial delivered.
    Please confirm how to correct this.
    **If there is only one BOM Item in the order, then partial delivery is ok..
    Thank you,

  • How to use "discontinuation data" in BOM item ?

    Hi everyone!
    I would like to use "discontinuation data" in BOM item , not in MRP4 view, how to set? thanks!
    Dandan

    >
    dandan li wrote:
    >
    >
    > I want to know the  "discontinuation data" in BOM item, not  Priority of AltItemGroup !
    Dear Dandan Li,
    Plz Re-check Mr. SmanS Reply in that thread
    it is Regarding As per ur query
    More over Plz try to encourage your repliers always
    [committed quantity in production order;
    Like wise there are many other threads of ur's
    Plz Don't misunderstand
    Regards
    Madhu

  • How to calculate  extended quantity in BOM IMPLOSION QUERY

    Hi guys,
    I have given an assignment to create BOM  item where used report, For this purpose I am using an BOM implosion API  (PACKAGE.PROCEDURE = BOMPIINQ.IMPLODER_USEREXIT)
    I am calling this API like this-
    declare
      V_SEQUENCE_ID    number;
      v_err_msg        VARCHAR2(80);
      v_err_code       NUMBER;
      V_DATE           VARCHAR2 (30);
    begin
    delete BOM_SMALL_IMPL_TEMP;
    -- V_SEQUENCE_ID:=142354;
    SELECT BOM_IMPLOSION_TEMP_S.NEXTVAL INTO V_SEQUENCE_ID FROM SYS.DUAL;
    SELECT TO_CHAR (SYSDATE, 'YYYY/MM/DD HH24:MI') INTO V_DATE FROM DUAL;
    BOMPIINQ.IMPLODER_USEREXIT (
            SEQUENCE_ID => V_SEQUENCE_ID,        
            ENG_MFG_FLAG => 1,                   
            ORG_ID => :org_id,             
            IMPL_FLAG => 1,                    
            DISPLAY_OPTION => 1,                    
            LEVELS_TO_IMPLODE => 10,             
            ITEM_ID =>:item_id,           --34077520002
            IMPL_DATE => V_DATE,
            unit_number_from =>null,
              unit_number_to=>null,               
            ERR_MSG => v_err_msg,
            ERR_CODE =>v_err_code,
            organization_option =>1,
            organization_hierarchy =>null,
            serial_number_from =>null,
              serial_number_to =>null
    end;
    Now I query the table BOM_SMALL_IMPL_TEMP and it shows the data as per the structure of the item where used.
    NOW ALL I WANT IS I WANT TO CALCULATE EXTENDED QUANTITY  (PARENT-QTY * ITS_CHILD_QTY)
    CURRENTLY IT SHOWS ONLY COMPONENT QUANTITY. HOW CAN I CALCULATE EXTENDED QUANTITY LIKE WE DO IN BOM EXPLOSION?
    Can any one help me on this?
    Thanks,
    Himanshu Gupta

    Thanks , Yes it works but need to work out.
    I have used rather calling API and then query using this-
    select t1.*,
    DECODE(T1.PART,T1.PART,(SELECT DISTINCT SEGMENT1 FROM MSI WHERE INVENTORY_ITEM_ID = T1.PART)) LOWEST_ITEM,
    DECODE(T1.PART,T1.PART,(SELECT DISTINCT DESCRIPTION FROM MSI WHERE INVENTORY_ITEM_ID = T1.PART)) LOWEST_ITEM_DESC,
    t2.segment1 PARENT_ITEM,
    T2.DESCRIPTION PARENT_DESCRIPTION,
    T2.ITEM_TYPE PARENT_ITEM_TYPE,
    DECODE(T2.ORGANIZATION_ID, 125, 'MU1', 126, 'MU2') ORG_CODE,
    T3.ITEM_COST,
    T1.QTY*T3.ITEM_COST EXTENDED_COST
    from
    (select t.*
             from (WITH t AS (SELECT distinct SYS_CONNECT_BY_PATH(a.parent_item_id, '\') || '\' || a.current_item_id || '\' as path,
                                              a.component_quantity qty_per_assembly
                                FROM BOM_SMALL_IMPL_TEMP1 a,
                                     mtl_system_items_b      b
                               where a.parent_item_id = b.inventory_item_id
                                 and b.organization_id = a.organization_id
                               START WITH b.item_type IN ('SA','FG MFG')
                              --CONNECT BY  a.current_item_id = PRIOR a.parent_item_id
                              CONNECT BY nocycle a.parent_item_id = PRIOR
                                         a.current_item_id)
                    SELECT root_part, part, SUM(qty) AS qty
                      FROM (SELECT SUBSTR(t1.path,
                                          2,
                                          INSTR(t1.path,'\', 1, 2) -
                                          INSTR(t1.path, '\', 1, 1) - 1) as ROOT_PART,
                                   SUBSTR(t1.path,
                                          INSTR(t1.path, '\', -1, 2) + 1,
                                          INSTR(t1.path,'\', -1, 1) -
                                          INSTR(t1.path, '\', -1, 2) - 1) as PART,
                                   (SELECT EXP(SUM(LN(t2.qty_per_assembly)))
                                      FROM t t2
                                     WHERE t1.path LIKE t2.path || '%') AS qty
                              FROM t t1
                             GROUP BY t1.path)
                     GROUP BY root_part, part) t
                   where t.part = :lt_part
           ) t1,
          mtl_system_items_b t2, CST_ITEM_COSTS T3
    where t1.root_part = t2.inventory_item_id
    AND T1.PART = T3.INVENTORY_ITEM_ID
    AND T2.ORGANIZATION_ID = T3
    .ORGANIZATION_ID
       --and t2.item_type = 'FG MFG'
       and t2.organization_id = :lt_org;
    and now it is running perfectly

Maybe you are looking for

  • Problem with FTE in DataTips of PlotChart (missing texts)

    Hi @all, we have decided to use the Flex 4.1 and Flash text engine in our projects. Now I have the following problem with the dataTips: the texts are appearing only partly if datatips of more than one point are showing. The behavior is not regularly.

  • How do i share my itunes library across accounts on my Mac mini server?

    got the new server for the holidays and I migrated my entire itunes library from my old PC.  It was my expectation that the accounts on the server would all have access to the same library, however, that does not appear to be the case.  When my son l

  • How to populate the field VTTK - EXTI1 in the shipment

    Hi there, I have a situation where I need to populate the field VTTK - EXTI1  with certain values, I would like to know if there is a user exit or badi to do this.  Actually the field is empty and it's possible to enter any value. Thanks in advance R

  • My computer died...factory resets....how do I get my music on iphone back on itunes

    My computer died and I had to reset it with factory presets. Downloaded Itunes But now I have music on iphone and if I sync it with itunes it will delete all my music. How can I get my music back on itunes.

  • Solaris-express-10/03 emacs core dump

    I've just installed emacs on Solaris express 10/03 in Sun-Blade-100 box and having problem in gui mode. Emacs only runs with -nw in text mode but not in gui mode. Starting with no options, it has segmentation fault with coredump. Although it is not r