Flow of Quality Management

Hi experts,
     I am new to this QM in sap R/3. Can u tell me the flow of quality management?
As I beginner how can start up in the QM module.
Expecting your valuable answers.
Regards,
Arun.

Dear Arun.
Please check the following links
1.<u>/message/4077298#4077298 [original link is broken]</u>
2.<u>QM</u>
Also start with master data for QM module,Inspection types...take th help from
SDN whenever u face some issue.
Cheers.
Regards
Mangal

Similar Messages

  • Configure & integrate the quality management with production planning

    hi,
      i know general flow of production planning ,
    i dono how to configure & integrate the quality management with production planning . can anyone explain step by step to configure.
    with regards,
    Elanchi

    Hi,
    You must define an inspection type 03 and activate it for materail. When you create production order you will have the inspection lot created. you define type of inspection plan in inspection lot type. You will insert an operation in routing og the material. This operation must contain inspection characteristics. use the operation key QM04 with a quality work center.
    Inspection process time will be assigned to your production order.
    I think you can manage t customise the process from this global definition of the QM process in Production.
    Best Regards,
    Salih Arslan
    SCM Functional Consultant
    Zeitine Solution Partners

  • Create Quality Management view for a Material in background mode

    I want to know if there is a way to create a Quality Management View (Quality Management tab) on Material Master (material already extended to plant ) in background mode.
    The requirement is to add inspection setup data for a material extended to a particular plant in background. I tried using 'BAPI_MATINSPCTRL_SAVEREPLICA' to add the data and it works perfect as required. Now the problem is this BAPI is creating the inspection setup data only for the material which has QM tab in MM02 for e.g. I manually created the inspection setup for a Material from MM01 and then deleted it , now the BAPI works fine for this material because when I created an inspection setup from MM01 it created the QM tab and after i deleted the entry the tab was still there with no entry in inspection setup.
    I want to create inspection setup for a material which does not have QM tab.
    I have to create everything is background mode. BDC is one option which I am list interested in.
    Thank you for helping in advance.

    Thank you for looking into my issue. I have to do the inspection setup in background without using any front end transaction.

  • Quality Management During Goods Receipt (Inspection Lot)

    Hi all,
    >>>>>>>>>>>>
    REQUIREMENT
    <<<<<<<<<<<<
    I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
    1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
    2) Do Goods Receipt for the PO with the equipment numbers created.
    3) Create Inspection Lot for the material document created during the GR for each equipment number.
    4) Execute Inspection Result.
    >>>>>>>>>>>>
    INFO NOW
    <<<<<<<<<<<<
    Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
    >>>>>>>>>>>>
    DONE
    <<<<<<<<<<<<
    Called BAPI to create Equipment.
    Called BAPI to create Goods Receipt.
    Inspection Lot Settings to create lots during MIGO
    1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
    2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
    3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
    4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
    I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
    I also have BAPI ready for Inspection Result.
    >>>>>>>>>>>>
    TESTING
    <<<<<<<<<<<<
    I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
    For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
    >>>>>>>>>>>>
    QUESTION
    <<<<<<<<<<<<
    Why the inspection lot is not getting created during MIGO for my scenarion?
    How to select the inspection plan in the program?

    deleted

  • Inspection setup in view quality management update in material master

    Hi all,
    We are using BAPI_MATERIAL_SAVEDATA for our material master updation.
    Here one  of the change in the program is to update the inspection setup in the view quality management.
    Can anybody tell in which stucture of the bapi BAPI_MATERIAL_SAVEDATA  i can pass the values of the inspection set up fields.If not is there any other bapi through which can be done?
    Thanks in advance.
    regards
    Nazmul

    Hi,
    To deactivate the Inspection Types for materials, you can use transaction QA08.
    Here use tab "Deactivate insp. type" and specify the inspection type which you want to dactivate.

  • Licensing Issue Quality Management 9.0 with UCCX 8.5

    Hi guys,
    The UCCX compatibility matrix, Cisco WFO System config Guide plus QM 9.0 installation guide all state QM9.0 is compatible with UCCX 8.5(SU3).
    We have ordered QM9.0 licenses using part number
    L-CCX-90-QM-L-K9=:L-CCX-90-QM-L-K9= : CCX 9.0 Quality Manager Server , 10 Seats LICENSE ONLY
    I am unable to add these licenses to our UCCX server as I am getting:
    Error: The Cisco Unified CCX Quality Manager Seat feature (2nd line) of xxxxx.lic has unsupported version number (9.0)
    Has anyone installed QM9.0 with UCCX 8.5 and if so what licenses did you have to purchase?
    Thanks!

    I have not done this yet, I was looking into getting the license to do same you are doing.  Thanks for the heads up. I will wait to see outcome of your attempt.
    My main drive to go to 9.x is to get IE9 32 bit support with the latest 9.x SR as I have a handful of supervisors who have Windows 7 and using it to play back recordings, etc and I'm tired of the compatibility issues and time spent on their PCs to keep it running after they do other updates, etc.  Was hoping 9.x with the IE9 and 32 bit support would help with those headaches.

  • Quality Management v9 - Recording file is .spx and size of 0 kb

    Guys,
    I have theses versions here :
    CUCM v9.1.2
    Quality management 9.0.1.57
    UCCX 9.0.2.11001-24
    Desktop are connected on the PC port of the phone !
    I want to do the desktop recording and I have an issue where the storage location contains only .spx files that are empty with 0 bytes.
    Here is the troubleshoot I did :
    From the Recording interface I can see all the conversation but I can't play it.
    If I use wireshark I can see the RTP on the destop, I can convert it and listen that RTP stream..so the stream is going to PC
    If I run the QMDump on the desktop of the agent I see the G711 Ulaw which is good but I can't find Skinny hearts beats ( logs of QMdump Attatch ).. I rebooted the phone but still..
    I see on the troubleshooting guide, that this situation could be during the conversion process, it says we need to get logs and escalate the case.
    Anyone have a suggestion ?

    Mary,
    this issue pertains to either not receiving a SIP invite to start recording, or not receiving the actual RTP from the phone.  More than likely it is not receiving a SIP invite.  Check the (WFO 9.0 "Recordserver.dbg") or (WFO 10.0 "Ctiservice.dbg") logs , look for INVITE, it should tell you if you received it or not.
    Example of a good SIP invite:
    SIP: IN|INVITE sip:[email protected]:5060 SIP/2.0|6156255c|10.192.252.36:32880->10.32.2.66:5060|Call-ID: [email protected]|From:
    Example of a BAD SIP response:
    type=Network Recording,person=140]] call CiscoCall[Call[2:20211600];ConnectionId=31651532] should have received SIP but didn't!
    If you are getting a SIP invite, then check the ports between Phone and Recordserver to ensure RTP can get through.
    If you are NOT getting a SIP invite, check your CUCM configuration for Recording:
    here is a link to guide you.
    http://www.cisco.com/c/en/us/td/docs/voice_ip_comm/cucm/admin/6_0_1/ccmfeat/cmfsgd601/fsmr.html#wp1047595

  • Is Quality management module required to be used for vendor evaluation?

    Hi,
    There is vendor evaluation functionality in MM. Is use of quality management module is mandatory for this? I wish to track the performance of vendor regarding quality (How much he has supplied, out of which how many are accepted and how many are rejected). Can I get this report without using QM?
    Thanks in advance,
    Satish

    you can enter Quality results manually in vendor evealuation, so QM is not necessary for this, however with QM you can get the scores semi-automatic and  automatically.

  • Function module for Mass uploadnotifications in Quality Management

    Hi  Experts,
    I need function module for quality management which MASS UPLOAD THE QM NOTIFICATIONS.
    Thanks

    Hi,
    For updation use BAPI_QUALNOT_ADD_DATA.
    Hope it helps.
    Regards
    Hiren K.Chitalia

  • SAP TechEd 2011- Data Integration and Quality Managment Sessions

    Looking for answers on "Data Integration and Quality Management," check out the related educational sessions at SAP TechEd 2011 ([Las Vegas|http://bit.ly/qE0dZs], [Bangalore|http://bit.ly/oVdGsM], [Madrid|http://bit.ly/rnSNOT]). [Register today|http://www.sdn.sap.com/irj/scn/sapteched]!

    Hi,
    you must check in sap teched site and register it, the link as below
    [SAP Teched Banglore 2011|http://www2.sapevents.com/SAP/TechEd2011Bangalore/index.cfm?fuseaction=agenda.sessionCatalogueHOS&view=overview]
    Thanks,
    Jansi

  • ADD On of Quality Management

    whr i can find Add on on Quality Management
    Quality Management
    Quality Planning       Need Addon
    Quality Notification          ""
    Quality Inspection (Raw materials in Procurement and Finished products in Production)   "",
    Test Equipment Management

    Hi,
       For Test Equipment Management here is the link for SAP library:
    http://help.sap.com/saphelp_nw04/helpdata/en/2d/352209448c11d189420000e829fbbd/frameset.htm
    For quality notification.
    http://help.sap.com/saphelp_nw04/helpdata/en/8d/3e6143462a11d189000000e8323d3a/frameset.htm
    Hoping this might help you in your query.
    Have a best day ahead.

  • Control Key for Quality Management in Procurement

    if we activate Control Key for Quality Management in Procurement in material master then wether we need  also store a control key at the plant level for quality management in procurement.
    if we want want to maintaine
    pls tell me how it is
    pls expalin
    faisal

    if we activate Control Key for Quality Management in Procurement in material master then wether we need also store a control key at the plant level for quality management in procurement.
    I am not clear about your question. But I guess you want to know about control key function. You activate "proc. asctive" box in QM view of material master, that is always at plant level. When you activate this, system automatically asks for a control key & cert type, thats mandatory field.

  • Warehouse Management (WM) Quality Management Interface

    When receiving materials into quality management from a purchase order the system automatically puts the material into the interim bin 902.   Is it possible to configure the system to automatically create the transfer order (and select the putaway bin) from the Quality management usage decision - moving the material from 902 to the put away bin?  The materials management movement type is 321.

    whenever you recieve material from external supplier, then it goes to 902, this has nothing to do with the stock status.
    At the same time you usually get a transfer request to move the material to the bins.
    When your quality inspection is done, then this will create a so-called posting change notice with a positive quant in urestricted status and a negative quant with Q status, both in storage type 922.
    It does not really matter if your q-status quantity is still in 902 or already in the final bins, when you process the posting change notice in LU04, except you are moving the postive quant manually from the 902 zone and issue already material.
    Both, the automatic creation of TOs for the transfer from 902 to the bin as well as the processing of the PCN can be automated.
    Background jobs are  RLAUTA10 and  RLAUTA11

  • BDC for MM02 - Quality management

    Hi Friends,
    I need to create BDC program for MM02 with Quality Management View.
    My problem is with the sequence of the QM view in MM02 for different material types as per with recording.
    Kindly suggest me to resolve the issue.
    Thanks & Regards,
    S.Suresh
    Edited by: The Rock on Nov 7, 2011 1:43 PM

    Hi S.Suresh,
    I would simply read table QMAT to check if material/plant has Inspection Type '01'.
    Then, in case Inspection Type needs to be created, just call the BAPI_MATINSPCTRL_SAVEREPLICA FM with structure INSPECTIONCTRL properly filled-in.
    If successful, then remember to call BAPI_TRANSACTION_COMMIT.
    Hope this could help.
    Bye,
    Flavio

  • Standard Asynchronous ES for Quality Management interface

    Hi,
    Synchronous standard ES is available for Quality Management interfaces under ES bundle. 
    Could you please suggest if there is any standard Asynchronous ES available for above QM interfaces like Inspection plan, Inspection results and Usage Decision.
    Br,
    Madan

    Dear Hummel
    This link required SAP ID and use less for those who do not have S User ID's.
    further more.... could you please differentiate Stand SAP QM process compare to QM process in  RDS?

Maybe you are looking for

  • Change selective color(pixels) of an image.

    I want to change the selective color of an image to another desired color. I want to this in pixel's scope. If there is an image with three colors red(FF0000), green(00FF00) and yellow(FFFF00); in this case i want to change the color of red to blue,

  • Black Thumbnails on Import

    I recently had a strange problem with iPhoto (5.04); On importing a folder of photos, the thumbnails were all black. I had also had my privillages corrupted on my user folder by a bad installer, and could not empty trash or create new folders, etc. I

  • BAPI_SALESORDER_CHANGE - dynpro_not_found ???

    Dear all, I found a lot of discussions about using BAPI_SALESORDER_CHANGE and possible errors, but I didn't find anything about the runtime error 'DYNPRO_NOT_FOUND' ... As may other developers I want to change 'reason for rejection', but when the BAP

  • [HELP] PROBLEM WITH KEYBOARD HP MINI 110 - 1017TU

    I have HP MINI 110-1017TU. warranty expired since 2 years ago. my problem is, while i'm type letter "p" its show "p0" or "0" its show "0p" "q" its show "q1" or "1" its show "1q its happen when i pressed w,e,r,u,i,o i try replace the keyboard with the

  • Soundblaster live 24bit, distort

    Hi, just purchased a new computer with a Soundblaster Li've 24 bit. The problem I have is that a while of playing sound the kard starts to produce static crackles and distortion. If I run a cubase project, it's fine in the beginning, but after some m