FM for checking Available Capacity of Work Center

Dear All,
I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it).  It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process.  Any inputs would be appreciated.
Thanks in advance.

Dear
Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
If you are stick to FM : Help about available capacity
Hope this will address you issue
Regards
JH
Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM

Similar Messages

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • Trying to find Function modul for requirement capacity in work center

    Hi Colleagues,
    I have tried to find a function modul: Import - Work center , Export - requirement capacity.
    but havn't succeed with.
    I will be glad for any help.
    tnx & best regards

    I need a FM that export the requirement capacity of a Work center.
    Report CM01 has the same functionallity, however, by debugging it I coudn't find any useful function, morever, I have found a thread in the forum with the same issue but it wasn't helpful.
    an example for my needs is as followed:
    Function: CAPACITY_REQUIREMENT_FOR_WORK_CENTER
    IMPORT:
                            1. Work Center = MG1602
                            2. Plant = 1000
                            3.date from = 01.04.2011
                            4. date to     = 01.05.2011
    EXPORT:
                            1. Capacity Requirment (Total) =  240 [Hours]
                            2. Capacity Requirment (period) = 22  [hours]

  • Pooled capacity, machine work center can have labour?

    Dear All,
    1) We have eg. a common pool of welders for Location A and Location B welding work centers.  How do we setup the pooled capacity and assign to them?
    2) We have eg. 2 CNC machining work centers (Vert and Horiz) but we have labour support to do machine setup, labour related jobs etc.  If we need to perform labour capacity planning in this machine-based work center, is this done by maintaining a separate work center for this labour support and assigned to the same Cost Center?  Or for machine-based work center, labour capacity planning is not required?
    Thank you for contributing.

    Dear
    We have eg. a common pool of welders for Location A and Location B welding work centers. How do we setup the pooled capacity and assign to them?
    There is no differnce between pooled capacity and available caapcity .Only thing is you can utilised this capacity pool for various work centre level.
    To do that , Goto - SPRO-Production -BAsic Data-Work center-Capacity Planning-Define Capacity categories -Create Capacity Categoery for common pool of welders  , Create Capacity in CR11 and assing them into Work cetre Capaicty tab-Pooled Capacity Catogeries and maintian No of indivuial caapcity in Capacity Header -Standard Available caapcity-Indivual Capacity ( Total Number of welders with working timing , utilisation ) .
    Quest2 : To address this issue  , you can select Setup , Labour and Machine in Defalut tab of  same Work centre with proper Standard Value Key .Now , as they are all part of the Production activity , so you can keep the same Cost Centre ( Production Cost Centre )  in the Work centre tab with Formula Key of Labour ,Machine and setup .Goto CR02-Default Tab and Costing tab .
    Hope this is clear
    regards
    JH

  • Same order start date for 4 FG in same work center

    Hi All,
          I have four different Finished goods all have same lead time and same requirement date in same work center, I didn't have capacity planning so all FG have same start date in same work center after MRP run, how it is practically possible on the shopfloor.
    Is there any solution available.
    Sekhar

    The fact of running MRP (with or without Lead time scheduling) has nothing to do with the leveling of capacity. Lets consider both cases :
    Indicator "1" :
    - No capacity load is determined
    - Basic Dates from material master calculated to cover the requirements.
    Indicator "2" :
    - Capacity Loads are calculated.
    - Dates coming from recipes or routings calculated to fulfill the material requirements.
    - Overload displayed in CM01
    What you need is to run Capacity Leveling (CM25, CM29 ), dispatching the orders to the work center in a feasible date. But this step is never included in MRP run.
    Regards

  • BAPI for deletion of employee from work center T Code IR02

    Any one can give me a BAPI to delete position/person from work center ?
    T Code IR02
    IR02 -> HRMS - > Expand - > select person - > delete.
    Thank you
    Mrudang

    Thanks for your fast reply!
    I have looked to both functions before. Beside that they are both not remote enabled (which is not such a big problem as I could copy them or build a custom BAPI around them) I'm not quite sure how they could solve my problem.
    If I got it right, I would first use CR_CAPACITIES_OF_WORKCENTER to get the KAPID and using it as input for CLOI_WC_CAPACITY_READ. But I have problems to understand the output of CLOI_WC_CAPACITY_READ. The data type of the capacity is a float ( FLTP ) and the number seems to be to big, eg. 9.800000000000000E+01= 98h for one day.
    Could you try to explain your solution once again?
    Thanks,
    Simon

  • Tables for Basic end date and work center for operation

    Hi!
    I need table name to fetch the basic end date of a maintenance order and maintenance work centers with respect to each operation in maintenance order.
    Regards,
    VM
    Edited by: V M on Jul 20, 2010 7:22 AM
    Edited by: V M on Jul 20, 2010 7:35 AM

    Hi VM,
    Input is Order Number (AUFNR).
    You can find the Basic End date of Order in Table AFKO, filed is GLTRP.
    For work center in Operations, you can use the Table AUFPL from AFKO.
    Pass this AUFPL in AFVC and get the ARBID.
    Then pass this ARBID to CRHD Table as OBJID, and get the work Center (ARBPL)
    Regards,
    MLN Prasad

  • Transaction code for checking the capacity of  a job

    Hi,
      Can anybody tell me if there is a transaction code for viewing the capacity of Job.
    Thanks and regards,
    Avinash.S

    Hi Avinash,
    I am not geeting what you want normally CM01 for w/c vise Load you can use.
    Pls elaborate yr problem a little bit.
    Umesh

  • OIDs for an Available MIB NOT Working for SNMP

    Hello All,
    Device: Cisco Catalyst 4510R+E
    IOS: Cisco IOS Software, IOS-XE Software, Catalyst 4500 L3 Switch Software (cat4500e-UNIVERSAL-M), Version 03.03.02.SG RELEASE SOFTWARE (fc1)
    I am trying to do snmpwalk/snmpget requests to our switch for CPU/Memory/Flash type usages. When I did an snmpwalk in order to get ALL OID's values, one of the OIDs which is for "Agent Capabilities for OLD-CISCO-CPU-MIB", which says it's supported. But when I try to use one of the OIDs found in that MIB on Cisco.com, it returns with the following:
    Version 1 Attempt:
    # snmpget -v 1 -c public  x.x.x.x  1.3.6.1.4.1.9.2.1.57
    Error in packet
    Reason: (noSuchName) There is no such variable name in this MIB.
    Failed object: SNMPv2-SMI::enterprises.9.2.1.57
    Version 2c Attempt:
    # snmpget -v2c -c public x.x.x.x 1.3.6.1.4.1.9.2.1.57
    SNMPv2-SMI::enterprises.9.2.1.57 = No Such Instance currently exists at this OID
    Any idea why this OID would not be working when it says it supports the OLD-CISCO-CPU-MIB..? Or does anyone know of some OIDs that I could try that would get me any of CPU, Memory, Flash, etc Usages...? I've checked Cisco SNMP Object Navigator, but none of the CPU one's I've tried seem to work.
    Any thoughts or suggestions would be much appreciated.
    Thanks in Advance,
    Matt

    You are getting this error because your SELECT statement is not returning any rows. You need to do something like:
    DECLARE
      l_count number:=0;
      CURSOR check_emp IS
        SELECT COUNT(ename) cnt
          FROM emp
         WHERE ename = :p14_ename;
    BEGIN
      IF :p14_ename IS NOT NULL AND :REQUEST ='CREATE' THEN
        OPEN check_emp;
        FETCH check_emp INTO l_count;
        IF (l_count > 0) THEN
          CLOSE check_emp;
          return l_count||' This employee name already exists. Please enter a new name.';
        END IF;
        CLOSE check_emp;
      END IF;
    END;Mike

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Varying Maintenance Work Center Capacity by Days of the Week

    I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week.  I got an answer and it worked.
    We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays).  Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010.  When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date.  It's also the same capacity as shown in the 'Standard Available Capacity' section.
    I looked back at the work center I had modified previously and it's showing the same thing.  It's like it's ignoring the validity dates.
    Any ideas?
    David Macindoe

    David,
      I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
      I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
    Regards
    Narasimhan

  • Capacity Leveling of Work Center

    Hi all,
    I have a problem with Capacity of Work center (WC).
    I have a Internal Activity, and i assigned a WC for this Internal Activity. WC's capacity is 100H/day for 1 number of element.
    Work of this WC is 250H, duration 5 days, number of element 1. Default capacity of this WC is distributed by Distribution Key define in Activity. . And they are divided equally between factory days in 5 day. That is capacity requirement is 50H/Day
    So, i want to edit this WC's capacity following value:
    Day 1: 100H/day
    Day 2: 50H/day
    day 3: 0H/day
    day 4: 0H/day
    day 5: 100H/day
    How can i do it?? I try to use Dispatch Manually but i cant solve this problem.
    Please help me for this case.
    Thank all.
    NLQ

    Dear
    Capacity leveling depends on some of the basic set up of Capacity Requirement Planning .You need to have proper CRP set up frist .
    Couple of check points : -
    Did you work centre is relevent for finitie scheduling in CR02-Capacity Header and wht is the over laod percentage for work centre ?
    Did you have Capacity Requirement Related Set up like Over all profile , time profile , Startegy Profile -OPD0?
    Did your Capacity Check -OPJK -Order Control at order level are active for availibilty Check 1 and 2 and assinged Over all Profile ?
    Set up :
    1.Please assing a operation control key like PP01 where Details Capacity Check and scheduling is active .
    2.In CR02-Work centre -Capacity Header -You should have Follow check box marked
    1.Releven for Finitie Scheduleing
    2.Can be used for multiple Operation
    3.
    3.OPU3/OPU5 -Define Scheduling paramter -Mark Scheduling and Capcity Check for planned order or production Order
    4.In SPRO -Shop Floor Control-Define Production Scheduling Profile -You need to matian the relevent Parameters like
    1.Schedueling Automatically 2.Scheduling Log 3.Adjust Scheduling -Basic date , Depedent Requirement date 4.Scheduling Type -Backward etc .
    These are all basic level set up beside CRP overall profile and other profile like strategy /time etc which may in place as you are analysing in CM01.
    Please find below some of the useful CRP details : Refer this threads which are self explaintory :
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm
    http://www.scribd.com/doc/17026521/SAP-ECC-60-PP-Capacity-Planning-httpsapdocsinfo
    capacity planning
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf
    Capacity Planning
    capacity requirements planning
    How to dispatch operation to do Capacity Leveling at Work Centre Level :
    1.Frist Check the  over load at work centre . Goto -CM07/CM05-give plant only -then hit the Stnadard view -You will find weekly or daily baiss load ( Requirement , Avaliable Capcity , Overlaod etc )
    2.Check the week in which days you are tring to dipatch -if you selet the week check box and double clik it will show u all the dataiul load .Basde on the available capacity in other week-days u need to dipatch in CM22/CM31  or CM25/CM21
    While dipatching in CM22/CM31-Select the Stragegy button on the top header -Mark Date entry when dispatching  so that when you select the operation of any production order or planned order for certain work centre , it will pop with window having information of Date , Work Centre , Time .Onec you did this you will receive Scheduling log with certain information .
    Hope this helps
    regards
    JH

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

  • Pooled Capacity Not updating in Work center

    Hi All, I want to update pooled capacity in Work center. But when i delete the existing capacity it is giving error that " Capacity still being used". Can any one suggest,how to tackle this problem? I want to give solution to Client. Thanks in Advance..!

    HI,
    Capacity Utilisation rate = Actual Capacity / Theoritical Capacity
    Theoritical Capacity= Shift period * No. of machines available
                                 = 8 hrs * 2 = 16 hrs
    Actual Capacity value depends on how the company decides it. Say if the break 30 mins has to be considered, then the actual capacity will be 15 hrs for 2 capacities and hence,
    Capacity Utilisation rate = 15 / 16 = 93.8%
    So, decide the utilisation rate based on the Company's requiremnt.
    Hope the above gives you an idea.
    -Thaila Shree

  • Operations Executed at a Particular Work Center for a Sales Order

    Hi All,
    We are using a MTO scenario. I have to get a report in which I have to list work center wise operations (and the corresponding material) which are carried out for a particular sales order.
    User will create a sales order, and then do Sales Order based MRP in MD50. System will do a BOM explosion for the header material and will generate planned orders for the production relevant materials. User will then convert all these sales order specific planned orders to production orders. For a particular sales order these would be many operations (at different BOM levels may be ) that would be carried out at a particular work center. I need to get a logic for generating this report. Is there any FM etc or table table-field fetchig logic....
    Regards

    hi,
    maintain initial screen entry as sale order.
    Pass values to AFPO table. Identify all AFPO-AUFNR values which satisfies AFPO-DAUTY = 10
    Transfer AUFNR values to AFKO and check AUFPL (Routing number of operations in the order)
    Transfer AUFPL  to AFVC and check the value of AFVC-ARBID (Object ID of the resource)
    Transfer ARBID to CRHD and check value of ARBPL (Work Center)
    Regards,
    Pavan

Maybe you are looking for

  • The points on LScript and SQL

    Hello experts, We have some customers requests that would require the use of L Scripts, such as Projected Inventory, Stock Coverage and Projected Wasted Stock calculation. I tried gathering information on L code, but only found very few useful hints.

  • HT3621 Can you connect a iPod fifth generation with a kindle fire HD?

    I tried to pair them and my ipod kept saying my kindle wasn't supported. What can I do?

  • Home sharing and Apple TV connection

    I have been trying to connect my Apple TV with my MacBook and it keep on saying my Apple ID or password was incorrect. I have changed the password numerous time and yet I am still unable to connect. Can someone help!! Please!!!

  • Using Compressor to create QuickTime file for Web

    Have: a 2 minute clip, shot in HD, edited in FCP7. Exported it as a FCP QuickTime movie, 1080i60, size is 441MB. Need to: take that QuickTime file into Compressor and create a much smaller file, which will ultimately be converted to Flash and posted

  • Versioning, Landscaping & Industry support in ESR

    Hi all, I have the below questions regarding ESR. Versioning Capabilities of ESR Versioning capabilities in ESR ?? ESR Landscaping ESR Landscaping Industry support in ESR Industry support  in ESR Your inputs are valuble. Regards, Siva Maranani