Folio and Articles Limit

I have a .Indd (13mbyte) but I can't add it to the folio because it weighs more than 1GB.
How should I know before making the preview?
This article consists of 12 pages:
     - first page with a simple sliding frame,
     - second page with a small gallery
     - other 8 pages has a still image with 3 or 4 hot spots

In that folder will also display temporary files (TIFF images) that have not yet been used in the folio, but for convenience are present in the "Links" folder.
It's probably best to keep it clean "Links" folder with only the images that are actually attached and used in the document indesign.
I thought indesign take photos only really used in the folio.
Now aspect the picture of the customer, who has since deleted that folder in the material useless

Similar Messages

  • Question concerning the structure of folios and articles.

    Hey there,
    What's my goal:
    A client of mine asked if it was possible to set a DPS document:
    That when you scroll through your app from left to right (and visa versa) that you always get to the TOP-page when you get into a new article.
    I was wondering if there was a way to fix that somwhere? I can't really find it
    Thanks in advance.

    Hallo Kevin,
    as far as I know it's currently not possible. When you open a freshly downloaded issue, you will always start on the most top page, but as soon as you have scrolled down in a article, the app will
    save the "laast seen" page and jump back to this possition as soon as you come backt to the article.
    maybe you should file a feature request to be addes as an option switch in the DPS App Builder.
    kind regards
    Michael
    CrossIP communications gmbh
    next generation PDF4DPS conversion

  • Preview folios and articles

    This question was posted in response to the following article: http://help.adobe.com/en_US/digitalpubsuite/using/WS9293e1fb3b977c5c7b1f65ad12f28224932-7f f6.html

    I'm geting an error when i go to preview my folio. It says the folio contains one or more stacks that are not yet supported in content viewer only supported on iOS viewers. Any suggestions to fix this?
    thanks

  • Has anyone ever received an error message that says "There are -1 articles in the folio and you have reached the -1 article maximum allowed." I'm not sure why I'm getting this message or what to do. Any advice?

    What do I need to do to be able to upload articles to a folio again? Has anyone else ever received this message?

    I'm trying to add any article to any shared folio, and I'm unable to do so.
    I'm working on a new folio, and I wanted to start populating it with articles so I tried to add an article and I received the error message saying that I've reached my limit. But it seems unusual that I'm getting that, especially since the limit it mentions is "-1 articles." I've never seen this error before.
    I've tried deleting entire folios that had about 20 articles within them and it still sends me the same message.
    I have noticed that I am able to upload articles to an offline folio... but I don't think that's helpful to me right now.

  • "swipe moviment" between pages and articles in a folio

    hello.
    I'm making an app and I want to navigate through is pages and articles only using links and buttons. Is there any way to eliminate that "swipe moviment" between pages and articles in a folio?

    No.
    Neil

  • Folio file size limit

    In the past their were file size limits for folios and folio resources. I believe folios and their resources could not go over 100MB.
    Is their a file size limit to a folio and its resources? What is the limit?
    What happens if the limit is exceeded?
    Dave

    Article size is currently capped at 2GB. We've seen individual articles of up to 750MB in size but as mentioned previously you do start bumping into timeout issues uploading content of that size. We're currently looking at implementing a maximum article size based on the practical limitations of upload and download times and timeout values being hit.
    This check will be applied at article creation time and you will not be allowed to create articles larger than our maximum size. Please note that we are working on architecture changes that will allow the creation of larger content but that will take some time to implement.
    Currently to get the best performance you should have all your content on your local machine (Not on a network drive), shut down any extra applications, get the fastest machine you can, with the most memory. The size of article is direclty proportional to the speed at which you can bundle an article and get it uploaded to the server.

  • Expected Value and Overall limit value usage.

    Hi Sap Gurus,
    if the frame work order we have these 2 field Expected value and overall limit field value to be filled,
    and the system allows Invoice (or GR) up to the maximum of the overall limit value. and only if the value entered crosses the overall limit value the system issues a Error Message ( which is agreeable)
    but the logical requirement is that, if the value crosses the Expected value limit the system should display a warning message, indicating that the value has crossed the expected value.
    is there any config or note to be applied to get this funtionality.
    Thanks and regards
    Priya S

    Hi,
    Please refer to the Online documentation:                                      
             Material Management                                                   
             -> External Services Management                                       
                -> Procurement of Services: Processes                              
                   -> Accelerated and Simplified Processes                         
                      -> Use of Value Limits (for Unplanned Services)                                                                               
    Inside this documentation, it is stated that there is a variety of             
    limits (combinations) to be used:-                                                                               
    - Overall limit only                                                         
      - Overall limit and limit on services covered by contract item(s)            
      - Overall limit, limit on services covered by contract item(s),              
      - and other limit                                                            
      - Overall limit and other limit                                              
      - Overall limit on services from model specifications or standard            
        service catalog                                                            
      - Expected value                                                             
    The expected value is used in the update of the               
    PO item value and this is the value used in the release strategy.                   
    Here is the f1 help:                                                                               
    Expected value - ESUH-COMMITMENT                                                    
    Value that the unplanned services (or the materials) covered by this                
    item are not expected to exceed.                                                                               
    Use                                                                               
    If you are working with the release (approval) procedure for purchasing             
    documents, this value serves as the basis for a release strategy applied            
    to this document.                                                                               
    If you tick 'No limit',you don't need to enter 'Overall limit',but must             
    enter 'Expected value'.Because 'Expected value' will affect the release             
    strategy. Please read the note 440601 connected to this.     
    Concerning the variability of actual cost of a purchase order,                   
    expected value means that the unplanned services (or materials)                  
    covered by this item are not EXPECTED to exceed.                                 
    It is not mandatory that it has the same value like total limit value.           
    Expected value can exceed, it is used for comparison with total limit            
    value in cost control.                                                           
    Expected value can also be combined with unlimited total limit in a              
    purchasing document.                                                                               
    Regards,
    Edit

  • User Exit for validating overall limit field and expected limit field-ME2xN

    Dear Gurus,
    Can you please suggest me any user exit or BAdi to validate the overall limit field and expected limit field in transaction ME2xN.
    Or any other way to to achieve this functionality in ME2xN.
    Our Requirement is while raising a service PO in the Limits tab the 'Overall limit' should be same as 'Expected Value', at present the user can enter overall limit greater than 'Expected Value'.
    Regards,
    Priyank Joshi

    this will not work. you cannot add another structure (AUFK) on top of CEBAN. all characteristics have to be of one structure and since you want to release a PR it has to be CEBAN. before attempting to program something around that why do you not go to tx. OLME -> PR -> Release Strategy -> With Classfication -> Release Strategie and run it in a simulation mode. you will then see how it reacts.
    there's a white-paper on service.sap.com explaning in detail release-strategies. it's a good one and a good read too!

  • Open order value and credit limit used are -ve

    Hi,
    We are running into the problem  where there is a negative open order value and orders are bypassing credit hold.
    The values are incorrect in the open order value and in the credit limit used.  These both show as negative values, which  is bad. 
    We have made settings in OVA8 correctly. Is there any other setting should be made in order to block the open order value and credit limit used ????
    Thanks in advance. Appreciate if it is replied immediately.
    Sankar

    Hello,
    Please take the help of the SD consultant in this regard. Because open orders means there are many like invoiced and not yet delivered. And the credit limit is also part of the SD to check. 
    Please check in the T.code FD32 to find out the credit limit detials of the customer.
    If helpful pls assign points.
    Rams

  • IDOC posting for distinct PO records(as header) and article(line item)

    Hi! All
    It would give me your valuable suggestions and help me with developing the mapping below:
    I have a file to IDOC scenario, which has about 10 fields and two of these fields are PO and article no.
    I need to post IDOC for each distinct PO number(header) and then article number under these PO should post as line items.For exmaple:
    consider sample records having the following PO and artcile number:
    PO|article_no
    123456|abc123
    123456|abc456
    123456|abc678                                    
    These 3 records should post only as one IDOC, having the header PO 123456 and line items(abc123,abc456,abc678)
    On the target side, PO is mapped to the parent segment and artcile is in the child segment.
    Thank you for all the help!!
    Regards,
    Patrick.

    Patric,
    I think solution is simple...while creating recordset from file create recordset for every occurance of Header..
    I think your File structure would be something like this in FCC..
    header,1,Line_Item,*...hence it wull create recordset for every occurance of header and you can map Line Items to idoc line items...Also specify recordset per messages = *.
    I have done something like this...
    Let me know if you need mode details.
    Nilesh

  • Output current and voltage limit

    I am currently using a PXI 4130 to output 1mA with 2V backing. I am measuring the voltage and current with a DMM and I am getting good values. I need to be able to prove that the voltage and current will not largely exceed 1mA or 2V so that it will not damage any components. Looking at the code I used it says that voltage level range is 6 and current limit range is 20 and I am not sure what that means exactly. What precautions/values can I change to make sure these values never get exceeded
    Thanks
    Attachments:
    NI-DCPower Source DC Voltage.vi ‏48 KB

    Hello lvuser,
    In you code you are also measuring the voltage and current back into your program. You can make programmatic decisions based on these measurements, for example, stopping the program based off of a voltage that floats too high. Our devices make sure to try to maintain the voltages and currents you tell them by completing a closed loop system with measurements taken on the same inputs that are sourcing. Try taking the readings you get in your program and using some threshold to trigger a case statement that holds a function to close the resource and turn off the generation.
    Regards,
    -Travis E
    National Instruments
    Applications Engineer

  • Folio and Desktop Integration Suite

    hello ,
    can i edit the Folio and add new content from DIS ??
    i tried to test this but the following error appear :
    'Undefined' is null or not an object

    Hi ,
    Yes , editing / adding new contents to Folio is possible . I am seeing the same error as you have mentioned when trying to do Edit Folio from DIS client .
    Thanks
    Srinath

  • Set scroll and zoom limit

    I got this .fla file from another forum it seems quite good but,
    I cant set the limit of the scroll when it reaches the end of the image or bottom
    I also want to set the image zoom in and out limit
    please anyone need some help here.
    this is where I got the file
    http://www.sitepoint.com/forums/showthread.php?t=157075

    calpolyjeff wrote:
    when I was done fooling around w/pan and zoom, I found that I had extended the duration of the image so that it was now about 5 times longer than it should have been
    You have to watch the Pan & Zoom tool cues in the image and the changes with the timeline as you work in the tool. As you add / move / delete your frames you will be changing the duration elements - the Hold Time and The Pan Time.
    In the example below my Pan Time between frame one and frame two is sixteen seconds. You can change that by clicking the pan time and entering a duration. The other time I've highlighted is the is the one second hold time for frame two. Again you can change it by clicking it. On the timeline itself you can also see the Hold Time for frame one at the five second point.
    Hope this helps,
    Cheers,
    Neale
    Insanity is hereditary, you get it from your children

  • Create folio and add content to it using CIS 11g

    Hello,
    How should I create a folio and add content to it using CIS 11g? tried following code but it fails with error code
    Caused By: intradoc.data.DataException: !csGetFileNeedsParameter,Latest
    ISCSAdministrativeAPI adminAPI =
    application.getUCPMAPI().getActiveAPI().getAdministrativeAPI();
    Map arguments = new HashMap();
    arguments.put("NumChanges", "1");
    arguments.put("change0", "1607:addContent:1F93-3807-DFB3-4BDF-8F63");
    arguments.put("RevisionSelectionMethod", "Latest");
    arguments.put("change_data0", "dID:410");
    ISCSServerResponse serverResp =
    adminAPI.executeIDCService(context, "UPDATE_FOLIO", arguments);
    Any help is appreciated. Thanks.

    If you only use dID, you need to use: putLocal("RevisionSelectionMethod", "Specific")
    I never got this working with strictly dID. Once I fed it dDocName and then used the below it got rid of the error:
    putLocal("RevisionSelectionMethod", "Latest")
    Good luck!

  • Adobe DPS Folio and Content Viewer Query

    Hello,
    I am currently creating folios using the Foilo Overlays and Folio Builder and then previewing them on the Content Viewer on the iPad. My question is after the 1st May will I still have the ability to do this? I don't create app just preview them on my iPad to see how they work. If anyone can give me an answer it would be much appreciated.
    Regards,
    Alan

    Yes, after May 1, you'll still be able to create, edit, and share folios, and you can use Adobe Content Viewer to view folios. You just won't be able to build single-folio apps using a Single Edition or Creative Cloud license.

Maybe you are looking for

  • ITunes 10.2.1 update causing excessive usbmuxd warnings

    Updated to iTunes 10.2.1(1) this morning and weird usbmuxd behavior started immediately. Here is Console's last reference to usbmuxd a minute before I started installing the update. Mar 10 08:36:26 Mac-Pro com.apple.usbmuxd[60]: usbmuxd-207 built for

  • Any Upgrades Possible for Mid-2007 MBP?

    I was wondering if anybody knew the answer to this question. Before I start, there are a couple of issues I'd like to address. First, my Macbook Pro's optical drive has become unreliable just like most other users have experienced over the years. To

  • Secial Field in FBL3N

    Hi Can any one please guide me to bring " Long text" (Not the Text) into FBL3N standard report. This is the second screen from Text in FBL3N basic transaction report The technical detail for the field in question is given below. Table name- EENO_DYNP

  • Automatic submit

    Hi there, I have include a javascript sentence to activate my submit page, but it does not working, can anyone take alook to my program and help me to solve this problem just I need activate the submit ones the Scan Barcode Number field has been scan

  • Mini over 1 year old, click wheel playing up won't swicth off

    Hi guys, I have this ipod for over a year and never once have any problem. Yesterday i couldn't switch my ipod off,the click wheel won't respond. Everything else are fine,though few times couldn't go to playlist.I reset it few times still won't work.