Follow-On Document - Bid Invitation
Hi,
Anybody knows how can I turn default this field "Follow-On Document" with the value "PO or Contract".
Every time when I try to create a Bid Invitation, this field show me up "PO" such default.
See the print of the screen: [SCREEN|http://geocities.yahoo.com.br/pedrosapmm/doc.jpg]
Tks,
Pedro
Hi Pedro,
This works the other way. Please make sure that both the indicators are not selected. Then you will "Purchase Order and Contract" as default.
SPRO -> Supplier Relationship Management -> SRM Server -> Cross-Application Basic Settings -> Define Transaction Types -> BUS2200
and for all your BID transaction types (PO and Contract must be not be selected).
Hope this solves your problem.
Regards
Kathirvel
Similar Messages
-
Problem in creating follow-on document (RFQ) for a bid invitation.
Hi Experts,
We have an issue while creating follow-on document(RFQ) for a bid invitation.
Process is as follows :
We have a bid invitation and sent it to two vendors. After this, created two responses one is accepted and another one is rejected.
Now the accepted bid is ready to "Create follow-on Document(RFQ)". But when we do this, the bid with rejected vendor also including in the follow-on document. This should not be the case.
The follow-on document should include only the accepted bid, but not the rejected bid.
Could anyone tell me how to achieve this ?
Thank you very much in advance.As far as I understand, what you described is the standard behavior. ALL undeleted vendors are copied over to the follow-on RFQ regardless if their bids have been rejected or not. What you can do is to implement BBP_DOC_CHANGE_BADI for BUS2200 and explicitly remove the vendors which created rejected bids. Make use of the header field "copy_of_guid" to identify the originated RFQ.
-
Classic Scenario: follow on document from BID
Dear All,
We are trying to create a PO from an accepted BID . We can create the PO, and if we check it in the backend system, everything is OK.
Our problem is that we are trying to find in SRM, somewhere that shows us the follow on document of the Bid but we can´t find it.
It´s important to say that as soon as the PO is created, we get a message that contains the PO number. But after that, we can´t find in SRM the PO number anymore.
Is this a lack of SRM or may be another problem? Has anyone face up with this issue? If so, How it was resolved?
Thanks,
Pablo.-I noticed that you have a very similiar Bidding scenario that we have. We can create a bid invitation in SRM and we have used the BADI - BBP_DETERMINE_LOGSYS to indicate to the system to create a purchase order in the backend system after the bid is accepted. We keep getting the following error in SM21: Purchase orders cannot be created without IPC pricing
Did you have to turn on the IPC in order to create the purchase order in R/3? We are on SRM 4.0. Also, if you have used the BBP_DETEMINE_LOGSYS Badi and have example code that might be helpful as well...thanks! -
Subsequent Document for Bid Invitation - Dumpt
Hello SRM Seniors!
I had created a shopping cart and by this shopping cart I made a bid invitation.
Vendors send to me the quotations and the data and time finished. ok!
Now, I would like to transform my quotation in a purchase order or contract. How can I do this?
Take a look in this .ppt documento what I'm have doing: [Process|http://geocities.yahoo.com.br/pedrosapmm/soco02.ppt]
Thanks,
Pedro Marques
Edited by: Mr. Pedro Marques on Jun 27, 2008 7:22 PMHi,
Where can I accept the quotation in Bidder/Bids?
[Bidders/Bids|http://geocities.yahoo.com.br/pedrosapmm/bidinv_bidder.jpg]
[Basic Data|http://geocities.yahoo.com.br/pedrosapmm/basic_tab.jpg]
Where can I choice PO or Contract?
Follow-On Document was locked.
Thanks,
Pedro marques
Edited by: Mr. Pedro Marques on Jun 27, 2008 7:51 PM -
Sending documents for Bid Invitation
Hi All,
What type of documents can we send with Bid Invitation? What are the advantages using cFolders with Bid Invitations.
Thanks,
RaviHi,
Foll are the settings reqd:
--.define a LS for cFolders( you have to duplicate SRM LS if it is on the same server)
-->define an RFC destination for this system (even if same as SRM)
-->define a backend system of type cFolders in SRM SPRO
-->activate SICF cFolders service (with external alias)
Normally the collaboration area should be displayed in document tab in the Bid inv screen.
See these related links;
http://help.sap.com/saphelp_srm50/helpdata/en/c1/c3fe3930a34b2ae10000000a114084/frameset.htm
http://help.sap.com/saphelp_ppm400/helpdata/en/e7/1fc30727cd4ddeb7f6351416ebf591/frameset.htm
BR,
Disha.
Do reward points for useful answers. -
How to hide document fields in Bid Invitation
While creating Bid invitation I need to hide some fields e.g. Attachements, upload a document, description, button Search & Add. These fields are available under tab Header data -> Documents.
BADI 'BBP_UI_CONTROL_BADI' works to hide Bid Invitation Basic data, but not for above.
Can anybody let me know how to hide above fields.
Nilesh KumarHi,
I dont think there is any BADI/screen variant for this requirement.But yes,if any of the 2 are available in the std,ITS template changes should be avoided.
The foll are the screen variants available in SRM 5.0:
Item data overview in the invoice without purchase order reference: Screen variant BBP_IV_NON_PO; Method GET_SCREENVARIANT_INV
Item data overview in the invoice with purchase order reference: Screen variant BBP_IV, Method GET_SCREENVARIANT_INV
Item data overview in the confirmation: Screen variant BBP_CF; Method GET_SCREENVARIANT_CONF
Item data overview in the confirmation for time recording: Screen variant BBP_CF_TIMEREC; Method GET_SCREENVARIANT_CONF
Item data overview in the purchase order: Screen variant BBP_PO; Method GET_SCREENVARIANT_PO
Item data overview for contracts: Screen variant BBP_CTR_ITEMLIST; Method GET_SCREENVARIANT_CTR
Item data overview for selection of contracts: Screen variant BBP_CTR_ITEM_SELLIST; Method GET_SCREENVARIANT_CTR
Search results for changing/processing a purchase order: Screen variant BBP_SEARCH_PO_IN_PO; Method GET_SCREENVARIANT_SEARCH
Search results for entering an invoice and/or confirmation: Screen variant BBP_SEARCH_PO; Method GET_SCREENVARIANT_SEARCH
Search results for entering a purchase order: Screen variant BBP_SEARCH_SC; Method GET_SCREENVARIANT_SEARCH
Search results for displaying/processing a bid invitation: Screen variant BBP_SEARCH_BID; Method GET_SCREENVARIANT_SEARCH
Search results for displaying/processing a bid: Screen variant BBP_SEARCH_QUOT; Method GET_SCREENVARIANT_SEARCH
Search results for displaying/processing an auction: Screen variant BBP_SEARCH_AUC; Method GET_SCREENVARIANT_SEARCH
Search results for displaying/processing an invoice: Screen variant BBP_CHANGE_IV; Method GET_SCREENVARIANT_SEARCH
Search results for displaying/processing a confirmation: Screen variant BBP_CHANGE_CF; Method GET_SCREENVARIANT_SEARCH
Search results for entering/displaying/processing/status of a shopping cart: Screen variant BBP_SC; Method GET_SCREENVARIANT_SC
Worklist for Sourcing: Screen variant BBP_SOCO_WL; Method GET_SCREENVARIANT_SOCO
Work area in Sourcing: Screen variant BBP_SOCO_GA; Method GET_SCREENVARIANT_SOCO
Overview for the budget display: Screen variant BBP_BUDGET; Method GET_SCREENVARIANT_BUDGET
BR,
Disha. -
Restrict access to bid invitation cFolder documents
SRM Experts,
I have a requirement to restrict access to bid invitation cFolder documents.
Here is the scenario:
Buyer1 creates a bid invitation and a cFolder. We do not want any other buyers within our organization to access this bid invitation cFolder.
How can this be achived?
At this time, if a buyer (ex: Buyer2) has access to create a bid invitation or view a bid invitation, the system is automatically gives Buyer2 access to cFolder created by Buyer1.
This needs to be restricted, any advice would be appreciated.
Note: BADI BAdI BBP_CFOLDER_BADI is already deactivated in the system
Please let me know if you have any ideas.
ThanksHi,
You can restrict the access through Product categories in the PPOMA_BBP for each user .
So that he can create Bid invitation only to that product category..
please check this link
you can find the customization guide for Cfolders on
https://websmp202.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700007402242002E
Please check with SAP PLM consultant . You can controlled through Authorisation role
This is the role used :User
- Role name: SAP_CFX_USER
Better check with the above link
Regards
G.Ganesh Kumar -
BADI to change the document Tendering Text of Bid Invitation
Hi Experts...
Im need a BADI to change the document Tendering Text of Bid Invitation. Anybody knows?
Thanks.
VictorHi,
You can use the badi "BBP_DOC_CHANGE_BADI" to chnage the value for the long text "Tendering text".
In the EXPORT table ET_LONGTEXT,just pass the text ID deatils and the new content for this text.
The text ID for the longtext "Tendering text" is "HTXT"(for header level) and ITXT(for item level).
BR,
Disha.
Do reward points for useful answers. -
SRM 4.0 - Upload function of Bid Invitations (Bidding Engine)
Hello,
I am currently working on the Bidding Engine in SRM 4.0
I would very much like to use the Download/Upload function in Bid Invitations, but for now I have the feeling it doesnt work.
I tested it by downloading a Bid Invitation and changing just one info like an item quantity or description. I put U (for Update) in the corresponding cell of the Change column. I also held the bid invitation in SRM before returning to it to upload the modified Excel-file.
When I upload the Excel file, I dont have any error messages, but no changes are done either.
Does anyone of you have an idea how I could make it work?
Thanks!
AndreaHi,
Please do the following things.
Excel updown/download is very flexible functionality.
(BADI : BBP_PD_DOWNLOAD)
1. You can change the format (how the document should be downloaded, which fields : Control variants in BBPC_UP_DOWNLOAD table)
2. You can also upload file (your own format : implement parsing method)
3. You can add your own fields. (APPEND_UPLOAD_DATA)
We are working on one such scenario for Contract Upload.
You can also check the following notes.
There is a SAP Note on downloading BID file.
Note 734060 - SRM: Upload and download of documents using MS Excel
They have given one example in this note.This is a consulting note,you will find it
Two more notes which can help you
734060
734946
I hope it will help.
BR,
Vijay Mittal
Plz award the points for help. -
PO Creation error after processing bid invitation
Hi Guys,
I need small help from you. I have created one bid invitation with out shopping cart. I had processed the bid invitation. Few vendors have submitted their bids. Purchaser had accepted those bid and approver had approved those bids. Now I have the option to "Generate PO" and "Create contract". If I click on Generate PO button I am getting an error that Purchase order has not been created.
I am unable to process further. Please help me. I have maintained PO number range in both the systems means in R/3 and SRM. Transaction types are also maintained in both the system. What else settings I need to configure?
if i click on "Create contract" buttion then I am able to create Contract in SRM system in held state. When this Purchasing contract will be copy to Backend system? once I chance the Contract status to release then this will be copied to backend?
My requirement is to create Purchase Order ?
Regards
Apparao aHi
Please provide your system version details.
In the bid invitation, the Follow-On Document field must contain the entry Purchase Order or Contract.
· In the case of bid invitations that are created manually, purchase orders are local only (product category is not relevant). In the case of direct material purchase orders, a copy (that cannot be changed) is created in the backend. Whether or not it concerns direct material needs to be stated in the item details in the bid invitation. You must specify the goods recipient and purchasing group. Also:
-> Outline levels can be displayed in a local purchase order
-> Bid invitation texts, bid texts, and documents are transferred to the purchase order (however not internal notes).
Also refer to this link for configuartion settings ->
http://help.sap.com/saphelp_srm50/helpdata/en/d3/133dcd5641b244a60578baa996a597/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/38/4cc5376848616ae10000009b38f889/frameset.htm
Hope this will help.
Please reward suitable points, incase it suits your requirements.
Regards
- Atul -
Url for public tender/bid invitation?
Dear Gurus,
We are configuring public tender/ bid invitation document in our SRM server 7.01 (SRM 7 enhancement pack 1).
We have created a bid invitation document of type public. It has gone through approval and got published. We have not configured the system for decoupled bidding (bidding response from SUS available from SRM 7.01).
In which portal, the bid invitation will be published? is it the supplier portal or there will be separate portal link available for the same? Could you please give me a hint where to look for the public tender?
Secondly, who will get to see the public tender? Are only the suppliers present in the SRM system or any supplier who is even not registered with the client can see the public tender?
Any inputs will be highly appreciated.
Thanks and regards,
Ranjan
Ranjan SutradharDear Ranjan,
Your requirement can be achieved with the press tendering(paper add or advertisement on company website), where the client will be giving the details related to the Bid invitation so that the suppliers can view them and if interested they can register themselves to access the bid invitation and proceed with the follow on activities for response submission.
As you have mentioned , you can publish a link in the client main page referring to the Bid invitation with details and asking the interested suppliers to registered themselves via supplier registration url , so that a corresponding business partner will be generated for them in the SRM system and at the same time purchaser will be notified with the interested suppliers.
Once the supplier is registered, then they can access the bid invitation with there login credentials.
But at no point of time suppliers without registering in the SRM system can access the Bid invitation.
Hope this will answer your query.
Thanks & Best Regards,
Rahul -
Problem with attachements in bid invitation
I posted 3 attached documents in a bid invitation,1.xls,an 2 .doc ,the problem is that the supplier can't open the documents attached plus the documents are not big, can any one please help me with this issue? there will be rewards.
Hi
I don't know which SAP version are you using at present ?
Anyways, here are few OSS notes, which might help
<b>1030777 Follow-on note to 848909. Size of the table BBPCONT is big
1028642 Dump occurs during Bidinvitation creation from Shopping cart
1027890 Document Attachments Sporiiaclly Not Opening on IBID
848909 Size of the table BBPCONT is very big.
1016341 Attachment and Note from bid not copied to purchase order
998019 Changing bid in bid invitation: Adding attachments
951147 Attachments from bid not displayed in bid invitation
995042 BBP_QUOT: Texts/remarks/attachments not shown correctly</b>
<u>Please update me incase you need any further help.</u>
Hope this will help.
Please reward suitable points, incase it suits your requirements.
Regards
- Atul -
Buffer Table Not Up To Date Short Dump When Publishing Change Version of Bid Invitation
Hi experts,
We are running SRM 5.5 with Support Level 16.
We have a bid invitation for which a user is trying to publish a Change Version. This bid contains two bid outlines, with one line item in each bid outline:
ITEM 1: HIER (Bid Outline)
ITEM 2: Line Item
ITEM 3: HIER (Bid Outline)
ITEM 4: Line Item
However, upon clicking on the Check or Publish button, the system throws a CX_BBP_PD_ABORT exception short dump. The reason for the exception given in ST22 is "Buffer table not up to date".
Due to organisational system security restrictions, I am unable to copy-paste the dump from ST22, so I will be typing out some of the details here.
Transaction: BBP_BID_INV
Program: SAPLBBP_PDH
Screen: SAPLBBP_BID_INV_1000
Termination occurred in the ABAP program "SAPLBBP_PDH" - in "BBP_PD_ABORT". The main program was "SAPLBBP_BID_INV".
In the source code you have the termination point in line 73.
Active Calls/Events
(formatted below as "No: Type: Name")
24: Function: BBP_PD_ABORT
23: Form: ABORT
22: Form: ITMADM_UPDATE
21: Form: ITMADM_MAINTAIN_SINGLE
20: Form: ITEM_F_CHECK_FROM_WTAB
19: Form: ITEMLIST_F_CHECK
18: Function: BBP_ITEMLIST_CHECK
17: Form: PROCDOC_DB_CHECK
16: Form: PROCDOC_CHECK
15: Function: BBP_PROCDOC_CHECK
14: Form: SSIS_DOCUMENT_CHECK_COMPLETE
13: Form: STATUS_SET_AND_INTERNAL_SAVE
12: Form: PROCDOC_UPDATE
11: Function: BBP_PROCDOC_UPDATE
10: Form: CHANGE_VERSION_UPDATES_ACTIVE
9: Function: BBP_PDCV_UPDATE_ACTIVE
8: Form: PROCDOC_CHECK
7: Function: BBP_PROCDOC_CHECK
6: Function: BBP_PD_BID_CHECK
5: Form: FCODE_DOCUMENT_CHECK
4: Form: FCODE
3: Function: BBP_BID_PROCESS
2: Form: PROCESS
1: Module (PAI): PROCESS
The ABORT subroutine is being called in Step 22 (ITMADM_UPDATE), at the following line:
* parent guids have to be identical ...
if gt_itmadm-parent <> w_itmadm-parent.
perform abort.
endif.
Upon tracing the variable values in the ST22 dump, it appears the program terminates when processing line 3 (i.e. the second Bid Outline). It appears that the first Bid Outline processes fine.
In the iteration for Line 3, the dump provides that gt_itmadm-parent contains the GUID to the Change Version document header, whereas w_itmadm-parent contains the GUID to the original Bid Invitation document header, resulting in a mismatch and subsequently program termination.
We have tried to replicate this bid invitation in our Development environment, but when executing, both gt_itmadm-parent and w_itmadm-parent contain GUIDs to the Change Version document header, hence the program does not abort.
Any suggestions would be greatly appreciated.
Thanks!
Best regards,
Kwong HowHi Janu,
For Note 1561750, I have looked at the Correction Details and observed that it makes changes to an IF-ELSE block, but will result in the same path of code execution as before. I.e., the Note changes the code from "IF a THEN b, ELSE c" to just "c", but according to my code trace, we are already executing the "ELSE c" block in its current state.
We will look further into Note 1877600. The unfortunate situation here is that since we are unable to replicate this issue in our Development/QA environment, and the Note description does not explicitly fit the situation we are facing, we need to be very sure that the Note can address the issue before bringing it into Production.
Otherwise, we will raise a message as suggested.
Thank you so much for your help!
Best regards,
Kwong How -
Bid Invitation (Notification and Output)
Hi Gurus,
I have no clue how to manage Output / Messages for Bid Invitations. I need the system to do the following:
1) Send email notification to Bidders in the bid invitation and also a notification when I make changes to the bid Invitation - How and where do I configure the message
2) Post a notification on a portal
3) Print the bid Invitation with all the attributes (to bidders who cannot respond electronicaly), so that the same can be posted to the vendor and then the purchase can perform surrogate bidding.
Regards,
AbdulHi,
1. make sure email set up is done as per note 455140. To send e-mails after bid is published for the bid invitation transaction 'BID' attach relevant event schema. This will take care of sending mails whenver bid invitation is published or changed.
2. Provide the role BBP_EC_SUS_BIDDER to the bidders to enable them to see bid invitaions and send bids from SUS portal. For this you also need to enable SSO (single sign on) between EBP and SUS. Please refer the below link for further information.
sending RFQs from SRM EBP to SRM SUS
3. It is possible to down load the Bid invitation. Further update the mail id of the bidder with your id so that you can receive the bid invitation smartform. This you can take a print out and send it to bidders. You can make config setting in SPRO 'define actions for document output' to send the bid invitation smartform.
Hope this clarifies all your doubts here.
rgds,
RRK -
SC not in the sourcing cockpit after the follow-on document is deleted
HI,
In sourcing cockpit , I created a contract by SC , but I deleted the contract , the SC didn't appear in sourcing cockpit. the SOURCE_REL_IND still is 'Y', I have no way to create new contract by the SC .
I don't know if it is the standard functionatity, It seem to be not reasonable.
Please tell me the solution that SC can be back to sourcing cockpit automatiocally.
even if I carry out the BBP_GET_STATUS_2. it still don't work.
Thanks a lot.
JesseHi
the rule is below
sc created 2 qty -- PO created 2 qty -PO deleted - now order quantity and PO quantity difference is there so now SC comes to cockpit and this shopping cart item needs to sourced and PO needs be created.
i did not test below scenario.
SC CREATED - contract or Bid invitation created and now Contract / bid invitation deleted and now you are expecting this sc item comes to cockpit.
Note 1068497 - BBPSC04: Incorrect status for items completed in sourcing
Symptom
You create a shopping cart which is sent to sourcing cockpit. You create a follow-on document. For eg: Bid invitation. You delete the same and complete the item in sourcing. The status of the item in check status is shown as 'Approved' instead of 'Cannot be ordered'.
As per the above note sap rule, even though Bid Invitation deleted and reference shopping cart must venture to cockpit to create another follow on document.in your case SOURCE_REL_IND = Y instead of X. What is the item status of sc after contract / po deleted?
Maybe you are looking for
-
I added a new Fluid Grid Layout and when I try to add a DIV I receive the message "Could not find Dreamweaver Fluid Grid Style Sheet". I don't see the pink bars on my screen as shown in all of the tutorials. Can I use this option in CS6? I have fo
-
How to reactivate my ipad air?
activation ipad air is locked. Forget security questions, can't sign in apple id email as well. What shoul I do to reactive it again. thank you
-
How do you preserve levels on apps when you are forced to sync to a new computer?
-
How to copy default settings to all user ?
Dear Expert I want to set for all users have same default settings (default form layout) is there any way to copy default settings from 1 user to another users ? really appreciate your help thank you Best Regards JeiMing
-
Help!!!! I recently installed Hyperion version 11.1.2.1 and configured my products. My Shared Services is up and running, and so is my Essbase. But my Workspace is blank. When i go to the url, all i see is a blank blue screen with the file,menu,tools