Follow up activities after SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4

Dear Friends
We have completed SAP (CU&UC) upgrade from SAP 4.6c to ECC6 EHP4.
We refereed the upgrade guide for follow activities and we required confirmation before performing the activities.
Could you please help us what needs to be done immediately after upgrade.
Regards,
Bharathi

Dear Nils,
Thanks for the support.
Yes, we are following the same document 'CUUC46C_to_NW701SP07' for unicode conversion after the upgrade from the note 928729.
Please suggest us in that document which are the steps should be carried out after ECC6.0 EHP4 upgrade,
1. Preparation
2. Unicode Preconversion Phase in SAP Basis 4.6C
3. Upgrade Process
4. Unicode Conversion Phase
5.  Unicode Conversion Completion Phase
6. SAP Notes
Regards,
Bharathi

Similar Messages

  • TP version problem during upgrade from 4.7 sr2 to ECC6

    Hello All,
    i am doing an upgrade from 4.7 to ECC6 (ultimately i have to upgrade to EHP4). I am stuck in phase PREPARE module Initialization finished with status failed #. Below is the error i am getting. before pasting log file i tried my best to uprade TP level by upgrading the Patch level. but its not taking effact in to SAP system. If i check TP version in STMS >> system >> Check TP tool it shows me old version.
    below is the error log excerpt from file CHECKS.LOG
       #====================================================#
    Requests and information for module Initialization #
       #====================================================#
    ERROR:   The upgrade needs a patched version of R3trans which is
             build on 21.06.06 or later.
             The R3trans in your active SAP kernel is either older or
             the version could not be determined. Call it without
             any option to determine the build date.
             If the build date is too old, you have to replace it
             before you can continue the upgrade.
             Download the latest executable available from the SAP service
             market place and update it before you continue.
             Otherwise, the upgrade tools will be corrupted.
    INFO:    The version check of the disp+work in your active SAP kernel
            determined that it has a sufficient level.
             No update of disp+work is necessary.
    ERROR:   The upgrade needs a patched version of tp with version
             number 340.16.05 or higher.
             The tp in your active SAP kernel is either older or the
             version could not be determined. Call it without any option
             to determine the version.
             If the version is too old, you have to replace it before
             you can continue the upgrade.
             Download the latest executable available from the SAP service
             market place and update it before you continue.
             Otherwise, the upgrade tools will be corrupted.
    ERROR: To be able to use ASU Toolbox, your system requires
           the ST-PI software component with at least Support Package Level 8
          After the update is done, the module must be repeated!
           For more information, see the upgrade documentation
    INFO:       The upgrade strategy for the addon ABA_PLUS
                is described in note: 632429
    INFO:       The upgrade strategy for the addon APPINT
                is described in note: 632429
    INFO:       The upgrade strategy for the addon BP-R3PF
                is described in note: 632429
    INFO:       The upgrade strategy for the addon FINBASIS
                is described in note: 438521
    INFO:       The upgrade strategy for the addon LSO
                is described in note: 503468
    INFO:       The upgrade strategy for the addon LSOFE
                is described in note: 503907
    INFO:       The upgrade strategy for the addon PI
                is described in note: 700779
    INFO:       The upgrade strategy for the addon PI_BASIS
                is described in note: 555060
    INFO:       The upgrade strategy for the addon SLL_PI
                is described in note: 1306751
    INFO:       The upgrade strategy for the addon ST-A/PI
                is described in note: 69455
    INFO:       The upgrade strategy for the addon ST-PI
                is described in note: 539977
    INFO:       The upgrade strategy for the addon WP-PI
                is described in note: 632429
       #===========================================================#
    PREPARE module Initialization finished with status failed #
       #===========================================================#
    i downloaded the 47 kernel files SAPEXEDB_304-20001172.SAR and SAPEXE_304-20001172.SAR and installed the kernel file. if i check TP version from command level it shows me 340.16.62, but in SAP STMS it shows me 340.16.03. Can somebody explain what shoulkd i do?
    Can i know also if i can update SAP Kernel from 4.7 sr2 to NW7.0 without upgrading even started?
    If somebody can tell me the exact number of CDs to use to upgrade from 4.7 SR2 to ECC6 EHp4, that would be very
    nice.
    Mani

    Hi Mani,
    ERROR: The upgrade needs a patched version of R3trans which is
    build on 21.06.06 or later.
    ERROR: The upgrade needs a patched version of tp with version
    number 340.16.05 or higher.
    show that the tp and R3trans used by the source 470 system are old.
    You should download the latest tp and R3trans for kernel 470, and
    replace the old tp and R3trans with the downloaded ones under the 470 kernel directory. The 470 kernel directory is specified by parameter DIR_EXECUTABLE which is usually /usr/sap/<SID>/SYS/exe/run.
    Please note that there is also a kernel directory under /<DIR_PUT>/<SID>/SYS/exe which is for the the target system 700. Please do not replace tp and R3trans under this directory with the ones downloaded for kernel 470.
    NO, you cannot update SAP Kernel from 4.7 sr2 to NW7.0 without upgrading even started. Kernel upgrade will be done by SAPup automatically.
    With Best Regards
    Julia

  • Error after upgrading from  sap b1 pl 35 to pl 49

    hello sap experts 
    iam getting the following error after upgrading from  sap b1 pl 35 to pl 49 this error is coming if we have given round off or discount in the below cell
    "Discount deviates from authorised ranges (sales oreder-discount%for document) [message 439-15] pls make it as soon as possible an i will be thankful to those guys .
    regards
    Jenny

    Hello Jenny,
    You may check by supreuser account first to see if you got the same error.  If not, it probably just related to user authorization.  If yes, it must be a bug.
    Thanks,
    Gordon

  • Depreciation Run Error while Upgrading from SAP 4.6C TO ECC6.0

    Hi
    We are upgrading from 4.6c to ECC 6.0.  In ECC 6.0 we need to make the Number Range Interval as "Internal" and Batch Session tick to be removed from the Depreciation Document Type. 
    While executing depreciation run, it got terminated and I have done the above changes.  After that I have restarted the Depreciation.  I have got the following error Message.
    Message(s) during check of document ERROR00001
    Message no. AAPO511
    S:/SAPDMC/LSMW_AUX_020:006 20
    Message no. /SAPDMC/LSMW_AUX_020006
    If any body aware solution, kindly reply to this message
    Thanks
    siva

    Check this useful links
    Key differences between SAP 4.6 - ECC 6.0
    http://sap.ittoolbox.com/groups/technical-functional/sap-hr/difference-sap-ecc60-with-sap-r3-3161113
    LE/WM functionality difference between 4.6c and ECC 6.0
    differences between SAP R/3 ECC 6 & SAP R/3 4.6C in Material management mod
    Upgrade from SAP R/3 4.6 C to ECC6.0 - To find obselete and new tcodes
    Upgrade from SAP R/3 4.6 C to ECC6.0 - To find obselete and new tcodes

  • Upgrade from SAP Webas 6.40 to SAP Netweaver 2004s

    Do we have to change the virtual host name used for high availability clustering environment to local host name before we conduct the upgrade from SAP WebAS 6.40 to SAP NetWeaver 2004's ?

    Do we have to change the virtual host name used for high availability clustering environment to local host name before we conduct the upgrade from SAP WebAS 6.40 to SAP NetWeaver 2004's ?

  • Is it possible for XI 2.0 to connect to ECC 6.0 upgraded from SAP R/3 4.6?

    Hi,
    I just wanted to know whether it is possible for XI 2.0 to be used with ECC 6.0 which is upgraded from SAP R/3 4.6.
    If yes, could you forward some links so as to know how.
    Thanks,
    Fariha

    hi,
    >>>>Is that Possible..?
    yes
    >>>Wont there be any additional configuration needed ?
    if you use IDOCs then you don't need anything special
    Regards,
    michal

  • How  to Upgrade from SAP NetWeaver 7.01 to NW 7.02?

    Hi Experts,
      I am working on GRC upgrade project,we need upgrade to GRC10.0 from GRC3.0.
    GRC 10.0 only work on NW7.02,we now have NW7.01. 
      How  to Upgrade from SAP NetWeaver 7.01 to NW 7.02?
    Use EHPI tools or just spam/saint  or any other way ?
    current version:
    SAP_ABA 701 0006 SAPKA70106
    SAP_BASIS  701 0006 SAPKB70106
    PI_BASIS 701 0006 SAPK-70106INPIBASIS
    SAP_01 0006 BW SAPKW70106
    Thanks!

    HI,
    Net wevaer 7.2 CE is totally different from Net weaver 7.01.
    No relation i feel.kindly check the links.
    http://help.sap.com/saphelp_nwce72/helpdata/en/44/d958673ef05f4de10000000a11466f/frameset.htm
    http://help.sap.com/content/documentation/netweaver/index.htm
                      OR
    You do not need Netweaver 7.2 CE for using NWBC 3.0. You just need netweaver 7.02.
    You simply need to apply enhancement package 2 on your existing 7.01 system to make it 7.02.
    Please refer to installation guides on service marketplace, there you can see the EHP2 installation guides.
    Also, see SAP Note 900000 - Netweaver Business Client - FAQ. This will give you all the details required.
    *Regards,
    Ajitabh

  • Upgrade from SAP BO 3.1 SP3 to SAP BO 3.1 SP5

    Hi
    We are doing upgrade from SAP BO 3.1 SP3 to SAP BO 3.1 SP5, can you please help in below points
    1. How much time does it take to run SP5 upgrade service pack for servers and client tools. The server need to be upgraded only on weekend, is it possible to upgrade in 1.5 days?
    2. The OS is Windows 2008 server. what should be the rollback plan in case of upgrade failure ? One of server uses VM image while Production server doesnt have any VM image.
    3. If BO client tools are on SP3, can they still connect to BO server components on SP5 - (for interim period when servers are upgraded first)
    Thanks
    anu

    Hi Anu,
    1. The upgarde should be completed in 1.5 days for the server and client componenets depending upon the number of servers you have in the cluster . If you are planning for upgarde do it successfully first on TEST , DEV and then proceed with PROD servers
    2. The roll back plan includes thebackup of the CMS database , the filestore directory and the complete installation folder . In case of any issue , you can the place the backup . If the servers are on the VM , it is always recommeded to have the snapshot of the images before the upgrade
    3. Yes, they can connect to the SP3 servers , but always recommeded to upgarde and have servers and client tools on same patch .
    Thanks,
    Sneha

  • Impact of upgrade from SAP CRM Interaction Center 4.0 to 5.0 on Genesys CTI

    Hi Friends,
    I would like to know that what is the impact of upgrade from SAP CRM Interaction Center 4.0 to 5.0 on Genesys CTI software.
    1) Will there be anything we need to change?
                for e.g.
                     a) Settings
                     b) Software
                     c) Hardware
    2) What do we need to keep in mind when upgrading from SAP CRM Interaction Center 4.0 to 5.0?

    Hello!
    The biggest change you must face is related to Java. If you had CRM4.0 Java configuration, you must change your settings to the non-java configuration CRM5.0 has. Most of those changes are performed by the upgrade program, but you must activate services in transaction SCIF.
    Your other concerns:
    - Software: Most of the Genesys releases are compatible with both java and non java configurations. Anyway, I am sure Genesys has compatibility instructions.
    - Hardware: No changes to my knowledge
    <b>Hope it helps. Please, reward points if so</b>
    Regards
    Joaquin

  • Update SAP 7.00/0021 from SAP 7.00/0020

    Hi Friends,
    I have installed SAP ECC 6.0 IDES on windows 32 bit system. for update of SPAM SAP 7.00/0021 from SAP 7.00/0020 showing me in the import_phase, import_proper showing red status. I also imported the tp and R3tran to the current market level. Kernel also current market level.
    Error in Phase : IMPORT_PROPER
    Reason for Error : Nothing
    Error Message : Nothing.
    It is running in the phase DD import finished with return code 4. After that it is not comming out.
    Please suggest me what to do?. Guide me.
    Thanks
    Ramesh

    Hi,
    I have the same problem. But not only for SPAM update, it's valid for all patches. The import remain still in import_proper step and the log show just a warning. I guess it's related somehow to database parameters.
    Anyway, if someone has a clue, please send us.
    Thanks in advance

  • Trying to log on sap biw 3.0 from sap r/3

    Dear sap professionals,
    this is suresh, i am trying to logon to sap BIW 3.0 from sap r/3, to do this i used the proper Tcode. but the issue is i am getting the error message "name or password incorrect please reenter". any body knows how to make the remote connection to BIW 3.0. thanks in advance

    in my case,
    i got the same error..
    By mistake, i touched [Caps Lock] button. ( haha )
    i typed the password again.
    it worked. i mean i could log on the BW system.
    so i think,
    we need to type <b>the password as "Capital Letters".</b>
    I hope it helps you.
    all the best
    David.Kang

  • SAP PM Work Order from SAP SD order

    Hi ,
    Is that possible to create SAP PM Work Order from SAP SD order in IS - U?
    What will be the trigger points for this?
    Thanks & Regards,
    VEER

    Hello All,
    sorry for updating the thread so late.
    Actually the issue here was the memory ID. We changed that and the print started coming fine.
    Thanks to all who replied,
    Amit.

  • Oracle Follow-Up activities after EHP4 Upgrade

    Hi!
    I am currently executing the EHP4 Upgrade for SAP ERP 6.0 with Oracle.
    After doing so I need to execute several oracle specific actions
    Can some one give me technical documentation for the following actions:
    1) Delete all empty Tablespaces
    Question: How (SQL commando) can I identify which of my tablespaces are empty?
    2) Tablespace "PSAPSR3700" should be released/deallocated
    Question: what does it mean? 
    3) Load generation ???
    Any helpful information will be very appreciated
    Jürgen

    > 1) Delete all empty Tablespaces
    > Question: How (SQL commando) can I identify which of my tablespaces are empty?
    You can check that using brtools.
    > 2) Tablespace "PSAPSR3700" should be released/deallocated
    > Question: what does it mean? 
    The sources are in PSAPSR3701 with EHP4 so that old tablespace is no more needed.
    > 3) Load generation ???
    Yes -run SGEN.
    Markus

  • Upgrade from SAP R/3 4.7 to mySAP ERP 2005 : technical changes

    Hi All,
    I wanted to know what objects(tables,structures,data elements ,ZPrograms,SAP Programs,Roles etc..) in d the entire SAP landscape will bear difference when compared with older version (SAP R/3 4.7).
    I would like to know technically which objects will be modified after the system is upgraded.
    Need urgent reply,
    Answers will be rewarded

    Dear Rohan,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • IM (Inventory material) is failing in ECC 6.0 upgrade from SAP R/3 4.7

    Hello,
    We are working on Technical upgrade project (SAP R/3 4.7 to ECC 6.0 EHP 6) for one of our Client.
    when we are trying to create a purchase order (ME21N) in upgraded system (ECC 6.0), the field  IM Material is failing to accept the internal material values from MATNR field. After entering the IM material, the value immediately got disappeared and it needs some workaround to get the material back in to the IM field along with MPN material.
    It was working fine (accepting Internal material) in R/3 4.7, if we give a valid internal material, it immediately get copies to the field IM Material.
    In case of ECC 6.0, it is completely failing.
    Please suggest if you have come across any solution?
    Regards
    Rifaie

    Hi Selvan,
    Go through document in below thread,you will get more info on upgrade
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/sapERP6.0+Upgrade%2520%2520SAP%2520ERP%25206.0%2520Upgrade
    Faq's on SAP upgrade in below link,
    SAP ERP 6.0 Upgrade
    Thanks Regards,
    Syfulla

Maybe you are looking for

  • Error 80070005 when running Windows 7 SP1 64-bit Updates

    I have tried using the subinacl.msi but seems to be not working...any other ideas?

  • LED, Chime, Fan... and that's it!  Mini will not boot.

    Greetings, My Mini (stats below) will not boot. The LED lights, the chime sounds, and the fan turns on. However, the HD does not spin and it won't take a DVD. I have reset PRAM/VRAM through the keyboard sequence and through Open Firmware. I have also

  • BPC 7.0 SP07 - Multi Server Install

    Hi All, We are just starting the process of installing BPC 7.0 SP07 and trying to decide what components to add on a two server architecture. This is what we are planning to do: Server 1 (64 bit) consists of: SQL, OLAP and Reporting servers Server 2

  • UPLOAD ORGANIZATIONAL CHART IN SAP

    Hi Experts, My customer has the following requirement: In order to avoid manual entry of Organizational Data we need to upload the Organizational Chart from his System in SAP. Is there a way to upload the Objects and the Relationships between them? T

  • R/3 report accsessing

    Hi guru's,              i am trying to integrate 100  r/3 report's to the user at a time  .is there any technique involved in integrating 100 reports to the user at a time.sys Object creation for every report is mandatory or not.and creation of sys A