Follow up to MRSS planning board how to populate
Thanks for teh reply Varun. It was correct as I did not knwo that the create/save populate teh planning board data via the BADi.
However 3 of the 4 added fields TPLNR, ABCKZ, and ILARTa re being populated in the Order Change (IW32) transaction but the field called Remaining Work field OFMNW_2 is not. It is generally calculated when teh actual work in teh IW41 confirmation is changed to less than planned. I.E. if the planned work was 8 and the operator puts 4 in actual work, then the IW41 screen shows remeaining work field filled in with the difference (4).
How can I populate this field via the BADi implementation PUSH_TO_MRS method. I tried to link the user exit for confirmation save (Enhancement CONFPM05, user exit EXIT_SAPLCORF_005 INCLUDE ZXCOFU05) to then invoke the instance of the class method call in the user exit after saving the remaing work field in an EXPORT to MEMORY ID:
Here is the code in the user exit that then fires off the BADI implementaion method PUSH_TO_MRS
read table AFRUD_TAB index 1.
EXPORT AFRUD_TAB-ISMNW to memory id 'z_OFMNW'.
data z_ZCL_IM_MRSS_RSG_PM_INT type ref to ZCL_IM_MRSS_RSG_PM_INT.
data zheader type BAPI_ALM_ORDER_HEADER_E.
data wa_zCT_INFO type line of /MRSS/T_DEM_INFO_EXT_TAB.
DATA: Z_DEM_H type /MRSS/T_DEM_H_EXT_TAB,
zCT_ADM type /MRSS/T_DEM_ADM_WRK_EXT_TAB,
zCT_PLR type /MRSS/T_DEM_PLR_EXT_TAB,
zCT_PLRS type /MRSS/T_DEM_PLRS_EXT_TAB,
zCT_INFO type /MRSS/T_DEM_INFO_EXT_TAB,
zCT_TOOL type /MRSS/T_DEM_TOOL_EXT_TAB,
zCT_RELAT type /MRSS/T_DEM_RELAT_EXT_TAB,
zCT_QUALIF type /MRSS/T_QUALIF_REQ_DEM_EXT_TAB,
zCT_ASSIGNMENT type /MRSS/T_***_KEY_EXT_TAB,
zCT_STATUS type /MRSS/T_DEM_STATUS_EXT_TAB,
zCT_PARTNER type /MRSS/T_DEM_PARTNER_EXT_TAB,
zCT_OPERATIONS type /MRSS/T_DEM_OPERATION_TAB.
create object z_ZCL_IM_MRSS_RSG_PM_INT.
z_zcl_im_mrss_rsg_pm_int->/mrss/if_ex_rsg_pm_int~push_to_mrs(
EXPORTING
is_header = zheader
changing
ct_dem_h = Z_DEM_H
ct_adm = zCT_ADM
ct_plr = zCT_PLR
ct_plrs = zCT_PLRS
ct_info = zCT_INFO
ct_tool = zCT_TOOL
ct_relat = zCT_RELAT
ct_qualif = zCT_QUALIF
ct_assignment = zCT_ASSIGNMENT
ct_status = zCT_STATUS
ct_partner = zCT_PARTNER
ct_operations = zCT_OPERATIONS
EXCEPTIONS
failed = 1
others = 2
IF sy-subrc <> 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
ENDIF.
Hi Stephen...
I think you are going wrong...
From you post I understand that:
1) You have implemented the user exit EXIT_SAPLCORF_005.
Note: This is called when you enter the confirmation in IW41.
2) Your understanding here is right that you need to integrate this information into MRS and you can do it from the above user exit.
3) But you are wrong -- if you call the BADI here.
Note: BADI methods will not work if you call them arbitrarily anywhere !! They work only when called in a specified program flow.
The given BADI is called during the forward integration -- meaning when the order is saved. After the BADI is called MRS save is called and the data is saved in MRS.
Calling the BADI method alone has not effect.
I suggest that you read more information about BADIs and User Exits.
Regards
Varun.
Similar Messages
-
MRS (Multi Resource Scheduling) - Displaying Planning Board
I've gotten the MRS planning board to function the way I want it in my sandbox, for example, when I run /MRSS/PLBOTIME the all the resources show up that are in the planning node the resource planner is assigned to and all subordinate resource nodes. Also, the demand shows up. I thought life was good. I've now moved to my development box and configured the system the same as sandbox (to the best of my knowledge).
Now when I run /MRSS/PLBOTIME:
1. I get a popup window telling me that there are several valid resource planning nodes and requiring me to select one.
2. While the resources show up the demand does not.
Now when I run /MRSS/PLBOSRV:
1. The demands I selected show up but none of the resources do.
As I mentioned above, to the best of my knowledge, the MRS configuration is the same between the two boxes (e.g., work center types properly assigned, resource planning nodes and evaluation paths as delivered, user interface profiles, /MRSS/SGE_PN_MNT, etc.). I can't figure out why the popup window is now showing up asking me to select a resource plannng node and, more importantly, why in one case the resources show up but not the demand and in the other the demand shows up but not the resources. The only way I can now get both demand and resources to show up in the planning board is by running /MRSS/PLBOORGSRV.
Mark
Edited by: Mark Scott on Aug 13, 2009 8:58 AMThanks for the response:
/MRSS/PLBOTIME -->
1. What I had seen before in two other systems is that the org.units that are associated with me as the Resource Planner would show up, as well as all other subordinate org.units, both resources and demands. In this system what I see is that the demands associated with subordinate org.units are not showing up, only the resources. I went into another system I have access to in order to confirm what I had been seeing.
2. Also, when launching the Planning Board using this transaction in other systems I had never seen a window pop up telling me there were "several valid resource planning nodes" and asking me to pick an org.unit from the list, it always just gave me the org.unit I was associated with plus any subordinate ones. (We upgraded to SP06 last night and this morning this window didn't pop up, instead it gave me the resources and demand for the org.unit I am the Resource Planner for, as well as those for subordinate org.units....weird.)
/MRSS/PLBOSRV --> Logical as you described is what I expected, however, what I was seeing was that the resources associated with the demands were not showing up. After a closer look what appears to be happening is that the selected demands are being brought into the Planning Board but no resources unless the resource has previously been assigned to the demand. In other words, resources associated with the work centers used in the operations (and their linked org.units) are not showing up in this Planning Board, they only show up if they had previously been assigned to a demand. I can, of course, manually bring in resources once I'm in this Planning Board. Is this what you meant?
/MRSS/PLBOORD --> I followed your logic of "if I am responsible for the parent org.unit then I am responsible for the lower org.units also". However, the logic escapes me as to why this only applies to resources and not demand. Regardless, as long as I know that's how it works then I can deal with it.
Mark
Edited by: Mark Scott on Aug 18, 2009 9:57 AM
Edited by: Mark Scott on Aug 18, 2009 6:18 PM
Edited by: Mark Scott on Aug 18, 2009 6:25 PM -
MRS - Resources and demands are not visible in the Planning Board
Hi Friends - I am working on the the MRSS 610. We have installed it on the our ECC 6.0 as an add-on. We have configured the system as per the configuration guide.
But when I am accessing Manageru2019s Planning Board - /MRSS/PLBOMGR , using the Organization unit, I am getting Notification saying that the resources assigned to the Organization unit are not available in the MRS.
"Resource 00000000010000000000000000000000 not yet created in the WFM Core"
The details of the Error message
"Resource 00000000010000000000000000000000 not yet created in the WFM Core
Message no. /MRSS/SGE034
Diagnosis
Resource 00000000010000000000000000000000 has not yet been created in MRS.
System Response
No assignments have been created for resource 00000000010000000000000000000000, even though, according to the organizational model, this resource is to be taken into consideration in the planning board.
Procedure
Contact technical support.
Procedure for System Administration
Create the resource in question in MRS."
I have run the Report
/MRSS/HCM_RPTWFMIF : Transfers the HR data (availability times, qualifications and the resources itself) into the MRS Basis
But even after that I am not getting the resources in the planning board.
Also I am not able to view the Demands from PM/CS orders.
I have created PM Orders and
Assigned Work centres to the operations and
assigned the Resources to the Operations.
The HR assignment to the work center is also done.
I have tried T Code /MRSS/PLBOSRV - Enter the MRS planning board using a specified order
to pull the order demand. But it is not working
Its giving following message
1004280 is not a valid demand
Message no. /MRSS/SGU139
Diagnosis
The order does not exist in MRS.
This may be because:
The order number has an invalid format.
The order does not exist.
The order is not relevant for planning and has therefore not been transferred to MRS.
The order has been deleted from MRS.
Pls help me on this.
Thanks in advance and warm regards
PurnenduHi Anil/Saurabh - Thanks a lot for your replies.
I have checked the MRS configuration as per your suggestion.
It looks fine as per the configuration guide. I have done the PM/CS integration for Orders as demand.
But the Demands are not visible on the Planning Board.
I have checked in the debugging mode what is causing the problem - It looks like
"The Database Table: /mrss/d_dem_h needs entry"
But there are no entries in this table.
I could not find any Customizing transactions or Application transactions for maintaining this table. This is an Application Table for Master and Transaction Data and its Display and Maintenance allowed with Restriction.
I could not also find any transaction for transferring Demand from ECC(R/3) to MRS.
How do I maintain entries in this table?
How do I transfer Demand from ECC to MRS?
Saurabh - I have also been not able to transfer HR Resources from ECC to MRS.
We don't have WFM Core installed in our instance. But MRS should work fine without WFM. MRS Basis should take care of it.
To transfer Employee resources i have run the Program " /MRSS/HCM_RPTWFMIF". But when I execute the transaction with the selection parameters system shows that it is processing (Clock at the bottom Status bar) but it does not shows any result or status.
So I am not sure whether it is executing the program properly.
Pls help me resolve these issues.
Thanks and warm regards
Purnendu -
Creation of Order in DS Planning Board (/SAPAPO/CDPS0)
Hi all,
My requirement is i want to create order manually in DS planning board by passing product, location,resource,runlength etc.
Again i am using PPM to calculate the setup time (between previous order and the current order).
In order to get the PPM data, i am calling FM "/SAPAPO/DM_PPM_GET_PLAN" and here i pass planid to get the details.
To get planid, i call FM "/SAPAPO/SOS_FIND" i.e. to get source of supply information which includes planid
Please tell me
(1) what is planid ?
(2) How planid is this linked to PPM ?
(3) What do we mean by sources of supply? Can't we get the same info from pegid ?
(4) What is the structure of PPM ? I mean what are activities, components, alternative components etc.
Regards,
DebHi Nandha / Vikas
Thanks for your input.
I am summerizing the whole concept, Please correct me and answer my questions in between :-
In order to create an order in DS Planning board manually, we need information like product,location,resource,quantity etc. (User's input).
Then we should follow the steps as follows -:
Step 1 :- Find Sources of Supply
Since this gives information like how we are going to produce or procure the product. It can be PPM or PDS or Transportation lane.
For PPM we will get the Plan id (Unique ID for PPM) and then we will get the details of PPM accordingly.
But, Please mention what about PDS and Transportation lane ?
I mean from source of supply how can we know that the product can be produced or procured by PPM or PDS or Transportation lane ? Any field indicator is there for PPM or PDS or Transportation lane? Because in my requirement, First i need to check which one is active for the entered product:- PPM or PDS.
(2) Once we know that the source of supply is PPM or PDS or transaportation lane, then we will call different FMs to get the details.
For PPM we know how to proceed. I mean using planid we can get the details.
But for PDS and Transaportation lane please mention the FM name and i/p parameters to get the details like setup group id, production rate etc.
Thnaks once again for your valuable inputs.
Deb -
PPDS Planning board - PM Resource Vs Production Resource
Dear Experts,
I have question regarding capacity Leveling in PPDS
For Instance I have Resource A in production and also same Resource defined as Resource A in Plant maintenance
Now there is Break down in Resource A and have maintenance order in ECC
Does PPDS will pick this overload in the planning board
Please explain how PPDS is used in such scenarios
if you need more clear explanation please let me know
Regards
RajHi Raj,
Maintainance order is integrated with APO as downtime. SO maintainance order will come as downtime on a resource in APO.
If there is already order scheduled during this time in APO it will not get rescheduled to some other time. But if are running some detailed scheduling heuristics such situation will get corrected.
There is also BADI avaialble where you can enable automatic rescheduling using follow up actions
Regards,
Santosh -
Pool asset management planning board (PAM03)
Hi experts,
PAM03 comes with default icons/labels for vehicle pooling. For example in the tool bar there is a filter for 'licence plate' or 'vehicles' for sorting. As you know the PAM can be used for variety of assets such as IT. I wanted to know if you've ever attempted to update the planning board to be used for assets other than vehicles.
I believe in note 1272432 there is mention to this functionality using function module PAMS_GRAPH_UC_OTHERS. I'm still trying to figure out how this works so any input is appreciated.
ThanksHi PAM user, the steps necessary for PAM are described in the following places, at the sap Help portal
http://help.sap.com/erp2005_ehp_04/helpdata/en/2b/1a73268dd74a0988c00a90171294f7/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/5ad2c9e2f249abad4df1479243a001/frameset.htm
Make sure you activate the SAP Business Function for PAM, which is LOG_EAM_PAM (via transaction SFW5). This will also provide the right settings within config for the planning board and Pool Asset Management.
Only thing that does not automatically gets updates, is table PAMS_VSTAI, which needs to have the following entries:
Pool Asset Management ABGH 04 Productive Split I3908 Picked Up
Pool Asset Management AUFE 02 Completed Split I3910 Settled
Pool Asset Management DISP 01 Productive Split I3902 Assigned
Pool Asset Management GELA Completed Split I3905 Deleted by requestor
Pool Asset Management GELD Completed Split I3903 Deleted by planner
Pool Asset Management NDIS 01 Reqmt I3901 Need
Pool Asset Management RESM 06 Productive Split I3907 Reserved
Pool Asset Management RGBE 03 Completed Split I3909 Returned
Pool Asset Management STAN 05 Completed Split I3906 Need revoked
Pool Asset Management STOR 05 Completed Split I3904 Planned need revoked
Pool Asset Management SY01 08 Absence Maintenance/ Repair
Pool Asset Management SY02 07 Absence End of Leasing
I hope this helps you in setting up the solution. Feel free to provide feedback on if it worked.
Cheers,
Hanneke -
MRS (Multi Resource Scheduling) - Show operation status in Planning Board
Because the current MRS thread is some long and complicated I chose to move this question into a seperate thread:
Initial question:
Like many companies, it is not unusual at my customer for their Planners to create orders with multiple operations, particularly since many orders require different crafts to perform the work. When the Planning Board is launched and Planners lok at work scheduled for the past week they want to be able to see at a glance which operations have been completed and which operations, perhaps from the same order, have not and may need to be rescheduled. Their preference is to select "final confirmation" when using transaction IW41 and thereby set the operation system status to CNF when the work on an operation has been completed. They then want to somehow use this CNF operation status to drive something visual in the graphical Demand layout display and Resource layout display to enable the Planner to see at a glance that the operation has been completed. I've tried several approaches with configuration of abstract statuses and the user interface profile without success. My customer's interest in being able to see the completion status of an operation in the MRS Planning Board makes a lot of sense to me. I'm hoping someone can help me with a technique for modifying the Planning Board so that it displays the completion status of an operation in a visual way.
Response from Varun Verma:
Hi Mark,
The problem at your customers end is nothing new.
What you can do ( many other customers have done it in similar way ) is:
1) you integrate the status CNF into MRS.
Check the customizing: Basic Settings -> Assign ERP Objects -> Status
2) configure in MRS that for status CNF, the assignments and demands (only in item work list or Hotlist) is colored to GREEN (or any other color)
Check customizing: Set Up Scheduler Workplace -> Workplace Profiles -> Define User Interface Profiles
Thus the users will know visually, that the green colored assignments are already completed.
By the way, in your work list you can also filter the demands based on their status
Regards
Varun.
Followup question:
Varun,
Thanks for the response. I thought I had tried this but perhaps it's because in the UI profile I had not entered something in both the status groups for assignments and the status groups for demands. I have a bit more testing to do but it appears that the demand status now gets updated from the operation status of PCNF (linked to abstract status WORK_START) and CNF (linked to abstract status WORK_STOP). I also get a red bar (C4) for PCNF and a green bar (C1) for CNF. Do you have a better status group I should be using in place of C1 and C4? Status groups C1 and C4 give me a bar but it doesn't look like the demand bar with a outline and alphanumeric description of the demand, it's just a colored bar.
I know the work list can be filtered based on their MRS "planning" status, however, it doesn't appear to permit filtering by the status of the operation unless I add the operation status as an additional field in the worklist. Is there something I'm missing here? And even if it did, my customer wants to be able to see the CNF status indication in the Demand layout and schedule using the work centers so the worklist is not being shown like it is in the Resource layout.
Mark
Edited by: Mark Scott on Aug 10, 2009 3:35 PMHi Mark,
Well I assumed that you have confirmations integration active !! But I guess not because you say that the status is not integrated always.
What you need to do:
1) I assume you have SP05 or later.
2) Implement the user exit: CONFPM05. In the implementation of this exit you need to call FM: /MRSS/RSG_PM_ORDER_CONFIRM
3) Go to customizing: Basic Settings --> Assign ERP Objects --> Status
-- Here, define an abstract status (MRS Status) for confirmed and partially confirmed
-- map it to R3 status CNF and PCNF.
After this, whenever you enter confirmation for PM order from transaction IW41, the status will be integrated.
Now you can use the MRS statuses defined in step 3 to configure the colors.
Implementing the user exit CONFPM05 might require some technical input. But it is easy. Just a few double clicks and copy paste.
Contact an ABAP developer for the same.
This should solve your issue.
Regards
Varun -
Ability to display multiple texts within graphic planning board Gantt chart
I have been unable to change the planning board Bar Chart Graphic Profile (OPG0 and OPG9) to be able to display both material text and a user field within the Gantt chart graphic. I have copied the SAPSFCG011 profile and created my own. The profile is displayed below from CMCH.
Overall prof: ZBWSFCG011 SFC: View work center/capacity (3 graf.)
...... Select.profile: ZBWSFCS001 SFC: View work center -> cap.(3 graf.)
...... Control profile: ZBW___C002 Gen: Planning table
...... Time prof: ZBW___Z002 Gen: Medium-term (3 months)
...... Evaluation prof.: ZBW___A001 Gen: Standard evaluation profile
...... Strategy prof.: ZBW___T001 Finite scheduling forw./all functs.activ
...... Capacity planning table: ZBWSFCL010 SFC: only main cap. (3 graf.)
.......... Graphics profile ZBW___X002 BARC 1 Default profile 2 Capa. planning board
.......... Chart sequence ZBWSFCT002 SFC: Main caps. (3 graph.)
.......... Layout ID ZBWSFCLA10 SFC: Work center view (graphical)
.......... LineRepresSelection ZBW___ZR02 SAP standard 2
.......... Scale time axis SAP___M031 Stand. weekly per. split rough
.......... Graph.object.select. ZBW___OA02 Pool group order path
.............. DStat Sq Structur Field na ROp Comparison val NStat Struct
.............. 00000 01 KBED TYPKZ NE 1 00001
.............. 00000 02 AFVG OBJNR ST SAP005 00000 SAP002 Standard operation partially confirmed
.............. 00000 03 AFVG OBJNR ST SAP006 00000 SAP003 Standard operation completely confirmed
.............. 00000 99 DEF 00000 ZJB000 Standard operation
................... Graphical object type ZJB000 Standard operation
........................ Form type 22 Plan. board:Graphic obj. w. ordNo matTxt
........................... Form group ZBW001
............................... Form definition PLTO22 Planning board graphic order and mat.txt
.................................. Layout definition [[$a//$b]]
.................................. Layout definition
.................................. Layout definition
.................................. Layout definition
In addition to the profile change, I have configured the graphical object type ZJB000 (in OPG9) to look as follows:
0 AFKO Order header MATXT Material description
2 KBED Capacity requirements A SSTAD Latest start / date SSTAU Latest start / time
3 KBED Capacity requirements A SSSBD Latest scheduled start: Processing (date) SSSBZ Latest scheduled start: Processing (time)
4 KBED Capacity requirements A SSSAD Latest scheduled start: Teardown (date) SSSAZ Latest scheduled start: Teardown (time)
5 KBED Capacity requirements A SENDD Latest finish / date SENDU Latest finish / time
6 AFVG Order operation USR08 User field for date
I have found that the 2nd text field (USR08) must be added as the last step (#6). When I had it as #1, the planning board did not display the USR08 value.
Now both are displayed in the Gantt chart graphic. However, it is difficult to see this long string of data as the bars in the Gantt chart may not be long enough to display the data.
Therefore we would like to use the "hover over" text which is displayed in the status line at the bottom of the screen. We have tried using both the Info Text and the Quick Info options within the Bar Chart: Options Profile (OPG0). Only the first text (the material descirption) is dislayed within either the Quick Info or the Info Text.
Is it possible to have multiple object values appear in Quick Info or Info Text? Or is it possible to control which text is displayed in the Quick Info or Info Text?
Any help in this area would be greatly appreciated, as this is a make-or-break issue for the business to use the planning board. Thank you!I'm also looking for a standard customizing alternative to do the same thing.
Still, if you're interested, I've already done it successfully with user exit PLAT0001.
Hope this helps.
Best regards. -
Dear experts,
I have been working on the CM25 graphic planning board. So far I have not been able to show if a production order is scheduled to be finished in time.
Do you know if it is possible to show this somehow?
I am thinking in two directions:
1) The planning and scheduling log gives a warning message if the "scheduled finish date" differs from the "basic finish date" (also when it is produced too early). Can I change the settings of the scheduling and planning log?
2) I know how to link different colors in the planning board depending on a user status. Is it possible to determine a status which compares the "scheduled finish date" and "basic finish date"?
Are there any other solutions?
Will definitely reward points!!!
Regards,
TimDear Rachael,
One thing I learned is that CM25 is full of surprises. In the end I did manage to compare the "basic date" and "scheduled date" and assign different colors to them. Our customer requirements are converted via MRP which calculates the basic dates of our planned orders. As long as the basic dates are correct, the colors of the planning board will indicate if an order is still on time or not.
The problem is that if a planned order is firmed or if a production order is created the basic dates will no longer change even if the customer requirements change...
It turns out that we will be able to use this solution for our client, but I did not find a real solution to compare production with the customer requirements.
If you need more info, please come back.
Regards,
Tim -
MRS: PRT Tool Resource does not appear in Planning Board
Hi Experts,
I am trying to perform tool assignment but somehow the tool resource does not appear in the planning board. I have the following set up:
- Tool created as both material and Equipment (category P)
- Equipment assigned to work center linked to Org Unit
- Order with operations created with PRT assigned
What I am seeing in the planning board:
- I can see the operation with the linked PRT
- I can see the HR resource under the same work center Org Unit
- However, I cannot see the Tool resource.
Am I missing somethng here? Any kind of pointers would be greatly appreciated.
Thank you in advance,
JkThank you for your response, Varun.
I do have the equipment work center set to be the same as the operation work center. Also, when I try to add the PRT manually in the planning board, I get 2 error messages:
"Resource is not available"
"Selected equipment 0 is invalid"
Have you encountered this before?
Thank and Regards,
jk -
Planning board user status at operation level
Hi Guys,
Our user is not using planning board and therefore system status should not have DISP status as system status.
Now user needs two profiles in the CM07 bases on the statuses SCH and RFS.
Profile 1: For operation user status=SCH
Profile 2: For operation user status=RFS
I know how to create over all profile for planning board from the below path.
IMG>Production>Capacity Requirements Planning>Evaluation>Profiles-->Define overall profiles
Could any one please suggest me where and how to define required user statuses against the profile.
Thanks,
LuckyHello,
Please check the transction BS02. or Below Path in SPRO
Production Planning for Process Industries>Master Data>Resource>General Data>Define Status Profiles
Regards,
Rakesh -
Dear All,
Need help in understanding how and when will the % duration of work which we get while confirming an acitivty will show up in higher WBS.
Eg.
WBS level 1 % duration of work doesnt show up (no time bar visible)
WBS level 2 % duration of work - doesnt show up (only actual time bar visible)
Activity 1 % duration of work 20- visible in plan board
Activity 2 % duration of work 20- visible in plan board
Requirement at higher WBS it should show % duration of work as it shows in Microsoft project.
Please Help
Regards,
FarhanDear venkat,
My problem is not solved can i send you the screen shot so that you can guide me .
If yes please get me your ID.
Regards,
Farhan -
Hiding the Optimizer button from the DS planning board
Hi
How to hide the optimizer button from the DS planning board ..
ThanksHi Chak
I think the problem may be with a livecache inconsistency. The Planning Board should be reading it's information from the livecache, whereby the Product View may be getting it's situation from the database. Try running the livecache consistency checks if it occurs again.
Regards -
DS Planning Board Object Color Change according to Order Type etc.
Hi,
I want to differatiate the colors of the objects on the resource,
according to their certain propertis, for example order type,
But if they have the same status the sytem marks them on the same
color,
I went into the customizing for the BOARD Profile and color adjustments
but there are only certain criteria and I could not decide
which object type to which color,
Does anyone know anything about it?
MehmetSetting up the colour or Order (or actually Operations) can be quite a challenge.
Sugest you use the SAP standard, copy it and then change suitably.
Follow this in SPRO >> APO >> Supply Chain Planning >> PPDS >> DS Planning Board >> Maintain Planning Board Profiles
Here select the appropriate planning board profile, click on Chart. Select appropriate chart - like Operations chart will be a good choice.
Then double-click on the Decision Table for Graphical Objects, check the last mentioned Decision Group and Decisions.
That will have reference to Grpahical Object Id.
Pick up the Graphical Object ID and then double click Grpahical Elements from the left pane. Enter the Graphical Object Id (Planning Board Profile is already chosen).
Select the grpahical elements and click on the Detail button to see the Display Colour.
So if you need to change the Operations based on Order Type like Fixed, Deallocated, Created etc. then change the colour of the graphical object here.
Somnath -
Scheduling comparision in Gantt Chart- Project planning board
Hi All,
I Need to use the "Scheduling comparision" in Project planning board gantt chart. This is to compare the original status of activities before and after scheduling.
But the "Scheduling comparision" button in the PPB does'nt seem to work.
( I am selecting the activity and then pressing the button for"display original status" )
How do I use this functionality?
Thanks in advance.Hi Potluri Srinivas ,
After some tests, I still donot get, how does this functionalties work either.
I assume, it is linked with the setting in 'option' -> 'planning board' -> 'diagramm area' -> 'orginal schedule'. But I donot know, how the two things linked directly.
If you find it out, please post it.
Thanks and regards,
Zhenbo
Maybe you are looking for
-
How to convert a number to FLOAT with 9 decimal values.
Hi all, I need to convert a number like '10.02' to a floating point number with 9 decimal values like '10.022111221'. I think that the right function is TO_BINARY_FLOAT, but how can I obtain 9 decimal values? If I use the following syntax: select TO_
-
PC Suite 6.41.6 or 6.81.13.0
I would like to know whether it is advisable to use PC Suite 6.41.6 or 6.81.13.0 to transfer data (contact,calendar,images,music,notes) from 6230i to 6233? And, to do that...should I use backup.restore feature or synchronisation? And, through Phone B
-
What path to use to access network files from Java app running on Mac
I have a Java app running on a Mac with OS X that I'm using to check for files that exists on Windows servers within our network. Using a path like /Volumes/<Share>/ works because I've already connected to the drive using Finder. If I try to use a fu
-
STO returns with EWM Error "Posting with reference to pur. order only possi
Hi Experts, We are trying to STO returns GR (161 Movement) with transaction MIGO for a EWM managed plant. Plant A is a EWM managed plant and Plant B is IM managed plant. We created a stock transfer order with "B" as supplying plant for plant "A" but
-
I had to forcequit pages and now it won't reopen. Could someone help?
I had to forcequit pages and now it won't reopen. Could someone help?