For Externally Procured Materials (ex - ROH) - SG's are maintained or not?

Hello
Do I need to maintain SG's ( like SG10, 40, 70) for ROH as these are externally procured?
As I see since ROH are externally procured, no need to maintain the SG (10, 40, 70,etc) in MRP 3 view of the ROH* material master as SG's (10, 40, 70)* are meant for maintianing PIRS & PIRs means it is inhouse production
Iam not limiting myself to SG's (10,40, 70) for ROH, instead any SG need not be maintained for ROH (externally procured) 
If I want to see that ROH materials get consumed by  the FERT then maintain SG 40/70 for the FERT/HALB (inhouse production) that should consume the ROH (externally procured)
Questions:
Q.For externally procured materials do I need to maintain the SG?
Q. If no need to maintain SG's for externally procured materials then what fields do I need to maintain to see that externally procured material which are used in the finished product gets consumed by sales orders?
Please clarify
Thank You

Pradeep
Thank you for your reply & time
If the component is semifinished & is externally procured, then following settings needs to be maintained
Procurement Type : F
Special Procurement Key : 30 (subcontracting)
But Subcontracting(30) is used when we want semifinshed product to be manufactured outside the company from a raw material issued by the company
& control key we maintain is PP02
In above scenario, then we go for subcontracting or else we need not maintain the subcontracting
Please clarify
In your answer (" u have to set Individual/coll = 1 or blank at MRR of Down level material.")
what does MRR stand for
Due points have been assigned

Similar Messages

  • MRP - Create Planned Orders only for Externally Procured Materials

    Dear All,
    We have a scenario that our client gives us the daily requirement schedule for the current month and a monthly forecast for future months so that we can plan our externally procured materials based on the forecast.
    Now I only want the MRP run to create Planned Orders for HALB and FERT based on my current months daily schedule and planned orders for ROH (Externally Procured) based on the next months forecast (monthly).
    I dont want the system to create planned orders for HALB and FERT from the forecast. The requirement for the ROH are however derived from the Finished Good BOM and the forecast is also given for the FERT material. I know its a long shot but is there a possibility in the system to do such a thing or a work around?

    Your business case is not clear; MRP will create planned orders for inhouse produced materials, and either planned orders or purchase requisitions for external procurement.
    You can choose to convert or release external procurement for a long time ahead (eventhough taht if you have proper lead times defined you can release by lead time), but convert inhouse planned orders to production orders only for next period (week, month). Actually this is common practice.
    So I fail to understand your problem.

  • Bom for External procured materials

    Hi, my bom is as follows. in top level semi product is F procurement type and next to this is 2 roh components of F procurement type. when i run md02, no pr generated for bottom level materials. pls advise why it is not generating the pr's for the same.

    Run MRP (MD02) for lower level materials as well, then you will get PRs. If you want PRs at all levels, then run MD01 in NETCH mode.

  • Parallel MRP run for Internally and Externally procured materials

    Hello all,
    we want to run MRP with different settings for externally procured materials (create purchase Requisition) and internally produced materials. The choices provided my MRP run is either create planed order or Requisitions when run background. Is the activation of user exit M61X0001 the solution to this issue?  I can recall that we had done this is some project in the past, not 100% sure to be sincere. Can anyone help on this?
    Thank you for any help.
    Edited by: Ioannis Salichos on Aug 11, 2010 11:51 PM
    Edited by: Ioannis Salichos on Aug 11, 2010 11:57 PM

    you are right, this is the user exit that can be used to control this.
    see an excellent "how to use"  from R Brahmankar
    in this thread:
    Re: mass MRP run

  • Cross Plant Planning for External procured Material in MRP with their stock

    Dear Gurus,
                 I have one requirement my client want Cross plant planning in MRP. this plants are only site plants no Manufacturing. All materials in these plants are Externally Procure Materials(F). Now they want cross plant planning  for Externally Procure Materials or cross plant planning  for Externally Procure Materials  with consider all plant stock details while planning.
            can you tell me procedure for this,
    Thanks in advance,
    Regards,
    Devraj

    Hi,
    In R/3 you cannot consider all plants in planning, you have to use SAP APO to achieve your goal (if your goal is to optimize the procurement in your plants). When you execute MRP run in R/3 it will only consider the details of one single plant.
    I mean if you have several plants used for external procurement, and you want to make an optimal decision considering all the stocks and open transactional data, requirements in those plants, it is not possible in R/3 as per my knowledge - multi site/plant planning won't give you such optimal solutiion.
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2d4d44af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_apo/helpdata/en/7e/63fc37004d0a1ee10000009b38f8cf/frameset.htm
    Regards,
    Csaba
    Edited by: Csaba Szommer on Nov 17, 2008 10:27 AM

  • KANBAN for external Procurement and Purchase order

    Good morning
    I am working with kanban for external procurement
    Through  PKBC-transaction I set "empty status" and SAP creates the purchase order
    is it possible to create 1 purchase order about 2 or more item?
    in which way?
    thanks

    Hi,
    Thanks for reply... Can you breif me the procedure to achieve it..In material master, where i need to mention it....
    Regards,
    Subhash

  • Capacity Planning for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • MRP planning for external procurement

    Dear all,
    How do i make my system, upon MRP, trigger a purchasing requisition for external procurement of a external 3rd-party vendor?
    How to setup this in the system and master data?
    thanks,
    tuffy

    Dear Tuffy,
    For all the externally procured items,maintain the procurement type as F in MRP2 view.
    Maintain Purchase Info record for the material and vendor combination in ME11 and then assign the vendor for the material,plant
    combination in the source list in ME01.
    In this case the Purchase Info Record should be created for standard Info Record.
    In the case of sub-contracting assign the procurement type as F and special procurement value as 30 in the MRP 2 view of the
    material master and create Subc-ntracting Purchase Info Record in ME11 and assign the vendor in source list in ME01and source
    list usage as 2 in both the cases.
    The above sub-contracting is assembly sub-contracting process.
    Check and revert
    Regards
    S Mangalraj

  • Error in BP for External Procurement

    Hi together,
    I've set up the BP for External Procurement 60.2 as described in the manual. From all pages only the iViews "Overview-Purchasing" and the iView Vendor Confirmations on the Overview works without error. The other iViews wouldn't displayed (Page cannot displayed).
    I'm using EP 6.0 SP13 and ECC 5.0. The BSP's are activated in SICF.
    If I test the iView i got in the default trace the error "java.lang.NumberFormatException: For input string: "10985373858"". I haven't any idea, from which point this number will come.
    Have anybody experince with this package?
    Regards Thomas

    Hi Olaf,
    please see Java-iViews-Errors in BP for CRM and CRMContextException (here especially Michael Healey's reply).
    Hope it helps,
    Detlev

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • Quota for External Procurement

    Hi,
    Can any One please tell me how to create quota arrangement for external procurement relationships using BAPI.
    Thanks In advance.
    Thank you..

    You can always use BAPI BAPI_QTASRVAPS_SAVEMULTI2
    Go to SE37 and test out the BAPI. Ensure there are T Lanes and mode for creating the inbound QA for external Proc.

  • Schdelung for externally procured material.

    Dear Gurus,
    We have defined planned delivery time for externally procured material. After MRP run system is generating delivery dates for that.
    We want if there is capacity constraint at supplier's end then how to handle this issue in MRP run.
    Example -
    PR generated after MRP run for XXX material code for 5000 kg and required date is 15/06/2009.
    Supplier's manufacturing capaicty of this material is 500/day i.e. from today he will be produced only 3500kg.
    In case shop floor plan will not executed due to shortage of supplies.
    How to map this scenario in SAP so that MRP controller will come know that the said material will not be available on required date and he will have plan some thing else during that period.
    Regards,
    Abhay

    Have you tried with Lot SIze Data in MRP 1 view
    you can give 500 in Maximum Lot Size
    and lot size as per your business need for example 7 days no split quota something like that
    After MRP run, your planner can see the next material expected availablity and plan the production
    otherwise, if company permits for surplus inventory , then keep some buffer as Safety stock and plan accordingly
    Edited by: deshamol on Jun 9, 2009 12:59 PM

  • BOM explosion not done for externally procured item.

    Hi Experts,
    We have done MRP run for finish goods which is creating planned orders for HALB material, but it is not further exploding the BOM of HALB material, so  we are not getting any planned order/pur requisition for ROH. Plz help me out asap.

    Hi,
    When you run MRP for an externally procured item say - HALB , proposals will be generated say-planned order for ext proc for that item and the BOM will not be exploded further.

  • Purchase Requisition are not getting generated for External Procured Materi

    Hello PP Guru,
    The is a issue which the client is facing.
    The requirement is as follows
    There is material which is externally procured.
    They do the MRP run by using MDBT.
    Now the problem is Planned orders are getiing generated instead of Purchase requisition.
    It should always generate PR instead of planned Order.
    When the check in ME57 the PR is not reflecting, but when the check in MD16 the planned orders are getting reflected.
    Every time they have to convert the Planned order to Purchase Requisition in MD16.
    So can you please let me know as to why is this problem.
    Thanks & Regards
    Nilesh

    In the variant which you use in MDBT, modify the value for Create purchase req. to 1. Now if you execute MRP with the new / modified variant system will always trigger PR irrespective of the opening period.
    But if you want PR within opening period & outside of it should be planned orders, then maintain 2.

  • Kanban process for external procurement

    We want to use the external procurement process for replenishment of stock with Kanbans. So if we turn on the external procurement, it makes us create a scheduling agreement and link it to the kanban. The process is that when you scan the kanban EMPTY it creates a PR and then you can convert the PR to a PO.
    However, the users want to make this process less cumbersome. They want to have an external kanban but have a blanket PO. So when the kanban is set to EMPTY they want an output to generate to the vendor to replenish stock. And once stock is received (101 movement) against that PO they want the kanban to automatically change to FULL. Or they want it so that once they receive the stock manually, they go to scan the kanban FULL and it receives the PO for them (101 movement).
    I read the SAP documentation and it appears I can have a PO against this external kanban but I canu2019t figure out how to set this up.
    Any ideas?

    Hi,
    I am not getting clearly.Please explain the requirement in detail
    Actually the external procurement cycle works as
    1) in the control select the replenishment strategy like
       A)Working with purchase orders.
       B)Working with purchase Requisition.
       C)Working with scheduling agreements.
    Select as per the customer requirement.
    2) Then once you make bin EMPTY then system automatically creates PO or PR or schedule line.
    3) Once you do the GR against the PO or schedule line manually then bin status changes to FULL automatically or make
       manually bin FULL then GR against the PO happens automatically. It's Vice versa .
    Explain your problem in details.
    Regards,
    Vijay

Maybe you are looking for

  • After upgrading to Lion Logic Pro 9 is not working right

    I have no idea what is going on, I was working on a project this evening, did a bunch of work as a matter of fact, I always hit save after every litte bit of work I do, it's a force of habit now. When I go to re-open my project I get some kind of err

  • Work around for Budget allocated to Different Projects.

    Hi All, Is there any way i can work around to allocate the Budget based on Projects? Its a construction industry and each of the projects will have a budget for expenditure. At any point of time this budget should not be exceeded in a given project.

  • In "Show more Bookmarks" if I right click does not work (I want to open in a new tab)

    This is using Mac Firefox current version. I use lots of tabs and don't have space for all of them so there is a >> at the right end for clicking and displaying the rest of them. If I click and display list and highlight one of them, the right click

  • EP_BUILDT and SAP_BUILDT not showing up in JSPM to upgrade

    Dear all, We are applying SPS from 09 to 13 in our NW04s environment (Portal). JSPM does not show EP_BUILDT and SAP_BUILDT to upgrade in the list. I have tried both the Support Pack Stack option and Single Support Pack option. All other components ha

  • Quiz Score in Slide Presentation

    Hi All, I have prepared a short tutorial in slide presentation format with 20 questions at the end, and I'm trying to get the quiz score (using Flash with AICC tracking) displayed on the last slide but I haven't been successful so far. I am using sli