Forecast and days supply.

Dear guru.
Do you know a solution in order to consider also forecast for calculation of Days supply , Recipts days supply  ?
Thanks in advance.

Dear,
Please refer this useful explanation of Mr Rajesha,
[Days supply,Receipts days supply   |Days supply,Recipts days supply]
[Days supply -MRP   |Calculation of days supply -MRP]
Hope it will help you.
Regards,
R.Brahmankar

Similar Messages

  • Target Days Supply in SNP Heuristics and Deployment

    Dear Experts,
    Does the Target Days supply only define the minimum and not the maximum stock levels?
    Example: consider a Period P1
    The target dayu2019s supply is 20 days, and the Days Supply in Period P1 is more than 20 (suppose 35)
    The Total Demand in that week is not big enough to bring the Days supply < 20
    Question:
    Does the system still create a Distribution Reciept (Planned) in this case and keeps increasing the day's supply of dest location? Or does it create stock transfers only if Days Supply is threatening to fall below the Target Days Supply?
    In other words:
    Does Target Days Supply only come into picture when Days Supply < Target Days Supply, in which case the system adds the difference (Target Stock Level u2013 Current Stock Level) to total demand while creating stock transfers.
    When Days Supply is >> Target Days Supply, does the SNP Heuristic still create a Stock Transfer even though there is enough stock to cater to the current total demand and not fall below Target Stock?
    Hope you can help in understanding this concept.
    Regards,
    Rimjhim

    Thanks for your reply.
    Please correct if I have misunderstood:
    While calculating the net requirement during SNP Heuristic run, the system will apply Target Stock Level into consideration and will only create a Pur Req if the stock is falling below the Target stock.
    Thanks,
    Rimjhim

  • Targets days supply

    Hi Gurus,
    Please let me know on targets days supply in PP DS and the effect of it on planning. what are the necessary settings to be maintained for achieving the same ?
    Thanks,
    Prasanth

    Hi Prasanth,
    In APO the requirements is rolling that is if you have Forecasting then the forecast for a month it is
    disaggregated into days or weeks hence if you plan to have a safety stock planning done by APO this method
    of maintaining Target days helps to maintain the stocks at the location all the time so if you define 4 days
    as the Target days of supply then at all time Heuristics run or optimizer run will ensure that stocks are
    there to meet the requirement of next 4 days as is in your case. In case of shortfall system will generate
    a requirement on the Source plant based on the transportation lane.
    Settings are maintained in Product Master under Lot size tab (Quantity and date Determination).
    Please let me know if you need any further information on this
    Thanks,
    Harsh

  • Upgrade video card and power supply or upgrade my pc?

    I have a :
    HP
    Series Pavilion Model M8530F(KT334AA) Type Media Center / HTPC Processor AMD Phenom X4 9550(2.2GHz) Processor Main Features 64 bit Quad-Core Processor Cache Per Processor 4 x 512KB L2 Cache Memory 5GB DDR2 800 Hard Drive 750GB 7200RPM SATA Optical Drive 1 SuperMulti DVD Burner with LightScribe Technology Graphics NVIDIA GeForce 9300GE with Hybrid SLI Technology with 256MB dedicated video memory, DVI and HDMI capabilities, and support for Microsoft DirectX 10. Up to 1919MB Total Available Graphics Memory as allocated by Windows Vista Audio High Definition audio Ethernet Integrated 10/100/1000Mbps network interface Keyboard HP multimedia keyboard Mouse HP optical mouse Operating System Windows Vista Home Premium 64-bit Software Included Photo and Video
    muvee autoProducer Basic: Automatically create professional looking home videos and burn to DVD
    Entertainment
    Cyberlink DVD Suite Deluxe: Automatically fix and edit videos and create CDs and DVDs. Edit, burn and archive data to discs.
    Productivity
    Microsoft Works 9: Includes a word processor, spreadsheet, database and calendar
    Microsoft Office Home and Student Edition 2007 Trial: 60-day trial version
    Adobe Reader 8: Read and print PDF file
    PC Security
    Norton Internet Security 2008: Protect your PC out of the box (60 days of complimentary live updates)
    Online Services
    Easy sign-up to major dial-up and broadband Internet Service Providers:
    - MSN dial-up (offer included)
    - NetZero Dial-Up (offer included)
    - NetZero Accelerated Dial-Up (offer included)
    - Juno Turbo Dial-Up (offer included)
    - High Speed Internet Services Comparison Shopping
    Motherboard Chipset NVIDIA GeForce 8200 Chipset
    CPU CPU Type Phenom X4 Installed Qty 1 CPU Speed 9550(2.2GHz) L2 Cache Per CPU 4 x 512KB CPU Socket Type AM2+ CPU Main Features 64 bit Quad-Core Processor
    Graphics GPU/VPU Type NVIDIA GeForce 9300 GE Graphics Interface PCI Express x16
    Memory Memory Capacity 5GB DDR2 Memory Speed DDR2 800 Form Factor DIMM 240-pin Memory Spec 2GB x 1 & 1GB x 3 Memory Slots (Available/Total) 0/4 Maximum Memory Supported 8GB
    Hard Drive HDD Capacity 750GB HDD Interface SATA HDD RPM 7200rpm
    Optical Drive Optical Drive Type DVD Super Multi Optical Drive Spec SuperMulti DVD Burner with LightScribe Technology
    16x DVD±R, 8x DVD+RW, 6x DVD-RW, 8x DVD+R DL, 4x DVD-R DL, 5x DVD-RAM, 16x DVD-ROM, 40x CDR, 32x CDRW, 40x CD-ROM
    Audio Audio Chipset Integrated
    Communications Modem 56K LAN Chipset Integrated LAN Speed 10/100/1000Mbps
    Front Panel Ports Front USB 2 Front IEEE 1394 1 Front Audio Ports 2 Card Reader Front panel 15-in-1 memory card reader: supports SmartMedia, xD, MultiMedia Card, Secure Digital (SD), Mini Secure Digital, Compact Flash I, Compact Flash II, IBM Microdrive, Memory Stick, Memory Stick Pro, Memory Stick Duo, Memory Stick Pro Duo, RSMMC, MMC Mobile, MMC+
    Back Panel Ports PS/2 2 Video Ports 1 DVI, 1 HDMI Rear USB 4 Rear IEEE 1394 1 RJ45 1 port Rear Audio Ports 6 ports S/P DIF 1 port
    Expansion PCI Slots (Available/Total) (2/3) PCI-E x1 slots
    (0/1) PCI-E x16 slot
    Mouse Mouse Type HP optical mouse
    Keyboard Keyboard Type HP multimedia keyboard
    Physical Spec Dimensions 16.54" x 15.16" x 7.60" Weight 32.00 lbs.
    Manufacturer Warranty Parts 1 year limited Labor 1 year limited
    Sorry for the long copy and paste. I read that I can upgrade the video card and power supply. But atm when I play world of warcraft at ultra settings, I tend to lag really bad in the new instances with the new cat expansion that came out. I wanted to know if I should upgrade the video card and power supply for better performance or just upgrade my whole pc tower.  Fyi, I am running a Acer X243w lcd flat panel monitor if that helps too.

    My brother has a high end laptop with a built in, high end gaming video card (I forget which one). He's able to run the game on full-on Ultra. 
    I have an integrated video card which games the game on.. 'cartoon'.. mode. It's lower then low. When someone shoots a powerful spell at me, I go into a DOS Prompt. (not really, but it's pretty bad).
    Funny thing is, I can still kick my brother's butt in any PVP match he wants to set up. 
    But I guess his graphics are pretty....
    As for which video card works best, I'd have to do some research. After that graphics update they did with CAT,  it's kind of a toss up again.
    I am a Bestbuy employee who volunteers on these boards on my own time. I am not paid for posting here, and you should understand that my opinions are exactly that - opinions. I do not represent Bestbuy in any way.
    : Open Mailbox

  • CTM - Safety days Supply

    Hello all,
    I'm working with CTM and I found a problem that I can't solve. If I set the profile to consider for example 8 safety days supply  (I tested with all settings) the system do not consider the safety days of supply for the first 9 days. The system creates the supply with no difference between demand and supply and at the 10th day it start to create supply with 8 days difference from demand. Did anyone know what is happening? I tryed with fixed and time-dependent safety days of supply and I'm working with the SCM 5.0.
    Thanks in advance,
    Marcelo

    Thanks a lot for your help.
    This setting seems to be a very good suggestion. The early demand fulfillment specifies the time that the system have to build up safety stock, but I tested it and this setting seems that doesn't work for safety days of supply. Do you know if there is another setting like this for the days of supply?

  • Safety days supply not followed due to change in Means of Transport in SNP

    Hello All,
    I am facing a strange issue regarding the SNP heuristics and means of transport. We observed that the system was not respecting the safety days supply. For example if we had a receipt in bucket 'N' and there is a violation of safety days supply in bucket 'N-1'. When we un a heuristic ideally system should delete the receipt in bucket 'N' and create a new one in bucket 'N-1'.
    But we observed that the system is retaining the existing receipt in bucket 'N' and also creating a new one in bucket 'N-1'. This is making the available days supply to increase manyfolds and the whole plan looks inconsistent from Safety Days point of view.
    After analyzing the issue i observed that if we have existing receipts using a Means of Transport 'X'. Now if we run the heuristic using a Means of Transport 'Y' then the system doesnt touch the existing receipts. If I run teh heuristics using the existing Mean of Transport then it works absolutely fine.
    Kindly suggest.
    Regards,
    Abhi

    Hi,
    when you check all products flag it means the means of transport is available for all products and not product specific, to select the MOT for SNP you need to check the aggrgtd plng flag.
    Also safety stock has nothing to do with MOT, SNP heuristic plans based on checks the quota arrangement if its for multiple MOT it will distribute the PR based on the ratio in quota if both MOT are able to meet demand on time, otherwise it will violate quota till the time both MOT are not capable of meeting the demand on time.
    If no quota is defined it will check for which lane is able to meet on time n if their are multiple lanes which can fulfill demand on time then it will choose MOT with less cost.
    Have you got multiple MOT for a source destination combination to be considered for SNP heuristic?
    Just check your design again and explain the problem again as this is not the standard expected behavior.
    Thanks,
    Sanjog

  • Customizing of the days' supply in MD04/MD06

    I don't see any difference with the first receipt days' supply and 2nd receipt.  We need for the 1st days supply more binding information, like the PO or process order,
    for the second we need assigned purchase requistions or firm planned orders. Could you please check.
    *Please set the indicator for consumption based planning not on safety stock or reorder point.
    Can some one give me steps how to implement the above requirement . I have gone thru the configuartion but need further help .
    Regards,
    SHD

    Shahid,
    You need to get your users to clarify their requirements.
    I don't see any difference with the first receipt days' supply and 2nd receipt. We need for the 1st days supply more binding information, like the PO or process order,
    This requirement is not explicit enough.  Tell the users you need an explicit list of the items they wish to include in the calculation for first days supply.  They can select from the list found in configuration (these are the only options available):
    Production/Process orders
    POs, shpg notifications, sched. lines, dely scheds
    QM inspection lots
    Firmed purchase requisitions
    Firmed planned orders
    Assigned planned orders
    Receipt reservations
    Shipping notifications
    for the second we need assigned purchase requisitions or firm planned orders
    This is explicit enough, but not possible.  Assignment of a purchase req is not adequate to delineate.  Unfirmed (but assigned) PuReqs will not be considered.
    Please set the indicator for consumption based planning not on safety stock or reorder point.
    Receipt days supply is configured at the plant level.  It will be same whether you are using consumption based planning, or demand based planning.  It is possible to have the system calculate days supply "until stock falls to Safety stock level" or "until stock falls to zero"
    Once you have your lists of items that are to be included in 'first day' and "second day', go to OMIL.  For items to be considered only in 'first day', enter a 1.  For items to be considered only in 'second day', enter a 2.  For items to be considered in both, enter an 'X'.  
    If you wish for the system to ignore safety stock (calculate days supply until stock falls to zero), enter 1 in the safety stock field.
    Rgds,
    DB49

  • Fixed Days Supply , Oracle E-Business Suite Planning

    Dear Sir/Madam,
    With regard to using fixed days supply on item attribute level, we are not yet sure what the effect is on the planning.
    We know that demand over a certain period of time (FDS) will be aggegrated to one orderline.
    However, if in week 10, demand has been aggegrated for let say quantity 10, and during that week (and thus in the weekly MRP RUN), additional demand of 2 in that same timeframe is needed.
    Will Oracle include that extra demand and make one orderline for 12?
    We currently think that FDS frames are frozen after one MRP Run. is this true, and can this be ignored?
    What I mean is:
    For item XB we have the following planned orders
    -5 need by date 10-03-2015
    -7 Need by date 10-06-2015
    -10 need by date 10-08-2015
    If we set FDS to 365 days, for item XB, Oracle will aggregate total demand of 22 in one orderline.
    But what happens if suddenly a new planned order enters O_MRP
    3 need by date 08-08-2015?
    Will the planning , unless we haven't released the orderline of 22, make a new orderline for 25 units for need by date 10-03? We currently think it generates a rush order.
    Many thanks in advance!

    OracleE-BusinessSuiteR12AdvancedSupplyChainPlanningConsultantCertifiedExpert wrote:
    Hi All,
    I work as demand planner(supply chain) and my company use oracle.
    I would like to know would above course would help me to do my job better ?
    The short answer is probably. 
    The long answer:
    - You have mentioned a certification and then referred to it as a "course".
    - To achieve certification you need to pass two exams: (Ref: Oracle EBS R12 Advanced Supply Chain Planning Certified Expert Consultant )
    - Associated training courses are recommended ... though not mandatory in this case ( See recommended training on exams from the above link).
    - It is almost certain that whatever training one undertakes that should increase knowledge ... and if job relevant it should help you get your job.
    - You will need to look at exam topics (or training course topics) and make a self assessment of how much you stand to gain; and how much it will gain it in future.
    ---- You should know more about yourself than anyone else, and if you are honest with yourself should be able to work out your own cost/risk/benefit.
    ------ Remember cost may not only be monetary ... it may be time you could have spent doing something else ... perhaps with your family.

  • Fixed Days Supply & Fixed Order Quantity

    Hi,
    in certain cases we use the Fixed Days Supply & Fixed Order Quantity attributes in the Item Master to influence our ASCP plan calculation (size of planned orders etc.)
    We need this because we do discrete production (semiconductor industry) and with the fixed order quantity we to ensure that the system plans with full Lots.
    However I am not sure what the impact of the Fixed Days Supply is, especially in combination with the Fixed Order Quantity.
    Unfortunatly the Manuals do not tell very much about this. Does anyone have experience with this and wants to share some knowledge? I would like to know what these parameters really do and maybe there are better ways for our setup...
    Thanks,
    David.

    Hi,
    thanks for the reply. I found the detailed explanation in user guide you mentioned.
    I am not sure that we made the setup in an optimum way.
    We use for example fixed days supply = 5 for many buy items, because we place weekly Purchase Orders for these items and want to have the planned orders combined instead of having a planned order for every day.
    And we use the fixed order quantity to prevent two things:
    1) The size of the planned order gets below a typicall Lot size and the calculated leadtime for this planned order is too short. We define item based resource usage rates so it will calculate the exact lead time for the small planned order, but in reality our production has to run the full Lot which takes more time of course.
    2) without the fixed order quantity the planned orders might become too big, which makes scheduling of them more difficult, because finding a free time-slot on the machines for a huge quantity must be more difficult than for a smaller planned order.
    But unfortunatly Oracle does not provide some business cases, especially for our semiconductor industry so it is more trial-and-error what we are doing...
    regards,
    David.

  • Use of Calendar in Days Supply Calculation in APO

    The Days Supply is R/3 is defined as - The range of coverage is then the number of workdays between todayu2019s date and the date of the requirement that causes the shortage minus one day
    The Days of Supply in APO defined as - The days' supply tells the planner how many calendar days the receipts and stocks will cover the current requirements for.
    In our case we have a factory defined in R/3 as 5 days working, so R/3 display Days Supply it displays only number of Working days till stock/receipt last while APO displays number of Calendar Days ( including non working days)
    Is there any way..i can make these 2 number same in R/3 and APO. Both System has same configuration for considering stock, receipt 7 requirement elements.
    Thanks in advance !!!

    Hi,
    Normally APO should consider the working days.
    could you check that the macro "Determine workdays" is properly executed; and that "Days' supply " is based on the workdays key figure.
    Please note that by default the relevant calendar is the shipping calendar; please ensure that it is maintained in the location master.
    If you want to based it on another calendar, you need to adapt the macro.
    Thanks and Regards
    Julien

  • Days supply is not populating in the planning book

    Hi Experts,
    When I select multiple products in the planning book, the value is papulating as total but if I drilled down to individual product then days supply(Key figure) values are not populating in the planning book.
    Please let me know if any idea.
    Regards,
    Hrishi

    From what you mention it looks like you do not use the standard SNP Planning Book. Was the macro inactive so that you had to regenerate?
    When you move a macro from workbench to level change it should not require to be regerated.
    Please check if following macros are active (green) under level change in sequence
    Determine Workdays
    Layout Attributes
    Drill (Level)
    Else compare the macros and sequence in the standard SNP Planning Book with the Planning Book you are using.
    The Day's Supply (All: Day's Supply) and Determine workdays macros are essential for populating the day's supply keyfigure.
    Thanks,
    Somnath

  • Can't Find the fixed days supply in the collected items.

    Dear All,
    after running the collection process , i can't find the fixed days supply item attribute in the collected data (from the table MSC_SYSTEM_ITEMS).
    Regards.
    Ahmad.

    Ensure that you have defined fixed_days_supply at the org-item level.
    If you have, then check if the collection is working properly by making some other change to an item (such as description change and change of the fixed lot multiplier).
    If those changes are not coming over, the problem may be with your Data collection. Can you run a full DC? Make sure that the snapshots have been refreshed properly.
    Hope this helps,
    Sandeep Gandhi

  • Stock Days' Supply Without Receipts - Negative despite ample stock?

    I am reviewing the MRP list for a material and find the following situation in MD06 as well as the stock / requirements list:
    SEALING WASHER;                                             3.0-     3.0-     3.0-     22.02.2011     216,071      PC     25,000
    Where the values are StckDS, 1st RDS, 2nd RDS, MRP date, plant stock, UOM and safety stock respectively.
    The plan situation considering only requirements and stock is as follows:
    22.02.2011     Stock                                                                                216,071
    22.02.2011     SafeSt     Safety Stock               25,000-     191,071
    05.12.2010     OrdRes     B445.112.261-00               6-     191,065
    05.12.2010     OrdRes     B445.112.275-00               6-     191,059
    22.12.2010     OrdRes     B445.119.578-00               40-     191,019
    17.02.2011     CusOrd     0041725938/000120/0001               350-     190,669
    02.05.2011     ----->     End of Planning Time Fence               0      0
    With more than enough stock to cover all current and future requirements, why would the stock days' supply go negative? I do not understand the calculation from the online help, where negative values are not explained.
    Edited by: Sriram N A on Feb 23, 2011 11:33 AM

    I overlooked th fact that there was a separate "project stock" segment that was being planned, for which the requirement was past due.  Hence the days' supply was negative.
    The coverage for use of normal unrestricted stock would be 999 as per the data.

  • QM Lot in Receipt Days Supply

    Hi All,
    We done the config for Receipt days supply as QM Lot to be considered for both 1st and 2nd Days receipt. But it is not considering. What would be the reason? Whether the issue is in QM or PP?
    Is there any possibilty that a particular status of QM lot will not considered as stock?
    Regards,
    Sureshbabu G.

    Hi
    In OPJJ - Availability Check control for the combination of checking group & checking rule ..check whether incl.quality insp stock option is ticked or not.
    Regards
    Brahmaji

  • Receipts Days Supply

    Hi All,
    Kindly explain the receipts days supply concept.
    We have a stock of 25 EA in the plant. We have a demand of 100 EA. When i run a MRP for the material, PR got generated on 26/05/2009 and it is rescheduled to 01/05/2009.
    We execute MD06 and it shows the supply as -10.8.
    How the system calculated the supply as -10.8?
    Please explain.
    Regards,
    Sureshbabu G.

    Hi
    Hope this example will be helpful in finding the receipts days supply
    Calculation of the range of coverage: Starting from the current plant stock, the requirements are deducted one after the other along the time axis. This is done until there is a shortage (requirement > stock). The range of coverage is then the number of workdays between todays date and the date of the requirement that causes the shortage minus one day. The value after the decimal point is the ratio between the opening stock on the day of the shortage and the requirement on the day of the shortage.
    Stock = 240 pcs
    Purchase orders are included in the days' supply, but not purchase requisitions
    1st day: Purchase order for 50 pcs       => Stock = 290 pcs
             Requirement for 90 pcs          => Stock = 200 pcs
    2nd day: Purchase requisition for 80 pcs => Stock = 200 pcs (remains)
             Requirement for 120 pcs         => Stock = 80 pcs
    3rd day: Requirement for 100 pcs         => Shortage
    Range of coverage = 3 workdays minus 1 + 80/100
                      = 2 + 0,8
                      = 2,8
    Regards
    Brahmaji

Maybe you are looking for

  • Slow Moving/Dead Stock Report

    Hi Guys BEsides T.COdes MC46 and MC50 what other reports that are available on SAP to give the same information and also their Current Stock Balances Vishnu

  • Authorization error; unknown user name or incorrect password

    Hi, We are facing the issue logging into Integration Builder in PI system getting "Authorization error; unknown user name or incorrect password" for all the users.I able to login NWA in PI system.Please find the default trace details below.help us. #

  • Ethernet Bridge Problem

    Well, i just bought a hawking Ethernet bridge. i set it up according to the manuel, and now i plue it into the back of my mac and it computer doesn't work. i try and set it up manually, but it won't connect. anyone have any ideas?

  • Memory Leak in CFMX7

    I just upgrade a server from Windows 2000 to windows 2003 server. CFMX7 has gone up from using around 250meg of RAM to over 1 Gig. I can not find any reference on Adobe's site about this issue. Has anyone seen this problem and if so what was your res

  • Find network share process and kill it

    Hi All, Is it possible that we could find open network share access process and kill it? For example, user is opened a folder via network share (e.g: \\myserver\c$\myfolder). Is it possible that we could somehow query process to identify this open ne