Forecast based planning -weekly schedules split -reg

Hi,
our requirement is we use forecast  based planning where in both forecast periods and historical periods are months
then when fore cast is run requirement is coming in Md04 in monthly buckets only
when we run MRP the out put schedules should come in weekly bucket taking this monthly requirement
how to get that
as we understand  weekly demand can be cumulated to get schedules on monthly but monthly demand can not be split in to weekly schedules as output
any thoughts
regards,
Madhu

Hi,
There's a customization transaction where you can define splitting of forecast requirements for MRP.
Go SPRO, Materials management, Consumption based planning, Forecast, Define Splitting of Forecast Requirements for MRP.
Regards,
Mario

Similar Messages

  • MRP Type VV - Forecast Based Planning

    Hi all,
    My company would like to look at MRP Type "VV" - Forecast Based Planning (under Consumption-based Planning) for FG production materials.    I've read quite a bit about the concept and some based set up to how it works.   We would like to base Planned Orders > Production Orders based on this type of forecast planning.   It seem that SAP advises this kind of plannig for Raw Materials but not FG.   Anyway, what I really need to know are the specifics of how you set up the master data (in the Material Master) to properly execute this type of MRP: like....
    MRP Type: VV
    Lot Size: EX
    Period Ind:  W
    Availability Check: 02
    Forecast Period:   12
    Periods per Season: 12
    Historical periods:  60
    other fields I'm not sure......
    RP Profile:  ??
    Forecat Profile:  ??
    what else......?
    Also, what is the recommended approach to convert this forecast plan into Planned requirements to be converted to Production Orders?   
    I appreciate any further information I can get on MRP Type "VV" and how it works.   I appreciate your input!

    Thanks for the info nudratmaab.    Can you provide further data on what to expect given this forecast.....say I pick MVGA (Moving Average Forecast)?  So I enter some consumption (say last 12 months) and run forecast (MP38).    The MD04 shows the average requirement per "W" bucket:
    02/23/2012     ForReq     W 08/2012                16-
    02/27/2012     ForReq     W 09/2012               116-
    03/05/2012     ForReq     W 10/2012               116-
    03/12/2012     ForReq     W 11/2012               116-
    03/19/2012     ForReq     W 12/2012               116-
    03/26/2012     ForReq     W 13/2012               116-
    04/02/2012     ForReq     W 14/2012               116-
    04/09/2012     ForReq     W 15/2012               116-
    04/16/2012     ForReq     W 16/2012               116-
    04/23/2012     ForReq     W 17/2012               116-
    04/30/2012     ForReq     W 18/2012               116-
    05/07/2012     ForReq     W 19/2012               116-
    The next part is where it is a little foggy for me.   For "VV" do I run WRP1 (Replenishment) or do I run MD02/ 03 (MRP) and then what is the ForReq converted to (or does it even convert)?   I'm looking to implement this for Production Planning Requirements for Finished Produced products (I need them to convert to PldOrd (Planned Orders) to be converted to PrdOrd (Production Orders) by production scheduler.   
    The second part of this is the Raw Material (BOM component) associated with these Finished Goods. THese BOM components are set up as MRP Type "PD" and Lot size "EX" and I was hoping that the FG MRP run would also do BOM explosion and drive requirements for the Raw Material as well.....I'm not seeing that.   
    I need professional / expert to tell me how this works:    So MRP Type "VV" & Lot Size "EX" for the Finished Goods.......and MRP TYpe "PD" & Lot Size "EX" for the Raw Material (BOM Component).....
    THanks again!!

  • Which table can we see consumption and forecast values in forecast based planning

    Dear SAP Gurus,
    I am working on implementing forecast based planning for Spare parts for my client. They have one Main Plant which do purchase of Spare Parts and through Stock transfers moved to 60+ Plants from where Spares are being sold.
    Now I am carrying out SAP trial runs for a set of 160+ materials with various models and want to compare with their existing methodology of requirement calculation.
    I want to compile Consumption and Forecast data month wise for these trial materials (160+ materials in 60 Plants) . One way I thought is to go individual Material Master and looks for values in Forecast view. However it is tedious and time consuming.
    The table name shows RMCP2 and RM03M for forecast and Cons values, but I could not find the table.
    Hence I want to know which table if I can view I can get the consumption and forecast data calculated for quick copying and compilation. 
    Thanks and Regards,
    R.Velmurugan.

    Dear Mariano,
    Thanks for your valuable inputs.
    Like I could able to get the consumption values for materials using table MVER and fields GSV01,GSV02 etc.,
    What field I need refer in table PROP for getting forecast values.
    As such I could not see any column where in data are similar to Forecast view.
    Thanks and Regards,
    R.Velmurugan.

  • Forecast Based Planning

    Hi Gurus,
    In which type of material forecast based planning (VV) is used in business process?
    Forecast requirement are obtained by forecast run of these material.
    Further you get the planned orders only when you run MRP on plant level or on that material. Planned orders not generated on its parent material?
    Pl through light on this.
    Srini

    hi
    forecast based planning is a type of consumption based planning . if u know the historical consumption of ur materials then u can plan with mrp type VV , u need to maintain the consumption data in forecast view of material master. Run ur forecast in MP38 or MPBT and then run mrp based on ur for req,.
    MRP run will not consider PIR or sales order .
    Reward if useful
    Amit

  • Forecasting Based Planning with Dynamic Safety stock Calculation?

    Hi Guys:
    Based on the client requirement we are going with forecast based planning i.e based on Sales historical data , rather then buyer determining how much amount of safety stock need to be maintained ,
    Can system calculate/propose safety stock based on lead time and service levels set for that particular material?.
    how to load historical sales data into the system before go Live , so when they run MRP Run ( using forecast based Planning ) -> Planning orders>PO are triggered? or is there any alternative ?
    Thanks
    Sweth.

    Hi.
    Range of coverage profile in material master MRP2 view
    The range of coverage profile contains the parameters for calculating the dynamic safety stock. This is a statistical calculation on the basis of average daily requirements.
    Use
    The dynamic safety stock is calculated depending on the requirements within a specified period and the range of coverage.
    Dependencies
    The range of coverage profiles (period length for calculating the average consumption, range of coverage, and so on) are maintained in Customizing in the MRP screen.
    SPRO>MM>CBP>MRP CALCULATION>Define rage of coverage profile
    or
    Production>MRP>MRP Calculation>Define rage of coverage profile
    Thanks
    Diwakar

  • Difference between Forecast Based Planning and Time-Phased Planning

    Difference between Forecast Based Planning and Time-Phased Planning and  Time-phased w.auto.reord.point

    Hi,
    go through this links
    http://help.sap.com/saphelp_40b/helpdata/fr/7d/c27143454011d182b40000e829fbfe/content.htm
    http://it.toolbox.com/wiki/index.php/Time-Phased_Planning
    http://help.sap.com/saphelp_46c/helpdata/en/fd/45bc639d6411d189b60000e829fbbd/content.htm
    Regards,
    Sreehari

  • Forecasting Based planning, consider incoming Sales orders, Consume PIR's

    Hello Guys:
    I am in real Problem about this one: I am implementing forecast-based MRP for our client which is a trading company: buys, keeps in storage and sells goods (R/3 ECC 6). We are using material forecast on a monthly period, and run MRP on a weekly period since POs are to be created weekly (therefore we also use the "Splitting indicator" to split monthly forecast values to weekly requirements)
    The way MRP calculates future stocks in this situation (MRP type VV) is like this:
    Current stock
    + Open POs to arrive
    - Forecast Requirement
    = Future stock
    The problem with that one is that if there is an SD order or delivery in the future, SAP does not count in that one as well. It is a real problem, just imagine that in two weeks we have a forecast of 10 pieces of a material. SAP will propose Preqs based on this 10 piece consumption, even if we have an SD sales order for that week on 30 pieces. (by the way the SD order is in the list of MD05 but SAP does not count in that one for future stock reductions).
    If I modify the MRP type in customizing OMDQ, I can make SAP to count in real consumptions (sales orders) in the future stocks: I set "MRP procedure" to PD (MRP) or "R1" (Time-phased materials planning). In this case MRP calculates like this:
    Current stock
    + Open POs to arrive
    - Forecast Requirement
    - Real future requirements (sales orders)
    = Future stock
    So in this case SAP will recommend double quantities to purchase: once for the forecast reqs and on the other hand for the real sales orders.
    It is a trap, SAP should reduce the forecast requirements with the real requirements. The really bad news is that there is a switch for this in OMDQ for the MRP types called "Reduce forecast" but it is not working: I have tried all the combinations of codes in the frame "Use forecast for MRP" but it can only decrease req for the current month and only on a timely basis code "2" for MRP procedure "PD" or "R1".
    Thanks for Help.
    Sweth123

    Hi Mario:
    I am using MRP type PD , Running the forecast using MP30 which generate the forecast requirement.
    I go to MD61 , I Slected Material Forecast option and Copied the forecast requirements as planned independent requirement,
    AFter that when i run MD02 and go to MD04 Screen.
    System Displays MRP Element: UnPlrq----Forecast quantity  --1000
                                MRP Element VSF for Planned Independent requirement -1000.
    Based upon historical consumption data , if there ia requirement of 1000pc , system is proposing 2000 pcs to buy.
    Is there any config setting i need to change so that system won't double the requirement quanitities?
    Please clarify
    Sweth.

  • Difference :Automatic Reorder Point Planning and Forecast based palning ?

    Dear MM Guru's,
    As we See in throtical Concepts that
    Automatic Reorder point planning and Forcast Based Planning Used the prevuious Historical Data.
    Please explain what is difference Between them.
    regards,
    A. S.

    Hi,
    Reorder Point Planning: -
    Use: -
    In reorder point planning, procurement is triggered when the sum of plant stock and firmed receipts falls below the reorder point.
    Features: -
    The reorder point should cover the average material requirements expected during the replenishment lead time.
    The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays. Therefore, the safety stock is included in the reorder level.
    The following values are important for defining the reorder point:
    - Safety stock
    - Average consumption
    - Replenishment lead time
    The following values are important for defining the safety stock:
    - Past consumption values (historical data) or future requirements
    - Vendor/production delivery timelines
    - Service level to be achieved
    - Forecast error, that is, the deviation from the expected requirements
    Manual Reorder Point Planning
    In manual reorder point planning, you define both the reorder level and the safety stock level manually in the appropriate material master.
    Automatic Reorder Point Planning
    In automatic reorder point planning, both the reorder level and the safety stock level are determined by the integrated forecasting program.
    The system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified by the MRP controller, and the material's replenishment lead time into account, and transfers them to the material master.
    Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually adapted to the current consumption and delivery situation. This means that a contribution is made towards keeping stock levels low.
    Forecast-Based Planning: -
    Use: -
    Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based planning operates using historical values and forecast values and future requirements are determined via the integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
    Features: -
    The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This offers the advantage that requirements, which are automatically determined, are continually adapted to suit current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast requirement quantity that has already been produced is not included in the planning run again.
    Reducing Forecast Requirements
    - Reducing forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system also reduces future forecast requirements.
    - Reducing current forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system does not reduce future forecast requirements.
    - Average reduction of the forecast requirements
    The reduction of the forecast requirements is based on average daily consumption. Actual consumption data is not relevant.
    The system calculates the average daily requirement first using the formula forecast requirement/number of workdays in the forecast period.
    The forecast requirements are then reduced by the quantity resulting from the following formula: number of workdays worked x average daily requirements.
    Period Pattern and Forecast Periods
    You can specify the period pattern for the forecast (daily, weekly, monthly or per accounting period) and the number of periods to be included in the forecast individually for each material. It is possible, however, that the forecast period pattern is not specific enough for planning purposes. In this case, you can define per material that the forecast requirements should be divided according to a finer period pattern for planning. You can also define how many forecast periods are to be taken into account during requirements planning. The splitting indicator is defined in Customizing for MRP per plant and per period unit and is assigned to the material in the material master.
    Example: -
    For a monthly forecast, the requirements date would be set on the first workday of the month because, for planning, it is assumed that the total requirement must be available at the beginning of the period. You can then divide this monthly requirement into either daily or weekly requirements.

  • Scheduling agreement with Consumption based planning

    Dear Experts,
    I Have a Scenario,
    I need to Bulit a Laptop which is a Finished Material, and the Components like Hardisk, Processor, Ram, Casing, Monitor are my Rawmaterials. By using these rawmaterials we are building the parent material.
    My Client requirement is 1) Plan and schedule the requirement
    2) Replenish the stock based on consumption based planning.
    My query is
    1) How should i proceed for mm based procurement ?
    2) Does i need to create scheduling agreement for rawmaterials and and maintain schedule lines ?
    3) For which materials i need to run the MRP ? weather its parent material or Component material ?
    4) What are the sequence of process need to be carried out ?
    Required ur valuable inputs on this.
    Best Regards
    SAP LEARNER
    Edited by: JAVEED AHAMED on Feb 12, 2010 8:34 AM

    Hi
    Consumption based planning and Scheduling agreement are two different functions.
    Consumption-based planning is based on past consumption values and uses the forecast or other statistical procedures to determine future requirements. The procedures in consumption-based planning do not refer to the master production schedule. That is, the net requirements calculation is not triggered either by planned independent requirements or dependent requirement. Instead, it is triggered when stock levels fall below a predefined reorder point or by forecast requirements calculated using past consumption values.
    A form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.
    With release documentation (in the standard system, document type LPA)
    The schedule lines in the system have internal character. This means that you can change them in any way you wish. The schedule lines stored in the system are not transmitted to the vendor until you explicitly create a scheduling agreement release (which may take one of two forms: a forecast delivery schedule or a JIT delivery schedule).
    The release documentation allows you to display the releases transmitted to a vendor over a certain period in order to establish exactly when you transmitted which information to the vendor.
    Without release documentation (in the standard system, document type LP)
    The schedule lines immediately have official character, i.e. they are immediately transmitted to the vendor the moment you save them (transmission time-spot 4 for messages). There is no release documentation in this case.
    It cannot be explained in few lines. You need to study the below link.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm

  • MRP based planning

    hi guys,
    what is MRP based planning and why it is used?Under what conditions do we go for MRP based plannig for procurement of materials?

    I will suggest you to read the SAP help on MRP first.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    Anyway i am trying to explainn you this functionality:
    The Concept Of MRP in SAP
    MRP in brief :
    MRP is the planning tool in SAP which will look at all aspects of a material and is highly based upon the master data of the material. MRP looks at current inventory, current requirements, open purchase req/orders and so on. So if a material is required to satisfy a sales order and there is no inventory, MRP will create a planned order if the item is to be produced in house. This planned order can then be converted to a production order by the master scheduler. If the item is to be procured, then MRP will create a purchase req which the Buyer will convert to a purchase order. This is just one scenario, the system is highly configurable and will do pretty much whatever you tell based on config and master data.
    Consumption based planning
    - Reorder planning
    - Forecast based planning
    - Time phased planning
    Details of re-order planning
    Our motive is to maintain optimum stock level of all the material included in the resource planning. so in this user or system sets a particular quantity of stock as reorder point . Whenever stock quantity fall below this point(reorder point) mrp comes into action and generates procurement proposals according to the settings done in implementation guide
    MRP run procedure
    1. Create requirement or demand in MD61
    2. MRP run by MD02 for a single material
    3. See the result in stock requirement list in MD04.
    MRP run we can carry out by
    1. MD02 - single item multi level
    2 .MD03 - single item single level
    3 .MD01 - Total planning
    4. MD04 Check MRP
    5. MD05 MRP lists
    Edited by: Manish Kumar Agarwal on Jun 4, 2009 12:23 PM

  • Usage of MRP Procedures in Consumption Based Planning during Implementation

    We have following procedures in CBP:
    1. Reorder Point Planning- Manual and Automatic
    2. Forecast based Planning
    3. Time phased Planning.
    In SAP implementations, which of these procedure is mostly used in companies in real time.
    Though the CBP planning node is in MM SPRO and  MM study material also contains CBP. During implementations, for CBP the responsibility rests with MM consultant or PP Consultant or both.
    Please share your views on this.

    Dear ,
    Let me share my views on this as we are runing CBP-Forcast base planning  in our trading business .
    Decision on CBP-Forecast base planning method are based on the following criteria
    1.Stockable and low value material
    2.Fast Moving with good sales pattern ( Trend Analysis , Historical Trend analysis on Product Group , Statistical Sales analysis )
    3.Inventory turn around based on the monthly physical inventory and sales
    4.Good service level percentage over an period .
    5.Consumption pattern .
    Decision on CBP-Re-order point planning method are based on the following criteria
    1. Material which are higher valu and Non Stockable
    2. Customer oriented traded goods
    3. Strategic vendor with good Sales pattern .
    4.Re-order Level based on Sales Forecast (Manual or Automatic )
    In SAP implementations, which of these procedure is mostly used in companies in real time : It is based on the business requirement (Trading /Manufacturing ) .Mostly Trading business goes for CBP-Forecast Base planning method (MRP Type -VV) IF THE MATERIALS HAS GOOD CONSUMPTION PATTERN OVER A PERIOD OF TIME .
    MRP is both the part of Supply Chain Planning and Manufactruing . Material master parameters are maintained by MM .CBP is one kind of MRP where Demand Management comes into PP whereas after MRP run , procurement proposal handeled by MM.So there is no hard and fast rule that it is only part of PP.It is the combination of MM and PP.
    Hope this will help you to analysise your requirement .
    Regards
    JH

  • Change the MRP run fro Reorder Point to Forecast Based.

    Dear Experts
    My client is a battery manufacturing company, its Semi Finished product is Make-to-Stock and Finished Product is Make-to-Order. Initially the MRP was configured as reorder based and in Material master it was set as VM     (Automatic reorder point plng ). But now we need to change the MRP form reorder point to Forecast Based. The rolling forecast of the coming 3 three months is given in Planned Independent requirement (MD61) as version u201800u2019 - REQUIREMENTS PLAN.
    We have changed the MRP procedure in Material Master form VM to VV Forecast-based planning of the finished product but unable to get any result means no Automatic PR is getting generated, the we have changed all the materialsu2019 MRP procedure of that Particular BOM to have the required MRP and Automatic PR raise but still no expected result is coming.
    I would request you to provide your expert opinion to execute the Forecast Based MRP, what else should I do achieve the Linking between the Rolling Forecast and MRP instead of Reorder point. Should I have to make changes in Material Master (Only on finished product, In house developed/manufactured Product, Raw material etc), any configuration change in MPR and PR . Looking forward for your specialist advice.
    Regards
    Sony

    I have provided the demand in MD61 and make stock level of the material in such a way that it should raise the PR for MRP run but it is not generating any PR. have checked that if I put value in the forecast tab of the material master manually then it is raising the PR but I need the system to pick the value form the demand that I provided in MD61. Is there any configuration related issue to get the values form the demand and generate PR accordingly. Please guide
    Should I have to provide 'VV' at the first level of the Material at its master data or at each component of the BOM irrespective of
    the components for Semi-Finished (In house production), Raw materials (Procure from the supplier). Please suggest...

  • What setup is require to run a consumption-based planning

    Dear all,
    I know there is a two way to run Consumption-Based Planning in standard SAP:
    1 - Forecast-based Planning, and
    2 - Re-order point Planning.
    My question is what is the configuration setup and material master value maintenance require for the above two procedures?
    Thanks
    Tuffy

    In Material Master
    MRP 1 view choose the
    MRP type
    VB - Manual reorder point or
    VM - automatic reorder point
    Reorder point
    Regards

  • Forecast base planning (Seasonal Model)

    Dear All,
    We are trying to implement the forecast based planning with the manual model selection as SEASONAL , here i did the basic required settings like
    Maintained the MRP type as VV (Forecast base planning), then forecast views are maintained for the material.
    Hist. periods 12 Forecast periods 2 Periods per season 12
    Historical value defined as
    04.2009 0 1,000
    03.2009 0 1,800
    02.2009 0 1,200
    01.2009 0 1,000
    12.2008 0 800
    11.2008 0 200
    10.2008 0 100
    09.2008 0 500
    08.2008 0 2,500
    07.2008 0 6,500
    06.2008 0 3,500
    05.2008 0 2,500
    Control data
    Initialization X Tracking limit 4.000
    Model selection Selection procedure 1
    Optimization level F Weighting group
    Alpha factor 0.20 Beta factor
    Gamma factor 0.40 Delta factor 0.30
    Forecast value as below
    Basic value 1800.000 Trend value
    MAD Error total
    Period Orig. HV Corr. HV Ex-post FV Orig. FV Corr. FV Season F C
    M 05.2009 2500 2500 1.39
    M 06.2009 3500 3500 1.94
    Can any one explain how this basic value and seasonal index calculated
    I know very well it has derived the values with some formulas, if i am correct it has used this formulas
    http://help.sap.com/saphelp_erp60/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm
    can any one explain in detail how it is calculating
    Have any one come across this requirement, please let me know issue is vital.
    Thanks in advance
    Regards,
    Ganesh

    Read this, you will find the calcualtions. Enjoy.
    [http://help.sap.com/saphelp_47x200/helpdata/en/51/a0d53437a05b2ee10000009b38f83b/frameset.htm]

  • Characteristic Based Planning in SOP - R/3

    Hi Experts,
    I would like to plan my material variants (stockable items of my configurable products) using Sales & Operations Planning. To that end, I wanted to know, if there is a functionality available in the R/3 SOP system, with which I

    Hello
    If you don't want to use forecast based planning, the only alternative is to make the forecast in SOP.
    After making the forcast on SOP, the values are transfered to demand management and then MRP is used to generate planned orders.
    Take a look on the following link for more details:
    Planning Table: the Forecast - Sales & Operations Planning (LO-LIS-PLN) - SAP Library
    How to Run the Forecast with Mass Processing - Sales & Operations Planning (LO-LIS-PLN) - SAP Library
    How to Transfer Data to Demand Management with Mas - Sales & Operations Planning (LO-LIS-PLN) - SAP Library
    BR
    CAetano

Maybe you are looking for

  • MacBook Pro (13") Trackpad

    Hi. When I bought my MacBoo Pro 3 weeks ago, the trackpad was working fine. But, it doesn't let me do a double-click if i use the bottom left corner. It does eventually work if I keep on clicking it, but it feels as if its sticking? Does anyone know

  • Remove + sign after adding character to list

    I add a character to the script, say, "Mum". I then add that character to character lists by reason that there's a PLUS sign inviting me to do so. We then decide to give 'mum' an actual name e.g. 'Sandra'. Accordingly, we amend all those occurrences

  • Transaction variant for f-58

    hi all, i need to know how to create screen variant & transaction variant for transaction code : F-58 ? When i try to create screen variant for F-58 I get an error: "screen variants are only possible for dialogue transactions". Thanks & regards. Mess

  • .psd problems  Help!!!

    This question is in 2 parts. I have a .psd with like 20+ layers. I broke it down into 9 different layers to put into motion for a cool 3D logo. So I drop the background image into motion and it changes the tint and the shape of the object. Now I can

  • Revenue for GL accounts

    Hi Folks, Which tables would give me the revenue details of a GL account between a date range? And is there a way to track the details of these line items to find what is the payor's country of origin etc? Thx.