Fork and BPM

Hi
I am using Fork in the BPM to collect and merge 3 messages. This is same as STD pattern "BpmPatternCollectMultiIf". It is working fine, it collects--> transforms --> sends. But always two PE are in "In process" state with a "clock" indicator. I tried putting Fork step inside a Block but no help. All receive steps uses a correlation to collect the messages.
I am manually deleting the process instance in SWWL and processing next set of messages. We are using XI which is on Netweaver 2004s.
Appreciate your help on this issue.
Regards
Prahllad

Hi Murthy
I have given the condition necessary branches =3, let me explain you how it is behaving.
The first message arrives the PE instance is created and waits for another two messages. Once other two messages arrive the PE created by the first message goes to successful state and also all the message comes out merged into one message.
But the second and third messages have also created the PE instance and they will be waiting for other two messages each..
Where the end condition is for this, if necessary branches are 3 then all PE instances should end once merged message comes out of the BPM (or when the send step is executed).
Please let me know any further help to resolve this issue.
Regards

Similar Messages

  • Fork and block

    hi all,
    what is the diffreence btween fork and block?
    regards,
    keerthi

    Hi Keerthi,
    Fork : when you want to continue a process in branches that are independent of each other and the branches of the fork join in a union operator.You can define the required number of branches to continue the process.
    Block: You can define the mode Parallel For Each(ParForEach) for a block or Dynamic Sequence (ForEach). This means that the block is executed for all elements of a multi-line container element.
    Check this link for all step types :http://help.sap.com/saphelp_nw2004s/helpdata/en/0f/80243b4a66ae0ce10000000a11402f/frameset.htm
    You can check it out how these step types will use in the process from SWC -SAP BASIS of the namespace http://sap.com/xi/XI/System/Patterns.It would gives the overall idea on BPM and you can find out the needful blogs from this forum.
    Cheers
    Veera

  • Business Rules and BPM

    Anybody here knows the difference between Business Rules and BPM..
    We can do pretty much everything with a Business Rules Engine as we would do with BPM , then in which scenario should we use BPM and in which scenario should we use Business Rules Engine?
    Ofcourse Business Rules Engine has more complex set of rules than any BPM product in the market for .eg. ILOG Business Rules...

    BPM and a rules engine are different. Both are important, but they have different uses.
    Oracle BPM Studio is used by Business Analysts and Developers to model processes, integrate underlying components (including business rules) and develop user interfaces.
    There's an Engine that executes the processes that have been modeled. It sends the work item instances to the right person or persons with the right data when the work item reaches an interactive activity in the process. Similarly the Engine has invokes the underlying components specified in the process when the work item instance reaches an automatic activity.
    There's an out of the box Workspace runtime that lets end users manage and run their work item instances as they flow throughout the processes.
    We can business rules inside the processes, but one does not replace the other.
    Dan

  • Hi Regarding How to work on SAP Net Weaver CE 7.1  and BPM

    Hi Friends
    I need Some help from u r side
       Currently i have got work on SAP Net Weaver CE 7.1  and BPM (Business Process Management)
       How to Work on these SAP Net Weaver CE 7.1  and BPM (Business Process Management)
      If u have any Documents .can u give that links
      How Configure SAP Net Weaver CE 7.1 with NWDI can u tell me this think also
    Regards
    Vijay

    Hi Friend,
    You can follow following pointers hope it will help.
    [SAP NetWeaver MDM-7.1 Key Mapping interoperability with SAP NetWeaver Process Integration-7.1 using Web Services u2013 Webinar Presentation|FEATURED EVENTS;
    [Best Practices Workflow for Master Data Managemen|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/50f1c01b-972d-2c10-3d9d-90887014fafb]
    [Best Practices on Workflow Tools Usage for Master Date Management (MDM) Scenarios - Webinar Presentation|http://www.sdn.sap.com/irj/sdn/index?rid=/library/uuid/c0fee6f1-8795-2c10-8ca9-e4883bae5e81]
    Regards
    Jeetendra

  • Integration Visual Composer and BPM (netwearver CE7.11)

    Hi Guys.
    System: netwearver CE7.11
    We have a problem with the process of integration between Visual Composer and BPM. We have found a message  |https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/2011e628-b317-2c10-9fa7-952155e10705] explaining the step by step to join my visual compeser with BPM.
    The steps from guide(the guide includes a video) already have been implemented and the final result looks fine, but it is in this moment, when we want to create and deploy the BPM process with the result from guide(Web dynpro wrapp with the visual composer), when the error happens, the BPM process is created OK but not properly deployed.
    Could anyone help us?, thank you in advanced.
    The message error is:
    Status ERROR
    Plugin : com.sap.ide.tools.services
    code=0
    children=[
    Status ERROR
    Plugin : com.sap.ide.tools.services
    code=0
    Deploy Exception.
    com.sap.engine.services.dc.api.deploy.DeployException: [ERROR CODE DPL.DCAPI.1027] DependenciesResolvingException.
    Reason: ASJ.dpl_dc.006505 [ERROR CODE DPL.DC.3033] An unresolved dependencies error occurred while sorting the deployment batch items regarding the dependencies.; nested exception is:
         com.sap.engine.services.dc.cm.deploy.sdu_deps_resolver.UnresolvedDependenciesException: [ERROR CODE DPL.DC.3437] Unresolved dependencies found for the following deployment items: [
    1. Component: name: [firsttask], vendor: [demo.sap.com], location: [localDevelopment], version: [20090617122840], software type: [J2EE], csn component: [], dependencies: [[name: 'tcblloggingapi', vendor: 'sap.com', name: 'tcddicruntimefacade', vendor: 'sap.com', name: 'tcaiibaseofflinefacade', vendor: 'sap.com', name: 'tccmi', vendor: 'sap.com', name: 'tcvcglxbridgecomp', vendor: 'test.sap.com', name: 'tcblexceptionlib', vendor: 'sap.com', name: 'tcbljrfcapi', vendor: 'sap.com', name: 'tcwdapi', vendor: 'sap.com']]
    Unresolved dependency:
    name: 'tcvcglx~bridgecomp', vendor: 'test.sap.com'     ( not found in the admitted batch items and the repository)
    Edited by: iaspano on Jun 18, 2009 5:31 PM

    Hi,
    Is 'tcvcglx~bridgecomp' already deployed or part of the deployment? There is a deploy time dependency specified. Thus without this DC the other DC won't deploy.
    Cheers
    Martin

  • What products to choose for a SOA and  BPM Scenario?

    Hi, i am beggining in this interesting world of SOA and BPM. I am responsible for evaluating to implement a business testing case of SOA and BPM that involves these products: Oracle BPM, Oracle Service Bus, Oracle BPEL, Oracle Weblogic Server.
    So, i decided to install and configured in the same order, the following products (some of them are from the Fussion Middle Ware 11g):
    1- Oracle Database XE
    2- Repository Creation Utility (11.1.1.2.0) to create schemas in database for SOA and BAM
    3- WebLogic Server (10.3.2)
    4- SOA Suite (11.1.1.2.0), that includes BPEL
    5- JDeveloper and Application Development Framework (11.1.1.2.0)
    6- Soa-jdev-extension
    7-Oracle BPM Suite
    Next, i tried to follow the running y building tutorial for Fusion Order Demo, according to "e10275-Running y Building an Application with SOA Suite" guide, but i couldn´t deploy the demo because of Ant Module Issue.
    Also, i've noticed, that the service bus included in SOA Suite 11g is not the Oracle Service Bus but Enterprise Service Bus called mediator, and according to documentation in Soa Suite 11g, Oracle Service Bus is available as a separate download with an Oracle SOA Suite license. But revising Oracle Service Bus downloads, there is an only one: Oracle Service Bus 10gR3 (10.3.1.0) hat works with Weblogic server 10.3.
    Besides that, there is no integration between Oracle BPM Suite and SOA Suite.
    And after all, i have the following questions:
    1. Is it correct the products choosen (version 11g) to implement Business SOA/BPM evaluation case?
    In case of answer to question 1 be affirmative:
    2. How can i integrate Oracle Service Bus to SOA Suite 11g?
    3. How can i integrate Oracle BPM Suite to SOA SUite 11g?
    In case of answer to question 1 be negative:
    4. What products to install and configure to fulfill the business test case products requeriments: Oracle BPM, Oracle Service Bus, Oracle BPEL, Oracle Weblogic Server?
    I would appreciated your help.
    Roycito

    Hi Roycito,
    And after all, i have the following questions:
    1. Is it correct the products choosen (version 11g) to implement Business SOA/BPM evaluation case?Yes. From technical perspecive it is possible and you have chosen the right combination, however it may differ as per your business requirements and use case.
    In case of answer to question 1 be affirmative:
    2. How can i integrate Oracle Service Bus to SOA Suite 11g?Current version of OSB (10.3.1) does not support 11g resource adapters so direct integration may not be possible but through a transport protocol such as HTTP(S), JMS, File and FTP, you can integrate OSB indirectly with SOA suite 11g. Please refer -
    http://download.oracle.com/docs/cd/E15523_01/integration.1111/e10223/04_osb.htm
    3. How can i integrate Oracle BPM Suite to SOA SUite 11g?Through BPEL it should possible. Please refer -
    http://download.oracle.com/docs/cd/E15523_01/integration.1111/e10223/505_bpm.htm
    Try to contact your local Oracle Sales Representative for more details and support from Oracle for implementaion of your use case.
    Regards,
    Anuj

  • Failing to assemble Downloaded Pre-built Virtual Machine for  SOA Suite and BPM Suite 11g

    Hello,
    I checked the download checksum of the files downloaded for Pre-built Virtual Machine for  SOA Suite and BPM Suite 11g ( Pre-built Virtual Machine for SOA Suite and BPM Suite 11g ) and they all match checksums.
    however, when I try to assemble them with 7zip, I get a corrupt error message.  I have tried downloading with Chrome and Internet Explorer.  I have also tried assembling the 7zip files different ways.
    Is there anything else I should try?
    Running on Windows 7, 64 bit machine.  (with lots of disk space).
    Is there any other way to get the files?
    thank you.

    thanks for the response
    I guess I will have to do that as well.
    However, it defeats the speed with which can ramp up with the toolset;  thus slowing my time I can allocate to learning it...

  • Differences between SOA Suite and BPM suite

    Hi All,
    Can any one tell us what are the differences between SOA Suite and BPM suite.
    Thanks
    parker.

    Please find the link below.
    Difference B/W SOA Suite and BPM Suite
    Hope it will help you.
    Bibhu

  • How to determine Chord and BPM

    Hi everyone,
    I'm a garage band beginner. I've successfully recorded 2 songs with loops, harmonies, and vocal tracks - even the occasional editing of a loop but I have difficulty when I start up a new project trying to determine chord and bpm - well, mostly bpm.
    There is a song I want to cover and customize myself. Is there anything in garage band or anywhere on the web that anyone knows of where I can play a song and it determines the bpms?
    Thanks in advance for your help.

    Thanks HangTime! What do I multiply it by?
    Multiply it by the seconds I counted?
    This is going to help TONS going forward.
    Message was edited by: Macthang

  • Configuration between SAP PI and BPM in SAP PO

    Dear Experts,
    I am working on SAP PO 7.31 and want to carry out configuration between SAP PI and BPM in SAP PO. I carried the post installation
    activities in NWA i.e. CTC.
    Helplessly , I could not find any documents and notes to refer the configurations.
    Regards
    Rebecca

    AAEx configuration:
    Advanced Adapter Engine Extended (AEX) - Installation and Configuration - III
    Configuring SAP BPM and PI runtime:
    Configuring Message Processing from PI to BPM - Process Orchestration - SAP Library
    Sample BPM
    NetWeaver BPM for System-to-System Message Orchestration (Including Migration of ccBPM to NW BPM)
    Hope this helps

  • Problem in completing the TASK when using Web Dynpro Java and BPM

    Hi,
    I am using Web Dynpro Java and BPM.
    i see my Web Dynpro View when i run the process.
    Just that the task is not completing.
    when i click on the Web Dynpro button to signal the completion of the event, nothing happens.
    i have appropriately created events in both Component controller and Interface Controller and used the same in creating the Task.
    a method in Component controller fires the event and a button click in the view calls this method.
    i have successfully completed Donka Dimitrova's "SAP Netweaver Business Process Management-End-to-End Process Implementation Sample " but when i tried my own with slight modifications, it is not working !!!
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/d07f3e88-554f-2b10-3cbf-ab8afea51b9f
    regards,
    -Amol Gupta

    Hi Amol,
    The way you described the things, I dont see any problems. Just to make sure that you are triggering the right event that you mapped as completion event for the task, try to cross check once again and see if the correct event is getting triggered. Also try to put some messages for debugging to see till where the control goes.
    Regards,
    Arafat

  • How can I synchronize directory service and bpm engine?

    hi,all
    I'm using bpm WL 10.3.1 with papi.
    Now I want to assign role to participant in process.
    I use DirHumanParticipant.setRolesAssignment() and DirHumanParticipant.update() to assign role dynamically.
    But it does not work.
    Actually, when I log in to the webconsole. The role has assigned to the participant.
    but when I log in to the workspace. I cannot find expect task in my work items.
    In the history view I can find it.
    Then I remove the role that i assigned previous and assign again in the webconsole.
    After that I log in to the workspace, now i can get the expect task in my work items.
    I think it need to synchronize between directory service and bpm engine. but I don't how to do it?
    Is there any way to do it with some api?
    thanks
    regards
    kenshin

    Hi!
    Here is how it works:
    1. The engine polls the directory periodically and checks if some changes were made to the participant role assignments.
    The poller frequency is configured on the Process Administrator.
    2. When a change is detected, the engine updates the information on the engine partcipant cache.
    However, if the participant is logged it, the update operation is postponed until the participant logs off.
    3. After checking the directory, the engine directory poller sends a notification to all the PAPI clients (including the Workspace)
    and the workspace side poller updates the participant assignment you see in the workspace.
    The notification mechanism is using the JMS Topic on the JEE version of the BPM.
    - First of all verify you are logged out when you add/remove the role.
    After that, wait 1 minute or the time specified in the Process Admin as the directory poller frequency.
    - Verify the JMS Topic is defined correctly. Check the engine log for any JMS Topic related error.
    Hope it helps.

  • Fork and Muliple Conditions

    Hi Experts,
    What is the difference between the Fork and Muliple Conditions?
    Thanks.

    VJ.
    Multiple condition: you define a condition for each processing branch.
    Fork: each branch is processed paralel.
    See <a href="http://help.sap.com/saphelp_nw04/helpdata/en/c5/e4b74f453d11d189430000e829fbbd/frameset.htm">Sap Help</a> for more information.
    Regards,
    Jasper

  • Fork and parforeach

    hi all,
    diff between fork and parforeach
    regards,
    krish

    Hi Krishna,
    The exact difference is static and dynamic. I mean when you know the exact number of incoming messages where by you want do some process on each message then you can use Fork else you can use Block with mode ParForEach
    ParForEach :
    parforEach is used for Mode property with Block step in Integration process.
    Block is used for to combine steps that you want to execute one after the other and which are to access the same local data .You can also use a block to combine steps that you want to have the same deadline or exception handler, or to define a local correlation.
    In a dynamic mode, the block is executed for each line of a multiline container element. In ParForEach mode, an instance of the block is generated for each line of the multiline container element. All instances are processed simultaneously. In ForEach mode, the block first runs through for the first line of the multiline container element, then for the second, and so on.
    You can use the ParForEach mode when you want to send a message to multiple receivers simultaneously, for example. To do so, you use a receiver determination step to determine a multiline container element with the list of receivers. You then define that the message is sent to these receivers in a block with the ParForEach mode. You can use the ForEach mode when you want to send a message to multiple receivers one after the other, for example.
    You specify the multiline container element in the Multiline Element attribute. In the Current Line field specify a container element that takes the value of the multi-line container element for which the block will run.
    You can define an end condition for the dynamic mode (see also: Condition Editor). This is checked as soon as the block has run through for one line of the multiline container element. The block is complete as soon as one of the lines of the multiline container element returns true for the end condition, or all lines of the multiline container element have been processed.
    For more details see the link
    http://help.sap.com/saphelp_nw04/helpdata/en/ce/bb2c421f3fda2ce10000000a1550b0/frameset.htm
    Fork
    You use a fork when you want to continue a process in branches that are independent of each other.
    Please see the following link.
    http://help.sap.com/saphelp_nw04/helpdata/en/ce/bb2c421f3fda2ce10000000a1550b0/frameset.htm
    Regards
    Chilla..

  • MySQL and BPM Suite

    Hello everyone,
    i'd like to know how i could access to a mysql database using oracle BPM Suite.
    thanks

    Please find the link below.
    Difference B/W SOA Suite and BPM Suite
    Hope it will help you.
    Bibhu

Maybe you are looking for

  • Storage and memory problems on a new mac. PLEASE HELP

    I had a macbook pro 5 years ago and backed everything up to my time machine. i just bought a new mac book pro yesterday. I only wanted to transfer my music and photo files over, and i somehow managed to do that but i think i made a mistake somewhere

  • How to burn CD's from the command line in 2009?

    I've always managed to burn CDs and DVDs from the command line but I haven't done it in a long time. cdrecord wasn't working as root and I noticed it was just a symlink pointing to wodim. I tried the following command as root in a directory with some

  • IT efficiency can be improved with automated cloning

    It is well known that creating clones manually is labor intensive process. But with the assistance of Solix's product we've been creating automated clones where clones are created and configured faster and with fewer errors. Solix also provides produ

  • BDC for AS02

    Hi, We want to make a BDC of T. Code AS02 (Change Asset).. In it, i want to change DepKy (Depreciation Key) - 0000 from any existing under Depreciation Areas Tab..but it is giving some error "Enter depreciation key with depreciation by days".. What c

  • Is it possible to merge images from 4 different folders into a single 4x4 image with ps scripting?

    So I have four folders that each contain 970 images.   The images in folder 1 are named exactly the same as the images in folder 2, 3, and 4.   All the images are also 400px in size.   What I'm trying to do is take all images of the same name from ea