Formulas within Master Recipe

Hi all,
I am currently looking into Formulas and Master Recipes,
Using transaction C203 you can see the BOM with its associated values that make up the recipe.  You can also look at any formulas associated with the material and its BOM.
I know the BOM is held in tables STPO and the formulas are held in table KALC.
What I cant seem to figure out is how the Materials on the BOM are linked to the materials on the Formula screen as in some instances I've seen the order can be different between the two.
Also I'm have been trying to figure out what KALC-ROW_ID is made up of, I think this is key to mapping between the two but cant seem to find any related help.
Any Help much appreciated.
Hiten.

Just to complete the thread a bit more
From what I've seen in the system it appears that KALC-ROW_ID might be a composite made of BOM Number + Inherited Node Number + other stuff

Similar Messages

  • Master recipes operations not getting transfered in SNP PDS to APO from R3

    Hello APO Gurus,
    I am trying to transfer SNP PDS for master receipes from R3 to APO.
    Issue description::
    The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.
    i have following points:
    1. Is there some customizing setting missing on R3 or APO side  for plant 1000 tbefore SNP PDS transfer
    2. What need to be checked on master recipes data in R3,
    i have checked on below points
    1. FG Materials and all the Component Material to be in APO in a Active Integration Model.
    2. BOM & Routing and Production Version setup correctly.
    3. The Routing Operations have to Relevant to 'SCHEDULING'.
    4. Try deleting the existing Integration model for materials & re-create new IM & activate.
    Please help me to send SNP PDS correctly to APO to take heuristic run.
    Regards
    Gajendra
    Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

    Hi,
    It is good that you have given your already checked points.
    Please check the following things also and try to retransfer the PDS.
    1. Check your resource in ECC, whether you have maintained the Process formula.
    2. Check you have maintained some values in Master Recipe for processing time
    3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.
    4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.
    Hope this will help you to solve the issue.
    Regards,
    Manimaran M.

  • Master Recipe tables

    Hi all,
    I want to know the Master Recipe tables. Please if anybody can speify Master Recipe tables, will be very much needed & hence helpful to me.
    Regards,
    MHP

    CPC_CMX_DB_COR                 Master Recipe: Context Table for Recipe He
    CPC_CMX_DB_COS                 Master Recipe: Context Table for Recipe Op
    CPC_CMX_DB_LOG                 XSteps: Change Log
    CPS_PRES                       Process Management - Values for Flag in Cu
    CPS_PREST                      Text Table zu CPS_PRES
    KALC                           Article Quantity Calculation - Formulas
    KALT                           Article Quantity Calculation: Header
    PLFT                           Process Instructions
    PLFV                           PI Characteristics/Sub-Operation Parameter
    PLKO Header data
    PLPO Item data
    RESB and MAPL
    sree
    Edited by: sree gowda on Jan 19, 2009 6:54 AM

  • Operation Spilits on Master Recipe

    I m working on a scheduling formula which can be as Labor Time * Operation Quantity / Base Quantity / Operation Splits / No. of employees. I was not able to find no. of splits sort of field in master recipe. what i guess is that it is for discrete manufacturing and not for process industry although i can use it in formula for process industry and some how it is working perfectly. as per the impact no. of operation split has direct impact on base quantity as in case of change of base quantity if i changed the base quantity with out using no of splits it wont work and if i use it the result is perfect. Can any one explain the phenomena plz.......
    Does no. of Employees has same impact as no. of splits teh only difference is that no. of employees is not affected by change in base quantity.
    Reply.......

    Hi Haque,
    You are correct the No.Of splitting is generally used in Discrete Mfg. It is avl in routing operation detailed screen. where you check the box splitting allowed and enter Number of Splits.
    As you said somehow it is working fine in your scenario could be taking the value as "1 " i.e. anything divided by 1 will be the same number.
    Neither the Base qty Nor the No of employees have any effect on the no. of splits. You can maintain the No.of splits as "1 " it will work fine.
    But I suggest you can create a new formula by removing the Operation Split from the denominator.
    Regards
    radhak mk

  • Master Recipe without material

    Dear PP Gurus,
    I have one query.
    I want to create master recipe without material, i have created the same.
    Now while creating process order it is giving error,
    BOM for material 500000010 does not contain any valid items
    Message no. CO636
    please guide
    thanks in advance
    kailash thakkar

    Hi Kailash,
    What is mean by
    I want to create master recipe without material, i have created the same.
    What's the reason behind it.
    Regarding error CO636,
    - Check your BOM of that 500000010 might be components are missing over here.
    or
    - might be From to To lot size of BOM is not match with your Process order qty.
    or
    - Also check Valid From to To Date of your BOM.
    Regards,
    Dhaval

  • Error while changing the master recipe (C202)

    In transaction C202 (Material master recipe), I am trying to make a change but getting error message :Update was terminated.
    I am trying to change a  master recipe which contains an error. Recipe: A61234 transaction C202.
    Thanks.

    Hope, By this time you must have resolved this issue at your end. Due you know any root cause, If yes, could you please share it with us.

  • Do you know the idoc for master recipe?

    Hi all.
    Do you know the idoc for maintain master recipe?
    I am looking for the idoc.
    I would like to create, update and delete master recipe with idoc.
    I have investigated about idoc,but can't find suitable idoc.
    (I did find it for BOM, but for recipe is nothing.)
    Thank you in advance..
    Satoru

    Hello,
    As far as I can see there are no BAPI's or IDOC's available to upload Master Recipe data.
    A suggestion would be to use the batch input technique to upload the master recipe master data. You find the documentation of the batch input recorder etc. via the menu path System -> Services -> Batch input -> Recorder
    I hope it helps,
    Regards,
    Marcelo

  • Mass creation of BOM and Master Recipe for Plants

    My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
    He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
    Thanks,
    Sac

    Dear Sir ,
    What is LSMW ?
    I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
    The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
    so is there any other way to do it ? if possible please give the detail procedure .
    Regards
    Pankaj .
    Edited by: pankaj.001 on Mar 9, 2011 10:55 AM

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • In LSMW which method is exactly suits for Master Recipe Creation (TC-C201)

    Hi All,
    I am unable to find which method suits for Master Recipe Creation in LSMW.
    Please send me in detail if any method suits.
    Can any body help me in this.
    Points will be awarded for correct answer which helps me come out of this problem.
    Regards,
    Shobha

    Hi shobha,
    if  there is code u have to do before uploading go for BDC or BAPI,
    it not go for LSMW (recording method) --> in this its very difficult to code.
    Thanks

  • Deleting operations in master recipe of process orders

    Dear Guru's,
           I want to delete the operations in master recipe of process orders. The operation numbers are different in different process orders. This activity has to be performed on bit large number of process orders. Can anyone help me in providing the process for doing this activity in mass. Any suggestions?
    Thanks in advance.
    Regards
    Kalyan

    Dear Kalyan,
    Why do you want to delete the operations(basically phases)at process order level?
    If it's really required to execute the Shop floor activties and if the order numbers is huge in number means then in my
    understanding only a LSMW/BDC can help you,but technically I'm concerned about selecting the operation/phases for deletion
    by passing on the confirmation number or operation number for a particular process order.
    If it would be the latest operation/phase for a product means then make the changes in the master recipe so that the same is
    getting copied into the process orders in the future.
    Check and correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Master recipe Batch-input / Bapi / Fct

    Hi,
    Does anybody have a program to insert data for master recipe ?
    I didn't understand how to use fct MRTRS300_MASTER_RECIPE_SAVE and the Batch-input on C201 have oss note ...
    Rgd
    Frédéric

    Frédéric,
    I tackle the same question, I will let you know when I find something. Please post your findings here as well.
    Regards,
    Serge

  • Report for Master Recipe

    Hi All;
    Is there any report apart from C251 which would give the deatils of the Master Recipe or to be more specific we need to download the Inspection characteristics from the Master Recipe.
    Regards

    Hi Lucky 121,
    Please try and check table PLKO whether it meets ur requirement.
    Regards
    Suri

  • Material Assignment in Master recipe

    Hi,
    Is there any FM/BAPI to assign material into a master recipe? Currently, we are using BDC to call C202 transaction for this purpose. This process takes long time for material assignment which leads to performance issue.
    Thanks in advance
    Senthil Kumar A

    In LSMW , object BUS1012 is offered for routing creation and change .
    Unfortunately there is no object for master recipe creation & change and there is no standard batch input, nor BAPI/IDOC, nor   direct input. You should create your own batch input or CATT.
    Here is a possible procedure:
    Please record a Batch-Input with transaction SHDB and try if this work. If not please try with TOFF as described in the notes.
    Read carefully SAP note 142022.

  • Master recipe not pickedup automatically

    Hi all,
           While creating process order the Master Recipe is not picked up in the master data tab....BOM and PV no are shown but not the Master Recipe...Is there any customization for picking up Mater Recipe automatically in process order....????
    Regards,
    Joseph.

    Dear
    Goto COR4-Select Order Type and plant-Double Click -Look at Master Recipe Selection set up -It should be set to Master Reciepe Selection ( Autmocatically ) not manually .
    Re-set this and check with a process order creation in COR1
    Regards
    JH

Maybe you are looking for

  • UPS and Surge Protection

    I just purchased a Mac Pro 3 gHz Tower and I would like to properly protect my tower as well as 30" mac cinema display, external harddrive, and cable modem line. If my power did go out, I would just need several minutes to save and close the machine.

  • Jabber for Window, phone mode, how to disable "use my computer for calls"

    We have a Citrix environment and only want to control the Cisco deskphone with Jabber for Windows in the phone mode. We use CUCM 8.6.2 and I have installed Jabber for Windows 9.7.0 and all works fine, I can control my deskphone, make and receive call

  • Display the id of new Record in the browse page of BC4J Struts App

    I am working on an application using BC4J Struts with backbone on Oracle 8i.I am using DBSequence Type for my Employee ID.Since I am using this Id as search criteria for employee, I want to show Employee Id after insertion of new Employee.How can I d

  • Album to desktop

    Sometimes when I drag an album to my desktop the songs fallout of the album, why? This leaves me with individual songs not a single album icon to click? Can you help me get a consistent single button that I  can click to play a whole album if ether i

  • Automate composing question

    Hello everyone, Here is the scenario: OUTPUT ======== We will be asked to produce approximately 150 MPEG4 (Divx, Xvid) format  files per day which will be uploaded to the Internet (that is, 320x240 @ 30fps).  Each file will play for approximately 10