Hi Experts,
I have a scenario like Shipper sub contracts the containers to different trucks and subsequently same containers loaded into vessel and later on these containers delivered to consignee using another sub contract with trucking company.
So here I want to link the initial subcontract freight order to the vessel forwarding order and the document flow would be like - Freight order - Forwarding order - Freight order.
Please advise if above scenario is possible.
Regards,
Shakti
http://help.sap.com/transportationmanagement91
International Outbound scenario explained in standard SAP documentation will be helpful.
I don't have any standard document to explain this. I can publish a blog for this [This will take some time].
However, the design depends on the master data you have for lanes and schedules.
One possible way to execute the above scenario is: [Manual planning]
1. Assign the Port of Netherlands to Berlin Plant as a transshipment location
2. Assign Port of Houston to Customer Location as transshipment location.
3. Maintain lanes for Berlin to Port of Netherlands, Port of Netherlands to Port of Houston and Port of Houston to Customer location.
4. Use rough cut planning and use transportation proposal in cockpit. This will spilt the FU stage into three.
5. Plan individually these three stages in separate cockpits for Truck and Ocean to create FOs and FB accordingly.
Note: You can automate many of these planning stages if you have proper master data.
Similar Messages
-
Fetch Charge item present under TransportCharges node for Freight order
Hi All,
I need to fetch the details of the charge elements for carrier for freight order.
I was able to traverse till node "TransportCharges" for the business object /scmtms/tor.
I am not to traverse further to the charge item present under the node 'TransportCharges'.
Which method I should use to fetch the details like 'Retrieve by association' or 'Retrieve' of service manager.
I was able to see the details in transaction /bobf/test_ui. I need to implement the code for the same functionality.
Please help me which parameters needs to be passed to the method to fetch the data, as I am getting dump when I trying to fetch the charge item details.
Regards,
Joseph MHi All,
Transport charge being a dependent object, to access the parameters need to use the class
/scmtms/cl_common_helper=>get_do_keys_4_rba( ).
This is done to convert the meta model keys to run time keys for processing.
Regards,
Joseph M -
How to configure follow up transactions for service order
Dear All,
I want to configure follow up transactions for service order as I already there is follow up transaction
For Service order below are follow up transactions
Service confirmation
Warranty claim
complaints
Task
If I want to add customized one then how to add ?? as I am not able to find out configure in IMG
kapilHave you already customized Copy Control for your Service Order? If you want to add other transaction types the setting is necessary.
The customizing path is shown as below.
SPRO
-> CRM
-> Transactions
-> Basic Settings
-> Copying Control for Business Transactions
-> Define Copying Control for Transaction Types
Regards,
Web -
Transaction for purchase order history
please tell me the transaction for purchase order history
Hi,
There is no standard T.code for checking the PO history,
Go to ME23N then check at header level there tab called status which shows the ordered quantity,delivered quantity,invoiced quantity,
If the delivered quantity & invoiced quantity is equal to less than ordered quantity then it shows the details like whether GR is done or not & invoice is made or not. This data @ overall PO level.
You can check the details of this above data @ item level there is tab called Purchase order history which shows the details of GR & invoice itme by item.
Same data you can check in the table EKBE through T.code SE11 or SE16.
Regards
Ravi Shankar. -
Dump during execution of MD4C transaction for service orders
Hello
When we tried to run the transaction "MD4C" for service order,the dump occurs.
Kindly let me know whether this report is feasible for service orders?
Thanks for your reply.
Regards
SantoshHi,
Take help of ABAPer
Kapil -
Sales order: Two schedule line items for single order item
Hi,
I have an issue with the schedule lines in the sales order. When we create a sales order with today as the delivery date, it creates two schedule lines for the single order item. But if we give future date as the delivery date, then it creates one schedule line only. The confirmed quantity for the first line item (with today we the delivery date) is zero and second line item confirmed quantity (with delivery date as tomorrow) is actual order quantity. So as there is no confirmed quantity on todayu2019s date, it looks like it is creating new line item. But we do we have stock.
We donu2019t have availability check on and we use custom line item and schedule line categories.
Please give some hints on what might be the issue.
There was on post with this kind of issue, but it was closed without answer.
Thanks,
SriniHi Srinivas,
So as there is no confirmed quantity on todayu2019s date, it looks like it is creating new line item. But we do have stock.
As per my understanding although you have sufficient stock for the material system may be confirming the quantity in future date because of the forward scheduling. As you know system adds different times while evaluating the confirmed delivery date. Check the route which system is using. -
How to include field Internal order in the material master for SD orders
Hello,
I would like to know how I can bring the field "Internal Order" to the material master, so I can create materials with assignments to internal orders.
We want to create Sales Orders where when we enter on order item with a material, the internal order is derived automatically from the material master.
Thank you in advance!
Jose EximenoHello,
I am not familiar with the field "product attributes" in relation with entering the field "internal order"...
Could you be a little more specific on how product attributes can be used to enter the internal order number in the material master?
Best regards,
Jose -
Custom transaction for WORK ORDER in ECC
HI all,
I need to create a custom transaction which incorporates the functions of transactions IW31,Iw32 and Iw33.DO I need to create a custom Module ppool for the above requirement or can I use a BDC for creating,updating and retrieving the created Work orders?Hi Rads1234,
yes, you can use BDC to implement it. besides, you can use BAPI_ALM_ORDER_MAINTAIN to do this, which is better than BDC from my point of view. -
Mass processing transaction for PP order
Hi,
Is there a way to REVOKE the DLFL status in a number of PP orders at a time and then set CLSD status.
I tried using COHV but it doenst seem to be having that feature.
Please suggest immediately.
Rg,
VipulHi Ravi,
You are absolutely right. Siva didnt see my reply at 10:53 hrs before in which I mentionedd the same problem as you have now conveyed.
I just request people to check the replies and go to the depth of the problem rather that giving repeated solutions. My remarks were not to finger any one here Siva. We all know we are busy and need help from each other in a proper way.
We are not testing each other knowledge here personally I guess.
Right, back to my query Ravi thanks for pointing..now can you throw some light as per how to REVOKE and DLFL using any MASS transaction.
As far as I think COHV or any other transaction cannot be used to REVOKE any other status.
rg,
vipul -
BDT TRANSACTION FOR SERVICE ORDER IW31
Hi Frens ,
I need to use BDT for adding fields on IW31 and i m not able to find the Tcode for the same. Please tell me the TCODE for same; for e.g for Contract account we have CAWM .
Please Help
Regards
Saket.Hi Pete ,
thanks for the prompt response,
But I need to do it through BDT specifically , and cant use screen exit.
It would be great if you could help me with that
thanks & Regards
Saket -
No planned order created when run MRP for Sale Order
As I have told on the subject. My problem is system does not generate planned order for components in BOM
Some more information is: requirement class in SO is 043
I have choose "2" in tab MRP 4 for individual/collective and all component and finish product have MRP type is PD and Strategy is 20 - make to order
Please help me to solve this
ThanksHi Hoai Vu,
Please check in OPPQ plant parameters in SPRO weather you maintained for the plant conversions of planned order to production order.
SPRO-> Production> material requirement planning> plant parameters--> carry out plant parameters or over all maintenance of plant parameters (OPPQ)
Then check the for the material did you maintained the work scheduling view or not.
I hope helps you any queries please revert me back.
Regards,
Madhu.G -
Table name& field name for production order & operation confirmation
Hi All,
I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
Thanks and Regards,
PSSHi there,
CORU(R/3 Application development: PP Confirmations )
AFFW Goods movements with errors from confirmatio
AFRC Table of planned changes to conf.: Automatic
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRP1 Table of planned changes to conf.: Automatic
AFRP2 Table of planned changes for confirmation: B
AFRP3 Table of planned changes for confirmation: C
AFRP4 Table of planned changes to confirmatn: Data
AFRU Order completion confirmations
AFWI Subsequently posted goods movements for conf
TAFWD CORU: Messages that are not interpreted as e
TCORD Table for field-dependent check routines
TCORU Parameters for order confirmations
TCORV Table with Routines for structureing variabl
TCORW Confirmation: Window Control
TPARU Control parallelized confirmation processes
TPRRU Control table for process chain for confirma
TPRRUT Text table for process control of confirmati
TRUGS User status caused by deviation
CO(R/3 Application development: PP Production orders )
AFBP CIM order: Batch print requests
AFFL Work order sequence
AFKO Order header data PP orders
AFPO Order item
AFVC Operation within an order
AFVU DB structure of the user fields of the opera
AFVV DB structure of the quantities/dates/values
FAPW Index of production-/issuing plant for produ
FTIND Missing parts index
ORDCOM Communication control Operation download
T024F Production scheduler
T399X Parameters dependent on order type
T441C Profile - availability check
T441CT Texts for Profile "Display Availability Chec
T490 Transactions PP - orders - order category
T496B CIM order: Assigning document types to refer
T496D CIM: Destination/lists/spool parameters per
T496F CIM order: Form description of the list
T496K CIM order: Entity table of possible table id
T496N CIM order: List descriptions
T496P Print PP documents: Determination of output
T496R Print PP shop papers: Report control
T496T Print PP shop papers: Transaction control
T496V PP Print: Default Value for Printing Online
T496Z CIM order: Table-controlled table access
TC32 Assigning subscreen to processing location
TC34 Allocating operation to object type for the
TC62 Sequence of detail screens when processing h
TCO01 Sequence/operations control in logicstics or
TCO03 CIM order: Texts for TCO01, Description of o
TCO04 Table for controlling the screen sequence gr
TCO05 CUA status depending on panel, trans. type,
TCO06 Exclusive functions for PP orders
TCO09 CIM order: Text IDs of objects in orders
TCO10 Valuation variant for order costing
TCO11 Control table for production orders - availa
TCO12 Control table production orders - stock dete
TCO36 PP orders: Control table for calling up pop-
TCO41 CIM order: Default values for generating ope
TCO43 PP-SFC order profile
TCO43T Description of production scheduler profile
TCO60 Sequence keys for input facility and verific
TCO61 Sequence key for PP orders
TCO62 Defining screen sequences for input facility
TCO63 Sequence of detail screens when maintaining
TCODB Database fields development class CO per ord
TCOF Profile for missing parts info system
TCOFF Profile for Missing Parts Info System: Displ
TCOFFT Texts for Missing Parts Info System: Display
TCOFG Profile for missing parts info system: crite
TCOFGT Texts for Missing Parts Info System: Criteri
TCOFK Texts for functions in milestones/trigger po
TCOFS Profile for Missing Parts Info System: Sort
TCOFST Texts for Missing Parts Info System: Sort Cr
TCOFT Texts for Missing Parts Info System
TCOKO Constants for PP orders
TCOKT Account assignment categories for order
TCOP Field selection profile
TCOPS Field selection profile
TCOPT Description of Profile for Field Selection
TDUMMY Dummy structure of a table for READ with VER
TRUG Reason for variances in completion confirmat
TRUGT Text describing the reason for a variance in
TXPR1 XPRA control - missing parts info system
Regards
Hemant G -
Issue in Credit Memo Posting in ECC against SAP TM Freight Order
Hello Experts,
I have created Credit Memo against TM Freight Order and Transferred to ECC.
Sender Outbound Service Interface on TM Side "TransportationOrderSUITEInvoicingPreparationRequest_Out" was successful.
But Receiver Inbound Service Interface on ECC Side is failing "TransportationOrderSUITEInvoicingPreparationRequest_In"
XML analysis gives below error message:
No instance of object type Purchase Order has been created. External reference
PO header data still faulty
Enter a vendor
Please enter items first
I was able to create a Service PO and Service Entry Sheet for FSD created against same Freight Order, so I don't see any issue in Config.
Thanks and Regards,
Arnab BiswasHi Arnab,
As understood, standard interface creates Service PO in ECC for your Freight order in SAP TM.
Then you are trying to create Invoicing document linked to the created service PO, which is just like FWSD of Freight order. Inbound XML data will give you thorough picture of this issue.
General Analysis :
When FWSD created in TM for Freight Order interface "TranspOrderSUITEInvoicingPreparationRequest_Out" is triggered and it will pass the same TM data of Freight Order to create invoice in ECC and not like the Service PO.
Kindly check your inbound XML with data in it.
You might need to change in outbound interface BADI while sending data out from SAP TM, or in inbound BADI to modify incoming data in ECC.
In SAP TM SPRO search with below content.
BAdI for TranspOrderSUITEInvoicingPreparationRequest_Out
or
you need to search inbound BADI in ECC side to make changes in inbound data.
Reward if found useful..
Thanks and Regards,
Kalpesh -
Tables For Linking Order Confirmation & Goods Receipt against Order
Hi,
We are using transaction CO11N (multiple times) with Auto GR feature. So, for every confirmation, a
material document for corresponding goods movement also is created.
Similarly for multiple confirmations, Mat Docs are created.
I am looking for tables where I can get a link between Order Confirmation counters & respective Mat Document.
I tried Tables AFRU and AUFM but it gives Mat. Document Number When only one GRis carried.
Anyone Plz guide.
regardsTo Dear ,
This is the tables that used in production orders
AUFK Production order headers
AFIH Maintenance order header
AUFM Goods movement for prod. order
AFKO Order header data PP orders
AFPO Order item
RESB Order componenten
AFVC Order operations
AFVV Quantities/dates/values in the operation
AFVU User fields of the operation
AFFL Work order sequence
AFFH PRT assignment data for the work order(routing)
JSTO Status profile
You can check here & I think AUFM ,AFVC ,AFFL may you will get trquire data .
Pleasse check & revrt me back .
Regards
SANIL -
Progress confirmation for process order
Hello to all,
I want to use the progress confirmation functionality for process order. I know that it is possible for production orders, but I couldn't find respective transaction for process order. Do you know if it is possible to use progress confirmation for process orders.
BR,
NikolayThanks for your inputs, but they are not useful!
COR6 - it cannot be used once the order is confirmed at phase level;
COOISPI - it's a report
COR6N -it is the standard transaction for process order confirmation
I want to do so-called "unplanned milestone" for process orders, something similar to CO1F for production orders.
BR,
Nikolay
Maybe you are looking for
-
My HP OFFICEJET 8500 PRO was working just fine wirelessly until I installed the Windows 8.1 update from the Microsoft. Now I cannot print at all. I get an error that says, "windows cannot print due to a problem with the current printer set up". I
-
Error in Executing Interface........
hi, I am getting this error in when execute interface. I am trying to load the file(Sorce ) to Oracle Table (Taget). both are on same server. ODI-1217: Session MOBILK (119001) fails with return code 6550. ODI-1226: Step MOBILK fails after 1 attempt(s
-
I have a second generation Nano dock that I've never used. When I bought my first Nano I didn't know there was a first and second generation. It turned out my Nano was first gen and wouldn't fit so I had to spend another $30 on a first gen dock. Now
-
I have been working on my logo with Illustrator CC and I needed to print my logo. And I used the .ai file and placed into a InDesign CC document and exported it as PDF for print. But this is the result of the printed PDF: and I was talking to the peo
-
*** Conflicting device support info for DFM 3.2 ***
Hellows... ;-) The helpful folks at TAC have been trying to troubleshoot one of my last and biggest pending items, which was the perceived inability of DFM to manage the devices on our network. This was a rather puzzling issue, as the other LMS co