"Frame Blending" while reversing the clip..?

Do I suppose to use "Frame Blending" while reversing the clip..? When going to check the "Reverse" in order to reverse direction of a movement of the clip - it is already checked by default... B U T - when I UNchecked it the quality of the footage with the reversed movement was somehow more clear.. (this is before rendering - just watching in the Viewer).
Is there any general rule regarding this "Frame Blending" (while reversing the clip)? Can I just trust the Viewer quality/difference between when the "Frame Blending" is checked and when is unchecked?

Hi all, and thanks for trying and commenting my plugins.
marekn,
unfortunately there are 2 potential limits in the use of both my Time Remap plugin and the corresponding FCP built-in Time Remap Function:
a. +only the speed of the video portion+ of the clip is modified, and there is no way I know to change speed of the corresponding audio accordingly;
b. the +clip length does not adapt to the new speed+ (longer for a lower speed, shorter for a higher speed - as in the Speed command).
If the average speed of the clip after applying the plugin is lower than its original speed a number of its last frames will be cut off the clip; in the opposite case instead the last frames of the clip will be a freeze frame of the last frame in the original clip.
Only the Speed command in both FCE and FCP changes speed of the audio and adapts the clip length: but Speed applies only a constant speed for the whole clip (not variable as Time Remap). Note that also Fit to Fill changes the audio speed and the clip length, because it basically applies a constant Speed change...
So, marekn, I'm afraid then there is no simple solution to your problem.
If you want the audio to keep in sync with the video while changing speed you have to unlink audio from video, apply Time Remap to the video and fix the audio by splitting it onto sections with different constant speeds, using the Speed command only applied to audio.
About the length of the clip you can use the workaround described in the last Hint (d.) in the Time Remap instructions: it basically suggests to apply Time Remap to a +nested sequence+ containing your clip followed by a stub: the new nested sequence should be long enough to contain the new 100%-50%-100% modified clip. In practice you could make it even longer and than cut off the needless frames after applying the plugin.
I hope this helps.
Piero

Similar Messages

  • If I use a sound clip in the multi-track editor multiple times; is there a way to reverse the clip w

    If I use a sound clip in the multi-track editor multiple times; is there a way to reverse the clip without change all the instances where the clip was used in the same multi-track session?
    I'm having to copy the clip rename it as clipreverses.wav then bring it back into audition to use it.
    Sony Vagas you can flip the same clip on a different track with a right click and not affect any other copies of that clip.

    Not that I'm aware of, no. You can easily make a unique copy of a clip (right-click on it, and you get it already saved for you), and I'd say that having this was more flexible in one way, at least, as you could then time-stretch it if you wanted to, without altering all other instances of it. Not saying that there wouldn't be any point in having a reverse-play option - I can see instances where it might be useful. It's just that it's not exactly difficult to achieve this anyway, which is probably why I don't ever recall a request for it!

  • Error while reversing the PGI

    Hi All,
    We got the following error message while reversing the PGI.
    " Goods issue for the delivery 123456 cannot be cancelled for the following reasons.
    Deficit of Customer stock unr. 2 EA : Material  Plant  V ".
      Message No : M7021.
    pease help on this.

    hi
    Check some where in delivery exit some one has put check to check free stock at the time of PGI and the system is checking the same at the time of reversal too. The sy-ucom is VABU_T for PGI give this logic like
    if Sy-ucom is VABU_T then only check for free stock.
    Please check and post the solution too. So it will helpful for all.
    Thx.

  • Error while reversing the GR from m.type 103 to 105

    Hi There,
    My scenario is once PO is created, then created the inbound delivery in VL31N against PO,after that post the GR with movement type 103 once inspection is complete then while reversing with m.type 105.
    system is giving error message that INBOUND DELIVERY STORAGE LOCATION CAN NOT BE CHANGED TO HERE
    When post the GR against the PO with m.type 103 system is allowing to post,but while reversing the document from m.type 103 to 105 system is giving above said error message,then entered the storage location in GR even though system is not allowing to reverse the document.
    If we enter the storage location in PO and Inbound delivery with out any problem system is allowing to post the GR with m.type 103 and reversing also allowing with m.type 103 to 105.
    So here I want to post the GR with m.type 103 and reverse with m.type 105 with out storage location in PO and inbound delivery. so for this issue is there any solution.
    EARLY ACTION IN THIS ISSUE WILL BE HIGHLY APPRECIATED
    Edited by: sapmm99 on Jul 13, 2010 6:48 PM

    >
    sapmm99 wrote:
    > Hi There,
    >
    > My scenario is once PO is created, then created the inbound delivery in VL31N against PO,after that post the GR with movement type 103 once inspection is complete then while reversing with m.type 105.
    > system is giving error message that INBOUND DELIVERY STORAGE LOCATION CAN NOT BE CHANGED TO HERE
    >
    > When post the GR against the PO with m.type 103 system is allowing to post,but while reversing the document from m.type 103 to 105 system is giving above said error message,then entered the storage location in GR even though system is not allowing to reverse the document.
    >
    > If we enter the storage location in PO and Inbound delivery with out any problem system is allowing to post the GR with m.type 103 and reversing also allowing with m.type 103 to 105.
    >
    > So here I want to post the GR with m.type 103 and reverse with m.type 105 with out storage location in PO and inbound delivery. so for this issue is there any solution.
    >
    > EARLY ACTION IN THIS ISSUE WILL BE HIGHLY APPRECIATED
    >
    > Edited by: sapmm99 on Jul 13, 2010 6:48 PM
    You should use the inbound delivery to post the GR doc not the PO.
    MIGO>Goods receipt>inbound delivery
    try that

  • No accounting documents generated while reversing the subcontract challan

    Dear Friends,
    Could any of you  pls clarify the following process.
    __Reversal & Recredit of subcontracting challan.__
    Step1- Created sc po
    Step2- Did 541 (mb1b)
    Step3- Created sc challan (J1IF01)
    Step4- Did the GR (Partial)
    Step5- Partial reconciliatin of challan (J1IFQ)
    When the rest of the finished products arrives , the challan exceeds 180 days.
    Now I have to reverse the challan & then have to reconcile the challan.
    After I have to take recredit & complete the challan.
    But the problem is there is no accounting document is generated after reversing the challan although the status of the challan is showing reversed. In J1IF13 the reversal base value is picked from the J1ID assessable value for the component. But the Reversal BED,Reversal ECS,Reversal TAX1 fields are blank.
    R Panda

    Hello,
    You create subcontracting challan so that you do not pay any duties when you send the components to the vendor ( Subcontractor ). So whn you cancel or reconcile ther will be no accounting entry. Material should come back within 180 days of time frame.
    Regards,
    Shailesh

  • Creating extra tables while reversing the schema

    Hi,
    while reversing a schema, ODI is createing some extra tables with name starting BIN....
    BIN$n0N0JG+2TE676lf8wPm3Kw==$0
    BIN$B3QnNwKfRwiJBzUokrdaOQ==$0
    BIN$SlMSt8GRTMeRu92uIx77zA==$0
    BIN$jdFr+kpVQkKobqoU6OY4fw==$0
    BIN$iRX5BQw3TR+jEGZfvUB1cQ==$0
    BIN$3lg8BtTjQ5S0m/E2Sm5Fxw==$0
    These extra tables are creating problems.
    Please help me why these tables are getting created.....
    Thanks,
    Naveen Suram

    Oracle maintains a recycle bin for dropped objects starting with Oracle 10g. Dropped tables go "into" the recyclebin, and can be restored (undropped) from the recycle bin.
    The recycle bin is enabled by default.
    SQL>ALTER SYSTEM SET recyclebin = OFF; -- It will disable recycle bin for the entire database
    SQL> ALTER SESSION SET recyclebin = OFF; -- It will disable recycle bin for the session
    Tables can also be dropped without sending them to the recycle bin.
    DROP TABLE t1 PURGE;
    Thanks,
    Sutirtha

  • Error while reversing the 101 document

    Dear Experts,
    i am getting the below error when reversing the document i.e 102 mvt type.
    ''Trans./ev. type of doc. WE not processable w. function WA''
    please help
    Regards
    prakash

    Dear,
    As its understood -
    Error : Transaction / event type of document WE not processable with function WA.
    Where is docyment WA - For Goods issue and WE - For Goods Receipts.
    I think you are attempting MIGO - Goods Return with movement 102 and entering material document number of Goods Issue or vice versa.
    Please make sure the entered reference material document number you are entering.
    Regards,
    Syed Hussain.
    Edited by: Syed Hussain on Sep 30, 2008 10:23 AM

  • Error while reversing the Invoice receipt

    Hi,
    When I tried to reverse a IR document using MR08, I am getting an error
    "Field COBL-PPRCTR does not exist"
    When I checked it I found that field was partner profit center.
    In PO account assignment tab is also missing.
    So how to reverse it?
    regards,
    vimal

    Hi
    I think Profit center has been made mandatory in the coding block , thats the reason you are not able to reverse the invoice  document.
    As you have said that this PO does not hav nay account assignment, Please check the invoice Finacial document & see if for the GR/IR clearing account any Profit center has been mainatined
    If not Maintained, you need to populate the same in the FI document by chnaging it using TCode FB02, if it is not possible assign the Profit center to the Material master  & then reverse the document using MR08.
    Thanks & Regards
    KK

  • Issue while reversing the doc

    Hello Friends,
    Before activation of cost element for a GL account we had done few postings into it.  Later on we realized and activated cost element, but the problem is there are some postings in the GL account which we posted before activation of  the cost element for this GL account, so those are not transferred to respective cost center. Now system Is not allowing to reverse those transactions as it is asking cost center assignment. But there is no cost center assignment in the original document.
    How can we rectify this issue?
    Rgds
    Murali. N

    Hi Murali
    To my mind, I see the solution in 2 steps and it seems possible to me
    1. Use OKBA and transfer the postings from FI to CO.... This will transfer all the postings which were made before creation of cost element
    You can specify a default cost center in KA02 or in OKb9 for this purpose
    2. Once the postings go in CO, reverse the FI documents now.... It will hit the same cost center as in step 1
    3. Now remove OKB9 entry
    4. make postings from FI again
    I am sure this should work
    Regards
    Ajay M

  • Error while reversing the GR

    Hi
    I have a function module which is used to create and reverse a GR for a purchase order based on movement type. When the movement type is 101 it creates the GR and when it is 102 reverses the GR.
    For creating the GR, function module BAPI_ENRTYSHEET_CREATE is used which creates a service entry sheet and inserts this record in ESKN table.
    his function module is followed by BAPI_TRANSACTION_COMMIT and BAPI_ENTRYSHEET_RELEASE.
    For reversing the GR, function module BAPI_ENTRYSHEET_RESET_RELEASE is used in which corresponding service entry sheet is fetched based on PO number and item number and this record is inserted in ESKN table.
    I have a situation in which we are creating a GR for a PO of movement type 101 and the corresponding details are inserted into ESKN table and then we are reversing the GR of movement type 102 for the same PO, here details corresponding to this GR has to be inserted into ESKN table but it is trying to insert the details of previous record of movement type 101 and throwing the dump as duplicate entries.
    please help to avoid this error.
    Thanks.

    If you are using only standard BAPI and absolutely zero direct table inserts, open an support message in http://service.sap.com/support.
    Create an example in SE37 for the BAPI that is throwing the error, and include that test data in the support message.
    SAP will not support Z programs, so don't even try to talk about your program. Just talk about the BAPI that is throwing the error. This is very important.

  • Error while reversing the asset accounting document through t code AB08

    Hello All,
    i have one query where the user has scrapped the assets through T code ABAVN in the month Dec 2009 with doc date of Nov 30th 2009. Now he realised that the posting was wrong and he wants to reverse it in 1st of Jan 2010 with the t code AB08. when we click on the reverse button in t code AB08, system is by defaultly taking the fiscal year, posting date and period, only we need to give the reason code. here user is trying to give the reversal date manually and making the posting. Now system is giving an error "Reversal in different fiscal year is not possible" with the message AA487.
    we are using SAP ECC 5.0 and i got SAP 1393737 for this and it is mention that there is a program error and needs to implement the program corrections.
    Please can any one suggest me, is that correct approach or should i need to follow the another work around to resolve this issue.
    Thanks in advance.
    Regards,
    Venkat

    Reversal in different fiscal year is not possible in the Standard        
    system since it will affect your balance sheet and other accounting      
    legal report.                                                                               
    It is not possible in FI-AA to reverse       
    a document in this way,  "because of the calculation of depreciation"                                                                               
    The reasons are:                                                                               
    1. The reconciliation of FI and FI-AA must be ensured, and therefore     
       Posting and Asset Value Date must be in the same fiscal year.                                                                               
    2. Depreciation of aquisitions posted in the previous year, are          
      not automatically corrected, when you post a reversal.                                                                               
    One way is to open the previous period(previous fiscal year) and post    
    the reversal to the same fiscal year. PLEASE NOTE THIS IS ONLY IF YOU    
    HAVE NOT EXECUTED YEAR END CLOSING TRANSACTIONS.     
    Blaz

  • Changing the topic while on the clip

    *I am using iMovie and it's really great except for one hitch- when I'm editing a clip with text on it, and I highlight the text, I can't seem to get it to work at all.*
    *I open the fonts list, and click my needed font and size, then press the 'x' button and nothing happens.*
    *I really need some help*!

    After making your changes to the text, you need to click on the "Done" button in both the Inspector (if that's open) and the Viewer. I assume you are clicking on the "X" button in the Inspector in order to close the Inspector - don't do this - you must click on "Done" to save any changes you've made (the Inspector will then close).
    John

  • Frame blend for default!!!

    Hi I'm using Premiere from ever...but I'm very angry that now frame blend is not selected for default anymore... So I'm working everytime with pal 576i sequence...and I edit all my clip with speed at 70 or 60%, for rallenty. So I have to add the option "frame blend" manually to every clips that I put on Timeline! Beore Cs5 "frame blend" was activated on every clip that we put on every sequence. So can you add the possibility to make "frame blend" by default to every clip on the preferences menu of Premiere or better on preferences of new sequence! I think that it's very IMPORTANT! P.S. There's also a bug...if I select any clip in project panel and select there "frame blend", when I take these clips and put theme on sequence "frame blend" will not be selected anymore. Thanks!

    Hi all,
    Just a small quick comment.  In past PP versions you could not turn frame blending off except for going though each and every chip in you project. I think the is why people preferred to have it turned off in the first place. This is a downfall so to speak in the PP software as a whole. There is just so much time wasted doing routine boring tasks like this one and others. I don't thnk adobe software is written that well. Some parts are nice but others could be a lot better. Like incooperating  a slow-mo eding feature that incooperates the shuttlepro to create an action to record the slow-mo in real time. I have done this by taking my video camera and recording the screen of my actions using the shuttlepro and the jog dial to precisly show the slow motion. I can easily run the clip in slow forward rewind at just about any speed and play it again. This is what slow-mo recording should be. And ths is partly what i am talking about. Back to the subject. A computer is good for one main purpose, to perform these boring routine tasks and a computer can do it well leaving the editor to concentrate on the creative process. For those of you that have a iPhone 4 or 4s or an ipad1 or iPad2 check out both iMovie for video and Photoforg2 for photo editing. Photoforge2 in particular will give you an idea of what I am talking about when I talking about powerful ease of use software. Also iMovie shows this point and I will give a short example...
    Say I want to email a 1080p video. Imove on the iphone tells me that the movie is to long/big to send. Instead of having me the user cut down and edit the movie to the right size imovie does the work for me and lets me confirm the resulting movie. I can use a slider to adjust the portion i want to send. Also imove compresses it and put it in the right format to send. These are all, things that are time comsuming for the user but a computer and well written software can perform well.

  • Reversing a clip

    Hi,
    I want to reverse a clip within a TIMELINE. when I type in "reverse' in the help it is not taking me to where I can learn this. What would be the word it recognizes? And would this be found in MOTION? I shot a string that was wrapped around a person''s arm and pulled it off. And now i want to make it look like it's crawling up his arm, hence the reverse.
    thanks for your help.
    Andy

    I shot a string that was wrapped around a person''s arm and pulled it off. And now i want to make it look like it's crawling up his arm, hence the reverse.
    <
    Cool, hope you like the results but you might want to consider reshooting once you examine the reversal results. Reversing the frames does not reverse the physics. In the case of a string being pulled, the slack must be removed before the string will overcome the friction. Effects experts work hard to build practical devices or shooting from angles that overcome the destruction of the illusion caused by obviously reversed physics.
    bogiesan

  • Error while reversing data from SQL Server to ODI

    hi,
    I was reversing data from SQL Server Java 1.6_022 in ODI Java 1.5, I was getting error Version Mismatch and I updated ODI Java version to 1.6_022.
    And now, I am getting the below error while reversing the data from SQL Server database.
    0 : 08001 : java.sql.SQLException: No suitable driver
    Looking for the assistance on the same.
    Thanks,
    Abhay

    If everything is fine the reversing should be fine. I would say check again if the Technology of the Model and the also the dataserver is created under the right Technology in topology too.
    also if this doesn't help , Please tell us the steps you have carried so far . Also can you try selective reverse is it showing the tables.

Maybe you are looking for