Free of cost material but the planned delivery cost is to be invoiced

Hi,
We are having a scenario where in we receive material free of cost but have to pay for the delivery cost to the vendor.
We are creating Purchase order with the "free item" checked and we are maintaining the freight condition at the header level as at the item level as soon as you check the free item check box, the conditions tab disappears.
Secondly if we are maintaining planned delivery at the header level it requires the Invoice check box to be checked. Which is not possible to maintain with the free check box ticked.
Have maintained the vendor master without the GR based IV tick.
Request to kindly do let us know where have we missed out.
Regards,
mahesh.

one of the way out of this issue is
give a heavy discount on that material from vendor and put the price of material such as to do the frieght .but if u r having moving average price for that material thenit is not at all preffered

Similar Messages

  • Planned Delivery Cost is changed during GR

    Hi Experts,
    PO is created with Planned Delivery Cost. When GR is created, the costs will be distributed to material cost.
    However, delivery costs can be changed for each delivery.
    How does SAP handle or distribute actual delivery costs into the received materials for each delivery? Where do I enter actual delivery costs with GR.
    Thanks,
    Sukhbold

    Hi,
    one option is availabe in SAP to post the unplanned delivery costs apart from the planned delivery costs,
    we can post the unplanned delivery costs to material 'or' separate G/L account also,
    pls check the fallowing path,
    IMG-Materials Management-Logistics Invoice Verification-Incoming Invoice-Configure How Unplanned Delivery Costs Are Posted,
    pls note that the above costs can post while doing invoice posting only
    chenna kesava reddy

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Issue with reversal of MIRO for Planned Delivery Cost

    Hi Xperts
    We have found out an issue while reversing the MIRO document for Planned Del costs. When we have done the MIRO, the accounting entry got correctly posted with correct account keys.Conditions are not inventoried.
    However, when we had reversed it - the stock account got hit.Do not understand, why that happened.Do you have any clue?
    1. Suppose we have done the MIRO for Del Cost & then performed GR.Now Stock has already consumed & afterwards we have found that the MIRO for Del Cost is wrong & reverse - in this scenario shall the Stock account will get a hit????
    2. I have maintained Price Control "V" in Material Master.However, I have maintained a Standard Price by mistake.In that case shall SAP ignores the MAP & takes Standard Price into account & post PRD??
    Regards
    Soumick 

    Hi,
    Before checking Planned Delivery costs accounting documents in MIRO posting and MIRO cancellation document, 1st check how Planned Delivery costs designed for your procurement process.
    Use t.code:ME23N, check your Purchase order
    Option-1:
    Is Planned Delivery costs added to inventory account and at the same time Planned Delivery costs posted to Separate Planned Delivery costs G/L account.
    OR
    Option-2:
    Is Planned Delivery costs posted to Planned Delivery costs G/L account ONLY
    OR
    Option-3:
    Is Planned Delivery costs added to inventory account ONLY.
    Based the above one setting, system  will post goods receipt and invoice posting document with corresponding accounting entries. Also cancellation of invoice posting document refer to these setting.But account posting depends on price control available in material master.
    NOTE:
    Standard price procedure (price control “S”):The system carries out all stock postings at a price defined in the material master. Variances in price are posted to price difference accounts.
    Moving average price (price control “V”): The system valuates goods receipts with the purchase order price and goods issues with the current moving average price.Differences in price between the purchase order price and the invoice are posted directly to the relevant stock account if there is sufficient stock coverage.
    Regards,
    Biju K

  • Not to Post Planned Delivery Cost in IV before MIGO

    Dear Experts,
    We are maintaining the Delivery cost Condition values for different vendors in Purchase Order and we are selecting the GR Based IV check box. At the time of MIRO before making MIGO (Goods receipt) it will not allow to Post Incoming Invoice if I select Goods/Service items or both Goods/Service items & Planned Delivery Cost but it will allow if we select only Planned Delivery Cost to Post.
    Kindly suggest us if anybody have the solution to restrict to Post the Planned Delivery cost before posting the Goods Receipt (MIGO).
    Thanks & regards,
    Dhanu

    Dear,
    First u do the MIGO, After that post the Material IV with goods/service, after that u again do IV for planned delivery cost selection of Planned delivery cost.
    Thanks,
    If this is helpful for u then reward me.

  • Delivery note wise planned delivery cost

    Hi Experts,
    Please let us know in MIRO we want to pass planned delivery cost bills delivery note wise.
    But while we choosing delivery note option the option to choose planned delivery cost is vanishing.
    Our main motto to get the planned delivery cost grn wise in MIRO, please suggest how that can be achieved.
    Regards

    hi thanks for reply I have found the solution that delivery note only take cares the value part of the material
    I have to use bill of lading to get the delivery cost at IR
    Is there any way or copy control that whatever is being entered in delivery note at MIGO should be copied to the bill of lading field, with a flexibility user can change if he wants
    rgds

  • Print planned delivery cost in PO

    Hello
    How can i print the planned delivery cost in purchase order standar?  because in partner funtion works well in MIRO and the account determination, but when i try to print this item in a purchase order it doesn`t apper only shows the purchase order and item of the main vendor.
    Thanks for your help

    Hi
    Planned delivery cost where you are adding in PO? In conditions tab right? In that case, Your Smart form/Jet form need to be modified to accomodate Planned delivery cost in PO print out.
    I can also suggest you that in some customer design the PO print form in a such a way that it will not be printed. In such cases they include the delivery cost along with material cost. So net price for a line item = Netprice + Delivery cost( While entering PO line item you have to calculate and add the costs.)
    In that case it will appear as a increased price for a line item in a PO print out.
    Hope this helps,

  • MIRO planned delivery cost and document reference

    Hi
    I create  a purchase order with one position including the planned delivery  with flag  Indicator: GR-Based Invoice Verification. OK
    I create the good receive with reference to purchase order: in Migo I update field xblnr Number of External Delivery Note. OK
    I enter an invoice to reference to purchase order number including the planned delivery costs using transaction MIRO: SAP enter the document and in RSEG update 2 record: on first record (refer to material) the field rseg - LBRNR (material document GR) and the field rseg - XBLNR are update BUT on second position (refer  planned delivery  cost) the fiel rseg - LBRNR (material document GR) and the field rseg - XBLNR are missing.
    I wanti to updat it. Is it possible?
    TKS

    Help me....

  • Bapi to post planned delivery cost of a purchase order

    Hi every body,
             Can anybody please give me the full details of the planned delivery cost data
    to post with BAPI_INCOMINGINVOICE_CREATE
    what are the manditory fields,
    I am using the following code , but  a few are posting , remaining r not posting
    but when I post the same through MIRO it is posted what is difference
    this error was came
    ERROR: enter good reciept data only when working with GR-based IV
    REPORT  ZBAPI_MIRO                              .
    tables: ekko,ekbe,ekpo,lfa1,EKBZ,t000.
    data: itemdata like BAPI_INCINV_CREATE_ITEM occurs 0 with header line,
      headerdata like BAPI_INCINV_CREATE_HEADER occurs 0 with header line,
         return like BAPIRET2 occurs 0 with header line,
         DOC_NO LIKE BAPI_INCINV_FLD-INV_DOC_NO,
         FISC_YEAR LIKE BAPI_INCINV_FLD-FISC_YEAR.
    DATA:error_flag.
    data: item_data like EK08BN occurs 0 with header line.
    data: begin of  itab occurs 0,
                 p_order like ekpo-ebeln,
                 p_item like ekpo-ebelp,
                 p_ctype like konv-kschl,
                 p_lifnr like lfa1-lifnr,
          end of itab.
    data:  order(10) type N,
          vendor(10) type N.
    data: begin of it_doc occurs 0,
                DOC_NO LIKE BAPI_INCINV_FLD-INV_DOC_NO,
                p_order like  ekko-ebeln,
          end of it_doc.
    PARAMETERS:  fn LIKE rlgrap-filename OBLIGATORY.
    DATA: FN1 TYPE STRING,
         l .
    AT SELECTION-SCREEN ON VALUE-REQUEST FOR fn. "p_file.
      CALL FUNCTION 'F4_FILENAME'
           EXPORTING
                field_name = 'FN'
           IMPORTING
                file_name  = fn.
    START-OF-SELECTION.
       FN1 = FN.
    PERFORM upload.
    loop at itab.
    CLEAR: EKBZ,EKPO,LFA1,ITEM_DATA,HEADERDATA,itemdata.
    REFRESH:itemdata,HEADERDATA,ITEM_DATA.
    order = itab-p_order.
    itab-p_order = order.
    vendor = itab-P_lifnr.
    itab-p_lifnr = vendor.
    select single * from ekbz where ebeln = order
                               and ebelp = itab-p_item
                              and kschl = itab-p_ctype
                              and bewtp = 'F'.
    select single * from ekpo where ebeln = order
                           and ebelp = itab-p_item.
    SELECT SINGLE * FROM LFA1 WHERE LIFNR = vendor.
    clear: item_data.
    refresh:item_data.
    call function 'ME_READ_COND_INVOICE'
       exporting
       I_BUDAT            =
        I_EBELN            = itab-p_order
        I_EBELP            = itab-p_item
       I_FRBNR            = ' '
         i_lifnr            = ' '
       I_XBLNR            = ' '
       RE_KURSF           =
       RE_WAERS           =
       I_RESWK            = ' '
       I_EKKI             = 'X'
       I_BUBIS            =
       RE_WWERT           =
       XEK08B_FLAG        =
       I_BELNR            =
       I_BUZEI            =
       I_READ_KRUEK       = ' '
       I_DISPLAY          = ' '
      TABLES
        XEK08BN            = item_data
       XEK08BN_CURR       =
    read table item_data with key kschl = itab-P_ctype.
    headerdata-INVOICE_IND = 'X'.
    headerdata-DOC_TYPE = 'KR'.
    headerdata-DOC_DATE = ekbz-budat.
    headerdata-PSTNG_DATE = SY-DATUM.
    headerdata-REF_DOC_NO = itab-P_ORDER.
    headerdata-COMP_CODE = 'HPL'.
    headerdata-DIFF_INV = itab-p_lifnr.
    headerdata-CURRENCY_ISO = ekbz-waers.
    headerdata-GROSS_AMOUNT = item_data-WEWWR - item_data-AREWR .
    headerdata-BLINE_DATE = SY-DATUM.
    headerdata-DEL_COSTS_TAXC = 'V0'.
    headerdata-PO_REF_NO = itab-P_ORDER.
    headerdata-bus_area = 'OTHR'.
    headerdata-ITEM_TEXT = LFA1-NAME1.
    *headerdata-HEADER_TXT = .
    headerdata-ALLOC_NMBR = itab-P_ORDER.
      APPEND HEADERDATA.
    CLEAR HEADERDATA.
    itemdata-INVOICE_DOC_ITEM = '00001' .
    itemdata-PO_NUMBER = itab-P_ORDER.
    itemdata-PO_ITEM = itab-P_ITEM.
    *itemdata-REF_DOC = ekbz-belnr.
    itemdata-REF_DOC_YEAR = ekbz-gjahr.
    itemdata-REF_DOC_IT = itab-P_ITEM.
    itemdata-TAX_CODE = 'V0'.
    itemdata-ITEM_AMOUNT = item_data-WEWWR - item_data-AREWR .
    itemdata-QUANTITY = item_data-BPWEM - item_data-BPREM .
    itemdata-PO_UNIT = ekpo-meins.
    itemdata-PO_PR_UOM = ekpo-meins.
    itemdata-COND_TYPE = itab-P_CTYPE.
    *itemdata-ITEM_TEXT = .
    append itemdata.
    clear itemdata.
    CALL FUNCTION 'BAPI_INCOMINGINVOICE_CREATE'
      EXPORTING
        HEADERDATA       = HEADERDATA
      IMPORTING
        INVOICEDOCNUMBER = DOC_NO
        FISCALYEAR       = FISC_YEAR
      TABLES
        ITEMDATA         = ITEMDATA
       ACCOUNTINGDATA   = I_ACCOUNTINGDATA
       TAXDATA          = I_TAX
        RETURN           = RETURN.
    if sy-subrc <>  0.
    message e999(re) with  'Problem occured'.
    else.
      loop at return.
        if not return is initial.
         clear bapi_retn_info.
         move-corresponding return to bapi_retn_info.
          if return-type = 'A' or return-type = 'E'.
            error_flag = 'X'.
          endif.
         append bapi_retn_info.
        endif.
      endloop.
      if error_flag = 'X'.
       message e999(re) with  'Problem occured'.
        rollback work.
      else.
          Return Table from BAPI call is empty
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
          EXPORTING
            WAIT   = 'X'
          IMPORTING
            RETURN = RETURN.
      endif.
    endif.
           write:/ 'Document no :', doc_no.
           it_doc-doc_no = doc_no.
           it_doc-p_order = itab-p_order.
           append it_doc.
           CLEAR IT_DOC.
    endloop.
    loop at it_doc.
       if it_doc-doc_no = ' '.
          write:/ 'purchase order not posted ' , it_doc-p_order.
       else.
       write:/ 'document no:' , it_doc-doc_no, 'p.order:' , it_doc-p_order.
      endif.
    endloop.
    *&      Form  upload
          text
    -->  p1        text
    <--  p2        text
    form upload .
      CALL function 'GUI_UPLOAD'
      exporting
        filename                      = FN1
       FILETYPE                      = 'ASC'
      HAS_FIELD_SEPARATOR           = ' '
      HEADER_LENGTH                 = 0
      READ_BY_LINE                  = 'X'
      DAT_MODE                      = ' '
      CODEPAGE                      = ' '
      IGNORE_CERR                   = ABAP_TRUE
      REPLACEMENT                   = '#'
      CHECK_BOM                     = ' '
      NO_AUTH_CHECK                 = ' '
    IMPORTING
      FILELENGTH                    =
      HEADER                        =
      tables
        data_tab                      = ITAB
    EXCEPTIONS
      FILE_OPEN_ERROR               = 1
      FILE_READ_ERROR               = 2
      NO_BATCH                      = 3
      GUI_REFUSE_FILETRANSFER       = 4
      INVALID_TYPE                  = 5
      NO_AUTHORITY                  = 6
      UNKNOWN_ERROR                 = 7
      BAD_DATA_FORMAT               = 8
      HEADER_NOT_ALLOWED            = 9
      SEPARATOR_NOT_ALLOWED         = 10
      HEADER_TOO_LONG               = 11
      UNKNOWN_DP_ERROR              = 12
      ACCESS_DENIED                 = 13
      DP_OUT_OF_MEMORY              = 14
      DISK_FULL                     = 15
      DP_TIMEOUT                    = 16
      OTHERS                        = 17
    endform.                    " upload

    I think you need to implement user-exit EXIT_SAPMM06E_012 of enhancement MM06E005.
    Look in OSS with seach term MM06E005 to get some examples.
    Note310154 "ME21N/ME51N: Customer-specific check, generating error log" has some examples.
    You should use the macros to set errors/warnings
    Example:
      mmpur_business_obj_id pt_ekpo-id.
      mmpur_metafield mmmfd_partners.
      mmpur_message_forced 'W' '00' '208' text-001 '' '' ''.
    regards,
    JG

  • Planned delivery cost in Import of Assets Materail

    Hi,
    I have a scenario, where we are purchasing (Import) Assets material from abroad. for this we have created Import PO with account assignment A. assigned the planned delivery cost in Condition Viz. Sea freight, Custom Duty, CHA charges and individual vendor also assigned at condition level.
    We have posted the MIRO for Custome Duty and Done the GR. Excise Invoice also Captured and posted. While posting the invoice of other Delivery cost after GR system is not showing any value in MIRO line item.
    Where as in normal inport cycle Value in Planned delivery cost IV (after GR) is appearing itself.
    Please guide how to Post Delievry cost IV in above scenario. we donot want to enter any amount manual in MIRO line item.
    Thanks & Regards,
    Ranjan Kumar

    Hi Ranjan,
    The idea with MIRO is to enter the vendor invoice that you got on paper, i.e. the gross amount, the tax amount(s) and the net item amounts - all from the vendor invoice. For this reason the defaulted amounts shouldn't be necessary.
    If your business case is different, then there's a workaround. MIRO only suggests amounts if two cases:
    - PO doesn't have provision for GR ("GR" flag on the tab "Delivery") or
    - PO does have provision for GR and the received qty up to day is higher than the total invoiced qty up to day.
    I have however used a user exit to make MIRO think the GR flag in the PO is not set. The user exit is the enhancement point MRM_AMOUNT_QUANTITY_PROPOSE_01 of the enh. spot ES_SAPLMRMC located right in the beginning  of the function MRM_AMOUNT_QUANTITY_PROPOSE. The function module receives the GR flag from the PO in the parameter I_MRM_PROP-WEPOS. Let your enhancement reset the flag and make MIRO believe the GR flag in the PO is not set. Then it will propose the PO qty and amount.
    However, let me underline again - the idea with MIRO is that you should type in the invoice that you hold your hand.
    BR
    Raf

  • Planned delivery Cost invoice verification via LIV EDI

    I have to verify the planned delivery cost in purchase order ( freight condition types). The invoice sent by the vendors via EDI ,have both material & freight cost. Unfortunately SAP doesnt allow to verify the planned freight cost via EDI. Is there a way to post freight costs along with material cost in EDI
    Has anybody used the BAPI_INCOMINGINVOICE_CREATE for delivery cost invoice verification using data from the invoice idoc.

    Hello
    Purchase order: 100 pcs @ 1.3/pc
    Planned delivery costs: 0.10/pc
    Goods receipt for that PO: 100 pc
    A/C postings @ GR
    Stock account: 140 Dr
    GR/IR clearing: 130 Cr
    Freight clearing: 10 Cr
    Invoice 100 pc @ 1.3/pc=130.00
          freight @ 0.10/pc= 10.00
              Total  =140.00
    A/C posting @ IR
    Vendor a/c's: 140 Cr (130 for Goods vendor and 10 for freight vendor)
    GR/IR clearing: 130 Dr
    Freight clearing: 10 Dr
    Since both are different vendors you have to credit the goods value to vendor A and freight charges to vendor B, you have to do them separately.
    Regards
    Gregory Mathews

  • ERS for Return Items with Planned Delivery Costs also as credit

    Hi
    I have the requirement to process ERS-Returns (MRRL) where I need to have a credit memo for the product cost and the planned delivery costs incurred with the original order. ($15,000 for product and $1200 for delivery costs = Credit Memo for $16,200)  I have tested this extensively but in all situations the planned delivery costs creates an 'invoice' not a credit memo.  
    Has anybody encountered this requirement?  If so, were you able to resolve without implementing an enhancement?
    Thanks.

    For delivery costs you need to maintain the following customizing:
      > OLMR
        > Evaluated Receipt Settlement (ERS)
          > Specify Automatic Settlement of Planned Delivery Costs
    The flag controls whether to include or exclude planned delivery costs
    from automatic settlement.
    Regarding the planned delivery cost, it will not listed in
    transaction MRRL. This is the standard SAP design. Instead, please
    use transaction MRDC.

  • Planned  delivery cost in po(mm)

    Hi Experts,
        where we will define The Planned Delivery cost in Purchase Order Screen and what is the purpose of revaluation and Material Valuation ?
    Thanks in Advance.

    Hi Viji
    Material revaluation:This feature enables users to make changes to existing stock prices. This can be necessary when the current price of the material does not match the actual market price. In that case, the price is adjusted and an accounting change posted.
    Material Valuation: It is a normal process where it depends on differnet factors like price control(MAP or SP) etc.
    regards
    Yogesh

  • Planned Delivery Cost Error

    Dear Experts ,
    I need valuable input to resolve the following problem :
    The Planned Delivery Cost as entered in PO is about 1,125,000 as Freight Charges for Procurement of Sugar which is about 182 K KG in Quantity. Now after the first two deliveries( 10 K each)  the user increases the quantity of sugar from about 182 K to 500 K.The net Delivery cost incurred is 2,854,183 for this PO which is not equal to cost of Freight Charges. Overall this has caused an entry in PRD (price difference Account) which is cause of concern.
    I need input to prevent such an entry for future.
    Regards,
    Sohaib

    Hi,
    Try to use Freight / Quantity (FRC1) in your PO so that if the quantity is changed in PO the freight is calculated accordingly.
    Regards
    Chandra Shekhar

  • Planned delivery cost indicator

    Hello everybody,
    Can anybody help me to get the *planned delivery cost indicator*  field in MIRO / PO/MIGO etc. screen...
    Thanks a lot in advance.
    Regards,
    Umakanta

    Hi,
    When you will go in to the transaction code MIRO,in the right hand side where we are entering the PO Number you can see the one field where you can select the planned delivery cost.Here you can fine the three options:
    1.Goods/Service Item
    2.planned delivery cost
    3.Goods/Service Item+planned delivery cost
    I hope it will help.
    Regards,
    Manish

Maybe you are looking for

  • Too low ringtone n msg tone

    hi i recently bought nokia 3500 which is s40 3rd edition.... when i recieve a call or a msg the tone is very low... sumtimes itz really hard to hear it if ur standing in a place wid noises... so any1 can help me figure out how can i increase my tone

  • ISW - Can Not Sync Password

    I use the ldap browser and it can connect to the ISW server. But when I verify the password, it shows nothing. Even on the ISW server, I use the "idsync resync -a "uid=myaccount", the result is the same. The new created user in the Window AD can sync

  • Store XML data in tables

    Hi, I Have to write a procedure which takes XML data and inserts into some tables. If the XML format is fixed then i can use extract function for parsing and can insert into the tables. But the problem is there is not fixed format for the xml. Are th

  • Copy photos and contacts to computer

    How do I copy my photos and contacts from my old iphone onto my new iphone without the original computer registered to the old iphone  (computer has been damaged)?

  • Why some scripts in R12 exit with status other than 0

    Some scripts in R12 like adformsctl.sh exit with status 3 , adstrtal.sh exit with status 1 etc when we read log file for these scripts startup the error is timed out . Ho we can find the root cause for these errors and their solution ? can some body