Frequency of Shelf life date

Hi,
    Can we find the frequency of Shelf life date in the database table which has stored the date change records. This shelf life date entered in the LS22 T.Code. But there is no log existing in the table. Please
consider this mail and reply ASAP.
Regards,
Sathya.M

Hi,
   I tried and activate log in table level, I could see the changes using SCU3 T.Code in table level. It
shows old value and new value of all the field in that table,Which means whatever changes made in that
table it displayed the history. My question is, can We activate the log for particular field.
Thanks.
Sathya.M

Similar Messages

  • Control "Shelf Life" date: Transaction LT03

    Hi,
    we want to check the validity date of the field "Shelf Life" (field SLEDBBD in the ALV) in the transaction LT03 before creating the Tranfert Order. For the moment the standard does not provide any control on this field:
    Basically, the standard flow is in that way:
    LT03: Create a Tranfert Order for Delivery (no control)
    LT12: ConfirmationCheck the validity date of the Shelf Life
    Reject
    Accept
    Our need consists to generate a blocking error message when the validating batch number is expired in LT03, like that:
    Have you got some Technical/Custo idea?
    Best regards.
    Rachid.

    Hi,
    You can control this via batch determination. Using condition technique, you can set the desired length of remaining shelf life for each of your customer (I mean you can create a condition record for each of them with the suitable parameters).
    Please check these links:
    http://www.renet-web.net/2008/09/05/sap-batch-determination-made-easy/
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/25/283aac4f7811d18a150000e816ae6e/frameset.htm
    (As per my best knowledge you won't be able to consider remaining shelf life during planning.)
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 5, 2009 8:56 AM

  • Check shelf life date by customer when goods issue

    Hi
    Since each customers will required to have different remaining shelf life of the product when deliver to their store such as 7-11 may required 100 days, Tesco Lotus 150 days so the manufacturing and trading companies of foods & beverage needs to control shelf life of their product by customer.
    In general , shelf life is set in material master - storage view so it's not attach to each customer - anybody know how to apply it?
    Pls help
    Regards,
    Chanchana

    Hi,
    You can control this via batch determination. Using condition technique, you can set the desired length of remaining shelf life for each of your customer (I mean you can create a condition record for each of them with the suitable parameters).
    Please check these links:
    http://www.renet-web.net/2008/09/05/sap-batch-determination-made-easy/
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/25/283aac4f7811d18a150000e816ae6e/frameset.htm
    (As per my best knowledge you won't be able to consider remaining shelf life during planning.)
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 5, 2009 8:56 AM

  • GR posting date is being considered as Shelf life expiry date

    Following settings made in material master:
    In Purchasing view: Batch management check box ticked.
    In Plant data / stor.1 view: (Shelf life data): Max storage period is 1, Time unit: YR
    Min remaining shelf life:1, Total Shelf life: 365, Period Ind for SLED: D
    Following data entered in GR:
    Document date: 10.03.2011, Posting date:10.03.2011
    In batch management tab of GR: Date of Manufacturing is :01.12.2010, SLED/BBD is appearing as 01.12.2011
    While taking shelf life report (on 12.03.2011) for the said material following output is displayed:
    Remaining shelf life             SLED / BBD
    -2 days                                10.03.2011
    In  batch display (MSC3N) Shelf life exp. date is appearing as 10.03.2011 where as in GR document it is showing as 01.12.2011.
    Kindly help where is the problem.
    regards,

    Hi,
    It is interesting.
    I understood the problem but for getting solution, you have to get ABAPeru2019s help. 
    In calculation in report, the report date 12.03.2011(DD.MM.YYYY) is taken by system as 03.12.2011(DD.MM.YYYY) and SLED is as per GR document 01.12.2011(DD.MM.YYYY). So 1-3= -2 days. Now, for calculating SLED date, system is deducting 2 days (or you can say adding -2) in report date 12.03.2011 (DD.MM.YYYY). So this is 10.03.2011.
    So in batch display (MSC3N), it is showing calculated date 10.03.2011.
    Please explain it to ABAPer & debug it, you will get solution.
    Before that try one thing. Check your user profile for date format. If it is MM.DD.YYYY, change it to DD.MM.YYYY, or vice versa. Then take report again , also check in MSC3N.
    BR.

  • Batch shelf life expiry date at Plant level

    Hi All,
                We have a requirement from the client to maintain Batch shelf life at plant level.
    Current process: Batch shelf life expiry date is maintained at the global level.
    Requirement: Shelf life data to be maintained at Global level and plant level both.We want flexibility to maintain shelf life both at Global level and plant level .
    If any one has worked in this scenario then kindly throw some light to resolve this issue.And also let me know if we move ahead to maintain shelf life data at  global n plant level then which all the area it will get effected in other stream reagrding shelf life best before date.
    This is very critical requirement from client prospective as we have legacy system involved like LIMS & COREDB.
    Your valuable input will be highly appreciated.
    Thanks n Regards,
    Vikas Soni.

    Hi Vikas,
    A doubt out of your query,
    How the expiry date is maintained Globally .
    Whenever a GR is done then the expiry date will be tagged to the particulat batch & the expiry date is valid for the batch in the particulat plant. Am I right?
    Thanks & regards
    Mahesh

  • Batch creation Date of Manuf and Shelf life issue

    Hello,
    I am having issues when batch gets created during Process order Creation/Confirmation.
    The issue is when the Batch gets created on creation/confirmation(101 GR) the field "Date of Manuf" is not populated on the batches(with todays date) which I checked in MSC3N.
    Because of this the shelf life is not getting populated(based on Shelf life data from MM) and is causing my Batch determination process to not work in Sales order/Delivery.
    Can anyone tell me if there is a config or master data set up
    1) which will either populate the field "Date of Manuf" automatically(when I do GR or Usage)
    or
    2) If it can give a pop up during Quality Inspection(usage) or Process order confirmation that will force someone to enter the Date of Manuf.
    Also when I check my classification tab for the batch(in MSC3N), the classification data does not gets created, which afffects my Batch determination process during Sales order/Delivery process.
    I have to manually go in the Batch(MSC2N) and enter todays date for Date of manuf and create classification data.
    Any Ideas what the issue is?
    Thanks
    SAP Fans...

    Hi, what you can do i set total shelf life in Plant Data / storage 1 view in the material master. In such way the date of manufacture will be required field to enter when you produce material. Shelf life date will be calculated automatically based on the total shelf life mantained. In some transactions (we are using MFBF) when total shelf life is populated in the material master, the date of production is defaulted in the transaction (with the current date), you can check if this is applicable in your scenario.
    Best Regards, Peter
    Hi, in addition to that you can check transaction OMCV - here you can activate automatic batch classification per movement type - so the batches can be classified automatically by SAP
    Edited by: Petar Stoyanov on Feb 24, 2009 10:49 PM

  • SHELF LIFE CONFIGURATION ISSUE

    Dear Guru
    I have an issue regarding shelf life material. I want that SLED should be calculate only for those material for which i have maintain shelf life data in material master.
    but  when i am trying to confirm process order for finished goods for  which  I have maintained batch  but not maintained shelf life data , system is calculating SLED for that also. 
    I have done configuration for shelf life like
    1 maintain period indicator
    2 set exp date check at plant level & movement type.
    it is working fine for those material for which i have maintained shelf life data in mat. master but giving error in finished good's process order confirmation for which we have  not  maintained any shelf life data in material master.
    error  showing during confirmation is "SHORTFALL OF 120 DAYS AGAINST SLED IN CURRENT ITEM (18.03.2011)."
    waiting for your reply......
    RAJ.....

    Dear Suleman
    thanx for your reply,
    Yesterday I have already resolved this issue by my own efforts.  you are also correct , in finished goods batch someone has entered expiry date. I have removed that date & now it is working fine. anyway i am giving you award for your correct reply.....

  • Shelf life field in material master

    Hi,
      For some raw material we want to maintain thta with shel life concept, along twith bacth management,  I have check in M01 for materila type ROW  but in out exisitng settings I have not found fields for entring the shelf life data in material master, so what settings to be check for this , which screen to be add.
    regards,
    zafar

    There is no settings for this.
    For any material, you can find the fields for Shelf Life data in "Plant Data/Storage 1" View.
    Please select this view
    Regards,
    Shetty

  • Shortfall of 818 days against remaining shelf life

    Hi Experts:
    I am trying to perform MIGO for an inbound delivery coming from a Scheduling Agreement.  I got the errror "shortfall of 818 days against remaining shelf life". I checked the material master, the shelf life of the material is 182 days only. How could it be? I would appreciate receiving solutions to the problem.

    hi,
    Pls check some points:
    You enter the shelf life data into the storage view of the material master record. This data includes:
    Maximum time a material can be stored
    Minimum shelf life a material must have available to be accepted by the system
    Percentage of the total shelf life that must still be available if the goods are to be sent to another distribution point
    Time unit used for the shelf life data (days, weeks or years)
    Total number of days that the goods can be kept u2013 from production to the shelf life expiration date...
    If anything else will soon update it..
    Regards
    Priyanka.P
    AWARD IF HELPFULL

  • Batch management - Shelf life and Production date

    Hi All,
    I am working with batch management where i did all the setting of characterestics, Batch class and neccessary settings. i am working with three characterestics shelf life expiration, production date and last goods reciept.
    I have to active shelf life and production date in Migo screen so that at the time of recieving my characterestics can store data. kindly help in customizing setting
    Thank you in advance
    Majid

    Hi,
    You need to activate shelf life expiration check in T.Code OMJ5 for movement type 101 and also plant.
    This will activates the entry of Shelf Life expiration/Production Date at the time of goods receipt.
    If you are using std. SAP Characteristic (LOBM) for Manufacturing Date,Best Before Date and Goods Receipt Date then the value of this characteristic will updates automatically in Batch ,depends on your goods receipt data.
    Regards,
    Dhaval

  • Stock transfer are not showing correct expire date for Shelf life subcontracting

    Hi Gurus,
    We have shelf life active for PPDS. We had added 5 characteristic to have min and Max shelf life in APO so that data will be considered during pegging.
    Self life works perfectly fine for production plant where based on manufacture date min shelf life is considered.
    LOBM_APO_SL_MIN
    LOBM_APO_SL_MAX
    LOBM_APO_SL_UTC
    LOBM_VERAB
    LOBM_HSDAT
    Question is for sub contracting process stock or inventory date is giving back dated where when we run planning run stock is getting expired.
    Can any one help in getting stock correct expire date instead of 1982---- some thing like this.
    Thanks in advance
    Thanks & Regards,
    Rajesh Kumar

    When you plan subcontracting in SNP following is generated.
    Object                             Source                                   Destination
    Sub Con PR (Header)       Sub contractor                       Plant
    PR/STR (Child)                Plant                                     Subcontractor
    PR (Child)                       Child Mat Vendor                    Plant (or direct to Sub Contractor)
    Usually first and third items will get converted to Purchase orders and will vanish as and when Goods Receipts are posted against them.
    The second order may not get converted in SAP.  Tis will remain in the system.  But in the next planning run, these will be deleted if the quantities have been already fulfilled.
    Regards
    Nitin Thatte

  • Disable Shelf Life Expiration date for Movement Type 311

    Hi All,
             Whenever we run the transaction MB1B with the movement type 311, it copies the batch and its shelf life expiiration date. Due to this, there are time when the user unknowingly enter a differrent SLED and hence change the batch unknowingly. We want to stop this. We want that while we are doing 311, the batch record and the SLED should get copied from the batch master BUT the field for SLED should be grayed out or the user should not be abale to enter ANYTHING in the SLED and the system should take the default SLED from batch master. Can we achieve it through config ? Please suggest.

    Please get a user exit developed and add it to the program SAPMM07M which is used in MB1B which will solve your purpose. The User exit should be fired when using 311 movement type during copying of Batch Characteristics. Hope this helps you.

  • Table and fields for " Batch Code Date " and "Shelf Life days".

    Hi All,
    What is the field for " Batch Code Date " and "Shelf Life days".
    And in which table are they present.
    Thanks & Regards,
    Ahmed.

    Check the table
    MCHA  Batches
    Field VFDAT  Shelf Life Expiration or Best-Before Date

  • Report for recieved, expiry dates of shelf life of materials

    Dear Gurus,
    I did nt find the solution in MB5M, because i want report for shelf life of materials based on recived date, expiry date, please share.

    Hi,
    When ever a material is having a shelf life , based upon the manyfactring date and the receiving date , the remaining shelf life can be found . If you want have a report which says the shelf life and receve date of a perticular batch and what should be the remaining shlef life or whather expired , once come into the plant , if not utilized , can be done through a ZREPORT or a query for the same .
    Regards,

  • Minimum Shelf life expiry date

    I have set up minimum shelf life expiry in customizing ,material master as well as system messages, when I do GR and entering the expiry date the warning message for delay does not appear, the system says the document is ok

    give facts.
    have set up minimum shelf life expiry in customizing ,
    you mean you activated SLED check per plant and movement type, right?
    material master
    what did you enter in which field?
    as well as system messages,
    What did you do with which system message?
    when I do GR and entering the expiry date
    What date did you enter?
    the warning message for delay does not appear
    Which message do you expect.

Maybe you are looking for