Full optimize Failed when scheduled

Hi everyone,
I got an issue with a full optimize package in SAP BPC 7.0 MS when scheduled.
The package admin_Optimize i use is the standard one. They are no overlapping package scheduled at the same time.
When i manually run the package for a Full optimize on one application it works.
When i manually run the package for a Lite optimize on one application it works.
When i schedule the package for a Lite optimize on one application it works.
When i schedule the package for a Full optimize on one application the package failed and stay stuck. Then the application stay unavailable.
This issue takes place in the production environment so i can't make a test during the day. and some people are using the application very early in the morning so they stay stuck in the morning.
Have you ever meet this issue ? What can i do ? What could be the test ?
Best regards,
Paul

When i start the full optimize by hand it's working fine (But we are supposed  to launch it at 4h15 in the morning so i would prefer to schedule it !)
Are you receiving any error message or actually the statusof package show that was not completed and no erro mesage is provided?
The package stay stuck, it never ends even after 4 hours. We are obliged to kill it.
Did you check tbllogs durin the time when the package is running ? It can provide very usefull information.
Yes we did, nothings appears in this table ... all the other package are correclty recorded even the LiteOptimize that is run 30 minutes after ... byt the way this Lite optimize doesn't failed.
Also please check the event viewer from BPC servers during the period when the full optimize was running.
No error  related to bpc. But i had an error 45 minutes before related to Osoft data manager

Similar Messages

  • WebI does not return failed when scheduling a report which only holds parti

    WebI does not return failed when scheduling a report which only holds partial results.
    We have scheduled reports which take some time to run. When they are scheduled they sometimes show successful even though the report only holds partial results. The only indication is when you open the report as webi report you see the warning that it holds partial results.
    When running the report manually, it works file.
    The issue is not in the no of rows in the universe settings because we this unselected. The issue is that it times out.
    The reason that it times out is that a lot of resources are used for loading and processing data when the report is scheduled. When running it manually, it works because at this time the serverload is less. the time in the universe is set to 10 min.
    The version we have is BOXIR2-SP4.
    Ok. Issue identified.
    The question is - why is the report successful when it holds partial results? If this is normal behavior, noone can really trust the scheduled reports, especially when you save it to excel and send it by mail.
    Is there a solution for this except increasing the allowed query time which would not solve the issu but only allow more reports to complete?
    Edited by: Karlgren Michael on Sep 17, 2009 1:22 PM

    Hi ,
    Currently this problem exists in XI R2. This feature will be part of thenext Service Pack i.e XI R2 SP6.
    This CER will be delivered from IDC Webi and BIP Platform as part of Jupiter Sp6.
    Problem Statement:
         Scheduled WebI Reports which are partially refreshed are distributed to the destinations for Users to View and make decisions. These users arenu2019t usually aware that these reports have u201CPARTIAL RESULTSu201D
    Recomended Solution:
        Allow the Schedule Creator / Modifier to set a parameter to stop the distribution of the u201CPARTIALLY REFRESHEDu201D WebI report.
    Thanks
    Salini

  • Full Optimize Failing

    Hello,
    Was wondering if any experts can give any insite into how to fix our full optimize from failing. We have had a custom package running for a few years which one of the last steps it does a full optimize. About a week ago it started to fail on this step and when we try to manually optimize from the front end it fails as well. We are able to optimize from the backend however. There are no additional processing running during this time, can anyone give any suggestions on what may be causing the problem? Is there some temp file that needs to be cleaned? I tried to do a modify of the application and that has not worked. We are on version 7.0.
    Thanks in advance!
    Kevin

    Here are a few of the messgaes I see in that table around the time of me trying to optimize this morning. Not sure what these mean:
      ==============[System Error Tracing]==============  [System  Name] - ApplicationService  [Message Type] - ErrorMessage  [Job Name]     - OSoft.Services.Webservice.ApplicationService.ApplicationService.Query()  [DateTime]     - 7-27-2011 7-29-05 AM  [UserId]       -   [Exception]       DetailMsg  - {You are not authorized to perform this task.   Please contact your BPC administrator.}  ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - ApplicationService  [Message Type] - ErrorMessage  [Job Name]     - OSoft.Services.Webservice.ApplicationService.ApplicationService.Query()  [DateTime]     - 7-27-2011 7-29-16 AM  [UserId]       -   [Exception]       DetailMsg  - {You are not authorized to perform this task.   Please contact your BPC administrator.}  ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - DatabaseHandler  [Message Type] - ErrorMessage  [Job Name]     - CommitTran  [DateTime]     - 7-27-2011 7-37-54 AM  [UserId]       - User  [SqlException]       Type      - System.Data.SqlClient.SqlException      Errors    - System.Data.SqlClient.SqlErrorCollection      Class     - 10      LineNumber- 0      Message   - {Timeout expired.  The timeout period elapsed prior to completion of the operation or the server is not responding.}      Number    - -2      Procedure - ConnectionRead (recv()).      Server    - BPCMS7P-OMF-03      State     - 0      Source    - .Net SqlClient Data Provider      TargetSite- Void OnError(System.Data.SqlClient.SqlException, System.Data.SqlClient.TdsParserState)      HelpLink  -   ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - DatabaseHandler  [Message Type] - ErrorMessage  [Job Name]     - RollbackTran  [DateTime]     - 7-27-2011 7-37-55 AM  [UserId]       - User  [Exception]       DetailMsg  - {This SqlTransaction has completed; it is no longer usable.}  ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - OSoftOptimizeManage  [Message Type] - ErrorMessage  [Job Name]     - OptimizeApplication()  [DateTime]     - 7-27-2011 7-37-55 AM  [UserId]       - mscorlib  [Exception]       DetailMsg  - {Exception has been thrown by the target of an invocation.}  ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - ApplicationService  [Message Type] - ErrorMessage  [Job Name]     - OSoft.Services.Webservice.ApplicationService.ApplicationService.Query()  [DateTime]     - 7-27-2011 7-40-18 AM  [UserId]       -   [Exception]       DetailMsg  - {You are not authorized to perform this task.   Please contact your BPC administrator.}  ==============[System Error Tracing  End ]============== 
      ==============[System Error Tracing]==============  [System  Name] - ApplicationService  [Message Type] - ErrorMessage  [Job Name]     - OSoft.Services.Webservice.ApplicationService.ApplicationService.Query()  [DateTime]     - 7-27-2011 7-40-45 AM  [UserId]       -   [Exception]       DetailMsg  - {You are not authorized to perform this task.   Please contact your BPC administrator.}  ==============[System Error Tracing  End ]==============

  • Webi Report Against SAP BW Query Fails When Scheduled

    Hi all,
    I'm facin a problem with all my Web intelligence Reports. When i refresh them on demand from view or design mode, everything works fine, but when i schedule them all instances fails with this error:
    A database error occured. The database error text is: The MDX query SELECT { [Measures].[DF4LK70NQJ0KRU6XHODIE9TGA], [Measures].[3EG3OC7QZBODSE9J2JI4OLOPI], [Measures].[CXDGYOWE9FJFHS72KIO78WGTT], [Measures].[12C28AI1LLXSDEHMWCDUMJWCW], [Measures].[E2OE5J39YBUPP4IPZCX1HNHZX], [Measures].[5X2TIT4FSFEBHYFDEFACO2DCF], [Measures].[E6WGO3AACYBZ20ZIHZF28Y9TT], [Measures].[CB1PAR1H2KF21CWAY6G3NP2WK], [Measures].[8GZAGANUUZA7B2V59A5FBB5BO] } ON COLUMNS , NON EMPTY CROSSJOIN( CROSSJOIN( CROSSJOIN( CROSSJOIN( CROSSJOIN( CROSSJOIN( [ZSOLTYPE].[LEVEL01].MEMBERS, [0CALMONTH].[LEVEL01].MEMBERS ), [0MATL_GROUP].[LEVEL01].MEMBERS ), [0MATERIAL__0MATL_TYPE].[LEVEL01].MEMBERS ), [0COMPL_DEL].[LEVEL01].MEMBERS ), [0BBP_STATUS].[LEVEL01].MEMBERS ), [0PLANT].[LEVEL01].MEMBERS ) ON ROWS FROM [CUBE_NAME/QUERY_NAME] SAP VARIABLES [ENTFINAL] INCLUDING X [0I_CALZ2] INCLUDING ENE 2008 : MAR 2008 failed to execute with the error FUNCTION_NOT_FOUND. (WIS 10901) .
    BO is XI3.0, BW 3.5, Universe made from a SAP BW Query.
    Thanks in advance!

    Hi Ingo,
    All the authorizations for crystal report to fetch data is in place, and crystal report refresh and schedule runs success fully. The issue is only in Web Intelligence.
    If it is same as crystal report we should see similar results for crystal report, which is not the case as of now. Crystal report refreshes without any error and we can able to schedule it without any problem.
    As it is said earlier, SAP secuirty guy doesnt find any missing authorizations. It is very difficult to say which authorization is missing.
    Edited by: Raghavendra Barekere on Nov 7, 2008 6:42 PM

  • SSIS Package Fails when Scheduled as a SQL Server Agent Job

    I have an SSIS package that runs without any problems when executed through BIDS.
    However, when I schedule the SSIS as an Agent job, it fails completely or part way through. When it partially runs, the part that it is failing on is a Script Task that moves the source data file to an archive folder (on the same server).
    I have tried using my domain account as the owner of the job, then the job fails straight off and I get an error:
    Unable to determine if the owner (Domain\MyID) of job JobName has server access (reason: Could not obtain information about Windows NT group/user 'Domain\MyID'
    If I change the owner to the 'sa' account , then the job partially runs, but then fails because 'sa' is a SQL account and does not have access to the filesystem.
    I have managed to get it to work by using the SQL2008_Local account and granting modify permissions to the affected folders.
    My question is - what is the advised way of doing this?
    Thanks
    Gary

    Hi Garyv.King,
    When you see a SSIS package fails running in a SQL Agent job, you need to first consider the following conditions:
    1. The user account that is used to run the package under SQL Server Agent differs from the original package author.
    2. The user account does not have the required permissions to make connections or to access resources outside the SSIS package.
    For more detailed information about the issue, please following this KB article:
    An SSIS package does not run when you call the SSIS package from a SQL Server Agent job step
    http://support.microsoft.com/kb/918760 
    You can check SQL Server Agent’s activity logs, Windows Event logs and SSIS logs to get more clues. Also the tool Process Monitor is helpful to track the cause of registry or file access related issues.
    The following 4 issues are common encountered in the SSIS forum.
    1. The package's Protection Level is set to EncryptSensitiveWithUserKey but your SQL Server Agent service account is different from the SSIS package creator.
    2. Data source connection issue.
    3. File or registry access permission issue.
    4. No 64-bit driver issue.
    For more information about it, please see:
    How do I troubleshoot SSIS packages failed execution in a SQL Agent job:
    http://social.technet.microsoft.com/Forums/en-US/sqlintegrationservices/thread/e13c137c-1535-4475-8c2f-c7e6e7d125fc 
    Thanks,
    Eileen

  • Offline backup failing when scheduled using DB13

    Hi,
               We have done our backup schedule of our BI 7 system running on AIX 5.3 and Oracle 10.2 using DB13.The activities like online backup and datbase check is executing correctly but offline backup is failing with status unknown.
    If i check in sm37 for the DBA job offline backup is showing status completed successfully but in brbackup logs there is no log for the offline backup activity.
    Kindly provide your suggestion on how i can resolve this issue.

    Hi Ammey,
                   Thanks for your reply.
    When I trigger the backup directly from brtools offline backup is happening successfully.The issue is happening only for the db13 scheduled offline backup.The same thing happened for Update statistics but check db is executed.
    So what has to be checked in backint settings pls provide you suggestion.
    rgds,
    vinayak

  • How to mail to users when a report fail when scheduled in Infoview-BO XIR2

    Hi,
    We need to send a mail notification to the mail recipients when a report fail. Is this possible in Infoview.
    Please suggest.
    Thanks in advance.

    it is not possible in infoview. but it can be done using CMC. if you go schedule a reports in CMC, goto notifications and add email notification and add email addresses.

  • Acrobat 9 Pro - PDF Optimizer fails when selecting overwrite file during save process

    Hello Everyone,
    I am wondering if Acrobat 9 Pro has changed in the way it handles PDF Optimizing functioning when trying to overwrite the file you are attempting to optimize. In Acrobat 8 Professional, it overwrites the file just fine when it gets to the save process. It does work when you modify the name during the save process, however, it would be nice to know if this is "the way it works" or the "program has an issue".
    Thoughts?
    Message received when trying to overwrite the file,
    COnversion Warnings> "An error was encountered while saving the document."
    Logically, it seems as though the application cannot save over an "opened" file thus dumping that message on me.
    Regards. D.

    > When using Save As to save a PDF, is it possible to have Commenting and Analysis enabled for that saved PDF by default?
    No.

  • SSIS Job is failing when scheduled.

    Hello,
    I'm getting error when running an ssis package in sql agent Job in sql server 2008. Error message as shown below.
    Message
    Executed as user: ANSWERS\administrator. The process could not be created for step 1 of job 0x71B1306CBCCA6846A4E345640CFAE163 (reason: The system cannot find the file specified).  The step failed.
    Any help would be appreciated ASAP.
    Thanks,
    Vinay

    Hi Vinay,
    According to the error message” The system cannot find the file specified”, it seems that there are some files are invalid or the account has no access to the files.
    Considering you are used excel file in the package, please pay attention to the following tips:
    If SQL Server Agent is 64-bit version, we should run a package in 32-bit mode from in the Job Step dialog box, on the Execution options tab, select Use 32 bit runtime.
    Make sure the script in command line is correct, for example the quotation marks.
    The path of the excel file or other files is valid.
    The path should contains the files.
    SQL Server Agent should has access to the files.
    If the Job is running under a proxy account, then that proxy should has access to the files.
    Restart SQL Server Agent.
    References:
    https://social.msdn.microsoft.com/forums/sqlserver/en-US/76d14c97-ad3e-4c18-9465-cded95c612f7/job-fails-with-the-system-cannot-find-the-file-specified
    https://ask.sqlservercentral.com/questions/108260/unable-to-run-dts-package-from-sql-server-agent-jo.html
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • Full Optimization and rearrangement of dimensions

    In BPC, there are times when Full optimize u2018mayu2019 create a new cube if rearrangements of dimensions gives more optimal performance. Also, upon transport, the technical name u2018mayu2019 be different for the same reason.
    My questions - how and when does BPC system realize to rearrange dimensions? Is it during every full optimize?
    I hope data does not get affected, but what gets affected?
    In basic terms, what is "rearrangement of dimensions"?
    Also, when should we do full optimize?
    When we transport, does that change the technical name?
    Thanks.
    Anand

    Hi Anand -
    Part two...
    This process being understood, on your specific questions:
    How and when does BPC system realize to rearrange dimensions?  The decision to rearrange dimensions is based upon an analysis of transactional data and sizing of the underlying SID tables supporting that data
    Is it during every full optimize?  Not necessarily.
    I hope data does not get affected, but what gets affected?
    Data is retained, but if the cube is reorganized then the technical name of the cube supporting the BPC application may change during the process.
    In basic terms, what is "rearrangement of dimensions"?
    Rearrangement of dimensions is the process where the BW characteristics are reassigned to different BW dimensions to promote an optimal data model.
    Also, when should we do full optimize?
    If you suspect that your performance has degraded due to changes in your transactional data storage patterns, you may need to update your current BW data model to achieve the best performance from your application.
    When we transport, does that change the technical name?
    There is guarantee that the same technical name will exist in the target system, so the answer is maybe not.  Please rview the folowing blog for more details on name retention after transport:
    [/people/sheldon.edelstein/blog/2010/03/30/bw-objects-technical-name-changeability-for-sap-bo-planning-consolidation-version-for-netweaver|/people/sheldon.edelstein/blog/2010/03/30/bw-objects-technical-name-changeability-for-sap-bo-planning-consolidation-version-for-netweaver]
    Regards,
    Sheldon

  • 0orgunit_att full load failed

    The full load failed. when i analyzed the error is job terminated in source system
    i checked the job overview in source system and there is a dump.
    the dump is
    Runtime Errors         ITAB_DUPLICATE_KEY
    Date and Time          02.02.2009 08:44:59
    Short text
         A row with the same key already exists.
    What happened?
         Error in the ABAP Application Program
         The current ABAP program "SAPLHRMS_BW_PA_OS" had to be terminated because it
          has
         come across a statement that unfortunately cannot be executed.
    What can you do?
         Note down which actions and inputs caused the error.
         To process the problem further, contact you SAP system
         administrator.
         Using Transaction ST22 for ABAP Dump Analysis, you can look
         at and manage termination messages, and you can also
         keep them for a long time.
    Error analysis
         An entry was to be entered into the table
          "\FUNCTION=HR_BW_EXTRACT_IO_ORGUNIT\DATA=MAIN_COSTCENTERS[]" (which should
    have
    had a unique table key (UNIQUE KEY)).
    However, there already existed a line with an identical key.
    The insert-operation could have ocurred as a result of an INSERT- or
    MOVE command, or in conjunction with a SELECT ... INTO.
    The statement "INSERT INITIAL LINE ..." cannot be used to insert several
    initial lines into a table with a unique key.
    to correct the error
    Probably the only way to eliminate the error is to correct the program.
    If the error occures in a non-modified SAP program, you may be able to
    find an interim solution in an SAP Note.
    If you have access to SAP Notes, carry out a search with the following
    keywords:
    "ITAB_DUPLICATE_KEY" " "
    "SAPLHRMS_BW_PA_OS" or "LHRMS_BW_PA_OSU06"
    "HR_BW_EXTRACT_IO_ORGUNIT"
    If you cannot solve the problem yourself and want to send an error
    notification to SAP, include the following information:
    please suggest <removed by moderator>.
    pramod
    Edited by: Siegfried Szameitat on Feb 2, 2009 11:06 AM

    Hi asish,
    Runtime Errors         ITAB_DUPLICATE_KEY
    Date and Time          02.02.2009 06:18:44
       180                i0027_flag         = ' '
       181                ombuffer_mode      = ' '
       182            TABLES
       183                in_objects         = in_objects
       184                main_costcenters   = main_co
       185            EXCEPTIONS
       186                OTHERS             = 0.
       187
       188
    >>>>>         INSERT LINES OF main_co INTO TABLE main_costcenters.
       190
       191         last_plvar = orgunits-plvar.
       192         REFRESH in_objects.
       193         MOVE-CORRESPONDING orgunits TO in_objects.
       194         APPEND in_objects.
       195       ENDIF.
       196
       197     ENDLOOP.
       198   ENDIF.
       199
       200   LOOP AT orgunits.
       201
       202     CLEAR:   infty1000, main_co, infty1008, l_t_hrobject.
       203     REFRESH: infty1000, main_co, infty1008, l_t_hrobject.
       204
       205     APPEND orgunits TO l_t_hrobject.
       206
       207     LOOP AT l_t_i1000_all INTO infty1000 WHERE objid = orgunits-objid.
       208       APPEND infty1000.
    i checked this this reflects a structure. i cannont modify as this is standard table.
    pramod

  • The Full Optimization & Lite Optimization Data Manager packages are failing

    Hi,
    The Full Optimization and Lite Optimization Data Manager packages are failing with the following message "An Error occured while querying for the webfolders path".
    Can anyone had similar issue earlier, please let me know how can we rectify the issue.
    Thanks,
    Vamshi Krishna

    Hi,
    Does the Full Optimize work from the Administration Console directly?
    If it's the case, delete the scheduled package for Full Optimize every night (in both eData -> Package Schedule Status and in the Scheduled Tasks on your server Control Panel -> Scheduled Tasks), and then try to reschedule it from scratch.
    If it's not solving your problem, I would check if there are some "wrong" records into the FACT and FAC2 tables.
    After that, I would also check if the tblAppOptimize is having other values than 0. For all applications, you should have a 0 there.
    Hope this will help you..
    Best Regards,
    Patrick

  • Creation of InitialContext fails when i hot-deploy scheduler-service.xml

    Creation of InitialContext fails when i hot-deploy scheduler-service.xml
    I configured scheduler-service as follows in Jboss 3.2:
    scheduler-service.xml
    <mbean code="org.jboss.varia.scheduler.Scheduler"
         name=":service=Scheduler">
    <attribute name="StartAtStartup">true</attribute>
    <attribute name="SchedulableClass">com.beta.my.utils.FMScheduler</attribute>
    <attribute name="SchedulableArguments">Schedulabe Test,12345</attribute>
    <attribute name="SchedulableArgumentTypes">java.lang.String,int</attribute>
    <attribute name="InitialStartDate">0</attribute>
    <attribute name="SchedulePeriod">10000</attribute>
    <attribute name="InitialRepetitions">-1</attribute>
    </mbean>
    Schedulable Class
    package com.beta.my.utils;
    import java.util.Date;
    import org.jboss.varia.scheduler.Schedulable;
    public static class FMScheduler
    implements Schedulable
    private String mName;
    private int mValue;
    public FMScheduler(String pName,int pValue)
    mName = pName;
    mValue = pValue;
    public void perform(Date pTimeOfCall,long pRemainingRepetitions)
    try {
              Context context = new InitialContext();//properties taken from jndi.properties file
              } catch (Exception e){
                   e.printStackTrace();
    I started my jboss..,FMScheduler created successfully, perform method in FMScheduler called succesfully after SchedulePeriod(1000)
    The problem occurs(NullPointerException) while i changed SchedulePeriod time and hot-deployed(just saved scheduler-service.xml).
    The following Exception occures due to InitialContext creation fails*(Context context = new InitialContext();)* in FMScheduler.
    17:46:27,361 ERROR [STDERR] java.lang.NullPointerException
    17:46:27,361 ERROR [STDERR] at org.jboss.mx.loading.UnifiedClassLoader.findR
    esources(UnifiedClassLoader.java:374)
    17:46:27,361 ERROR [STDERR] at java.lang.ClassLoader.getResources(ClassLoade
    r.java:825)
    17:46:27,361 ERROR [STDERR] at com.sun.naming.internal.VersionHelper12$5.run
    (VersionHelper12.java:145)
    17:46:27,361 ERROR [STDERR] at java.security.AccessController.doPrivileged(N
    ative Method)
    17:46:27,377 ERROR [STDERR] at com.sun.naming.internal.VersionHelper12.getRe
    sources(VersionHelper12.java:142)
    17:46:27,377 ERROR [STDERR] at com.sun.naming.internal.ResourceManager.getAp
    plicationResources(ResourceManager.java:468)
    17:46:27,377 ERROR [STDERR] at com.sun.naming.internal.ResourceManager.getIn
    itialEnvironment(ResourceManager.java:159)
    17:46:27,377 ERROR [STDERR] at javax.naming.InitialContext.init(InitialConte
    xt.java:215)
    17:46:27,377 ERROR [STDERR] at javax.naming.InitialContext.<init>(InitialCon
    text.java:195)
    17:46:27,377 ERROR [STDERR] at com.beta.my.utils.FMScheduler.perform
    (FMScheduler.java:42)
    17:46:27,392 ERROR [STDERR] at org.jboss.varia.scheduler.Scheduler$Listener.
    handleNotification(Scheduler.java:1263)
    17:46:27,392 ERROR [STDERR] at org.jboss.mx.server.NotificationListenerProxy
    .handleNotification(NotificationListenerProxy.java:69)
    17:46:27,392 ERROR [STDERR] at javax.management.NotificationBroadcasterSuppo
    rt.sendNotification(NotificationBroadcasterSupport.java:95)
    17:46:27,392 ERROR [STDERR] at javax.management.timer.Timer.sendNotification
    s(Timer.java:441)
    17:46:27,392 ERROR [STDERR] at javax.management.timer.Timer.access$000(Timer
    .java:31)
    17:46:27,408 ERROR [STDERR] at javax.management.timer.Timer$RegisteredNotifi
    cation.doRun(Timer.java:612)
    17:46:27,408 ERROR [STDERR] at org.jboss.mx.util.SchedulableRunnable.run(Sch
    edulableRunnable.java:164)
    17:46:27,408 ERROR [STDERR] at org.jboss.mx.util.ThreadPool$Worker.run(Threa
    dPool.java:225)
    please help me if u have any idea,thanks

    Hi Hamsa,
    Did you also create and configure an "Execution Destination"?
    You can test the Metadata destination configuration on Web Service Navigator.
    On the web service navigator (http://hostname:portnumber/wsnavigator) search in the metatda destination you have created for the service you imported in web dynpro as a model. If you can find it there test it on the ws navigator.
    Best regards,
    Yasar

  • SSIS package works in development environment but fails when job scheduler executes, file path invalid

    SIS package works in development environment but fails when job scheduler executes, file path invalid
    Relatively simple package to get OLE-DB connection to MS FoxPro 9.0 DB
    The failure in the job log states that the path is invalid its a network path (\\192.168.1.xxx\foldername) this has been run several ways with the remote computer being mapped as a network drive and through the \\ notation described above.
    Thinking it was a security issue between the SQL agent account and my account I tested by subsitution myself as a proxy account for the agent when running this job, again same result failed on network path.
    One issue I see is that the remote computer is running Server 2000 (legacy software incompatable with newer versions) 
    Is it possible that this is a security issue, since if i understand correctly the current MS domain security model didn't exist until Server 2003.

    Hi REIData,
    Have you got the issue resolved? Based on your description, please make sure the target folder is shared properly. If the computer on which the SQL Server Agent job runs doesn’t join the domain as the server that hosts the shared folder, you have to share
    the folder with everyone by adding “Everyone” to the people list on the File Sharing page of the folder and assign "Read/Write" permission to it.
    Regards,
    Mike Yin
    TechNet Community Support

  • Populate Available Promise Date on Sales Order when Scheduling failed: Cann

    Hello ,
    when we are importing orders into Order Management and if the available promise date is greater than Request date then scheduling fails with the message"Scheduling failed: Cannot meet request date or latest acceptable date Available Date:" The order is booked and the ATP items have schedule ship date Null and in the same order I have non ATP items with schedule ship date
    Is there a way to populate the Available promise date when Scheduling fails without ATP override.
    thank you for your time

    Hello ,
    when we are importing orders into Order Management and if the available promise date is greater than Request date then scheduling fails with the message"Scheduling failed: Cannot meet request date or latest acceptable date Available Date:" The order is booked and the ATP items have schedule ship date Null and in the same order I have non ATP items with schedule ship date
    Is there a way to populate the Available promise date when Scheduling fails without ATP override.