Hi,
I am using BAPI_COSTCENTER_CHANGE_MULTIPLE to change Cost Centers.
I am finding a Problem in changing the from and to date.
When i try to change the validity dates through standard transaction KS02
they have a Peculiar way of splitting the dates.
Is there any FM to split these dates?
Regards
Manjari

Hi Manjari
I think you need to be a bit more descriptive about your issue. Are you trying to say that for the same cost center, you need to have different validity periods in the CSKS table. For eg:
KOSTL    DATBI     DATAB
100         23.02.2011     01.02.2011
100         31.12.9999     24.02.2011
Let me know if i am getting you correct here.
If this is the case, then while populating the BAPI table for cost center '100' (as in the example) you need to divide this into two different items. The data will be same for all the BAPI fields except DATAB and DATBI. Let me know if you need a code snippet for this.
Hope this helps.
Harsh

Similar Messages

  • ALE for G/L and Cost Center Master Data

    Dear Expert,
    I am a fresher in ALE  and want to distribute G/L and Cost Center Master Data from our production system to Development and Q/A system. Can you give some guidances? and how to configure ALE for this purpose?
    Regards,
    MAL

    hi,
    steps to configure ALE :
    1.first u hav to create 2 logical systems for ur 2 clients in BD54.
    2.then assign thm in SCC4 for both clients.
    3.thn crete rfc destination in SM59.create in client from which u want to send only.
    4.create port in WE21 for sender.
    5.create partner profiles in We20 for both clients,outbound for sender and inbound for reciever.
    6.now create distribution model in BD64.
    generate partner profiles and distribute.
    now ur ale configration to send data frm 1 clnt to other is ready.
    u hav diff methods like master data,change pointers,idoc extensions,idoc reductions,...... to send data .
    hope this helps.
    reward points if helpful.

  • Profit center and cost center master data upload errors

    Hi Sapiens,
    Could you please guide me to resolve the below errors in profit center and cost cost center master data upload through LSMW. i am usinng recording method for upload and  getting below error while uploading the data from txt file.
    1. Valid from and to dates are not converting in DDMMYYYY format, which field type we have to use in field mapping?
    2. some of the fields data are overlapping when uploading the data.
    3. How to create validation for empty cells data.
    thank in advance.
    regards,
    jagadeesh.

    Hi
    when you are using LSMW for uploading PC & CC, simple way to correct the Error's WHILE RECORDING The First record, while Creating LSMW, B very care full while entering the details ,bez wht ever Fields your updating ..the same Fields get updated While LSMW Processed.
    As mentioned above update the vaild from and to date in wht ever format you want While recording, in the same format all the remaining records gets updated.. 
    Hope the suggections will Help you in solving your Issues.
    Thanks
    Goutam
    Edited by: Goutam78 on Apr 29, 2011 8:59 PM

  • Cost Center Master data field status change

    Hello Gurus,
    I need to change the field status of 'User Responsible' field as required from optional in the cost center master data. I am not being able to get the exact answer from my searches. If anyone can help with an answer, it would be great.

    Dear,
    You can use screen variant also...
    Transaction code: SHD0
    and make that field as required.

  • Change Tax Jurisdiction code (TXJCD) in Cost Center Master Data

    Hi There,
    We have a problem of making change to Tax Jurisdiction Code in Cost Center Master Data. We are on ECC 6.0 with Vertex system as external tax system. When we create Cost center, system automatically derive tax jurisdiction code from vertex) external system).  Now Vertex have made changes to Tax Jurisdiction Code for same place based on US Gov directive. these changes are time period base say from 01/01/2008 to 06/30/2009 Tax Jurisdiction Code  "TX1000" and from 07/01/2009 to 12/31/999 Tax Jurisdiction Code  "TX2000" (example)  When we go to change mode in Cost Center, system automatically derive the new Tax Jurisdiction Code  and update the cost center with new Tax Jurisdiction Code  "TX2000". When we book invoice for cost center, with back date say 06/29/2009, system through the error, that it is not a valid Tax Jurisdiction Code.
    My question is; how can we maintain two different Tax Jurisdiction Code  in SAP for Cost Center? From configuration stand point of view, we have maintained TXJCD as time dependent field, but still this field is grayed out and sytem populate the Tax Jurisdiction Code  from external system, since we have installed vertex system for tax purpose.
    Please let me know.
    Thanks,
    Pawan Sharma

    Pawan,
    have you received any response on this or identified any solutions as I have also a similar request.
    Thanks,

  • Lsmw Uploading cost center master data fields ERFNM,ERFDT at History tab

    Hi Gurus,
    I done uploading of cost center master data through LSMW.everything is fine but I have one issue.
    I done Uploading from 4.6 now in 4.6 the cost center was created by some one else when I am doing in ECC 6.0 system automatically taking my name as default it means I can not enter in ECC 6.o that who originally created  it  and what was that date. Is there any way to solve it or system will take only mine name in Fields( ERFNM,ERFDT )at cost center History Data while creating Master data.
    Many Many Thanks

    Yes, system will take the creator name from the person who actually creates the cost center in SAP.
    It will be filled automatically and you can not change the creator name.
    This is to ensure better audit trail and tracability.
    Regards,
    Gaurav

  • Defination of Department to assign in Cost Center Master Data

    Hi Experts,
       Can you anyone please suggest me reg, "Defination of Department to assign in Cost Center Master Data".
    because, My client needs Department wise Cost Centers balance.
    Pls explain in detail..
    Thanks in advance..
    Regards,
    Balaji Bhonsle

    In my (4.7) version there is a field for "Department".  This field is nothing more than a text field.  You can populate it with whatever you wish and use that field in a variety of reports.  One use would be to enter the legacy department number when going live.  Another would be to group several cost centers in some desired way.  However, if you are looking to group cost centers, the cost center grouping as previously suggested is a far superior choice normally since you can create many different groups whereas this field is limited to just one choice.  Another grouping available for reports is the Category, which is a one letter designation.  Be careful with this though, because it may be used to drive functionality as well.  Like P in my category implementation means "Production" and thus allows labor activities as a feature.
    I hope this helps.

  • Cost center Master data

    Hi All
    I would like to change cost center master data valied from date and to date for more than 1000 cost centers. Please let me know what is the easy way to do this.
    Thanks in advance
    Regards
    Prasad

    Hi,
    In Standard SAP we are not able to change the valid date.
    I believe you should do delete and create another cost center with the same parameters and with the new valid date.
    Or....create a programm with Abaper...but I am not sure if it will fix your issue.
    Thanks
    Daniel

  • Problem while changing Business Area in Cost Center Master Data

    I am having a problem while changing the Business area in cost center master data, the system does not allow to change the business area due to the following reasons;
    1.  The transactional data already exists for that cost center
    2.  The desired date required to be changed, falls between analysis period 01.01.2000 to 31.12.2999
    Can anyone help me in order to reslove this issue
    Thanking in anticipation
    Edited by: Arshad  Iqbal on May 24, 2010 2:10 PM

    Dear Dejan !!
    Thanks a lot for resolving my problem actaully i have tested the scenario in Testing Server by changing the fiscal year and the system allowed to change the business area before any transactional data posted.
    Thanks Once Again
    Regards
    Ch. Arshad Iqbal

  • Co code not seen for cost center master data creation in OKEON

    hI:
               In org tab of Cost center master data creation while configuring cost center hierarchy in OKEON i can not see organization tab. I have checked in OKKP Co area is assigned to co code but still the issue persist.
    Br

    hi
    you mean the tab is not displayed? strange, it seems that there should be a screen layout to control the ui, or any transaction variant is recorded. I tried in my side, the tab is there.
    @ Murali, you are right, but in that tab, not only company code can be configured, but also business area, functional area etc.
    best regards, Lawrence

  • Use of Costing Sheet in Cost Center Master Data

    In the ‘Template’ tab of the cost center master data there is a provision to mention ‘Costing Sheet’ under the heading ‘Overhead rates’.
    How does it work? Does it work for actual or plan?
    I want to use  ACTUAL assessment cycle between a sender cost center and few receiver cost centers. I want to add % overheads to the expenses posted on receiver cost centers. Can I  do this by mentioning a costing sheet  in ther sender / receiver cost center?
    If yes then how? If not what is the alternative?
    Regards,
    VRB

    Hi,
    Refer this link:
    http://help.sap.com/saphelp_470/helpdata/en/7e/cb815e43a311d189ee0000e81ddfac/frameset.htm
    Reward points if useful.
    Regards

  • How to make the Profit Center Field Mandatory in Cost center Master Data

    Dear All,
    Please let me know how to make the Profit Center Field mandatory in Cost Center Master Data as well as my Internal Order Master Data?
    Thanks in advance!
    Regards,
    Rajeswari Shankar.

    Hi Rajeswari,
    You can modify message number KS096 to "Error" via OBA5. Thus, the users would no be able to save a cost center without entering a profit center. (Depending on your release you can make KS096 modifiable by implementing note 486781.) 
    Concerning the internal orders (transaction KO01), you can run KOT2 and set Profit center field as required entry in "change field selection" section.
    Regards,
    Greta

  • Person Resposible in Cost Center Master Data

    Hi,
    I need a help in identifying about the field "Person Responsible" in Cost center master data.
    Is this field corresponds to Manager of the cost center, if so, what is the information we have to give there, it should be Manager's PERNR or Manager's user name or manager's full name ..????
    Thanks and Regards,
    Girimurugan

    Hi Giri,
    I see that this is your first post on SDN and would like to welcome you here.
    I suppose you have accidentally made two identical posts. You have got some responses in the other thread. If they have satisfied you, then close that thread by marking it as answered.
    Regards,
    Anand Mandalika.
    P.S : Please read the following two documents -
    1. https://www.sdn.sap.com/sdn/index.sdn?page=crp_help.htm
    2. /people/mark.finnern/blog/2004/08/10/spread-the-love

  • Company Code field now shown in Cost Center Master Data

    Hi
    I am new, I configured CCA. Created Controlling area and versions. When I created a cost center company code field not shown. I think one cost center assined to a one company code but in cost center master data Company code field not shown. I want to cost center company code specific. I using ECC6
    Pl help.

    Hi,
    When you will assign additional company codes, the cost centre created now, by default will be assigned to the existing company code, and for the new one - you will have to define cost centres again. So, everything is fine, do not worry.
    Regards,
    Eli

  • Profit Center Mandatory in Cost Center Master Data

    Hi guys,
    Can any one suggest,where can we make settings for profit center mandatory in the cost center master data?

    Hi Swapvik,
                    I was just surfing and came across the concept for the profit centre.Have a look at it , it might help you or even resolve the issue.
    Here is the Link: [Centre1|Re: Gl account is set to profit center mandatory;
    There is another link for configuration problem relating to the query.
    Link: [Centre2|Profit Center Column;
    I am sure this will resolve your query.
    Have a best day ahead.

Maybe you are looking for

  • Error - 1074360266 occurred at IMAQdx Open Camera.vi

    Hello, We're having issues with our LabView vision system; the VI is able to "run" with an unbroken arrow, but there is an error that appears: "Error - 1074360266 occurred at IMAQdx Open Camera.vi" with a possible reason of "NI-IMAQdx: (Hex 0xBFF6903

  • Hyper-V Server 2012 Migration Questions

    Hello All, This is my first post here, but I have used these forums many times for information. Sorry in advance for the long post. I have a few questions regarding migration to Hyper-V server 2012 for my production environment. I have done quite a b

  • Nokia N97 can't send picture message to Nokia 5800...

    I have a Nokia 5800 and my partner has a N97 and he can receive my picture messages but he is unable to send to my phone. We have gone through all the trouble shooting with our service providers. I put my sim card in two other new nokia 5800's and th

  • Can a neck strap be attached to a Nokia 6300?

    Hi all, I want to know whether the Nokia 6300 has the input for a neck strap. Thanks

  • EA4500 Parental Controls

    Firmware v2.1.39.145204   -  Parental Controls simply do not work.  I have tried setting with specific times and setting to block "always".  In both cases, the wireless device continues to get connected to the internet.  I even reloaded the firmware.