Function with production/planned orders of a work center or capacity

Hi,
does anybody know if a function exists which we could use in a tailor made report, which will list all production and planned orders for a given work center or capacity ?  The aim should be to create a report which is more or less equal to the capacity evaluation overviews in CM01-CM07, but then in ALV and with customer specific fields in it.
Many thanks for any valuable feedback !
Kristof Wylin.

Will be done in another way.  Orders will be collected via KBED.

Similar Messages

  • CM40 dispatch planned order among different work centers

    Hi
       we have a finish material ,which can be manufactured using 3 different work centers.Then I create 3 production versions to link each work center .
    PV1   Routing 1(work center1)   BOM 1    production line:work center1
    PV2   Routing 1(work center2)   BOM 1    production line:work center2
    PV3   Routing 1(work center3)   BOM 1    production line:work center3
       Is it possible to create a batch job to dispatch planned order between work centers in CM40?I am able to manually dispatch planned orders between different work centers in CM22..
       CM40 use the same selection/strategy profile as CM22 and the planned orders are dispatched to other period if current period get overload..But I expect CM40 to dispatch the planned orders to other available work centers..Anyone has any suggestions?
       thanks very much..
    Edited by: Monst Yang on Jan 10, 2012 9:59 PM

    Hello,
    With CM40 also you can dispatch planned orders as like CM22
    Please look into the below link for more functions performed with the transaction:
    http://help.sap.com/saphelp_46c/helpdata/en/f3/0869a3a6ae11d183d00000e83235ee/content.htm
    Hope the information was useful
    Regards,

  • Configure & integrate the quality management with production planning

    hi,
      i know general flow of production planning ,
    i dono how to configure & integrate the quality management with production planning . can anyone explain step by step to configure.
    with regards,
    Elanchi

    Hi,
    You must define an inspection type 03 and activate it for materail. When you create production order you will have the inspection lot created. you define type of inspection plan in inspection lot type. You will insert an operation in routing og the material. This operation must contain inspection characteristics. use the operation key QM04 with a quality work center.
    Inspection process time will be assigned to your production order.
    I think you can manage t customise the process from this global definition of the QM process in Production.
    Best Regards,
    Salih Arslan
    SCM Functional Consultant
    Zeitine Solution Partners

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • How to get a list of production orders for a work center?

    Hello SDN Community, 
    I have an requirement to display in a pop-up window a list of production orders for a work center.
    Does anyone know which screens/transactions would show this relationship?
    Or better yet, does anyone know how to demonstrate this from the tables themselves?
    Thank you,
    Dean Atteberry.

    Hello Mangalraj.S
    >>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
    >>and execute,by this you will be able to see the operations for each order and to which
    >>work center they are assigned.
    The system I am working on is ECC 6.0.
    For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc".  But nothing that says PPIOO000 - operations and layout.
    >>Or else in the in input screen of COOIS,enter the work center for which you want to see which
    >>are the production order's assigned and execute.
    For system I am working in, I do get a grid display when entering a work center.  It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc."   But no column with Work Center.
    Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
    Thank you,
    Dean Atteberry.

  • How to see Planned Purchase Order in Buyer Work Center

    Hello,
    I need to see Planned Purchase Order
    (created in Purchasing Super User(responsibility) => Purchase Order -> Purchase Order , Type (Planned Purchase Order))
    in Buyer Work Centre.
    I can see Standard Purchase Order in Buyer Work Center (under Orders Tab).
    I can see Contract Purchase Agreement in Buyer Work Center (under Agreement Tab).
    I can see Blanket Purchase Agreement in Buyer Work Center (under Agreement Tab).
    But can not see Planned purchase Order in "Buyer Work Center".
    Is this intentional ? If yes, then why.
    if no, then where we can see Planned Purchase Order in HTML pages.
    Thanks,
    Vishal Garg
    Mb: 9985803224
    Email: [email protected]

    hi
    there is no standard report which shows the expenditure/conditional value in po. you have to develop your customs report./

  • How can link the accosaries requirements with production planning

    "I am in cable manufacturing here i have a problem in  accessories requirements ( dies,Nozzles,Rollers,Embossing wheels etc )link with production planning,at the time of production than these material required for production   Can any body tell me how to link this ,accessories is not consubles "
    Thanks,
    Anurudh singh

    Yes you can use PRT for these requirments,
    Logistics - Production Process - Master Data - Production Resources/Tools - Production Resources/Tools - Equipment - Create.
    spro->production planning for process industries->master data->production resources/tools (PRT)
    you will see 5 transactions to configure your settings:
    -define PRT auth.grps
    -define PRT status
    -define Task List Usages
    -define PRT Group Keys
    -Define Overview Variant for Where-Used List/Mass Replacement

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Rotating Off-Days in PM Work Center Available Capacity

    Good Day!
    Background:
    Each Maintenance person is represented by a PM Work Center.
    Maintenance person have a rotating off-days which cycle repeats after 21 days.
    Requirement:
    We want to reflect rotating off-days to PM Work Center Available Capacity.
    Options tried but did not worked;
    Shift Definition Grouping:   Off-days is in HR's Period Work Schedule but only Daily Work Schedule can be pulled into Shift Definition Grouping and then into Work Center
    Reference Available Capacity:   Can be achieved via Shift Sequence Key in interval of available capacity but needs to maintain for each week with on-going maintenance
    Do anyone has implemented this similar requirement that we can reapply/build on?
    Your valuable inputs are deeply appreciated.
    Thanks!

    In work center capacity header
    click   change intervals
    click   insert
    Enter manually
    valid from and valid to dates
    No of ind capacity - 0

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • Standard Values in Production Order for Alternate Work Center

    Hi SAP Expert,
    I would like to find out whether there is possible solution for the requirements as below:
    e.g.
    >>> Routing for Product A only has one Operation 0010.
    >>> 4 Work Centers/Resources (A,B, C, D) can be assigned to run this operation where all these 4 Work centers/resources are having different capacities (Setup, Labour, Machine hour & Electricity are different).
    >>> Out of these 4 work centers, only one work center will be selected (Selection criteria will be based on the capacities & availability).
    >>> In my current setting, only one preferred work center (A) is maintained in the routing for operation 0010.
    Issue:
    >>> If I select the work center B manually in APO during the planned order creation, the Production Order created will be tied to work center B but the standard values captured in the Production Order are still referred to the standard value of A.
    Question:
    1. Is there any way I can maintained in the routing so that it will captured all the different standard values for each work centers?
    2. If the answer is yes for Q1, then can the SAP auto populate the correct standard value into the Production Order according to the work center I selected before the planned order is converted into Production Order?
    Thanks.
    Regards,
    Hooi Chia

    Hi,
    You can use alternative sequence in routing and mainain three different sequence for all 4 workcenter.
    At APO side you can maintain priority for alternative sequence in PPM/PDS.
    Now when you execute the scheduling Heuristic depending on priority and capacity workcenter will be assigned.
    Regards,
    Vishal

  • Production Order Confirmations by Work Center

    Using COOIS, I can see confirmations for production orders by work center, but it doesn't give me the option to display the material number and material number description.
    Is there an easy way to create a quick view for this?
    Could someone help me out?

    Hi,
      Try with tcode co28 ,choose order header
      Enter order category as production orders.
      Enter the profile as standard one
      Enter order number and execute.
      select the displayed order order number and choose the ALL Fields icon.
      OR
      Try with tcode co28 ,choose order header
      Enter order category as production orders.
      Enter the profile as standard one
      Enter order number and execute.
       Choose the  Fileds icon and selet the fileds you need and save .
    Regards
    nandha

  • Production Orders Controls by Work Center

    Hi PP Gurus!
    We have to check the production orders by work center. Can we do it? If yes, could you inform us which conditions are necessary to do it?
    Our release is 4.6C and we are using PP-Manufacture discrete.
    I would like to thank you for help us with this issue...
    Best Regards,
    Valdevair

    Hi Krishna,
    Thanks for your reply...
    We've executed the transaction according your suggestion, but the values for this column are in Blank in the report.
    Is there any specific condition for the SAP shows us?
    We are using transaction CO11n to register the hours per operation.
    Once more...thanks a lot.
    BR
    Valdevair

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Co-Product Planned Order

    Dear Guru's,
    I am executing Long-Term Planning through T-Code MS02. Material BOM also contains co-product. System does not creating
    Planned Order for CO-PRODUCT but showing simulative requirement. Is there any way or option to create plan order through MS02? Or it is an standard practice that system will not create planned order for CO-PRODUCTS due to its -ve quantity.
    Regards,
    Rashid Masood

    HI,
    If you are using Co-product & mainytain the _ve qty in the BOM means at the time fof Final Goods Movement the Atomatic stock updation in the Co-product satock there will be no Planned order generation for the Co-product.According to u order qty & qty maintain in the BOm the Co -prodcut Qty will get updated auto matically.
    Regards
    Satish

Maybe you are looking for

  • Passing value from Report Column to Javascript

    Dear Apex wizards, I am a bit stuck right now with implementing a modal pop-up/iframe/javascript and this forum is my last hope to fix this issue. Anyway, will try to explain what I am trying to accomplish. What I need is: I want to have an SQL repor

  • Windows 7 no longer recognizes iPhone

    My PC will no longer recognize my iPhone 3GS when I plug it it.  It will beep that I have plugged it into the USB port, but it will not show up under My Computer.  Help, please!

  • Administering Express basestations across subnets

    Hi all Should I be able to administer an Express base station sitting on a different subnet on a different physical LAN within our building (originating from a different port on the router)? I can see and administer the Express base station while it

  • Settings to trigger output at the time of PGI in shipment

    Dear Friends, I have a requirement where an output has to be triggered from the shipment document (VT02N), when the post goods issue is completed.i.e when the user completes the "shipment start" stage in the shipment document. The output document has

  • Push only works on WiFi - iOS 5.1.1 on 3GS 32GB

    Hello, I recently went back to my old iPhone after much frustration with another smartphone product that I wont mention here. I updated the phone to 5.1.1 as reccomended by iTunes and started setting up mail etc and everything worked as expected. But