Functional location BOM and Equipment BOM

Hi,
I would like to know which tables store information of Functional location BOM  (TCODE 1B11) and Equipment BOM (TCODE IB01). Is there a possibility that once we create these BOM's we can create alternative BOM as in case of Material BOM (TCODE CS01).
Regards,
Vishal

Hi,
Tables for Eq., BOM: EQST, STKO, STPO.
Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
Hope this helps.
Best Regards, Murugesh AS

Similar Messages

  • Function Module for creating Functional Location BOM and Equipment BOM

    Hi All,
    Is there any function module for creating and changing Functional Location BOM and Equipment BOM ???

    Hi,
    Tables for Eq., BOM: EQST, STKO, STPO.
    Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
    You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
    And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
    Hope this helps.
    Best Regards, Murugesh AS

  • Updating Order  Functional location data for equipment

    We have scenarios where we keep de-installing equipments from one FL to another . We have mapped standing orders in equipment . The FL in standing order of this equipment doesn't change automatically . We have to manually do this  (rightclick---update refrence object).
    Is there any way we can update order's FL  directly when we change equipment's FL in equipment.
    NPB

    USER  EXIT : IEQM0003
    FM-EXIT_SAPMIEQ0_001
    Transaction code=IE02
    Logic
                    Before equipment update (save)
    1.     Find value in standing order field. (EQUZ(put equipment number in EQUNR field)  get ILOAN  value  put  it in  ILOA field and get DAUFN (standing order) )
    a.     If standing order value  data found
    i.     Find functional location of the equipment (EQUZ (Table-input field EQUNR-fetch  ILOAN) table (input field ILOAN to table ILOA output TPLNR) (A)
    ii.     Find the functional location of the order AFHI(Table)u2014(EQUNR is  inut) u2013output ILOAN numberInput ILOAN in ILOA get TPLNR  (B)
    1.     If A=B matching with that of FL of equipment being updated
    a.     u2013No action
    b.     Save equipment changes
    2.     If not matching  A <> B
    a.     Save equipment
    b.     Update orderu2019s FL with that of equipmentu2019s FL through BDC  (input order number DAUFN)
    b.     If standing order value not found
    i.     Do not take any action
    ii.     Save equipment changes
    I can't update tables directly . I don't think any BAPI's exist to update objects in order . I can not execute a BDC from user exit . Now How to  automate this ?
    NPB
    NPB

  • Production BOM and Engineering BOM

    Dear Gurus ,
                          I want to know difference between Eng BOM and Prod BOM . We have standard multilevel engineering BOM but if I use that BOM for routing assignment I can only see 1 st level components . Can I put all components in single level so that I can assign them in FG routing and pick list will have all the components ?
    We are thinking of considering all assy as phantom so that there would be only one prod order for FG .
    Neal

    Hi,
    The engineering BOM is as designed material BOM. It may include all the part upto the level of nuts & Bolts & also the engineering drawings. But in Production BOM you may not include the engg drawings & the C class material like nut & bolt, which may be planned on Reorder point planning.
    I hope the answer is clear.
    Regards,
    Prashant

  • Sales bom and assembly bom

    i want to make sales bom which consists of all the materials to make a product(machine).this sales bom is available to sales person and he has to select the varients depends upon customer requirement(varient configuration).
    then all materials are to be manufactured and are to be available in stock.
    after this step assembly person has to assemble the components according to the assembly procedure for that he has to refer assembly bom which consists of logical grouping of components for his easiness in assembly.
    so sales bom has to be with materials only(components which are to be produced to make final product) and assembly bom is with logical grouping of these materials according to assembly procedures and total materials are same in sales bom and assembly bom
    is there any method in sap to link sales bom and assembly bom which are different for sales and assembly?this is make to order scenario
    thanking you
    srinivas

    Hi Srina,
    The difference between them is
    In the assembly bill of materials, the finished product appears in the sales order document.
    But in Sales bill of materials, the finished product and the components appear as separate items in the sales order document.
    For example the finished product can be a set of office furniture.
    you can use the assembly bill of materials to define the composition of the set. The finished product is not stored as an entire set in the warehouse. However, the individual components of the set (for example, chairs, tables, and Almirah) are items in stock. If a customer buys a set of Office furniture, draw the components from stock and deliver them to the customer as a set.
    Hope this help,
    Regards,
    MT

  • Function Location Chage in Equipment

    When i am changing the Functional location in the equipment master following data in the equipment getting blank after save.
    Planner Group,Work center, ABC indicator.
    Can any body suggest the reason behind it.

    Dear,
    Due to [Data Transfer|http://help.sap.com/saphelp_47x200/helpdata/en/01/d547ce4ab311d189740000e8322d00/frameset.htm].
    Regards
    Alfred

  • E BOM AND P BOM SAME BUT WHY 2____CRITICAL HELP

    Hello Team,
    From long back when i browsed through the SDN i was able to summarize the below,
    1) E bom and P bom are always seperate.
    2) Any changes in E bom will not automatically flow to P bom is required we need to do development using Z code.
    3) IF customer requires to maintain E bom and P bom both identical then there is no need to maintain 2 boms one is enough
    When i put all these infront of my client, he stated below
    In his earlier work at automotive industry, he has seen maintenance of both E and P BOMs both are identical but there is a XYZ reason and asking me to find it out. He says he knows that XYZ reason but he wants me to find it out.
    As i am new to SAP implementation i was totally confused, can any one help me on the same.
    Critical please help.
    regards,
    satish

    Thanks Vivek,
    You suggestions are 100% correct.  Thanks for guiding me to correct channel.
    I usually first try with all my the knowledge which i have got in earlier experience, then read the docs in sap portal if any doubts.Do trials in ides, sandbox, ask seniors, go through threads, even after all these when i feel i am not sure then i post thread as i feel to deliver the correct thing to customer.
    From next time i will be still more cautious, do more home work on the same.
    Apologies to the forum if i have followed some wrong path and have disturbed a lot.
    Truth is this forum has helped me a lot in resolving many key issues.
    Thanks a lot for all the help.
    Regards,
    Satish

  • Difference between Service BOM and Manufacturing BOM

    One fundamental question
    What is the difference between Service BOM and Manufacturing BOM. Also what is the difference between Manufacturing BOM and Engineering BOM.
    Why should a business create these 3 kinds of BOM's for their operations. cant 1 kind of BOM suffice ?

    This is a business definition that your business people should be able to tell you.
    Both are BoMs - it's just a question of which parts are defined under each category.
    Usually, "Service" BOMs are created by service org personnel as and when required, eg at new item introduction or new option introduction.
    "Manufacturing" BoMs are created by Engineering personnel and are the ones used when creating an order for a machine.
    Hope that it helps.
    Cheers,
    TC

  • EHP5_Engg BOM and Prod bom sync

    Hello Team,
    We have upgraded our ECC 6.0 with EHP5. 
    As per the information and work i had done SAP provides the
    "Guided Structure Synchronization for transition from engineering to manufacturing (or other type) BOMs".
    whats does this mean and how it works. I am not sure whether this is the option which allows bom changes to automatic flow or flow with few clicks from engg bom to prod bom.
    Any info please share the same, because i am looking for this option desperately.
    regards,
    satish

    Hello Alok,
    Thanks a lot, it was a very great answer. I have one small doubt in this.
    1) When we change anything in Engg BOM and Production BOM using ECM process (either in same ECM or 2 different ECMS) with date or serial number effectivity. the changes will automatically reflect on that particular date or serial number?
    OR
    2) When we do any change only  in Engg BOM using ECM process with date or serial number effectivity,  the changes will automatically (or by any setting) flow to production BOM on that particular date or serial number.?
    Which of the above 2 you mean?
    regards,
    satish

  • Equipment/Functional Location Attachments and Hyperlinks Batch Upload

    Hi,
    We would like to upload File attachments or create Hyperlinks for a reference object in batch - an equipment using transaction IE02 or a functional location IL02. We have already tried creating an LSMW for this however attachments and hyperlinks are deactivated using the LSMW functionality.
    Could you kindly advice?

    Hi,
    I guess you are trying to attach the Hyperlink and documents for individual objects through the generic object services(GOS).If thats the case the standard Generic object services does not support background process and hence the unavailability of the same in LSMW.
    However you can create a separate custom program to create attachments to individual objects using the class and Methods associated with Generic object services (GOS).
    The Method that you would need to use is "CL_BINARY_RELATION=>CREATE_LINK" associated to class "CL_BINARY_RELATION ". There are sample codes available in ABAP development forum to do exactly the same.
    Regards
    Narasimhan

  • Equipment BOM and Equipment Task List

    Hi
    I have created an Equipment BOM (IB01) and Equipment TL (IA01). When creating a WO using IW31 why doesn't the TL and BOM get copied across?
    Regards
    Adeel

    While doing maintenance for equipment (creating order in IW31), its not necessary that all the operations in task list & all the materials from BoM should be used.
    Based on the maintenance, you can select the operations from task list & you can select the components.
    In order, go to Extras => Task list selection => Reference object. It will list the task lists available for the equipment, from that you can select.
    For components, in components tab, there will be structure button. Click that, it will show you the BoM created, from that list, select required components.
    Note: Only in Production order, all the operations from Routing & all components from BoM will be copied. This is because for production order, all the operations & components are required to produce the finished product.

  • Mass Download documents related to BOM and/or BOM items

    Hi All,
    Is anyone aware of a mass download functionality of all the documents realted to a BOM - i.e all documents items of a BOM and documents attached to BOM items(part numbers).
    Thanks
    Raj

    Hi Mangesh,
    Yes, that is exactly it. The requirement is for mass downloading all the original drawings linked to all the components of a BOM to a local drive or to an ftp site.
    One possible way , i thought of, could be to use a program DMS_RELOCATE_CONTENT which as I understand relocates all the originals realated to a list of DIRs to another location. Of course, this means that we need compile a list of components related to a BOM using CS12 or similar program and get a list of parts that has drawing attached to it. Subsequently, use this list to compile DMS_RELOCATE_CONTENT. Not sure, if this is a correct way or if there is any other simple way of achieving this.
    Thanks
    Raj

  • Bapi For Bom and material Bom in cs71

    Hi,
        In CS71 we have 2 pushbuttons on the top ie create/copy BOM and create/copy Material BOM.   for these 2 funtions i need Bapi or FM for the functionality of those 2 pushbuttons.
    Duplicate thread Continue with this one - Re: How to search for BAPI or FM for some requirement
    Edited by: kishan P on Aug 20, 2010 11:54 AM

    I tried to find BAPI for transaction CS71, but it seems that its no available.
    Try using BDC method for the same.
    Regards,
    Lalit Mohan Gupta.

  • Engineering BOM and production BOM-very critical help

    Hello All,
    I am working for a client and below is the requirement, please guide me.
    1) Customer has 2 department here one is engg and other is production as usual.
    2) He needs BOMs only for 2 purposes a) For R and D  b) Production.
    3) He needs any changes in engineering and production to be reflected from certain specified date.
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods  to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.
    Please suggest if any better model can help.
    Regards,
    satish

    Hello Adler,
    That was good response. Here any of both situations can appear. So can you help me in knowing the procedure how to do the same in both cases
    Also below are my pending queries, any one please help
    1) He needs any changes in engineering and production to be reflected from certain specified date as per date he mentions
    4) He says he will raise ECN for every change.
    Now my questions are:
    1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
    2) what are methods to copy any fresh E bom to Production bom also?
    3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.

  • Group BOM and Plant BOM

    Hi All,
    We have a business scenario where there is Group BOM without plant and a Plant BOM with same usage (2).
    We hava requirement below
    If we make any changes in Group BOM with a change number, Plant BOM is also updated. But if we make any changes to Plant BOM with change number, Group BOM should not be updated.
    Any ideas how we can map this requirement?
    Both BOM have same usage - engineering -> 2
    Regards,
    Aby Thomas

    Any changes in Group BOM with a change number, Plant BOM is also updated when they are referenced to each other (CS07).
    In this case both share the same BOM number and changes are always reflected both ways.
    In my opinion a solution would be :- 
    1) Dereference the BOM's (CS09) , this will remove the plant bom from system.
    2) Create the plant BOM (as a copy of group bom)
    3) And then build enhancements in CS02 to copy online the changes in group BOM to plant BOM.

Maybe you are looking for

  • Iphone 5C no longer syncs calendar to iPad and MacBook Air

    I am having syncing problems with my iPhone 5C to my iPad and MacBook Air. I installed the latest updates on all three devices yesterday.  Now my iPhone will only sync to my other devices when I add or delete an event on my iPhone. It does not sync w

  • Access privileges lost in business rules

    Hello everyone, I noticed that my security for business rules have disappeared. Only my native admin account is able to see the groups that have access to BR through the EAS console. When I logon with my account or the main hyperion admin account (MS

  • Billing Enhancement - Condition Types

    Hi Friends,    I have got a requirement to determine condition types based on certain conditions through exits in VF01. The sceanrio is something like this... For each line item from a delivery document i got to determine condition types by cross-che

  • My ipod says i don't have access privilages? what do i do ?

    When i plug in my ipod it says i don't have enough access privilages , what do i do ?

  • Boot Camp - Windows XP not listed

    Due to work requirements, I had to install Windows XP on my MacBook to work with .NET framework and relative tools (MS VisualStudio, SQL Server, ISS, etc). The partitioning and installing stuff worked just fine but when I power up the laptop pressing